This is a pre-solicitation notice for a Multiple Award Task Order Contract (MATOC) for construction services to be awarded by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The VA intends to award multiple IDIQ contracts for maintenance, repair, alteration, and new construction services with task orders ranging from $2,000 to $2,000,000, not to exceed $50 million total. The facilities covered are located at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The VA anticipates a minimum of two IDIQ contract awards for general construction work and incidental construction-related services. As requirements are defined, task order solicitations will be competitively issued to all selected MATOC contractors, who will be given opportunity to bid or propose. The acquisition is 100% set-aside for Service-Disabled Veteran-Owned Small Business concerns. Offerors must represent status as an SDVOSB, small business, and CVE verification at time of proposal submission. The official solicitation is planned for issuance on or about 2/5/2018.
36C25218R0104 S02 SOL-Att-10 SEED PROJECT Drawings.pdf
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WAREHOUSE
TEMPORARY
CB17
WOMEN'S
ELECTRICAL
CLOSET
RM AB05
RM AB04
RM AB14
AB13
RM AB06
RM AB07
RM AB11
RM CB02
RM CB04
RM CB05
RM CB07
RM CB11
RM CB15
RM CB16
RAMP
.7
G R T E
.2
F L D
A C
A C
A C
A C
U P
U P
D N
R A M P
D N
U P
U P
D O W N
D O W N
U P
U P
U P
U P
U P
U P
U P
R A M P
U P
U P
R A M P
U P
U P
U P
R A M P
U P
U P
U P
R A M P
U P
U P
U P
U P
U P
STORAGE
B01
TELE
B14
ELEC
B13
EQUIP & PWR
B05
EXST STORAGE
B08
CORR
B12
EXST STORAGE
B04
HAC
B06
CORR
B11
ELEV LBY
B10
ELEV EQUIP
B09
STAIR
NO. 3
DISTR
B03
COPY CENTER
B02
ELEV
B07
CORR
B11
BUILDING 6 - KEYPLAN
BUILDING 6 "A" WING
ELEVATOR SHAFT AND
MACHINE ROOM
SCOPE OF WORK
N
BUILDING 5 - KEYPLAN
BUILDING 5
ELEVATOR SHAFT AND MACHINE ROOM
SCOPE OF WORK
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
Consultant:
FULLY SPRINKLERED
BLDG 5 AND 6
C U s e rs
\l ly n c h \D o c u m e n ts
\1 .1
.0
M ilV A
E le v
A v lly n c h .r v t
/1
/2
:3 :2
P
M
GI000
COVER SHEET
RING & DuCHATEAU LLP
17400 W. CAPITOL DRIVE
BROOKFIELD, WI 53045
(414) 778-1700
UPGRADE ELEVATORS BUILDING
5 AND 6A
MILWAUKEE VAMC
695-17-116
21 JULY 2017 ETA LAL
100% CONSTRUCTION
DOCUMENTS
MILWAUKEE VA
LERCH BATES, INC.
600 W FULTON
CHICAGO, IL 60661
(312) 332-5444
CLEMENT J. ZABLOCKI VA MEDICAL CENTER
UPGRADE ELEVATORS BUILDINGS 5 & 6A
100% CONSTRUCTION DOCUMENTS
SHEET LIST
SHEET NUMBER SHEET NAME
MECHANICAL
MI000 MECHANICAL GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
MH100 MECHANICAL DEMOLITION & NEW WORK PLANS
MM500 MECHANICAL SCHEDULES, DETAILS AND CONTROLS
SCHEMATICS
ELECTRICAL
ES000 SYMBOLS, ABBREVIATIONS AND SHEET INDEX
ES100D BUILDING 5 & 6 - DEMO PLANS
ES101 BUILDING 5 - WING PLANS
ES102 BUILDING 6 - WING PLANS
ES400 ONE-LINE SYMBOLS ABBREVIATIONS
ES500 ELECTRICAL DETAILS
ES600 ELECTRICAL SCHEDULE
SHEET LIST
SHEET NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI101 CODE ANALYSIS
GI102 INFECTION CONTROL/PHASING PLAN
HA101 HAZARDOUS MATERIAL REMOVAL PLAN
ARCHITECTURAL
AS001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AS101 BLDG 5 - WING PLANS
AS102 BLDG 6 A - WING PLANS
AS201 BLDG 5 - ELEVATIONS AND SECTIONS
AS202 BLDG 6 A - ELEVATIONS AND SECTIONS
PLUMBING
PS001 PLUMBING SYMBOLS AND ABBREVIATIONS
PS102 BUILDING 6 A - WING PLUMBING PLAN DRAWINGS
FIRE PROTECTION
FP001 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS
FP101 BUILDING 5 FIRE PROTECTION PLANS
FP102 BUILDING 6 A - WING FIRE PROTECTION PLANS
Contact: Contact:
RING & DUCHATEAU, LLP
Michael Jushka
Professional Engineer
MECHANICAL,
ELECTRICAL &
PLUMBING
OWNER ARCHITECT
LERCH BATES, INC.
Tom Hoffmann
Transportation Engineer
TRANSPORTATION
CONSULTANT
17400 West Capitol Drive Brookfield, WI 53045 p: 414.778.7414 e: mjushka@ringdu.com
600 W. Fulton Suite 501 Chicago, IL 60661 p: 312.386.7662 e: tom.hoffmann@lerchbates.com
CAMPUS MAP
LOCATION MAP
BUILDING 5
N
N
BUILDING 6 A-WING
BUILDING 5 - FIRST FLOOR BUILDING 6 A-WING - FIRST FLOOR
Contact: Contact:
CLEMENT J. ZABLOCKI
VA MEDICAL CENTER
Jim Beier
Project COR General Engineer
5000 West National Ave.
Milwaukee, WI 53295 p: 414.384.2000 x 47297 e: james.beier@va.gov
GUIDON DESIGN INC.
Evan Anderson-Decina, AIA
Project Manager | Architect
905 North Capitol Avenue Suite 100 Indianapolis, IN 46204 p: 317.800.6388 x 116 e: edecina@guidondesign.com
PROJECT NO: 695-17-116
NOTE:
IN THE CASE OF CONFLICTS OR DISCREPANCIES
WITHIN OR AMONG THE CONTRACT DRAWINGS, THE
BETTER QUALITY, MORE STRINGENT REQUIREMENTS
OR GREATER QUANTITY OF WORK, AS DETERMINED
BY THE GOVERNMENT, SHALL BE PROVIDED.
Revisions: Date:
UP
DN
CODE CRITERIA
GENERAL:
THE EXISTING BUILDING ELEVATOR SHAFTS, MACHINE/EQUIPMENT ROOMS AND ASSOCIATED SPACES WILL BE INCLUDED IN THE EXTENT OF THE
PROJECT.
NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF
THE IBC REQUIREMENTS ARE DIFFERENT).
CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM
WIDE.
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.
NOTES:
CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM
WIDE.
• INTERVENING ROOMS: IBC: SECTION 1014 EXIT ACCESS, 1014.2 EGRESS THROUGH INTERVENING SPACES. EGRESS THROUGH INTERVENING SPACES SHALL COMPLY WITH THIS SECTION. 1. EGRESS FROM A ROOM OR SPACE SHALL NOT PASS THROUGH ADJOINING OR INTERVENING ROOMS OR AREAS, EXCEPT WHERE SUCH ADJOINING ROOMS OR AREAS AND THE AREA SERVED ARE
ACCESSORY TO ONE OR THE OTHER.
• EXIT ROUTE, IBC/NFPA CONFLICT: SUITE EXITS DIRECTLY INTO EXIT STAIR, ALLOWED BY NFPA.
CODE REVIEW
THE 2015 EDITION OF THE LIFE SAFETY CODE, NFPA 101, AND THE SIXTH EDITION OF THE DEPARTMENT OF VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL HAVE BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS. FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2015 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN
USED.
OCCUPANCY CLASSIFICATION
BUILDING 5 AND BUILDING 6A ARE CLASSIFIED PER THE NFPA AS BUSINESS (NFPA 6.1.11).
CODE CRITERIA
1. GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS
ON ITS PROJECTS. SEE LIST OF VA DESIGN MANUALS ON THIS SHEET.
2. LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW
DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
FIRE RESISTANCE RATED SEPARATIONS
1. EXISTING ENCLOSURES OF SHAFTS/VERTICAL OPENINGS IN EXISTING BUILDINGS IS ½ HOUR (NFPA 8.6.5, 3). FOR ENCLOSURES CONNECTING FOUR OR MORE STORIES IN NEW CONSTRUCTION, A 2 HOUR RATING IS REQUIRED (NFPA 8.6.5, 1).
2. FIRE BARRIERS WILL EXTEND FROM THE TOP OF THE FLOOR BELOW TO THE UNDERSIDE OF THE FLOOR OR ROOF DECK ABOVE. THE OPENINGS AND PENETRATIONS IN REQUIRED EXIT ENCLOSURES WILL BE PROTECTED WITH SELF-CLOSING OR AUTOMATIC-CLOSING OPENING PROTECTIVES. OPENINGS IN FIRE RESISTANCE RATED WALLS WILL BE PROTECTED IN ACCORDANCE WITH THE FOLLOWING
PER NFPA TABLE 8.3.4.2:
COMPONENT WALLS AND PARTITIONS (HR) FIRE DOOR ASSEMBLIES (MIN)
ELEVATOR HOISTWAYS, ELEVATOR MACHINE ROOMS ½ 20
2 90
VERTICAL SHAFTS (INCLUDING ENCLOSED EXIT STAIRWAYS) 1 60
2 90
PIPING, CONDUIT, AND WIRE PENETRATIONS OF FIRE RATED CONSTRUCTION WILL BE PROTECTED BY MATERIALS OR SYSTEMS OF THE SAME HOURLY RATING LISTED BY UNDERWRITERS LABORATORIES (UL), FACTORY MUTUAL (FM), OR A NATIONAL RECOGNIZED TESTING LABORATORY (NRTL). DUCT, AIR TRANSFER OPENINGS, AND OTHER PENETRATIONS THROUGH FLOORS, SHAFT ENCLOSURES AND OTHER FIRE RATED CONSTRUCTION WILL BE
PROTECTED IN ACCORDANCE WITH THE IBC.
BUILDING PLACEMENT
1. THE PROJECT SCOPE WILL HAVE NO EFFECT ON BUILDING SEPARATION DISTANCES.
INTERIOR FINISH
INTERIOR WALL AND CEILING FINISH TO BE DESIGNED IN ACCORDANCE WITH THE NFPA 101.
• CLASS A, B AND C FINISH IS PERMITTED FOR INTERIOR WALLS AND CEILINGS IN ROOMS, AND CORRIDORS. CLASS A OR B FINISH IS
PERMITTED FOR EXITS.
• PER THE IBC SECTION 406.2.6 ALL FLOOR SURFACES SHALL BE OF CONCRETE OR OTHER SIMILAR NON-COMBUSTIBLE AND NON-
ABSORBENT MATERIALS. FLOOR FINISH SHALL NOT BE LESS THAN CLASS II
• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 8 OF THE NFPA 101 TO CLASS A, B AND C MATERIALS. INTERIOR WALL AND CEILING FINISH SHALL BE CLASS A OR CLASS B IN EXITS, CORRIDORS AND LOBBIES; AND CLASS A, CLASS B, OR CLASS C IN ALL OTHER AREAS.
CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.
CLASS B: FLAME SPREAD 26-75; SMOKE DEVELOPED 0-450.
CLASS C: FLAME SPREAD 76-200; SMOKE DEVELOPED 0-450
• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I OR CLASS II IN CORRIDORS AND EXITS.
EGRESS LIGHTING AND EXIT SIGNAGE
EMERGENCY EGRESS LIGHTING WILL BE CONFIRMED THROUGHOUT THE IMPACTED AREAS OF THE PROJECT WORK.
1. EXIT SIGNS SHALL BE PROVIDED IN AREAS ACCESSIBLE TO THE PUBLIC, IF AREA IS IMPACTED BY THE WORK, IN ACCORDANCE WITH NFPA 101.
EMERGENCY EGRESS LIGHTING SHALL PROVIDE COMMON PORTIONS OF THE FACILITY WITH MEANS OF EGRESS IN ACCORDANCE WITH THE
LIFE SAFETY CODE
2. EACH REQUIRED EXIT WILL BE IDENTIFIED WITH AN EXIT SIGN, INCLUDING EXIT ACCESS, AND WITHIN AREAS REQUIRING MULTIPLE EXITS.
DIRECTIONAL EXIT SIGNS WILL ALSO BE PROVIDED TO DIRECT OCCUPANTS TOWARD THE CLOSEST EXIT SO THAT NO OCCUPANT IS MORE
THAN 100 FEET FROM AN EXIT SIGN.
3. THE EGRESS LIGHTING AND EXIT SIGNS WILL BE PROVIDED WITH A SECONDARY SOURCE OF POWER IN THE EVENT THAT THE PRIMARY POWER SOURCE IS DISRUPTED. THE SECONDARY POWER SOURCE WILL CONSIST OF EITHER INTERNAL BATTERIES OR A CONNECTION TO AN
EMERGENCY POWER SYSTEM.
MEANS OF EGRESS
THE PROJECT SCOPE WILL HAVE NO EFFECT ON MEANS OF EGRESS.
EMERGENCY ELEVATOR OPERATION
EXISTING CONDITIONS WILL BE VERIFIED FOR COMPLIANCE WITH CURRENT REQUIREMENTS:
1. CURRENT CODE REQUIRE ELEVATORS TO BE CONNECTED TO SMOKE DETECTOR, LOCATED IN ITS RESPECTIVE LOBBY. UPON ACTIVATION OF A LOBBY SMOKE DETECTOR OR MACHINE ROOM SMOKE DETECTOR, THE ELEVATORS SERVED BY THAT LOBBY OR MACHINE ROOM WILL BE RECALLED TO THE MAIN LEVEL OF THE BUILDING, ONE AT A TIME. IN THE EVENT THAT THE ALARM IS ON THIS DESIGNATED LEVEL, THE ELEVATORS WILL BE RECALLED ONE AT A TIME TO AN ALTERNATE LEVEL. IT IS PROPOSED TO RECALL ONLY THE ELEVATOR OR GROUP OF
ELEVATORS SERVED BY THE AFFECTED LOBBY OR ELEVATOR MACHINE ROOM.
2. AFTER RETURNING TO THE APPROPRIATE LEVEL, THE ELEVATORS WILL STOP, THE DOORS WILL OPEN, AND THE ELEVATORS WILL BE RENDERED INOPERABLE WITHOUT THE USE OF THE FIREMAN'S KEY OR UNTIL SUCH TIME THAT THEY ARE MANUALLY RESET TO THE NORMAL OPERATING MODE. THIS MODE OF OPERATION IS PROVIDED FOR FIRE DEPARTMENT USE TO ALLOW FOR ACCESS TO ALL LEVELS SERVED BY
THE ELEVATORS.
AUTOMATIC SPRINKLER SYSTEM
SPRINKLER SYSTEM: BUILDING 6A BUILDING 5 ARE SERVED BY EXISTING SPRINKLER SYSTEMS, ASSUMED TO MEET THE REQUIREMENTS
THROUGHOUT IN ACCORDANCE WITH NFPA 13.
1. ANY CHANGES OR UPDATES TO THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2010 EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL AND NFPA 45 SHALL REGULATE
DESIGN AREA AND DENSITY:
PORTABLE FIRE EXTINGUISHERS
PORTABLE FIRE EXTINGUISHERS ARE BE PROVIDED THROUGHOUT THE BUILDING AS REQUIRED BY IFC SECTION 906.1 AND SPACED IN ACCORDANCE WITH NFPA 10, 2010 EDITION. THE DESIGN TEAM VISUALLY OBSERVED FIRE EXTINGUISHERS WITHIN THE MACHINES ROOMS.
FIRE ALARM SYSTEM
EXISTING MANUAL AND AUTOMATIC FIRE ALARM SYSTEM HAS BEEN OBSERVED SERVING THE BUILDING. EXISTING CONDITIONS IS ASSUMED TO BE
PROVIDED AS REQUIRED BY NFPA 72
SHUNT TRIP
DISCONNECT MEANS IS REQUIRED PER NFPA 602.51. MEANS OF DISCONNECT SHALL BE A SHUNT TRIP PER 620.51B.
REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND
REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.
NFPA 13, 220, 780
AISC
ACI 318-11
AISC 341-10
AISC 360-10
Ventilation – Per VA guidelines, ICC International Mechanical Code, and ASHRAE 62.1 – 2007.
Energy Efficiency - Per VA guidelines, all new mechanical equipment installed per this project shall meet the minimum requirements of ASHRAE 90.1-2007.
Building Automation System Control - The selected system will offer temperature monitoring with the ability to connect to the campus network. It is expected that the current system will have sufficient capacity to accommodate the required controls.
Electrical Codes NFPA 70 2011 NEC (National Electric Code) NFPA 70E Standard for Electrical Safety in the Workplace 2012 NFPA 72 2013 National Fire Alarm and Signaling Code NFPA 780 Standard for the Installation of Lightning Protection Systems 2011 Edition Maintenance - Equipment layouts will reviewed for access and ease of maintenance.
Portable fire extinguishers will be provided throughout the garages as required by IFC section 906.1 and spaced in accordance with NFPA 10, 2010 edition.
ASME - A17.1 Safety Code for Elevators and Escalators ANSI A117.1-2009 Standard on Accessible & Usable Buildings and Facilities and 2010 ADA Standards for Accessible Design NFPA 101, Life Safety Code, 2012 edition (LSC) NFPA 13, Standard for the Installation of Sprinkler Systems, 2013 edition.
NFPA 14, Standard for the Installation of Standpipe and Hose System, 2013 edition.
NFPA 10, Standard for Portable Fire Extinguishers, 2013 edition.
NFPA 24, Standard for the Installation of Private Fire Service Mains and their Appurtenance, 2013 edition.
NFPA 80, Standard for Fire Doors and Other Opening Protectives, 2013 edition.
NFPA 90A, Standard for the Installation of Air-Conditioning and Ventilating Systems, 2012 edition.
ASTM E 136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace, 2009b edition.
NFPA 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems, 2013 edition.
ASTM E2072-04, Specification for Photoluinescent (Phosphorescent) Safety Markings, 2004 edition.
International Building Code (IBC) by the International Code Council (ICC), 2015.
International Fire Code (IFC) by the International Code Council (ICC).
International Fuel Gas Code (IFGC) by the International Code Council (ICC).
International Mechanical Code (IMC) by the International Code Council (ICC).
International Plumbing Code (IPC) by the International Code Council (ICC).
ASME A17.1 Elevator Code
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD
APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY
(TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS
ARCHITECTURAL, AUGUST 1, 2014
ASBESTOS ABATEMENT, JULY 2011
CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2011, 2012
ELECTRICAL, DECEMBER 2015
ENERGY REDUCTION/ SUSTAINABILITY, MAY 2014
EQUIPMENT, JUNE 2006
ESTIMATING, MARCH 8, 2011
NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010
FIRE PROTECTION, SIXTH EDITION REVISED SEPTEMBER 2011
HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2011
INTERIOR DESIGN, MAY 2008
PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015
PLUMBING, NOVEMBER 2014
STRUCTURAL, FEBRUARY 1, 2014
WAY FINDING AND SIGNAGE, INTERIOR DECEMBER 2012
SEISMIC DESIGN REQUIREMENTS, H-18-8
ENVIRONMENTAL PLANNING GUIDANCE PG-18-17
VA DESIGN MANUALS PG-18-10: GOVERNING CODES: CODE ANALYSIS - NFPA 101, CHAPTER 39
CODE ANALYSIS LEGEND
FE
EXIT EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER
BEYOND PROJECT BOUNDARY
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
WORK AREA B03
STAIRS B11
WORK AREA B04
CORRIDOR B12
WAITING B08
ELEV EQUIP B09
B07
HOISTWAY
CORRIDOR B10
FE
E X
IT
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
E
X
IT
EXIT
HAC 110
HOISTWAY
STORAGE 109
OFFICE 122
TOILET 104
STAIRS
CORRIDOR
ENTRY
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
HOISTWAY
E X
IT
CORRIDOR
STAIRS
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
E X
IT
HOISTWAY
STAIRS
CORRIDOR
BREAK
ROOM
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
MECH ROOM AB11
ELEV EQUIP AB11A
HOISTWAY
AB06
AB05
AB04
EXIT
FE
MECH ROOM AB11B
STAIRS
CORRIDOR
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
HOISTWAY
A104
EXIT
CORRIDOR
STAIRS
HAC
SHOWER TOILET
TOILET
LEAN TRAINING
CENTER
NO CHANGE TO ANY EGRESS/LIFE SAFETY ELEMENTS
MENS 218
HOISTWAY
BREAKROOM 204
EXIT
CORRIDOR
SHOWER WOMEN 219
STAIRS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
Consultant:
FULLY SPRINKLERED
BLDG 5 AND 6BLDG 6BLDG 5
C U s e rs
\l ly n c h \D o c u m e n ts
\1 .1
.0
M ilV A
E le v
A v lly n c h .r v t
/1
/2
:3 :2
P
M
GI101
CODE ANALYSIS
RING & DuCHATEAU LLP
17400 W. CAPITOL DRIVE
BROOKFIELD, WI 53045
(414) 778-1700
UPGRADE ELEVATORS BUILDING
5 AND 6A
MILWAUKEE VAMC
695-17-116
21 JULY 2017 ETA LAL
100% CONSTRUCTION
DOCUMENTS
MILWAUKEE VA
LERCH BATES, INC.
600 W FULTON
CHICAGO, IL 60661
(312) 332-5444
SCALE: 1/8" = 1'-0"GI101
3 BLDG 5 BASEMENT FLOOR - LIFE SAFETY
SCALE: 1/8" = 1'-0"GI101
4 BLDG 5 FIRST FLOOR PLAN - LIFE SAFETY
SCALE: 1/8" = 1'-0"GI101
5 BLDG 5 SECOND FLOOR PLAN - LIFE SAFETY
SCALE: 1/8" = 1'-0"GI101
6 BLDG 5 THIRD FLOOR PLAN - LIFE SAFETY
SCALE: 1/8" = 1'-0"GI101
7 BLDG 6A - BASEMENT FLOOR PLAN - LIFE SAFETY
SCALE: 1/8" = 1'-0"GI101
8 BLDG 6A - FIRST FLOOR PLAN - LIFE SAFETY
SCALE: 1/8" = 1'-0"GI101
9 BLDG 6A - SECOND FLOOR PLAN - LIFE SAFETY
N
N
N
NNN
N
INFECTION CONTROL PLAN NOTES IC-#
INFECTION CONTROL: PRECAUTION CLASS II
TYPE OF CONSTRUCTION ACTIVITY: "C"
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES
DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES.
POPULATION AND GEOGRAPHIC PATIENT RISKS GROUP: "II - LOW RISK"
• OFFICES
• WAREHOUSES
PROVIDE IC TEMPORARY BARRIER WALL CONSTRUCTION PER NFPA 241. REFER TO
DETAIL 3/GI102 AND 4/GI102.
REMOVE EXISTING DOOR FROM FRAME DURING CONSTRUCTION IF REQUIRED FOR
MANEUVERABILITY. PROVIDE IC TEMPORARY PLASTIC BARRIER WALL DURING
CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.
RETURN DOOR TO FRAME AT END OF CONSTRUCTION TO RETURN TO PREVIOUS
WORKING CONDITION.
ON FLOORS ABOVE BASEMENT LEVEL PROVIDE IC TEMPORARY PLASTIC BARRIER
WALL CONSTRUCTION WITH INTEGRAL ZIPPER ACCESS. REFER TO SPECIFICATION
FOR ADDITIONAL INFORMATION
PIPING EXISTS OVERHEAD IN THIS AREA. IT IS CONTRACTORS RESPONSIBILITY TO
PROVIDE RATED WALL CONSTRUCTION TO DECK WITH COMPRESSIBLE FIRE
SEALANT AROUND PIPING OR PROVIDE EQUIVALENT RATED HARD CEILING BELOW
PIPING TO ENSURE RATING IS MAINTAINED DURING CONSTRUCTION. RE: IMAGES
5/GI102 AND 6/GI102.
PROVIDE TEMP CARD READER AT IC WALL DOOR. REUSE CARD READER IN PH2
FROM PH1.
PROVIDE HEPA EQUIPPED AIR INFILTRATION UNIT. REFER TO SPEC 01 01 10 IC.
EXHAUST TO OUTSIDE THROUGH ELEVATOR EQUIP. ROOM.
INFECTION CONTROL DOOR TO BE EQUIPPED WITH CONTRACTOR CORE.
INFECTION CONTROL DOOR TO BE EQUIPPED WITH VA MECHANICAL CORE FOR VA
PERSONNEL. COORDINATE WITH COR.
IC-1
IC-2
IC-3
IC-4
IC-5
IC-6
IC-7
IC-8
REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED BY
CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE FOR
ADDITIONAL INFORMATION.
PROJECT SHALL BE COMPLETED IN TWO PHASES, PHASE 1 AND PHASE 2. REFER
TO SPECIFICATION 01 00 00.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND FIELD
VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE CEILING
WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE PROJECT
BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER WALL
CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR AND PATIENT
SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY IC BARRIER WALL
CONSTRUCTION LOCATIONS IN DRAWINGS ARE APPROXIMATE. CONTRACTOR
SHALL PROVIDE DRAWING TO COR AND PATIENT SAFETY/ INFECTION CONTROL
REPRESENTATIVE ONCE ICRA PROTOCOLS AND PLAN IS IN PLACE.
PROVIDE THE REQUIRED VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT
EACH TEMPORARY DOOR LOCATION.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC, MULTI-
PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS UP
TO 30 GALLONS.
NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH 4 MIL.
POLY SHEET.
DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT BOUNDARY
THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED ROUTE IN
ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED WITH A LID.
MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY STORED IN
DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE MATERIALS
SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE PROJECT
BOUNDARY.
A
B
C
D
E
F
G
H
I
J
K
INFECTION CONTROL: GENERAL NOTES
PHASING GENERAL NOTES
A
B
C
D
E
F
G
PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
PROJECT SHALL BE COMPLETED DURING NORMAL BUSINESS HOURS. COORDINATE
WITH COR.
REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION FOR
EACH PHASE AND AREA OF WORK.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR AND
STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING INFORMATION FOR
ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK
ALSO REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE PROJECT
BOUNDARY.
IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN,
CEILING TILES SHALL BE REMOVED AND STORED IN A SAFE MANOR UNTIL CEILING
TILES CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED DURING
NORMAL BUSINESS HOURS.
EVERY EFFORT SHALL BE MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.
INFECTION CONTROL: DURING CONSTRUCTION
PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE
WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING
SEAL UNUSED DOORS WITH DUCT TAPE
BLOCK OFF AND SEAL AIR VENTS
PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY
WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.
MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED
COVER HEAT AND SMOKE DETECTORS DURING ALL DUST PRODUCING ACTIVITIES.
A
B
C
D
E
F
G
INFECTION CONTROL: UPON COMPLETION
WIPE WORK SURFACES WITH DISINFECTANT
CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS
WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING
WORK AREA
REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED
TERMINAL CLEANING AS NEEDED AND/OR UPON PROJECT COMPLETION
A
B
C
D
E
IC/PHASING LEGEND
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS
DOORS
HEPA FILTRATION UNIT. BY CONTRACTOR
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR
ASSEMBLY AND FRAME WITH
SEALS, CARD READER,
HARDWARE AND CLOSER
CARD READER
SEAL ALL EDGES WITH TAPE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE
FOR REQUIRED CONDITION TO
STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
CONTINUOUS FIRESAFE FIRE CAULK
TOP AND BOTTOM, & BOTH SIDES
3 1/2" SOUND ATTENUATION BATT.
5/8" TYPE X GYPSUM BOARD, BOTH
SIDES
3 5/8" METAL STUD @ 16" O.C. WITH
RUNNER CHANNELS ALONG TOP
AND BOTTOM
CONSTRUCTION
SIDE
PUBLIC
SIDE
6 MIL. FIRE RETARDANT VISQUEEN
MEMBRANE. TAPE TO STRUCTURAL
DECK ABOVE AND TO FLOOR BELOW
WITH DUCT TAPE.
UNDERSIDE OF STRUCTURAL DECK
UL LISTING: U465
COORDINATE WITH EXISTING
CEILING
SEAL ONE SIDE WITH TAPE
IC001
IC-3
IC-5
IC-1
IC-4
IC2
WORK AREA B04
CORRIDOR B12
WAITING B08
WORK AREA B03CORRIDOR B10
STAIRS B11
ELEV EQUIP B09
B07
HOISTWAY
IC-7
IC-6
4'
IC
IC
IC-3
IC-1
IC-5 IC-5IC-4
MECH ROOM AB11
HOISTWAY
AB06
AB05
AB04
IC-8
IC-7
IC-6
CORRIDOR
STAIRS
ELEV EQUIP AB11A
MECH ROOM AB11B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
Consultant:
FULLY SPRINKLERED
BLDG 5 AND 6
C U s e rs
\l ly n c h \D o c u m e n ts
\1 .1
.0
M ilV A
E le v
A v lly n c h .r v t
/1
/2
:3 :2
P
M
GI102
INFECTION CONTROL/PHASING
PLANRING & DuCHATEAU LLP
17400 W. CAPITOL DRIVE
BROOKFIELD, WI 53045
(414) 778-1700
UPGRADE ELEVATORS BUILDING
5 AND 6A
MILWAUKEE VAMC
695-17-116
21 JULY 2017 ETA LAL
100% CONSTRUCTION
DOCUMENTS
MILWAUKEE VA
LERCH BATES, INC.
600 W FULTON
CHICAGO, IL 60661
(312) 332-5444
SCALE: 1/4" = 1'-0"GI102
4 TEMPORARY 1-HR BARRIER WALL CONSTRUCTION ELEVATION NFPA 241
SCALE: 1 1/2" = 1'-0"GI102
3 TEMPORARY 1-HR BARRIER WALL CONSTRUCTION - NFPA 241
SCALE: 1/8" = 1'-0"GI102
1 BLDG 5 BASEMENT FLOOR PLAN - IC/PHASING
SCALE: 1/8" = 1'-0"GI102
2 BLDG 6A - BASEMENT FLOOR PLAN - IC/PHASING
NN
SCALE: 6" = 1'-0"GI102
5 BLDG 6A BASEMENT CORRIDOR
SCALE: 6" = 1'-0"GI102
6 BLDG 5 BASEMENT CORRIDOR
NOTE: PICTURE OF IC-4 PLAN NOTE CONDITION FOR REFERENCE NOTE: PICTURE OF IC-4 PLAN NOTE CONDITION FOR REFERENCE
HAZARDOUS MATERIAL REMOVAL GENERAL NOTES
CONTRACTOR TO PROVIDE HAZARDOUS MATERIAL SURVEY PRIOR TO
CONSTRUCTION PER SPECIFICATION 02 82 11. SURVEY AREAS TO INCLUDE
ALL AREAS NOTED WITHIN DEMOLITION. SURVEY TO BE SCHEDULED WITH
COR.
HAZMAT REMOVAL NOTES APPLY TO ENTIRE ROOMS. CONTRACTOR SHALL
IDENTIFY ALL MATERIALS DESCRIBED BY NOTE IN EACH ROOM AND REMOVE
ACCORDING TO SAFETY STANDARDS. REFERENCE SPECIFICATION 028211
ALL HAZARDOUS MATERIALS SHALL BE REMOVED IN COMPLIANCE WITH
APPLICABLE CODES AND LAWS.
THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE HAZARD(S) AND LEVEL OF
PROTECTION REQUIRED FOR ALL EMPLOYEES OR SUBCONTRACTORS TO
COMPLETE THE CONSTRUCTION WORK.
REFER TO SPECIFICATION 02 82 11 FOR ADDITIONAL INFORMATION.
BASED ON THE DATE OF THE EXISTING CONSTRUCTION AND UNDERSTANDING
OF THE FACILITY, LEAD PAINT IS WITHIN THE PROJECT AREA. THIS PROJECT
SCOPE HAS NO SIGNIFICANT DEMOLITION. DO NOT PROVIDE LEAD PAINT
ABATMENT. PROVIDE LEAD PAINT SURFACE STABILIZATION WHERE WORK IS
DONE. CONTRACTOR TO USE MEASURES FOR PROTECTION AND TO MINIMIZE
PAINT DEBRIS.
CONTRACTOR TO SUBMIT LEAD SURFACE STABILIZATION PLAN AND
PROCEDURES PRIOR TO COMMENCING WORK. SUBMITAL SHALL BE IN
ACCORDANCE WITH SPECIFICATIONS.
PROVIDE COST FOR ABATEMENT AND REMOVAL OF VCT AND MASTIC
FLOORING WITHIN ELEVATOR CAB.
THE QUANTITIES AND LOCATIONS OF ACM AS INDICATED ON THE DRAWINGS
AND THE EXTENT OF WORK INCLUDED IN THIS SECTION ARE ESTIMATED
WHICH ARE LIMITED BY THE PHYSICAL CONSTRAINTS IMPOSED BY
OCCUPANCY OF THE BUILDINGS AND ACCESSIBILITY TO ACM. ACCORDINGLY,
MINOR VARIATIONS (+/- 5%) IN QUANTITIES OF ACM WITHIN THE REGULATED
AREA ARE CONSIDERED AS HAVING NO IMPACT ON CONTRACT PRICE AND
TIME REQUIREMENTS OF THIS CONTRACT. WHERE ADDITIONAL WORK IS
REQUIRED BEYOND THE ABOVE VARIATION, THE CONTRACTOR SHALL
PROVIDE UNIT PRICES FOR NEWLY DISCOVERED ACM AND THOSE PRICES
SHALL BE USED FOR ADDITIONAL WORK REQUIRED UNDER THE CONTRACTOR.
WHERE LESS WORK IS REQUIRED BEYOND 5% LESS, THE CONTRACTOR SHALL
PROVIDE A CREDIT TO THE VA BASED ON THE SAME UNIT PRICES USED FOR
ADDITIONAL WORK.
A
B
C
D
E
F
G
H
I
HAZARDOUS MATERIAL REMOVAL PLAN NOTES
PROVIDE ABATEMENT OF VCT AND MASTIC FLOORING WITHIN ELEVATOR CAB.1
WORK AREA B03
CORRIDOR B10
STAIRS B11
ELEV EQUIP B09
B07
HOISTWAY
WAITING B08
CORRIDOR B12
WORK AREA B04
AB04
AB05
AB06
MECH ROOM AB11
HOISTWAY
MECH ROOM AB11B
ELEV EQUIP AB11A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
Consultant:
FULLY SPRINKLERED
BLDG 5 AND 6BLDG 6BLDG 5
C U s e rs
\l ly n c h \D o c u m e n ts
\1 .1
.0
M ilV A
E le v
A v lly n c h .r v t
/1
/2
:3 :2
P
M
HA101
HAZARDOUS MATERIAL REMOVAL
PLANRING & DuCHATEAU LLP
17400 W. CAPITOL DRIVE
BROOKFIELD, WI 53045
(414) 778-1700
UPGRADE ELEVATORS BUILDING
5 AND 6A
MILWAUKEE VAMC
695-17-116
21 JULY 2017 ETA LAL
100% CONSTRUCTION
DOCUMENTS
MILWAUKEE VA
LERCH BATES, INC.
600 W FULTON
CHICAGO, IL 60661
(312) 332-5444
SCALE: 1/8" = 1'-0"HA101
1 BLDG 5 BASEMENT FLOOR PLAN - HAZMAT
SCALE: 1/8" = 1'-0"HA101
2 BLDG 6A - BASEMENT FLOOR PLAN - HAZMAT
N
N
GENERAL CONSTRUCTION NOTES
THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®
SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION
MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL
DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,
SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES
MANAGEMENT.
THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE
CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE
NATIONAL CAD STANDARD AS GUIDES.
DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.
CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER
QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY
THE BID DUE DATE.
CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH OWNER’S
REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED WITH UTILITY
SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY, ACCESS
CONTROL, ETC.
ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT
LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK
AND ACCESS TO EXISTING UTILITIES FOR TIE IN.
DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING
BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC
MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR
VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH THE
PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS AND THE
SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS, ROUGH-IN
DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION REQUIREMENTS.
CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF
WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR
THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK THEY
PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF WORK
WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY CERTAIN
SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.
CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR
UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,
GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.
CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING AND
MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING
CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING
PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. AND/OR I.C.B.O.
APPROVED METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.
MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS SHOW INFORMATION IN A
DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL CONTRACTOR IS TO
COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING AND ELECTRICAL
EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND STRUCTURAL DETAILING OF
SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT
IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW
CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED
CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY
ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR MISSING
DIMENSIONS.
DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL
ORIENTATION AND CONTEXT ONLY.
THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW
STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN
GRID LINES UNLESS NOTED OTHERWISE.
FLOOR ELEVATION 0’-0” IS EQUAL TO THE FINISH FLOOR SLAB OF THE EXISTING SLAB
FLOOR CONSTRUCTION.
ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.
CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS
“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE DETAIL,
AREA, OR ITEM REFERENCED.
PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,
INSTALLATION AND ROUGH-IN.
INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS
AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL
DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.
FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND EQUIPMENT
TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY AND
ROUGH-IN.
ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY CALLED
OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.
ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE
FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND
HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL
UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO UTILITY
LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE OWNER.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING
REQUIRED DURING CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT CONSTRUCTION,
FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE CONSTRUCTION SITE.
ANY DAMAGE OR UNACCEPTABLE WEAR BY THE CONSTRUCTION TEAM SHALL BE
REPAIRED/REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER.
IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER
QUALITY OF WORK, AS DETERMINED BY THE GOVERNMENT, SHALL BE PROVIDED.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING HARDWARE,
ACCESS CONTROL AND AUTOMATIC OPERATORS ARE PROVIDED WITH COMPLETE
AND COMPATIBLE SYSTEMS. REFER TO DOOR HARDWARE SCHEDULE, HARDWARE
SPECIFICATIONS, AUTOMATIC OPERATOR SPECIFICATIONS, ACCESS CONTROL
SPECIFICATIONS AND ELECTRICAL DRAWINGS.
A/C AIR CONDITIONING
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
A&E ARCHITECT AND ENGINEERS
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITIES HAVING JURISDICTION
AHU AIR HANDLING UNIT
ALT ALTERNATIVE
ALT TRANS ALTERNATIVE TRANSPORTATION
ALUM ALUMINUM
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AVG AVERAGE
BB BULLETIN BOARD
BD BOARD
BG BUMPER GUARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BO BOTTOM OF
BRG BEARING
CB CATCH BASIN
CBB CEMENTITIOUS BACKER BOARD
CER CERAMIC
CF CUBIC FEET
CFCI CONTRACTOR FURNISH CONTRACTOR INSTALL
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD, CEILING GRILLE
C & G CURB & GUTTER
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNITS
CO CLEANOUT(S)
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
CP CONCRETE PIPE
CPT CARPET
CRS COLD ROLLED STEEL
CS CAST STONE
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CT CERAMIC TILE
CTR CENTER
CU FT CUBIC FEET
CUH CABINET UNIT HEATER
CY CUBIC YARD
D DRYER
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DISP DISPENSER
DIV DIVISION
DN DOWN
DR DOOR
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
E EAST
(E) EXISTING
EA EACH
EF EXHAUST FAN
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATED
ETS EXPOSED TO STRUCTURE
ETR EXISTING TO REMAIN
ARCHITECTURAL ABBREVIATIONS
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FF & E FURNITURE FIXTURES & EQUIPMENT
FIN FINISH
FIXT FIXTURE
FL FLOW LINE
FLR FLOOR
FLUOR FLUORESCENT
FO FINISH OPENING
FOS FACE OF STUD
FR FIRE RATED
FSP FIRE STANDPIPE
FT FOOT / FEET
FTG FOOTING
FURR FURRING
FV FIELD VERIFY
FVC FIRE VALVE CABINET
FWC FABRIC WALLCOVERING
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GARBAGE DISPOSAL
GF CMU GROUND FACE CMU
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLACK
GLU LAM GLUE LAMINATED WOOD
GND GROUND
GT GROUT
GYP BD GYPSUM BOARD
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIB
HC HOLLOW CORE
HCP HANDICAPPED
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HGT HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR, HANDRAIL
HT HEIGHT
HVAC HEATING, VENTILATING & AIR CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IG INSULATING GLASS
IN INCH
INCAN INCANDESCENT
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INV INVERT
ITG INSULATED TEMPERED GLASS
JAN JANITOR
J-BOX JUNCTION BOX
JT JOINT
L LONG
LAV LAVATORY
LB(S) # POUND(S)
LF LINEAL FEET
LLV LONG LEG VERTICAL
LT LIGHT
LVR LOUVER
M & BH MOP AND BROOM HOLDER
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MB MARKER BOARD
MECH MECHANICAL
MEPF MECHANICAL, ELECTRICAL, PLUMBING,
FIRE PROTECTION (CONDUIT)
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MO MASONRY OPENING
MSB MOP SERVICE BASIN
MTD MOUNTED
MTL METAL
N NORTH
NA NOT APPLICABLE
NECY NECESSARY
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER,
OVERFLOW DRAIN
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED
OWNER INSTALLED
OH OPPOSITE HAND
OPN OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
P PLASTIC
PARTN PARTITION
PBD PARTICLE BOARD
PCC PRECAST CONCRETE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATED
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT
PT CONC POST-TENSIONED CONCRETE
PTD PAPER TOWEL DISPENSER
PTL PORCELAIN TILE
PVC POLYVINYL CHLORIDE
QA QUALITY ASSURANCE
QT QUARRY TILE
R R-VALUE (INSULATION),
RADIUS, RISER
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE: REFERENCE
REBAR REINFORCING BAR
REC RECESSED
RECPT RECEPTACLE
REF REFRIGERATOR
REG REGISTER
REINF REINFORCE
REQD REQUIRED
RESIL RESILIENT
REV REVISION
RH ROOF HATCH
RM ROOM
RO ROUGH OPENING
RT RUBBER STAIR TREAD
S SOUTH
SAF SEAMLESS ACRYLIC FLOORING
SAP SUSPENDED ACOUSTICAL PANELS
SAT SUSPENDED ACOUSTICAL TILE
SB SPLASHBLOCK
SC SEALED CONCRETE, SOLID CORE
SCHED SCHEDULE
SCP SCUPPER
SD SOAP DISPENSER
SEAL SEALER
SECT SECTION
SECT SECTION
SF SQUARE FOOT
SF CMU SPLIT-FACE CMU
SHR SHOWER
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SL SLOPE
SLV SHORT LEG VERTICAL
SND SANITARY NAPKIN DISPOSER
SNV SANITARY NAPKIN VENDOR
SPECS SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STRUC STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TA TOILET ACCESSORIES
TB TACKBOARD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TBD TO BE DETERMINED
TD TUBULAR DAYLIGHTING DEVICE
TEL TELEPHONE
TEMP TEMPERATURE
TG TEMPERED GLASS,
TONGUE & GROOVE,
TRANSFER GRILLE
THRU THROUGH
TO TOP OF
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TTD TOILET TISSUE DISPENSER
TV TELEVISION
TYP TYPICAL
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
URN URINAL
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WDP WOOD PANELING
WDW WINDOW
WF WIDE FLANGE
WGL WIRED GLASS
WH WATER HEATER
WR WASTE RECEPTACLE,
WATER RESISTANT
WS WATER STOP
WSCT WAINSCOTT
WT WEIGHT
WWF WELDED WIRE FABRIC
ARCHITECTURAL SYMBOLS
X
X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION REFERENCE
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET LOCATION
DETAIL REFERENCE
BUILDING
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
ELEVATION REFERENCES
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
HANDICAP SYMBOL
N
TRUE NORTH ARROW
ROOM
NEW WALL
WALL TO BE REMOVED
NEW WALL TAG
S3.A2
INDICATES STRUCTURAL MATERIAL
INDICATES NOMINAL SIZE
INDICATES CONSTRUCTION
INDICATES TOP OF WALL CONDITION
REFER TO WALL LEGEND
FOR MORE INFORMATION
NEW DOOR101
DOOR TAG
EXISTING DOOR
101 ROOM TAG
1 PLAN NOTE
ALTERNATE/BID DEDUCT ITEM
PT-1 FINISH INDICATION
A STOREFRONT/WINDOW
T GLAZING
ITEMS TO BE DEMOLISHED
DEMOLISHED DOOR
SHEET LOCATION
VIEW NUMBER
X / XXXX
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
EXISTING WALL TO REMAIN
INCANDESCENT WALL MOUNTED LIGHTING
INCANDESCENT SURFACE MOUNT LIGHTING
SURFACE MOUNTED FLUORESCENT
RECESSED FLUORESCENT
HVAC RETURN AIR GRILLE
HVAC SUPPLY DIFFUSER
PENDANT LIGHT
ACCESS PANEL
EXIT LIGHTING
S
D
SPEAKER
SMOKE DETECTOR
INCANDESCENT RECESSED LIGHTING
A 9'-0"
CEILING TAG CEILING TYPE
FINISHED CEILING HEIGHT
REFER TO CEILING LEGEND
FOR MORE INFORMATION
EXTENT OF REVISION
REVISION SET
MECH/ELEC ITEMS: REFER TO MEP SHEETS AS APPLICABLE
101 EQUIPMENT/FURNITURE TAG
TEMPORARY IC BARRIER WALL
CONSTRUCTION (DUST WALL)
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY
REFLECTED CEILING PLAN SYMBOLS
NOTE:
IN THE CASE OF CONFLICTS OR DISCREPANCIES
WITHIN OR AMONG THE CONTRACT DRAWINGS, THE
BETTER QUALITY, MORE STRINGENT REQUIREMENTS
OR GREATER QUANTITY OF WORK, AS DETERMINED
BY THE GOVERNMENT, SHALL BE PROVIDED.
GENERAL CONSTRUCTION NOTES
THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®
SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION
MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL
DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,
SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES
MANAGEMENT.
THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE
CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE
NATIONAL CAD STANDARD AS GUIDES.
DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.
CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER
QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY
THE BID DUE DATE.
CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH OWNER’S
REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED WITH UTILITY
SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY, ACCESS
CONTROL, ETC.
ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT
LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK
AND ACCESS TO EXISTING UTILITIES FOR TIE IN.
DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING
BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC
MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR
VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH THE
PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS AND THE
SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS, ROUGH-IN
DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION REQUIREMENTS.
CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF
WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR
THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK THEY
PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF WORK
WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY CERTAIN
SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.
CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR
UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,
GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.
CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING AND
MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING
CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING
PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. AND/OR I.C.B.O.
APPROVED METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.
MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS SHOW INFORMATION IN A
DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL CONTRACTOR IS TO
COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING AND ELECTRICAL
EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND STRUCTURAL DETAILING OF
SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT
IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW
CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED
CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY
ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR MISSING
DIMENSIONS.
DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL
ORIENTATION AND CONTEXT ONLY.
THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW
STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN
GRID LINES UNLESS NOTED OTHERWISE.
FLOOR ELEVATION 0’-0” IS EQUAL TO THE FINISH FLOOR SLAB OF THE EXISTING SLAB
FLOOR CONSTRUCTION.
ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.
CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS
“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE DETAIL,
AREA, OR ITEM REFERENCED.
PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,
INSTALLATION AND ROUGH-IN.
INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS
AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL
DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.
FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND EQUIPMENT
TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY AND
ROUGH-IN.
ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY CALLED
OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.
ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE
FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND
HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL
UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO UTILITY
LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE OWNER.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING
REQUIRED DURING CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT CONSTRUCTION,
FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE CONSTRUCTION SITE.
ANY DAMAGE OR UNACCEPTABLE WEAR BY THE CONSTRUCTION TEAM SHALL BE
REPAIRED/REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER.
IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER
QUALITY OF WORK, AS DETERMINED BY THE GOVERNMENT, SHALL BE PROVIDED.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING HARDWARE,
ACCESS CONTROL AND AUTOMATIC OPERATORS ARE PROVIDED WITH COMPLETE
AND COMPATIBLE SYSTEMS. REFER TO DOOR HARDWARE SCHEDULE, HARDWARE
SPECIFICATIONS, AUTOMATIC OPERATOR SPECIFICATIONS, ACCESS CONTROL
SPECIFICATIONS AND ELECTRICAL DRAWINGS.
A/C AIR CONDITIONING
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
A&E ARCHITECT AND ENGINEERS
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITIES HAVING JURISDICTION
AHU AIR HANDLING UNIT
ALT ALTERNATIVE
ALT TRANS ALTERNATIVE TRANSPORTATION
ALUM ALUMINUM
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AVG AVERAGE
BB BULLETIN BOARD
BD BOARD
BG BUMPER GUARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BO BOTTOM OF
BRG BEARING
CB CATCH BASIN
CBB CEMENTITIOUS BACKER BOARD
CER CERAMIC
CF CUBIC FEET
CFCI CONTRACTOR FURNISH CONTRACTOR INSTALL
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD, CEILING GRILLE
C & G CURB & GUTTER
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNITS
CO CLEANOUT(S)
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
CP CONCRETE PIPE
CPT CARPET
CRS COLD ROLLED STEEL
CS CAST STONE
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CT CERAMIC TILE
CTR CENTER
CU FT CUBIC FEET
CUH CABINET UNIT HEATER
CY CUBIC YARD
D DRYER
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DISP DISPENSER
DIV DIVISION
DN DOWN
DR DOOR
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
E EAST
(E) EXISTING
EA EACH
EF EXHAUST FAN
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EQ EQUAL
EQU…