36C25218R0104-00003000.docx
DOCX document 83 KB Posted
- Solicitation number
- 36C25218R0104
About this file
This document provides information regarding a Multiple Award Task Order Contract (MATOC) solicitation for construction services at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The VA intends to award a minimum of two IDIQ contracts under solicitation number 36C25218R0104, with a maximum aggregate value of $50 million over five years. Eligible work includes general construction, carpentry, paving, roofing, mechanical, electrical and plumbing services. Task order solicitations will be competitively issued to all selected MATOC contractors for requirements between $2,000 to $2 million. The acquisition is reserved exclusively for Service-Disabled Veteran-Owned Small Businesses. Proposals are due by February 5, 2018 in response to the official solicitation.
36C25218R0104 00003 36C25218R0104 00003.docx
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| 36C25218R0104 | Construction Multiple Award Task Order Contract | |
| Amendment 00003 | Clement J. Zablocki VAMC, Milwaukee, WI |
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00003 03-08-2018 695-18-2-6997-0001 695-18-2-6985-0002 (Seed Project) Per Task Order 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders
36C25218R0104 02-05-2018
X X X 1:00 PM Local Time 03-21-2018 This amendment includes responses to offeror requests for information. See continuation page.
NOTE: The page limitation for Proposal Volume 1 Part 1 has been reverted back to 25 pages. Refer to RFI #42.
NOTE: The proposal receipt date and time remains unchanged as 1:00 PM Local Time 03-21-2018
Continue to monitor FBO.GOV for any and all changes to this solicitation.
Ricky Bond Contracting Officer Amendment of Solicitation Amendment 00003 Solicitation 36C25218R0104 Construction Multiple Award Task Order Contract Seed Project: Upgrade Elevators Buildings 5 & 6A Wing (695-17-116) Clement J. Zablocki VAMC, Milwaukee, This Amendment consists of Responses to RFIs 42-44.
REQUEST FOR INFORMATION (RFI) RESPONSES
The following questions and answers provide clarification to the contract documents:
36C252-18-R-0104 Construction MATOC – Clement J. Zablocki VAMC, Milwaukee, WI Contractor Requests for Information
42. Follow on question and answer for RFI #6 of Amendment 00002: The first statement is asking for a site specific safety plan per Spec. 01 35 26. If we are to give a Site Specific SP per 01 35 26 will far exceed 25 pages. On past projects at the Milwaukee VA our site specific Safety Plan (Accident Prevention Plan) is anywhere from 220 pages to 250 pages dependent on the project. Showing a site specific Safety Plan per Spec 01 35 26 would be impossible in 25 pages even if summarized. To Clarify… If we include the pages required, this means that when we exceed the 25 pages with our Safety Plan does that mean the additional pages in V1 Part1 (Tab 3) are not counted in just Tab 3 (Meaning approx. 225 pages won’t be considered if we are to submit an Accident Prevention Plan per 01 35 26) or will Tab sections 5,6 & 7 will not be considered that follow that? Also…If a site specific per Spec 01 35 26 is required is it Site Specific to the SEED Project or the Milwaukee Campus in general? Can the page count for Tab 3 be increased to 250 pages so we can include a Safety Plan per Spec section 01 35 26 and adequately be evaluated?
Response: The response to RFI #6 of Amendment 00002 is hereby rescinded and replaced with the following: Offerors shall submit a safety plan which addresses the items listed in the basis for award and evaluation factors section of the solicitation. Upon award of a task order, the awardee will be required to submit a site specific safety plan in accordance with VA Specification 01 35 26. Page limitations for Volume 1 Part 1 are hereby reverted back to 25 pages. Tabs 4, 5, 6 & 7 are to be included in the page limitation and will not be removed if the page limitation is exceeded. If the page limitation is exceeded, pages in excess of the limit from the following tabs, in the order provided, will not be read or considered: Tab 3, Tab 2, Tab 1. All references of 50-page limit in the response to RFI #38 of Amendment 00002 are hereby changed to read 25-page limit.
43. For the 2 split systems they are calling for the 2 indoor units to be 110V on the schedule. Mitsubishi does not make this model in 110V it would be 208v 1PH. An electrical sub panel would need to be added for this. Please clarify.
Response: The two indoor cooling units should be 208 Volts. On Drawing MM500, on the Room Cooling Units Schedule, in the column marked Volts, Replace 120 with 208 for both indoor units listed.
44. In response to the answer to question 37 on amendment 00002 “ added spec section 03 07 60 FRP concrete”. How does this relate to the concrete pad? Is this not typical cast in place concrete? Are there other areas we should be aware of that we do not see that would require FRP Concrete?
Response: Milwaukee VAMC’s standard work process is to use Fiber reinforced concrete for slab on grade, non-structural concrete. For the seed project the only poured concrete are these 2 concrete pads at 5 & 6.