About this file

36C25218B0066 S02 171004_MILVA_RTU102_100Drawings_6of7.pdf

View the file

Other files

File Type Posted
36C25218C0056-000.docx DOCX document
36C25218B0066-00003001.pdf PDF
36C25218B0066-00003000.docx DOCX document
36C25218B0066-00002001.pdf PDF
36C25218B0066-00002000.docx DOCX document
36C25218B0066-012.docx DOCX document
36C25218B0066-00001002.pdf PDF
36C25218B0066-00001001.pdf PDF
36C25218B0066-00001004.pdf PDF
36C25218B0066-00001003.pdf PDF
36C25218B0066-00001000.docx DOCX document
36C25218B0066-005.pdf PDF
36C25218B0066-006.pdf PDF
36C25218B0066-004.pdf PDF
36C25218B0066-002.pdf PDF
36C25218B0066-011.pdf PDF
36C25218B0066-003.pdf PDF
36C25218B0066-001.docx DOCX document
36C25218B0066-007.pdf PDF
36C25218B0066-009.pdf PDF
36C25218B0066-008.pdf PDF
36C25218B0066-000.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

B

A

D

E

12 13 14 15

RTU-9

WP

EF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

RING & DuCHATEAU LLP

17400 W. CAPITOL DRIVE

BROOKFIELD, WI 53045

(414) 778-1700

INSTALL EMS BUILDING 102

MILWAUKEE VAMC

695-17-108

JULY 24, 2017Revisions: Date:

100% BID SET

VA MILWAUKEEGUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

NON-SPRINKLERED

BLDG 102

1 HIGH ROOF PLAN - ELECTRICAL DEMOLITION

SCALE: 1/8" = 1'-0"ED102

0' 4' 8' 16'

N

ED103

HIGH ROOF PLAN - ELECTRICAL

DEMOLITION

MM MJ

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

RING & DuCHATEAU LLP

17400 W. CAPITOL DRIVE

BROOKFIELD, WI 53045

(414) 778-1700

INSTALL EMS BUILDING 102

MILWAUKEE VAMC

695-17-108

JULY 24, 2017Revisions: Date:

100% BID SET

VA MILWAUKEEGUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

NON-SPRINKLERED

BLDG 102

ES100

BASEMENT FLOOR PLAN -

ELECTRICAL

1 BASEMENT FLOOR PLAN - ELECTRICAL

SCALE: 1/8" = 1'-0"ES100

0' 4' 8' 16'

N

F A

C P

EX

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

RING & DuCHATEAU LLP

17400 W. CAPITOL DRIVE

BROOKFIELD, WI 53045

(414) 778-1700

INSTALL EMS BUILDING 102

MILWAUKEE VAMC

695-17-108

JULY 24, 2017Revisions: Date:

100% BID SET

VA MILWAUKEEGUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

NON-SPRINKLERED

BLDG 102

1 FIRST FLOOR PLAN - ELECTRICAL

SCALE: 1/8" = 1'-0"ES101

0' 4' 8' 16'

N

ES101

FIRST FLOOR PLAN - ELECTRICAL

MJ MJ

DN

DN

EXISTING RECEIVING

ELEV

E1

EXISTING RECEIVING

STAIR

S1

2 HR

2 HR

TCP

CM/W

AHU-135-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

RING & DuCHATEAU LLP

17400 W. CAPITOL DRIVE

BROOKFIELD, WI 53045

(414) 778-1700

INSTALL EMS BUILDING 102

MILWAUKEE VAMC

695-17-108

JULY 24, 2017Revisions: Date:

100% BID SET

VA MILWAUKEEGUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

NON-SPRINKLERED

BLDG 102

ES102

SECOND FLOOR PLAN -

ELECTRICAL

1 SECOND FLOOR PLAN - ELECTRICAL

SCALE: 1/8" = 1'-0"ES102

0' 4' 8' 16'

N

C

B

A

D

E

12 13 14 15

AHU-135-2

WP

UL/11-28

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

RING & DuCHATEAU LLP

17400 W. CAPITOL DRIVE

BROOKFIELD, WI 53045

(414) 778-1700

INSTALL EMS BUILDING 102

MILWAUKEE VAMC

695-17-108

JULY 24, 2017Revisions: Date:

100% BID SET

VA MILWAUKEEGUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

NON-SPRINKLERED

BLDG 102

1 HIGH ROOF PLAN - ELECTRICAL

SCALE: 1/8" = 1'-0"ES103

0' 4' 8' 16'

N

ES103

HIGH ROOF PLAN - ELECTRICAL

MANUAL OR AUTOMATIC

MEDIUM VOLTAGE

PANELBOARD

OVERLOAD

XX

XX

ENCLOSURE

EQUIPMENT CONNECTION -

ENGINE GENERATOR

TRANSFORMER

XX

XX

SURGE SUPPRESSION

DENOTES

LA = LIGHTNING ARRESTORS

SPD = SURGE PROTECTIVE DEVICE

FEEDER CONTINUATION CONNECTION #

FEEDER CONTINUED ON SHEET INDICATED

DEVICE UPSTREAM OR DOWNSTREAM

(CAP)

(ATS)

CAPACITOR

AUTOMATIC TRANSFER SWITCH

KEY INTERLOCKING - KEY #

KEY NORMALLY REMOVED

SEE EQUIPMENT SCHEDULE

"AF" - DENOTES AMP FRAME

"XXX" - DENOTES AMP RATING

XX

XXX

XXX

GP - GROUND FAULT PROTECTION - PERSONNEL

UVT - UNDER VOLTAGE TRIP

ST - SHUNT TRIP

MC - MOLDED CASE CIRCUIT BREAKER

SS - SOLID STATE MOLDED CASE CIRCUIT BREAKER

IC - INSULATED CASE CIRCUIT BREAKER

PC - LOW VOLTAGE POWER CIRCUIT BREAKER

GE - GROUND FAULT PROTECTION - EQUIPMENT

ALS - ALARM SWITCH

AXS - AUXILIARY SWITCH

EOP - ELECTRIC OPERATOR

AF - ARC FAULT CIRCUIT INTERRUPTER (RESIDENTIAL ONLY)

CL - CURRENT LIMITING

CIRCUIT BREAKER INFORMATION

CIRCUIT BREAKER ACCESSORIES

CIRCUIT BREAKER TYPE

ONE-LINE SYMBOLS

(XX) DEVICE DESIGNNATION

DENOTES THE FOLLOWING:

DENOTES THE FOLLOWING:

(CB) CIRCUIT BREAKER

(CON) CONTACTOR

(DS) DISCONNECT SWITCH

(VM)

(AM)

VOLTMETER

AMMETER

DENOTES THE FOLLOWING:

(VS) VOLTMETER SWITCH

(AS) AMMETER SWITCH

(M) KWHR METER

(DM) DIGITAL METER

XX

(XX) DEVICE DESIGNATION TYPE -

DENOTES THE FOLLOWING:

SEE SPECIFICATION

-SEE SCHEDULE & DETAILS

XX

XXXXX

"AS" - DENOTES AMP SENSOR

"AT" - DENOTES AMP TRIP

XXXAF

XXXAS

XXXAT

3P

CIRCUIT BREAKER OPTIONS

GS - GROUND FAULT SENSING / ALARM

HC - HEATING, COOLING, AIR CONDITIONING, REFRIGERATION - HCAR

HM - HIGH MAGNETIC - HID, MOTORS

MS - MOLDED CASE SWITCH

MP - MOTOR CIRCUIT PROTECTOR

L1 - LONG TIME / INSTANTANEOUS - LI

L2 - LONG TIME / SHORT TIME / INSTANTANEOUS - LSI

L3 - LONG TIME / SHORT TIME / INSTANTANEOUS / GROUND FAULT TRIP - LSIG

L4 - LONG TIME / SHORT TIME / INSTANTANEOUS / GROUND FAULT SENSING - LSIA

SC - SYSTEM COMMUNICATION

SD - SYSTEM DIAGNOSTICS

SM - SYSTEM MONITORING

ZS - ZONE SELECTIVE INTERLOCKING

"XXX" - DENOTES AMP RATING

FS XXX

VW - VIEWING WINDOW

AXS - AUXILIARY SWITCH

DL - DOUBLE LUGS

PL - PILOT LIGHT

DS - UNFUSED DISCONNECT SWITCH

EDS - ELEVATOR DISCONNECT SWITCH

LOW VOLTAGE DISCONNECT SWITCH INFORMATION

DISCONNECT SWITCH ACCESSORIES

"AS" - DENOTES AMP SWITCH

"AF" - DENOTES AMP FUSE

XXXAS

XXXAF

3P

DISCONNECT SWITCH TYPE

AR - ARC FLASH REDUCTION

MEDIUM VOLTAGE

MEDIUM VOLTAGE

MEDIUM VOLTAGE

MEDIUM VOLTAGE

FUSE

FUSIBLE SWITCH

SWITCH

FUSED LOAD BREAK

CABLE TERMINATION

LOW VOLTAGE

LOW VOLTAGE FUSED

LOW VOLTAGE

LOW VOLTAGE

LOW VOLTAGE

FUSE

DISCONNECT SWITCH

DISCONNECT SWITCH

CIRCUIT BREAKER

DRAWOUT

LOW VOLTAGE

DRAWOUT POWER

CIRCUIT BREAKER

CIRCUIT BREAKER

POTENTIAL TRANSFORMER

CURRENT TRANSFORMER

CAPACITOR

GROUND

G

JUNCTION BOX

K#

KEY INTERLOCKING - KEY #

KEY NORMALLY INSERTED

-SEE SCHEDULE & DETAILS

K#

X

X

TRANSFER SWITCH

NORMALLY CLOSED

CONTACTOR

NORMALLY OPEN

CONTACTOR

CONTROL SWITCH

FLOAT SWITCH

LIGHT FIXTURE

NO

NC

NO

EXX

XXX/XX

X

FR - FULLY RATED (100%)

GENERAL NOTES -

1.

NEW.

2.

ARE EXISTING TO REMAIN.

3.

BELOW ARE EXISTING TO BE REMOVED.

4.

BELOW ARE TYPICAL EQUIPMENT DIVISIONS.

5.

FUTURE.

6.

BE KEPT TO AN ABSOLUTE MINIMUM.

7.

DIAGRAM SHALL BE PROTECTED FROM AVAILABLE FAULT CURRENT

SHOWN BY EITHER OF THE FOLLOWING METHODS:

- PROVIDE BREAKERS WITH A MINIMUM AIC RATING GREATER THAN

INDICATED

- THE SERIES RATING METHOD IS NOT ACCEPTABLE

T

XX

X

XXX kVA

/ X / X

P: XXX

S: XXX

XXX XXX

TRANSFORMER INFORMATION

1 - NON VENTILATED ENCLOSURE

2 - INTEGRAL STRIP HEATER

3 - WEATHER SHIELD

OPTIONS

TEMPERATURE RISE

SECONDARY VOLTAGE

PRIMARY VOLTAGE

kVA

TRANSFORMER ID

RATING

TYPE

DT - DRY TYPE

LF - LIQUID FILLED

DP - DRY TYPE PAD MOUNT

LP - LIQUID FILLED PAD MOUNT

GP - GENERAL PURPOSE

K-# - K-RATED

EE - ENERGY EFFICIENT

4 - NEMA 3R

5 - STAINLESS STEEL

CR - CAST RESIN

EC - ENCAPSULATED CORE

ATS

X / X / X / X / X

XXX

XXX

XXX

XXX XXX

XXXXXX

XXX

N - NORMAL BRANCH

LS - LIFE SAFETY BRANCH

CR - CRITICAL CARE BRANCH

BRANCH

EQ - EQUIPMENT BRANCH

EM - EMERGENCY BRANCH

TRANSFER SWITCH ID

ES - ESSENTIAL SYSTEMS

NES - NON ESSENTIAL SYSTEMS

AMPS

VOLTAGE

CLOSING & WITHSTAND AIC RATING

TRANSFER

AUTO - AUTOMATIC

MAN - MANUAL

POLES

TRANSFER SWITCH TYPE

OPTIONS

1 - LOAD SHED RELAY

2 - BLOCK TRANSFER RELAY

3 - SYNCH CHECK RELAY

4 - PEAK READING AMMETER

5 - STANDARD METER

6 - VOLTMETER

7 - COMPRESSION LUGS

8 - ELEVATOR INTERFACE RELAY

TRANSFER SWITCH INFORMATION

BYPASS

NON BYPASS

FIRE PUMP

TRANSITION

OPEN TRANSITION

CLOSED TRANSITION

DELAYED TRANSITION

SPD

XXX

XXX

X / X / X / X

SURGE PROTECTIVE DEVICE

TYPE

OPTIONS

1 - UNIT STATUS INDICATORS

2 - AUDIBLE ALARM

3 - TRANSIENT COUNTER

4 - REMOTE MONITOR PANEL

5 - SERVICE DISCONNECT SWITCH

6 - SUMMARY ALARM RELAY CONTACTS

7 - HIGH PERFORMANCE INTERCONNECT CABLE

SE - 125 kA - SERVICE ENTRANCE

BP - 80 kA - BRANCH PANEL

VOLTAGE

SPD ID

BYPASS ISOLATION

TRANSFER SWITCH

XXX MOUNTING TYPE

8 - MASTERMIND MONITORING

XXXXXX

XXXXXX

DS XXX

XXXAS

XXXAF

3P

XXXXXX

XXXXXX

(JB) JUNCTION BOX

(MTS) MANUAL TRANSFER SWITCH

(T) TRANSFORMER

(SS) SURGE SUPPRESSION

(UPS) UNINTERRUPTIBLE POWER SUPPLY

(WW) WIREWAY

(FS) FUSIBLE SWITCH

(F) FUSE

(MVF) MEDIUM VOLTAGE FUSE

(MVFS)MEDIUM VOLTAGE FUSIBLE SWITCH

(MVS) MEDIUM VOLTAGE SWITCH

(MVT) MEDIUM VOLTAGE CABLE TERMINATION

(PLC) POWER LINE CONDITIONER

(MVC) MEDIUM VOLTAGE FUSED CUTOUT

(EDP) ELEVATOR DISTRIBUTION PANEL

(EDS) ELEVATOR DISCONNECT SWITCH

MD - MODIFIED DIFFERENTIAL GROUND FAULT

(BW) BUS WAY

XXX

CYCLE CLOSING & WITHSTAND RATING

3 CYCLE

30 CYCLE

9 - OVERLAPPING NEUTRAL CONTACTS

10 - DIGITAL METERING

ALL ITEMS INDICATED BY A DARK SOLID LINE AS SHOWN BELOW ARE

ALL ITEMS INDICATED BY A LIGHT DASHED LINE AS SHOWN BELOW

ALL ITEMS INDICATED BY A DARK DASH-DOT-DASH LINE AS SHOWN

ALL ITEMS INDICATED BY A LIGHT DASH-DOT-DASH LINE AS SHOWN

ALL ITEMS INDICATED BY A LIGHT SOLID LINE AS SHOWN BELOW ARE

ALL DOWNTIME SHALL BE SCHEDULED WITH THE OWNER AND SHALL

THE PANELS AND SWITCHBOARDS INDICATED ON THE ONE LINE

FS - FUSED DISCONNECT SWITCH

LOAD BREAK ELBOW

CABLE TERMINATION

ELBOW CABLE

TERMINATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

RING & DuCHATEAU LLP

17400 W. CAPITOL DRIVE

BROOKFIELD, WI 53045

(414) 778-1700

INSTALL EMS BUILDING 102

MILWAUKEE VAMC

695-17-108

JULY 24, 2017Revisions: Date:

100% BID SET

VA MILWAUKEEGUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

NON-SPRINKLERED

BLDG 102

ES400

ONE-LINE SYMBOLS AND

ABBREVIATIONS

PANEL

UL-B1

B110

PANEL

UL-12

M101

PANEL

UL-11

M101

FLUID COOLER

FC-135-3

ROOF

RF-166A

ROOF

SF-166A

ROOF

WCCH-B100-3

B100

PANEL

EUL-LS-11

M101

PANEL

EUL-CR-B1

B100FC

ELEVATOR

B130

TO EXISTING CAMPUS MV SWITCHGEAR

FEEDER RELAY NW-4A

MAIN RELAY NW-1

AHU-135-2

ROOF

ACW

W/D #2

W/D #1

USC2

RTU-9

ROOF

PANEL

G

2ND FLOOR

TEMP C3T

TRAILER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

RING & DuCHATEAU LLP

17400 W. CAPITOL DRIVE

BROOKFIELD, WI 53045

(414) 778-1700

INSTALL EMS BUILDING 102

MILWAUKEE VAMC

695-17-108

JULY 24, 2017Revisions: Date:

100% BID SET

VA MILWAUKEEGUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

NON-SPRINKLERED

BLDG 102

ES401

ONE-LINE DIAGRAM

File details come from the government source that posted it.