Sheet AI101 - Add 01.pdf
PDF 327 KB Posted
- Attached to
- 506-22-207 Facilities Maintenance Upgrades Federal contract opportunity
- Solicitation number
- 36C25025B0027
About this file
This document is a detailed architectural drawing (Sheet AI101) for the Ann Arbor VA Medical Center Facilities Maintenance Upgrades project, focusing on door and interior renovation specifications for the Surgical Suite in Building 1E. The drawing includes comprehensive schedules for room finishes, door specifications, and interior elevations, with key details such as:
Door Schedule: Includes 20 doors with specifications for width (3'-0" to 4'-0"), height (7'-0"), material (metal), and special requirements like lead lining and automatic operators. Many doors are designated as lead-lined, with various hardware sets and fire ratings. Door notes specify armor plating, painting requirements, and hardware set references. Room Finish Schedule covers multiple surgical and support spaces (e.g., Scrub Alcoves, Operating Rooms, Sub-Sterile areas) with resinous flooring (RF-1/RF-2) and existing finishes to remain. The document is part of bid documents dated 02/06/2025 with an addendum on 06/05/2025, prepared by FFE Engineering & Architecture for the VA Medical Center.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW DOOR AUTOMATIC
OPERATOR WITH PUSH BUTTON.
REFER TO AI101 DOOR SCHEDULE
FOR OPERATOR INFORMATION.
DASHED LINE INDICATES AREA
FOR NEW AUTO OPERATOR - SEE
DOOR SCHEDULE AND PLAN.
RELOCATED ITEMS TO AVOID NEW AUTO
OPERATOR AND EXISTING LEAD LINING.
EXISTING HANDRAIL TO REMAIN -
REMOVE AND REINSTALL AS
NECESSARY FOR INSTALLATION
OF TEMPORARY CONSTRUCTION
BARRIERS.
EXISTING WALL BUMPER GUARD
TO REMAIN - REMOVE AND
REINSTALL AS NECESSARY FOR
INSTALLATION OF TEMPORARY
CONSTRUCTION BARRIERS.
NEW LEAD-LINED HOLLOW METAL
DOOR - SEE DOOR SCHEDULE.
EXISTING LEAD LINING AT OPERATING
ROOM INTERIOR FACE UP TO 7'-0" A.F.F.
SEE SCHEDULE
S E
E S
C H
E D
U L E
NOTES:
LX LEADED X-RAY SAFETY GLAZING
V1
SEE SCHEDULE
S E
E S
C H
E D
U L E
F
LX
SEE SCHEDULE
S E
E S
C H
E D
U L E
NL
LX
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /A n n
A rb o r
V A
F
M U p g ra d e s /F
F E
A n n
A rb o r
F
M U p g ra d e s B
E rv t
/5
/2
:3
:2
A
M
AI101
SCHEDULES AND INTERIOR
ELEVATION
05/14/2025 SS KT
FACILITY MAINTENANCE
UPGRADES
506-22-207
ANN ARBOR, MICHIGAN
BID DOCUMENTS
1E
ANN ARBOR VA
MEDICAL
CENTER Approved: Veteran's Affairs Medical Center
ROOM FINISH SCHEDULE
ROOM NAME ROOM NUMBER AREA FLOOR FINISH CEILING
WALL FINISH
WALL BASEN E S W
SCRUB ALCOVE C5-13A 94 SF RF-1 ETR ETR ETR ETR ETR RF-1
SCRUB ALCOVE C5-13B 99 SF RF-1 ETR ETR ETR ETR ETR RF-1
SCRUB ALCOVE C15-13F 100 SF RF-1 ETR ETR ETR ETR ETR RF-1
SCRUB ALCOVE C521A 51 SF RF-1 ETR ETR ETR ETR ETR RF-1
SCRUB ALCOVE C521B 46 SF RF-1 ETR ETR ETR ETR ETR RF-1
SUB-STERILE D505B 103 SF RF-1 ETR ETR ETR ETR ETR RF-1
SPECIAL OR NO 9 (ORTHO) D507 628 SF RF-1/2 ETR ETR ETR ETR ETR RF-1
STORAGE D507A 53 SF RF-1 ETR ETR ETR ETR ETR RF-1
ANESTHESIA WORKROOM D518 588 SF ETR ETR ETR ETR ETR ETR ETR
CONTROL ROOM D521B 74 SF RF-1 ETR ETR ETR ETR ETR RF-1
SUB-STERILE D523A 109 SF RF-1 ETR ETR ETR ETR ETR RF-1
STERILE SUPPLY D525A 85 SF RF-1 ETR ETR ETR ETR ETR RF-1
STERILE SUPPLY E507A 61 SF RF-1 ETR ETR ETR ETR ETR RF-1
GENERAL OR 1 E508 782 SF RF-1/2 ETR ETR ETR ETR ETR RF-1
GENERAL OR 2 E525 434 SF ETR ETR ETR ETR ETR ETR ETR
SUB STERILE E525C 62 SF ETR ETR ETR ETR ETR ETR ETR
CONTROL ROOM E525D 47 SF ETR ETR ETR ETR ETR ETR ETR
FINISH LEGEND
MARK DESCRIPTION BASIS OF DESIGN STYLE / COLOR COMMENTS
ETR EXISTING TO REMAIN - - -
P-1 NOT USED - - -
P-2 PAINT - TYPE 2 TBD HIGH BUILD GLAZED COATING (EPOXY)
RF-1 RESINOUS FLOORING STONHARD TBD INTEGRAL WALL BASE
RF-2 RESINOUS FLOORING STONHARD TBD INTEGRAL WALL BASE
WSF-1 WELDED SHEET FLOORING TBD INTEGRAL WALL BASE
DOOR SCHEDULE
DOOR NUMBER
NO. OF
DOORS WIDTH HEIGHT THICKNESS
DOOR
MATERIAL
DOOR
TYPE
FRAME
MATERIAL
DOOR
FINISH
FRAME
FINISH
HARDWARE
SET
LEAD
LINED FIRE RATED AUTO OPERATOR
E505AA 1 4' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 6.0 YES - EXISTING AUTO OPERATOR
E505FF 1 4' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 12.0 YES - EXISTING AUTO OPERATOR
E505G 2 3' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 7.0 YES - NEW AUTO OPERATOR
E505GG 1 4' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 14.0 YES - NEW AUTO OPERATOR
E505II 1 3' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 5.0 YES - -
E505L 2 3' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 7.0 YES - NEW AUTO OPERATOR
E505M 2 3' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 10.0 YES - EXISTING AUTO OPERATOR
NON-FUNCTIONING.
PROVIDE NEW AUTO
OPERATOR
E505N 2 3' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 10.0 YES - EXISTING AUTO OPERATOR
E505O 2 3' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 9.0 YES - NEW AUTO OPERATOR
E505OO 2 3' - 0" 7' - 0" 1 3/4" METAL NL ETR P-2 P-2 3.0 - 90MIN -
E505PP 2 3' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 9.0 YES - EXISTING AUTO OPERATOR
E505Q 1 4' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 5.0 YES - -
E505QQ 2 3' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 9.0 YES - EXISTING AUTO OPERATOR
E505S 1 4' - 0" 7' - 0" 1 3/4" METAL NL ETR P-2 P-2 1.0 - - -
E505V 1 4' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 14.0 YES - NEW AUTO OPERATOR
E505W 2 3' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 9.0 YES - NEW AUTO OPERATOR
E505X 2 3' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 9.0 YES - NEW AUTO OPERATOR
E505Z 1 4' - 0" 7' - 0" 1 3/4" METAL V1 ETR P-2 P-2 14.0 YES - NEW AUTO OPERATOR
1/4" = 1'-0"
INTERIOR ELEVATION AT TYPICAL CORRIDOR DOOR
1/4" = 1'-0"
DOOR ELEVATIONS
DOOR NOTES
1.) ALL NEW DOORS TO RECEIVE ARMOR PLATE ON THE PUSH SIDE AND A MOP PLATE ON THE PULL SIDE.
2.) PAINT BOTH SIDES OF ALL NEW HOLLOW METAL DOOR FRAMES.
3.) REFER TO SPECIFICATIONS FOR DOOR HARDWARE SETS.
No. Revisions: Date:
BID DOCUMENTS V.2 02/06/2025
1 ADDENDUM #1 06/05/2025
| Sheets |
| AI101 - SCHEDULES AND INTERIOR ELEVATION |
File details come from the government source that posted it. Updated .