Sheet AD401 - Add 01.pdf
PDF 467 KB Posted
- Attached to
- 506-22-207 Facilities Maintenance Upgrades Federal contract opportunity
- Solicitation number
- 36C25025B0027
About this file
This document is an Enlarged Demolition Plan (Sheet AD401) for the Ann Arbor VA Medical Center Facilities Maintenance Upgrades project. The architectural demolition plan details specific removal and preparation requirements for a surgical suite renovation, including:
Key demolition instructions include removing existing welded sheet flooring, resinous flooring, and adhesive materials, while preserving structural elements, walls, casework, plumbing fixtures, fire extinguishers, and door automatic operators. Specific notes indicate contractors must field verify mechanical, electrical, plumbing, and fire protection infrastructure to be removed or modified, coordinate work across disciplines, and prepare surfaces to receive new finishes. The plan covers multiple rooms including sterile supply areas, corridors, mechanical equipment rooms, control rooms, and staff facilities, with gray-shaded areas noted as out of scope for the renovation project.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E F H J K L M NG M.7
8.1
CORRIDOR
C5-15
GENERAL OR 2
E525
ANESTHESIA WORKROOM
D518
STORAGE & SUBSTERILE
D517
STORAGE
D507A
SPECIAL OR NO 9 (ORTHO)
D507
PLASTER SPLI NT
D507B
SUB-STERILE
D505B
SPECIAL OR NO 8 (NEURO)
D505
PUMP ROOM
D516
OR
D503
SPECIAL OR NO 7 (CARDIAC)
D501
SUB-STERILE
D501A
STORAGE
D501B
SCRUB ALCOVE
C15-13F
SCRUB ALCOVE
C5-13C
SCRUB ALCOVE
C5-13A
STERILE SUPPLY
D525A
SCRUB ALCOVE
C5-13G
GENERAL OR 3
D524
GENERAL OR 4
D523
SUB-STERILE
D523A
GENERAL OR 5
D522
SUB STERILE
D521A
X-RAY EQUIPMENT
D521C
CONTROL ROOM
D521B
SPECIAL OR NO 6
(VASCULAR)
D521
STORAGE
D520
CLEAN & STERILE SUPPLY
D515
SCRUB ALCOVE
C5-13D
SCRUB ALCOVE
B1E.39
SCRUB ALCOVE
C5-13B
CLEAN CORE
B1E.40
CORRIDOR
C5-8
CORRIDOR
C5-10
CORRIDOR
C5-22
H.A.C.
E506
CLEAN LIFT
E504
BIO-MED OFFICE
E503
FEMALE LOCKER
E521B
STAFF LOUNGE
E505
ENTRY
E522
MALE LOCKER
E522A
FEMALE TOILET
E521c
ENTRY
E521
MALE TOILET
E522B
GENERAL OR 1
E508
SHOWER
B1E.38
CORRIDOR
C5-20
STAFF TOILET
E523
POST ANESTHESIA
RECOVERY ROOM
E520
STORAGE
E520H
CORRIDOR
C5-19
MECHANICAL EQUIPMENT
ROOM
E530
ELECTRICAL
E530B
OFFICE
E511
H.A.C.
E510
LOUNGE
E512
CORRIDOR
C5-23PATIENT TOILET
E502
CHECK IN
E500D
PRE-OP HOLDING
E500
STAFF WORK STATIONS
E500A
CORRIDOR
C5-10
WORKSPACE
D506
OFFICE
D506E
OFFICE
D513
STORAGE
D509
H.A.C.
D510
SOILED UTILITY
B1E.41
SOILED UTILITY
D512
CART LIFT (DIRTY)
CL-2
EXAM
D506D
STORAGE
D508
OFFICE
D506C
OFFICE
D506B
OFFICE
D506A
STORAGE
D502/D504
STORAGE
D500
SURGICAL PATH LIFT
E501
DW-1
MECHANICAL EQUIPMENT
ROOM
D530
ELECTRICAL
D530B
CORRIDOR
C5-8
CORRIDOR
C5-8
SUB STERILE
E525C
CONTROL ROOM
E525D
STERILE SUPPLY
E507A
EQUIP ROOM
E525B
SCRUB ALCOVE
C521A
SCRUB ALCOVE
C521B
3 3 3
3 3
6 6 6
6 6
7 7
7 7 7 7 7
1 1 1 1
GENERAL DEMOLITION NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
REFER TO SHEET GI000 FOR GENERAL NOTES.
UNLESS NOTED OTHERWISE, DRAWINGS AND NOTES REFER TO ARCHITECTURAL DEMOLITION. DEMOLITION CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION INFRASTRUCTURE TO BE REMOVED/ MODIFIED. SEE MEP DRAWINGS FOR REMOVAL WORK ASSOCIATED WITH THOSE TRADES.
ALL EXISTING STRUCTURAL ELEMENTS AND WALLS ARE TO REMAIN.
FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES.
ALL ITEMS INDICATED AS DASHED SHALL BE REMOVED. THIS INCLUDES ALL FINISHES, MATERIALS, AND ASSOCIATED FIXTURES NOT SPECIFICALLY CALLED OUT. CONTRACTOR SHALL COORDINATE ALL ASSOCIATED WORK BETWEEN ALL
TRADES.
HALF-TONED ITEMS INDICATE EXISTING CONSTRUCTION AND SHALL BE PROTECTED & REMAIN.
SHADED AREAS IN GREY ARE OUT OF SCOPE.
PREPARE WALLS AND FLOOR SLAB AS REQUIRED TO RECEIVE NEW FINISH MATERIALS WHERE EXISTING FINISH IS
INDICATED TO BE REMOVED.
OWNER TO REMOVE EQUIPMENT PRIOR TO START OF CONSTRUCTION IN EACH PHASE.
EXISTING CASEWORK TO REMAIN, TYP.
EXISITNG PLUMBING FIXTURES TO REMAIN, TYP.
EXISTING PARTITIONS AND BUILDING WALLS TO REMAIN, TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//A nn A rb or
V A
- F M
U pg ra de s/
FF
E_ An n Ar bo r -
F M
U pg ra de s_ B1
E (2
2)
.rv t
6/ 5/
:2
6:
P M
AD401
ENLARGED DEMOLITION PLAN
05/14/2025 SS KT
FACILITY MAINTENANCE
UPGRADES
506-22-207
ANN ARBOR, MICHIGAN
BID DOCUMENTS
1E
ANN ARBOR VA
MEDICAL
CENTER Approved: Veteran's Affairs Medical Center
1/8" = 1'-0"1 ENLARGED DEMOLITION PLAN AT OPERATION ROOMS
D R A W I N G N O T E S :
1 EXISTING DOOR AUTOMATIC OPERATOR AND PUSH BUTTONS TO REMAIN.
2 EXISTING FIRE EXTINGUISHER TO REMAIN, TYP.
3 REMOVE EXISTING WELDED SHEET FLOORING, INTEGRAL BASE, AND ALL ADHESIVE MATERIAL - PREPARE TO RECEIVE
NEW FLOORING AND BASE, TYP.
4 REMOVE RESINOUS FLOORING, INTEGRAL BASE, AND ADHESIVE MATERIAL - PREPARE TO RECEIVE NEW FLOORING AND
BASE, TYP.
5 EXISTING WALL PROTECTION TO REMAIN, TYP.
6 LINE INDICATES CUT LINE. FLOORING IN CLEAN CORE TO REMAIN
7 REMOVE EXISTING DOOR SLAB AND HARDWARE - EXISTING DOOR FRAME TO REMAIN - PREPARE EXISTING FRAME TO
RECEIVE NEW DOOR SLAB, HARDWARE AND FINISHES, TYP.
N
KEY PLAN
B1W - LIBERTY
B1E - FREEDOM
B28
INDEPENDENCE
B29 - EPS
B1W/B1E - CENTRAL
SCOPE OF WORK
No. Revisions: Date:
BID DOCUMENTS V.2 02/06/2025
1 ADDENDUM #1 06/05/2025
File details come from the government source that posted it. Updated .