Sheet AD401 - Add 01.pdf

PDF 467 KB Posted

Attached to
506-22-207 Facilities Maintenance Upgrades Federal contract opportunity
Solicitation number
36C25025B0027
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document is an Enlarged Demolition Plan (Sheet AD401) for the Ann Arbor VA Medical Center Facilities Maintenance Upgrades project. The architectural demolition plan details specific removal and preparation requirements for a surgical suite renovation, including:

Key demolition instructions include removing existing welded sheet flooring, resinous flooring, and adhesive materials, while preserving structural elements, walls, casework, plumbing fixtures, fire extinguishers, and door automatic operators. Specific notes indicate contractors must field verify mechanical, electrical, plumbing, and fire protection infrastructure to be removed or modified, coordinate work across disciplines, and prepare surfaces to receive new finishes. The plan covers multiple rooms including sterile supply areas, corridors, mechanical equipment rooms, control rooms, and staff facilities, with gray-shaded areas noted as out of scope for the renovation project.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E F H J K L M NG M.7

8.1

CORRIDOR

C5-15

GENERAL OR 2

E525

ANESTHESIA WORKROOM

D518

STORAGE & SUBSTERILE

D517

STORAGE

D507A

SPECIAL OR NO 9 (ORTHO)

D507

PLASTER SPLI NT

D507B

SUB-STERILE

D505B

SPECIAL OR NO 8 (NEURO)

D505

PUMP ROOM

D516

OR

D503

SPECIAL OR NO 7 (CARDIAC)

D501

SUB-STERILE

D501A

STORAGE

D501B

SCRUB ALCOVE

C15-13F

SCRUB ALCOVE

C5-13C

SCRUB ALCOVE

C5-13A

STERILE SUPPLY

D525A

SCRUB ALCOVE

C5-13G

GENERAL OR 3

D524

GENERAL OR 4

D523

SUB-STERILE

D523A

GENERAL OR 5

D522

SUB STERILE

D521A

X-RAY EQUIPMENT

D521C

CONTROL ROOM

D521B

SPECIAL OR NO 6

(VASCULAR)

D521

STORAGE

D520

CLEAN & STERILE SUPPLY

D515

SCRUB ALCOVE

C5-13D

SCRUB ALCOVE

B1E.39

SCRUB ALCOVE

C5-13B

CLEAN CORE

B1E.40

CORRIDOR

C5-8

CORRIDOR

C5-10

CORRIDOR

C5-22

H.A.C.

E506

CLEAN LIFT

E504

BIO-MED OFFICE

E503

FEMALE LOCKER

E521B

STAFF LOUNGE

E505

ENTRY

E522

MALE LOCKER

E522A

FEMALE TOILET

E521c

ENTRY

E521

MALE TOILET

E522B

GENERAL OR 1

E508

SHOWER

B1E.38

CORRIDOR

C5-20

STAFF TOILET

E523

POST ANESTHESIA

RECOVERY ROOM

E520

STORAGE

E520H

CORRIDOR

C5-19

MECHANICAL EQUIPMENT

ROOM

E530

ELECTRICAL

E530B

OFFICE

E511

H.A.C.

E510

LOUNGE

E512

CORRIDOR

C5-23PATIENT TOILET

E502

CHECK IN

E500D

PRE-OP HOLDING

E500

STAFF WORK STATIONS

E500A

CORRIDOR

C5-10

WORKSPACE

D506

OFFICE

D506E

OFFICE

D513

STORAGE

D509

H.A.C.

D510

SOILED UTILITY

B1E.41

SOILED UTILITY

D512

CART LIFT (DIRTY)

CL-2

EXAM

D506D

STORAGE

D508

OFFICE

D506C

OFFICE

D506B

OFFICE

D506A

STORAGE

D502/D504

STORAGE

D500

SURGICAL PATH LIFT

E501

DW-1

MECHANICAL EQUIPMENT

ROOM

D530

ELECTRICAL

D530B

CORRIDOR

C5-8

CORRIDOR

C5-8

SUB STERILE

E525C

CONTROL ROOM

E525D

STERILE SUPPLY

E507A

EQUIP ROOM

E525B

SCRUB ALCOVE

C521A

SCRUB ALCOVE

C521B

3 3 3

3 3

6 6 6

6 6

7 7

7 7 7 7 7

1 1 1 1

GENERAL DEMOLITION NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

REFER TO SHEET GI000 FOR GENERAL NOTES.

UNLESS NOTED OTHERWISE, DRAWINGS AND NOTES REFER TO ARCHITECTURAL DEMOLITION. DEMOLITION CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION INFRASTRUCTURE TO BE REMOVED/ MODIFIED. SEE MEP DRAWINGS FOR REMOVAL WORK ASSOCIATED WITH THOSE TRADES.

ALL EXISTING STRUCTURAL ELEMENTS AND WALLS ARE TO REMAIN.

FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES.

ALL ITEMS INDICATED AS DASHED SHALL BE REMOVED. THIS INCLUDES ALL FINISHES, MATERIALS, AND ASSOCIATED FIXTURES NOT SPECIFICALLY CALLED OUT. CONTRACTOR SHALL COORDINATE ALL ASSOCIATED WORK BETWEEN ALL

TRADES.

HALF-TONED ITEMS INDICATE EXISTING CONSTRUCTION AND SHALL BE PROTECTED & REMAIN.

SHADED AREAS IN GREY ARE OUT OF SCOPE.

PREPARE WALLS AND FLOOR SLAB AS REQUIRED TO RECEIVE NEW FINISH MATERIALS WHERE EXISTING FINISH IS

INDICATED TO BE REMOVED.

OWNER TO REMOVE EQUIPMENT PRIOR TO START OF CONSTRUCTION IN EACH PHASE.

EXISTING CASEWORK TO REMAIN, TYP.

EXISITNG PLUMBING FIXTURES TO REMAIN, TYP.

EXISTING PARTITIONS AND BUILDING WALLS TO REMAIN, TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Au to de sk

D oc s:

//A nn A rb or

V A

- F M

U pg ra de s/

FF

E_ An n Ar bo r -

F M

U pg ra de s_ B1

E (2

2)

.rv t

6/ 5/

:2

6:

P M

AD401

ENLARGED DEMOLITION PLAN

05/14/2025 SS KT

FACILITY MAINTENANCE

UPGRADES

506-22-207

ANN ARBOR, MICHIGAN

BID DOCUMENTS

1E

ANN ARBOR VA

MEDICAL

CENTER Approved: Veteran's Affairs Medical Center

1/8" = 1'-0"1 ENLARGED DEMOLITION PLAN AT OPERATION ROOMS

D R A W I N G N O T E S :

1 EXISTING DOOR AUTOMATIC OPERATOR AND PUSH BUTTONS TO REMAIN.

2 EXISTING FIRE EXTINGUISHER TO REMAIN, TYP.

3 REMOVE EXISTING WELDED SHEET FLOORING, INTEGRAL BASE, AND ALL ADHESIVE MATERIAL - PREPARE TO RECEIVE

NEW FLOORING AND BASE, TYP.

4 REMOVE RESINOUS FLOORING, INTEGRAL BASE, AND ADHESIVE MATERIAL - PREPARE TO RECEIVE NEW FLOORING AND

BASE, TYP.

5 EXISTING WALL PROTECTION TO REMAIN, TYP.

6 LINE INDICATES CUT LINE. FLOORING IN CLEAN CORE TO REMAIN

7 REMOVE EXISTING DOOR SLAB AND HARDWARE - EXISTING DOOR FRAME TO REMAIN - PREPARE EXISTING FRAME TO

RECEIVE NEW DOOR SLAB, HARDWARE AND FINISHES, TYP.

N

KEY PLAN

B1W - LIBERTY

B1E - FREEDOM

B28

INDEPENDENCE

B29 - EPS

B1W/B1E - CENTRAL

SCOPE OF WORK

No. Revisions: Date:

BID DOCUMENTS V.2 02/06/2025

1 ADDENDUM #1 06/05/2025

File details come from the government source that posted it. Updated .