S06 Drawings - Project 506-21-205 - updated.pdf
PDF 17 MB Posted
- Attached to
- Z1DA--Renovate 9th Floor East Wing 506-21-205
- Solicitation number
- 36C25022B0063
About this file
This pre-solicitation notice announces the Department of Veterans Affairs' intent to issue an invitation for bids for the renovation of the 9th floor east wing at the LTC Charles S Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The project involves furnishing all necessary labor, tools, materials, equipment and supervision to complete the renovation according to provided drawings and specifications. The estimated value is between $1 million and $2 million.
The solicitation is designated as a 100% set-aside for qualified Service-Disabled Veteran Owned Small Businesses. The North American Industry Classification code is 236220 for commercial and institutional building construction. The agency intends to award a firm fixed-price contract within 120 days of bid opening. Interested parties should monitor the Contract Opportunities website for the issuance of the invitation for bids around July 11, 2022, which will include additional details and dates.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT OFFICER REPRESENTATIVE DATE
CHIEF OF ENGINEERING DATE
INTERIOR DESIGNER DATE
DEPARTMENT HEAD DATE
CONTRACT SPECIALIST DATE LEAD USER SIGNATURE DATE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
VA Ann Arbor Healthcare
System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\d v a lla n d in g h a m \D o c u m e n ts
\1
.1
.1
A v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/7
/2
:2
:1
A
M
GI000
COVER SHEET
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE 9TH FLOOR (EAST
WING)
ANN ARBOR, MI 48105
506-21-205
BLDG 1W
06/07/2022 JLG TAA
BID DOCUMENTS
FULLY SPRINKLERED
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI101 LIFE SAFETY PLAN
GC101 INFECTION CONTROL/PHASING PLAN
HA101 HAZARDOUS MATERIAL REMOVAL PLAN
ARCHITECTURAL
AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AE002 WALL TYPES
AD101 NINTH FLOOR DEMOLITION PLAN
AE101 NINTH FLOOR DIMENSION FLOOR PLAN
AE102 NINTH FLOOR ARCHITECTURAL FLOOR PLAN
AE111 NINTH FLOOR REFLECTED CEILING PLAN
AE601 DOOR & WINDOW SCHEDULE
AI101 FINISH WALL TREATMENT & SIGNAGE PLAN
AI102 FINISH FLOOR TREATMENT PLAN
AI201 INTERIOR ENLARGED PLANS AND ELEVATIONS
AI501 CASEWORK AND INTERIOR FINISHES DETAILS
AI601 FINISH SCHEDULES AND SIGN TYPES
QH101 NINTH FLOOR EQUIPMENT PLAN
FIRE PROTECTION
F000 FIRE SUPPRESSION SYMBOLS AND ABBREVIATIONS
FXD101 NINTH FLOOR FIRE SUPPRESSION DEMOLITION PLAN
FX101 NINTH FLOOR FIRE SUPPRESSION PLAN
PLUMBING
P000 PLUMBING SYMBOLS, ABBREV., SCHEDULES, AND RISERS
PD101 EIGHTH AND NINTH FLOOR PLUMBING DEMOLITION PLANS
PP101 EIGHTH AND NINTH FLOOR PLUMBING PIPING PLANS
MECHANICAL
M000 MECHANICAL SYMBOLS AND ABBREVIATIONS
MD101 NINTH FLOOR MECHANICAL DEMOLITION PLAN
MH101 NINTH FLOOR MECHANICAL HVAC PLAN
MP101 EIGHTH, NINTH, AND PENTHOUSE FLOOR MECHANICAL PIPING
PLANS
MM600 MECHANICAL SCHEDULES AND DETAILS
MM700 MECHANICAL CONTROLS SYSTEMS
ELECTRICAL
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
EDL101 NINTH FLOOR LIGHTING DEMOLITION PLAN
EDP101 NINTH FLOOR POWER AND SYSTEMS DEMOLITION PLAN
EL101 NINTH FLOOR LIGHTING PLAN
EP101 NINTH FLOOR POWER PLAN
EP300 ELECTRICAL ENLARGED PLANS
EP500 ELECTRICAL DETAILS
EP600 ELECTRICAL SCHEDULES
EP601 LIGHT FIXTURE SCHEDULES
ET101 NINTH FLOOR TECHNOLOGY PLAN
ET500 TECHNOLOGY DETAILS
ET501 TECHNOLOGY DETAILS
AREA MAP
VICINITY MAP
CAMPUS MAP
PROJECT LOCATION
PROJECT LOCATION-
NINTH FLOOR
N
N
N
506-21-205
RENOVATE 9TH FLOOR (EAST WING)
BID DOCUMENTS
2215 FULLER ROAD, ANN ARBOR, MI 48105
LTC CHARLES S. KETTLES VAMC
Contact:Contact: Contact:
GUIDON DESIGN INC.
Chris Hawk
MEP Project Manager
MECHANICAL,
ELECTRICAL &
PLUMBING
LTC CHARLES S. KETTLES VAMC
Jonathan Otten
COR
2215 Fuller Road, Ann Arbor, MI 48105 p: (734) 845-3735 e: jonathan.otten@va.gov
OWNER
GUIDON DESIGN INC.
David Vallandingham
Project Manager / Architect
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 130 e: dvallandingham@guidondesign.com
ARCHITECT
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 167 e: chawk@guidondesign.com
Revisions: Date:
BUILDING CODE PROJECT ANAYLISIS
BUILDING ADDRESS 2215
Fuller Road, Ann Arbor, MI
48105
GOVERNING CODE
PROVISIONS
NFPA IBC 2018
HEALTHCARE FEDERAL
BUILDING INFORMATION NFPA 2018
IBC NFPA
BUILDING USE AND OCCUPANCY
CLASSIFICATION
GROUP B BUSINESS CH. 38 CH. 3
CONSTRUCTION TYPE TYPE II-B TYPE II CH. 18/20
BUILDING FULLY FIRE SPRINKLERD YES
ALLOWABLE ACTUAL 18.1.6.1
ALLOWABLE BUILDING HEIGHT
ABOVE GRADE
UL Exist 504.3
ALLOWABLE BUILDING STORIES UL 10 504.4
ALLOWABLE BUILDING AREA UL 1.2 milion 506.2
OCCUPANCY SEPARATION NO 508.4
SMOKE COMPARTMENT YES
CONSTRUCTION RATING OF
BUILDING ELEMENTS.
FIRE RESISTANT RATING
REQUIREMENTS FOR BUILDING
ELEMENTS (HOURS)
STRUCTURAL FRAME 0 HR FIRE RATING
BEARING WALLS - EXTERIOR 0 HR FIRE RATING
BEARING WALLS - INTERIOR 0 HR FIRE RATING
NON BEARING WALLS - EXTERIOR 0 HR FIRE RATING
NON BEARING WALLS - INTERIOR 0 HR FIRE RATING
FLOOR CONSTRUCTION 0 HR FIRE RATING
ROOF CONSTRUCTION 0 HR FIRE RATING
SHAFT ENCLOSURE RATING 2 HR FIRE RATING
EXTERIOR WALL (SEPARATION DISTANCE) 602
NORTH Existing to Remain
SOUTH Existing to Remain
EAST Existing to Remain
WEST Existing to Remain
MEANS OF EGRESS
IBC NFPA
EGRESS CORRIDOR RATINGS 0 HR FIRE RATING 0 HR FIRE RATING 1020.01
MEANS OF EGRESS - OCCUPANT
LOAD
7.3.1.2 1004.5
OCCUPANT LOAD 4719/150 = 32
EGRESS WIDTH 1005
EXIT STAIR WIDTH 32 X .3 = 9 7.3 1005.3.1
EXIT DOOR WIDTH 32 X .2 = 6 7.3 1005.3.2
MINIMUM NUMBER OF EXITS 1006
EXITS PER FLOOR 2
MIX OCCUPANCY EXITS 2
MIX OCCUPANCY EXITS 2
COMMON PATH OF TRAVEL 1006
OCCUPANT Distance 100' Distance 100'
EXIT ACCESS TRAVEL DISTANCE 1017.2
OCCUPANT Distance 250' Distance 250'
CORRIDORS
MINIMUM CORRIDOR WIDTH MIN. WIDTH=36" MIN. WIDTH=36" 18.2.3.4 1020.2
DEAD END CORRIDOR DISTANCE = 50' DISTANCE = 50' 1020.4
BUILDING CODES
GOVERNING BUIDLING CODES
NPFA, NATIONAL FIRE PROTECTION ASSOCIATION FULL LISTING OF CURRENT CODES, INCLUDING BUT
NOT LIMITED TO:
NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHER 2018
NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS 2019
NFPA 72 FIRE ALARM CODE
NFPA 70, NEC NATIONAL ELECTRICAL CODE
NFPA 80 STANDARD FOR FIRE DOORS AND FIRE WINDOWS
NFPA 99 HEALTHCARE FACILITIES CODE 2018 ED.
NPFA 101 LIFE SAFETY CODE 2018 ED.
NFPA 220 STANDARD ON TYPES OF BUILDING CONSTRUCTION
NFPA 241 STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION
OPERATIONS
ICC CODES, INTERNATIONAL CODE COUNCIL FULL LISTING OF CURRENT CODES, INCLUDING BUT NOT
LIMITED TO:
INTERNATIONAL BUILDING CODE, 2018 2018 ED.
INTERNATIONAL PLUMBING CODE, 2018 2018 ED.
INTERNATIONAL MECHANICAL CODE, 2018 2018 ED.
INTERNATIONAL FUEL GAS CODE, 2018 2018 ED.
INTERNATIONAL FIRE CODE, 2018 2018 ED.
INTERNATIONAL ENERGY AND CONSERVATION CODE , 2018 2018 ED.
ASHRAE STANDARDS, AS REFERENCED WITHIN OTHER CODES INCLUDING, BUT NOT LIMITED TO:
STANDARD 170-2017, VENTILATION OF HEALTHCARE FACILITIES
STANDARD 188-2018, LEGIONELLOSIS: RISK MANAGEMENT FOR BUILDING WATER SYSTEMS
ACCESSIBILITY CODES
ADAAG, ADA ACCESSIBILITY GUIDELINES
VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS
FGI, THE FACILITY GUIDELINES INSTITUTE
GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS 2018 ED.
GUIDELINES FOR DESIGN AND CONSTRUCTION OF OUTPATIENT FACILITIES 2018 ED.
BEHAVIORAL HEALTH DESIGN GUIDE 2019 ED.
SYSTEMS RELATING TO MAINTENANCE OF FACILITIES
OSHA, OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION STANDARDS.
CODES AND GUIDELINES REFERENCED WITHIN NFPA AND ICC CODES ARE TO ALSO BE FOLLOWED AND
APPLIED TO ALL DESIGN AND CONSTRUCTION. REFER TO VA MANUAL PG-18-3, SPECIFICATIONS FOR
ADDITIONAL CODES, STANDARDS, GUIDELINES AND REGULATIONS. CONTRACTOR IS RESPONSIBLE FOR
CONSTRUCTING WORK COMPLIANT WITH OSHA, OCCUPATIONAL, SAFETY AND HEALTH
ADMINISTRATION STANDARDS.
VA DESIGN MANUALS PG-18-10
ARCHITECTURAL
ASBESTOS ABATEMENT
ELECTRICAL
ELEVATORS
EQUIPMENT
ESTIMATING
FIRE PROTECTION
HVAC
INTERIOR DESIGN
LIGHTING DESIGN
PHYSICAL SECURITY
LIFE SAFETY PROTECTED FACILITIES
MISSION CRITICAL FACILITIES
APPENDIX AA, APPENDIX AB, APPENDIX AC, APPENDIX B
PLUMBING
SITE PARKING, SITE DEVELOPMENT, SITE APPENDIX
STEAM, HEATING, HOT WATER, AND OUTSIDE DISTRIBUTION SYSTEMS
VOLUME 1, VOLUME 2 & VOLUME 3
STRUCTURAL
A. ANCILLARY FACILITY
B. ENERGY CENTER
C. MEDICAL UNIT
D. NURSING HOME
E. PARKING STRUCTURE
F. REGIONAL OFFICE
G. SEISMIC RETROFIT
SUSTAINABILITY
TELECOMMUNICATIONS
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
CODE ANALYSIS LEGEND
93 SF
A940D
OFFICE
OFA07
92 SF
A940E
OFFICE
OFA07
115 SF
A940F
OFFICE
OFA07
123 SF
A940C
OFFICE
OFA07
208 SF
A940G
OFFICE
OFA07
252 SF
CORRIDOR
C-93
81 SF
A940B
OFFICE
OFA07
292 SF
A940A
OFFICE
OFA07
75 SF
A938
KITCHENETTE
OFA07
56 SF
ELECT
A924
180 SF
STAIR 5
A925
643 SF
CORRIDOR
C-92
446 SF
A937
OPEN OFFICE
OFA07
73 SF
A931A
OFFICE
OFA07
82 SF
A931B
OFFICE
OFA07
76 SF
A927
PRINTER
SL001
135 SF
A923
PUBLIC AFFAIRS
PHOTOS
MIST1
161 SF
SERVICE ELEVATOR
LOBBY
A920
103 SF
EQUIPMENT LIFT
161 SF
A936
OFFICE
OFA07
89 SF
A934
OFFICE
OFA07
93 SF
A932
OFFICE
OFA07
92 SF
A930
OFFICE
OFA07
123 SF
A928
OFFICE
OFA07
91 SF
A926
OFFICE
OFA07
92 SF
A922
OFFICE
OFA07
115 SF
A921A
COMM
TETR1
19 SF
A919
HAC
20 SF
A918
STOR
230 SF
STAIR 1
ST908
762 SF
WEST ELEVATOR
LOBBY
C903
EGRESS PATH DISTANCE = 61' - 0" EGRESS PATH DISTANCE = 87' - 3"
EXIT SEPARATION = 108' - 0"
4719 SF
15032
B
EXIT
EXIT
DIAGONAL DISTANCE = 140' - 6"
FEC
FEC
FEC
SHADE INDICATES AREA
NOT IN SCOPE, TYP.
PROJECT LOCATION
NINTH FLOOR
KEY PLAN
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
VA Ann Arbor Healthcare
System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\d v a lla n d in g h a m \D o c u m e n ts
\1
.1
.1
A v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/7
/2
:2
:2
A
M
GI101
LIFE SAFETY PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE 9TH FLOOR (EAST
WING)
ANN ARBOR, MI 48105
506-21-205
BLDG 1W
06/07/2022 JLG DV
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"GI101
2 NINTH FLOOR LIFE SAFETY PLAN
N
UPUP
UP
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: D
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: TYPE IV DURING ABATEMENT ACTIVITES
TYPE III DURING NORMAL CONSTRUCTION
1. PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GI101.
2. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH
KEYED LOCK ACCESS. REFER TO ELEVATION 3/GI101.
3. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION AT ELEVATOR LOBBY FLOORING RENOVATION. REFER TO
SPECIFICATION FOR ADDITIONAL INFORMATION.
4. FLOORING WILL NEED TO BE TRANSITIONED AT THIS POINT ONCE
CONSTRUCTION BARRIER IS REMOVED.
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 01 35 26.
B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
C. PROJECT SHALL BE COMPLETED IN TWO PHASES.
D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED. CONTRACTOR TO PROVIDE NEGATIVE
AIR PRESSURE RELATIONSHIP TO SPACES OUTSIDE OF PROJECT AREA.
F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
G. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED
IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED
AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE GENERAL REQUIREMENTS
SPECIFICATION FOR HOURS OF OPERATION.
I. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
J. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION AND CONSTRUCTION AREA ACCESS. MAT SHALL BE REPLACED OR
CLEANED AS NECESSARY
K. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION AND CONSTRUCTION AREA ACCESS.
L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
P. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
INFECTION CONTROL PLAN NOTES
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL CONSTRUCTION MATRIX
CONSTRUCTION PROJECT TYPE
TYPE A TYPE B TYPE C TYPE DPATIENT RISK GROUP
I II II III/IVLOW RISK GROUP
I II III IVMEDIUM RISK GROUP
I II III/IV IVHIGH RISK GROUP
II III/IV III/IV IVHIGHEST RISK GROUP
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS DOORS
REFERENCE AREA FOR ABOVE CEILING
WORK ON FLOOR BELOW.
RE: ENGINEERING DRAWINGS FOR FULL
SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
INFECTION CONTROL LEGEND
CONTINUOUS FIRESAFE SEALANT
TOP AND BOTTOM, & BOTH SIDES
3 1/2" SOUND ATTENUATION BATT.
5/8" TYPE X GYPSUM BOARD, BOTH SIDES
3 5/8" METAL STUD @ 16" O.C. WITH
RUNNER CHANNELS ALONG TOP
AND BOTTOM
CONSTRUCTION
SIDE
PUBLIC
SIDE
6 MIL. FIRE RETARDANT VISQUEEN
MEMBRANE. CONTINUOUSLY ADHERE
TO THE STRUCTURAL DECK ABOVE AND
TO THE FLOOR BELOW WITH TAPE.
UNDERSIDE OF STRUCTURAL DECK
UL LISTING: U465
COORDINATE WITH EXISTING CEILING
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY
AND FRAME WITH SEALS, KEYED LOCK,
HARDWARE AND CLOSER
HAND SANITIZER
SEAL ALL EDGES WITH TAPE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE FOR
REQUIRED CONDITION TO STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
NEGATIVE PRESSURE GUAGE
H J Kl L N O P Q R S
92 SF
OFFICE
A922
91 SF
OFFICE
A926
123 SF
OFFICE
A928
92 SF
OFFICE
A930
93 SF
OFFICE
A932
89 SF
OFFICE
A934
161 SF
OFFICE
A936
75 SF
KITCHENETTE
A938
292 SF
OFFICE
A940A
81 SF
OFFICE
A940B
93 SF
OFFICE
A940D
92 SF
OFFICE
A940E
115 SF
OFFICE
A940F
123 SF
OFFICE
A940C
208 SF
OFFICE
A940G
180 SF
STAIR 5
A925
56 SF
ELECT
A924
446 SF
OPEN OFFICE
A937
73 SF
OFFICE
A931A
82 SF
OFFICE
A931B
76 SF
PRINTER
A927
115 SF
COMM
A921A
103 SF
EQUIPMENT LIFT
161 SF
SERVICE ELEVATOR
LOBBY
A920
135 SF
PUBLIC AFFAIRS
PHOTOS
A923
643 SF
CORRIDOR
C-92
252 SF
CORRIDOR
C-93
261 SF
SAS
PROGRAMMERS
A901
352 SF
CHIEF OF STAFF
A902A
1518 SF
SECRETARIAL
SUPPORT AND
WAITING
A902C
20 SF
STOR
A918
19 SF
HAC
A919
762 SF
WEST ELEVATOR
LOBBY
C903
230 SF
STAIR 1
ST908
172 SF
MALE TOILET
A909B
136 SF
FEMALE TOILET
A909A
663 SF
CONFERENCE
A917
394 SF
ELEVATORS
16 SF
ELECT
A903
390 SF
OPEN OFFICE
A931
70 SF
ELECT
A910A
M
4 3
CONTRACTOR
ACCESS DURING
CONSTRUCTION
SHADE INDICATES AREA
NOT IN SCOPE, TYP.
PROJECT LOCATION
NINTH FLOOR
KEY PLAN
N
EXISTING GWB TO REMAIN -
CONTRACTOR TO INSPECT
FOR DAMAGES/
PENETRATIONS AND REPAIR/
SEAL PENETRATIONS AS
REQUIRED
E
X
IS
T
IN
G G
W B
V
IF
/8
G W
B I
N F
IL
L
V
IF
HOSPITAL AREA
(NON CONSTRUCTION SIDE)
TOOL
TOOLS THAT CREATE
DUST WHEN USED MUST
BE TYPE THAT CONNECT
DIRECTLY TO SHOP VAC
HOSE
HEPA
SHOP
VAC
NEG. AIR
MACHINE
AIR
FLOW
OUT TO
WINDOW
REMOVE LIGHT OR
ACCESS PANEL &
SEAL AROUND
DUCT TO MAINTAIN
PRESSURE
DIFFERENTIAL
IN
F
E C
T
IO
N C
O N
T R
O L
T E
M P
O R
A R
Y B
A R
R
IE
R P
E R
PHASE 1:
THIS PHASE ENCOMPASSES THE MAJORITY OF
THE CONSTRUCTION WITHIN THE SCOPE
BOUNDARY. ALL CONSTRUCTION WITHIN THIS
AREA TO BE COMPLETED PRIOR TO BEGINNING
PHASE 2.
DURING PHASE 1: AFTER THE CEILING IS
DEMOLISHED AND BEFORE IT IS REPLACED, THE
CONTRACTOR SHALL PROVIDE ACCESS TO THE
PROJECT SITE TO THE GOVERNMENT. THE
GOVERNMENT WILL REPLACE AND RE-ROUTE THE
WATER 5-INCH COLD WATER MAIN, 3-INCH HOT
WATER MAIN, AND VARIOUS SECTIONS OF MINOR
BRANCH PIPING WITHIN PROJECT
AREA. CONTRACTOR SHALL ASSUME TIE-INS
SHOWN WITHIN THEIR SCOPE OF WORK WILL NOT
CHANGE IN DIAMETER OR LOCATION WITH THE
PIPE RE-ROUTING PERFORMED BY THE
GOVERNMENT. CONTRACTOR SHALL SCHEDULE
THEIR WORK WITH THE GOVERNMENT TO
MINIMIZE THE NUMBER OF SHUTDOWNS TO THE
WATER SYSTEM. CONTRACTOR SHALL ASSUME
THE GOVERNMENT WILL PERFORM THEIR WORK
CONCURRENT WITH THE CONTRACTOR’S
OPERATIONS.
PHASE 2:
THIS PHASE INCLUDES THE FLOORING WORK IN
THE WEST ELEVATOR LOBBY C903 AND THE
CORRIDOR BETWEEN THE WEST AND EAST
WINGS OF THE 9TH FLOOR. THIS WORK IS TO BE
COMPLETED OVER A PAIR OF WEEKENDS OR
AFTER BUSINESS HOURS. CONTRACTOR TO
COORDINATE TIMING OF WORK WITH COR. AT
END OF EACH DAYS WORK, CONTRACTOR TO
THOROUGHLY CLEAN WORK AREA AS THESE
CORRIDORS SHALL REMAIN FULLY OPERATIONAL
DURING NORMAL BUSINESS HOURS.
CONTRACTOR TO COORDINATE THE TIMING OF
THIS WORK WITH COR PRIOR TO BEGINNING THIS
PHASE. SEE AI102 FOR MORE INFORMATION.
PHASING LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
VA Ann Arbor Healthcare
System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\d v a lla n d in g h a m \D o c u m e n ts
\1
.1
.1
A v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/1
/2
:5
:5
A
M
GC101
INFECTION CONTROL/PHASING
PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE 9TH FLOOR (EAST
WING)
ANN ARBOR, MI 48105
506-21-205
BLDG 1W
06/07/2022 JLG DV
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1 1/2" = 1'-0"GC101
2 TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION NFPA 241
SCALE: 1/4" = 1'-0"GC101
3 TEMPORARY WALL CONSTRUCTION ELEVATION
SCALE: 1/8" = 1'-0"GC101
1 NINTH FLOOR INFECTION CONTROL PLAN
N
SCALE: 3/4" = 1'-0"GC101
4 DETAIL - EXTEND EXISTING PARTITION FOR CONSTRUCTION
AREA FOR REMOVAL OF ASBESTOS CONTAINING PIPE
INSULATION AND PIPE FITTINGS. 2 INCH PIPING WITH 2 INCH
THICK INSULATION. AREA FOR REMOVAL OF GLUE PODS ON 1'
X 1' CEILING TILE. ASSUME APPROXIMATELY 250 SQUARE
FEET.
AREA FOR REMOVAL OF ASBESTOS CONTAINING FLOOR
TILE AND MASTIC
A. HAZMAT REMOVAL NOTES APPLY TO ENTIRE ROOMS. CONTRACTOR SHALL
IDENTIFY ALL MATERIALS DESCRIBED BY NOTE IN EACH ROOM AND
REMOVE ACCORDING TO SAFETY STANDARDS. REFERENCE SPECIFICATION
02 82 11.
B. ALL HAZARDOUS MATERIALS SHALL BE REMOVED IN COMPLIANCE WITH
APPLICABLE CODES AND LAWS.
C. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE HAZARD(S) AND LEVEL
OF PROTECTION REQUIRED FOR ALL EMPLOYEES OR SUBCONTRACTORS
TO COMPLETE THE CONSTRUCTION WORK.
D. PROVIDE ABATEMENT OF VCT AND FLOORING MASTIC WITHIN HATCHED
AREA.
E. REFER TO SPECIFICATION AND ATTACHMENTS FOR ADDITIONAL
INFORMATION.
F. BASED ON THE DATE OF THE EXISTING CONSTRUCTION IT IS ASSUMED
LEAD PAINT IS WITHIN THE PROJECT AREA. CONDUCT DEMOLITION OF THE
EXISTING SPACE WITH THE ASSUMPTION OF LEAD PAINT ON EXPOSED
PLASTER WALLS AND PAINTED SURFACES. REFER TO SPECIFICATION
SECTION 02 83 33.13 LEAD-BASED PAINT REMOVAL, DISPOSAL AND FOR
ADDITIONAL INFORMATION.
G. BASED ON THE DATE OF THE EXISTING CONSTRUCTION AND
UNDERSTANDING OF THE FACILITY, LEAD PAINT IS WITHIN THE PROJECT
AREA. THIS PROJECT SCOPE HAS NO SIGNIFICANT DEMOLITION. DO NOT
PROVIDE LEAD PAINT ABATEMENT. PROVIDE LEAD PAINT SURFACE
STABILIZATION WHERE WORK IS DONE. CONTRACTOR TO USE MEASURES
FOR PROTECTION AND TO MINIMIZE PAINT DEBRIS.
H. CONTRACTOR TO SUBMIT LEAD SURFACES STABILIZATION PLAN AND
PROCEDURES PRIOR TO COMMENCING WORK. SUBMITTAL SHALL BE IN
ACCORDANCE WITH SPECIFICATIONS.
I. ALL ASBESTOS CONTAINING MATERIAL ABOVE CEILING TO BE REMOVED
WITHIN PROJECT BOUNDARY.
J. ALL WINDOW SILLS CONTAIN LEAD BASED MATERIALS AND WILL REQUIRE
ABATEMENT.
HAZARDOUS MATERIAL REMOVAL GENERAL NOTES
HAZARDOUS MATERIAL REMOVAL LEGEND
AREA FOR REMOVAL OF ASBESTOS CONTAINING PIPE
INSULATION AND PIPE FITTINGS. APPROXIMATELY 700
LINEAR FEET OF 2 INCH PIPING WITH 2 INCH THICK
INSULATION.
AREA FOR REMOVAL OF ASBESTOS CONTAINING FLOOR
TILE AND MASTIC. AREA FOR REMOVAL OF ASBESTOS
CONTAINING PIPE INSULATION AND PIPE FITTINGS. 2 INCH
PIPING WITH 2 INCH THICK INSULATION. ASSUME
APPROXIMATELY 1,000 SQUARE FEET.
H J Kl L N O P Q R S
M
UNION
A926A
STAIR 5
A925
OFFICE
A926B
COMPLIANCE
A927
VCC
A928
ELEC
A924
OFFICE
A923
OFFICE
A922A
OFFICE
A922
OFFICE
A929
COPY
ROOM
A930
OFFICE
A931
OFFICE
A932
OFFICE
A902A OFFICE
A901
OFFICE
A937
OFFICE
A936
OFFICE
A935
OFFICE
A934
OFFICE
A933
STAIR 1
A908
RECEPTION
A902C
ELEC
A903
MENS
TOILET
A909
WOMENS
TOILET
A910
ELEC
A910A
OFFICE
A921
LIBRARY
B901
DATA
A921A
H.A.C.
A919
STORAGE
A918
SERVICE
ELEVATOR
LOBBY
C9-4
CONFERENCE
A917
WEST
ELEVATOR
LOBBY
C9-03
CORRIDOR
C9-02
DATA
929A
CORRIDOR
A926
OFFICE
A926C
STORAGE
A926D
SCRPT
STAFF
A926A
FEC
A924A
LIFT
XXX
MECH
A905
TRAINING
B902
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
VA Ann Arbor Healthcare
System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\d v a lla n d in g h a m \D o c u m e n ts
\1
.1
.1
A v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/7
/2
:2
:2
A
M
HA101
HAZARDOUS MATERIAL REMOVAL
PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE 9TH FLOOR (EAST
WING)
ANN ARBOR, MI 48105
506-21-205
BLDG 1W
06/07/2022 JLG DV
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"HA101
1 NINTH FLOOR ABATEMENT PLAN
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
N
NORTH ARROW
HVAC RETURN AIR GRILLE
HVAC SUPPLY DIFFUSER
EXIT LIGHTING
SP
SD
SPEAKER
SMOKE DETECTOR
LED RECESSED LIGHT FIXTURE
A 9'-0"
CEILING TAG CEILING TYPE
FINISHED CEILING HEIGHT
REFER TO CEILING LEGEND FOR MORE
INFORMATION
EXTENT OF REVISION
REVISION SET
MECH/ELEC ITEMS: REFER TO MEP SHEETS AS APPLICABLE
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
A/C AIR CONDITION
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANT ANTENNA
APPD APPROVED
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ATCH ATTACHMENT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVG AVERAGE
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
BAT BATTEN
BD BOARD
BEV BEVEL
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BM BEAM OR BENCHMARK
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL OR CHANNEL CELSIUS
C CONC CAST CONCRETE
C TO C CENTER TO CENTER
CAB CABINET
CB CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS
CHEM CHEMICAL
CHFR CHAMFER
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CLEANOUT
CO₂ CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CS CAST CONCRETE STONE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
N NORTH
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEG NEGATIVE
NEUT NEUTRAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OD OUTSIDE DIAMETER OR OUTSIDE DIMENSION
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHANG
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OUTSIDE RADIUS
ORD ORDNANCE OR OVERFLOW ROOF DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OUT OUTLET
OZ OUNCE
PAR PARALLEL OR PARAPET
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR PORTLAND CEMENT
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PLATE, PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION OR REFRIGERATION
REFRACTORY
REG REGISTER
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWL RAIN WATER LEADER
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR WATER CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL HUNG
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WLD WELDED
WM WIRE MESH
WP WATERPROOFING
WPD WATER PRESSURE DROP
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)
YD YARD
YR YEAR
1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®
SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION
MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL
DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,
SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES
MANAGEMENT.
2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE
CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE
NATIONAL CAD STANDARD AS GUIDES.
3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.
CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER
QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY
THE BID DUE DATE.
4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH
OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED
WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY,
ACCESS CONTROL, ETC.
5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT
LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK
AND ACCESS TO EXISTING UTILITIES FOR TIE IN.
6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING
BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC
MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR
VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH
THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS
AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,
ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION
REQUIREMENTS.
7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF
WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE
FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK
THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF
WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY
CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.
8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR
UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,
GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.
9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING
AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING
CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING
PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED
METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.
10. MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS SHOW
INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL
CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING
AND ELECTRICAL EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND
STRUCTURAL DETAILING OF SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.
11. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT
IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW
CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED
CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY
ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR
MISSING DIMENSIONS.
12. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL
ORIENTATION AND CONTEXT ONLY.
13. THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
14. ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW
STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN
GRID LINES UNLESS NOTED OTHERWISE.
15. FLOOR ELEVATION 100’-0” IS EQUAL TO THE FINISH FLOOR SLAB OF THE EXISTING
SLAB FLOOR CONSTRUCTION UNLESS OTHERWISE NOTED.
16. ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.
17. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS
“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE
DETAIL, AREA, OR ITEM REFERENCED.
18. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,
INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.
19. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS
AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL
DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.
20. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND
EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF
DELIVERY AND ROUGH-IN.
21. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY
CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.
22. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE
FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND
HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL
UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO
UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE
OWNER.
24. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING
REQUIRED DURING CONSTRUCTION.
25. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT
CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE
CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE
CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO
COST TO THE OWNER.
26. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER
QUALITY OF WORK SHALL BE PROVIDED.
27. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING HARDWARE,
ACCESS CONTROL AND AUTOMATIC OPERATORS ARE PROVIDED WITH COMPLETE
AND COMPATIBLE SYSTEMS REQUIRED FOR THEIR OPERATION. REFER TO DOOR
HARDWARE SCHEDULE, HARDWARE SPECIFICATIONS, AUTOMATIC OPERATOR
SPECIFICATIONS, ACCESS CONTROL SPECIFICATIONS AND ELECTRICAL DRAWINGS.
28. CONTRACTOR IS RESPONSIBLE FOR HOSTING SUBMITTAL EXCHANGE FOR THE
DURATION OF THE CONSTRUCTION PERIOD OF PERFORMANCE. AT THE COMPLETION
OF THE PROJECT, PROVIDE A DIGITAL COPY OF ALL DOCUMENTS ON SUBMITTAL
EXCHANGE TO VA.
D DEPTH OR PENNY (NAIL)
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM OR DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOZ DOZEN
DN DOWN
DR DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
E EAST
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
ETS EXPOSE TO STRUCTURE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FH FLAT HEAD OR FLAT HEAD SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIP FILLER PANEL
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLUOR FLUORESCENT
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT, OR FRAME
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER OR FIBERGLASS
REINFORCED PLASTIC
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FWC FABRIC WALLCOVERING
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED CONCRETE
GFRG GLASS-FIBER-REINFORCED GYPSUM
GFRP GLASS-FIBER-REINFORCED PLASTIC
GI GALVANIZED IRON
GL GLASS
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GWB GYPSUM WALL BOARD
GYP GYPSUM
H HIGH
H PLAM HIGH PRESSURE PLASTIC LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HM HECTOMETER OR HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND FRAME
HMF HOLLOW METAL FRAME
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR HORSEPOWER
HS HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE DIAMETER
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE ASSEMBLY
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
J-BOX JUNCTION BOX
JT JOINT
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L ANGLE
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE OR LEFT HAND REVERSE
LATENT HEAT RATIO
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKWASH LOCKWASHER
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING CONCRETE
LYR LAYER
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM OR MEDIUM MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S RECOMMENDATION
MGT MANAGEMENT
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM MINUTE OR MINUTE MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
X
X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
ELEVATION REFERENCES
NEW WALL
WALL TO BE
REMOVED
S3A.G
INDICATES STRUCTURAL MATERIAL
INDICATES NOMINAL SIZE
INDICATES STRUCTURE AND FINISH HEIGHTS
INDICATES QUALIFER
EXISTING WALL TO
REMAIN
TEMPORARY IC
BARRIER WALL
CONSTRUCTION
ROOM
ROOM TAG
NEW DOOR
EXISTING DOOR
DEMOLISHED DOOR
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID CORE
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE DETECTOR OR SOAP
DISPENSER
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHT SHEET
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
S SOUTH
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR SERVICE SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIF STIFFENER
STL STEEL
STL LNTL STEEL LINTEL
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STNLS STAINLESS
STOR STORAGE
STRUCT STRUCTURAL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPEND
SV SHEET VINYL
SW SWITCH
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
TA TOILET ACCESSORY
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL OR TEMPERATURE
CONTROL PANEL OR TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TN TRUE NORTH
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TRANS TRANSOM
TRANS WD FIN TRANSPARENT WOOD FINISH
TRTD TREATED
TS TENSILE STRENGTH OR TUBE STEEL
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UC UNDERCUT
UL UNDERWRITERS LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V VOLT
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE OR VITRIFIED CLAY TILE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFAT VINYL FACED ACOUSTICAL TILE
VIC VICINITY
VIF VERIFY IN FIELD
VNR VENEER
VOC VOLATILE ORGANIC COMPOUND
VOL VOLUME
VOLT VOLTAGE
VP VENEER PLASTER
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
REVISION TO PLAN CALLOUT
WALLS
DOOR TAG
KEY NOTE TAGS
WALL TAG : REFER TO WALL LEGEND FOR MORE INFORMATION
DOORS
PT-1
A
FINISH INDICATION
FRAME / WINDOW
1 PLAN NOTE
1 DEMOLITION NOTE
KEY NOTE SYMBOLS
CONSTRUCTION GENERAL NOTESARCHITECTURAL SYMBOLS
REFLECTED CEILING PLAN SYMBOLS
ARCHITECTURAL ABBREVIATIONS
HVAC EXHAUST DUCT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
VA Ann Arbor Healthcare
System
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\d v a lla n d in g h a m \D o c u m e n ts
\1
.1
.1
A v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/7
/2
:2
:5
A
M
AE001
ARCHITECTURAL SYMBOLS AND
ABBREVIATIONSGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE 9TH FLOOR (EAST
WING)
ANN ARBOR, MI 48105
506-21-205
BLDG 1W
06/07/2022 JLG TAA
BID DOCUMENTS
FULLY SPRINKLERED
A. ALL WALLS WILL BE WALL TYPS S3A.Gi UNLESS OTHERWISE NOTED.
B. ALL WALL TYPE INDICATORS REFER TO THIS SHEET UNLESS OTHERWISE
NOTED.
C. REFER TO DIMENSION PLANS FOR PARTITION TYPE LOCATIONS.
PARTITIONS ARE DISTINGUISHED ON PLANS BY SYMBOL DESIGNATION
GRAPHIC DESIGNATION, OR A COMBINATION OF BOTH. NOT ALL
PARTITIONS ON THIS SHEET MAY BE USED. REFER TO PARTITION TYPE
SCHEDULE ON THIS SHEET FOR PARTITIONS USED ON THIS PROJECT.
D. ALL DIMENSIONS ARE FROM FACE OF STUD TO FACE OF STUD, OR TO FACE
OF BLOCK. REFER TO PARTITION TYPE FOR PARTITION WIDTH
DIMENSIONS.
E. ALL WALLS TO BE 16" O.C. UNLESS OTHERWISE NOTED.
F. REFER TO SPECIFICATIONS AND TO TABLE ON THIS SHEET FOR MINIMUM
STUD GAUGE, MAXIMUM SPACING AND ALLOWABLE LIMITING HEIGHT
DEFLECTION CRITERIA FOR GYPSUM BOARD ASSEMBLIES AND REQUIRED
FINISHES. FOR WALLS WHERE STUDS ARE ATTACHED TO STRUCTURE
ABOVE, PROVIDE CROSS BRACING AS NECESSARY MEETING THE CRITERIA
INDICATED TO ACCOMMODATE THE SPECIFIED DEFLECTION CRITERIA OF
THE WALL.
G. ALL INTERIOR NON-BEARING STUDS TO BE DESIGNED FOR A DEFLECTION
EQUAL TO BUT NOT GREATER THAN L/240, UNLESS FULL HEIGHT FINISH IS
DETERMINED TO BE FRAGILE OR BRITTLE, THEN DEFLECTION TO BE L/360.
EXAMPLES OF FRAGILE FINISHES WOULD INCLUDE BUT NOT LIMITED TO
ANY TYPE OF WALL TILE, PLASTER OR PLASTER SKIM COAT.
H. ALTHOUGH WALL STUD SIZES ARE LISTED ON PLANS AND WALL TYPE IN
AREAS WHERE STUDS ARE TO STRUCTURE ABOVE OR HIGH AREAS,
CONTRACTOR TO VERIFY SIZED INDICATED IS ADEQUATE FOR HEIGHT
LISTED. PROVIDE ADEQUATE SIZE STELL STUD FRAMING AND NOTIFY
ARCHITECT OF ANY DISCREPANCY PRIOR TO FABRICATION OR
INSTALLATION.
I. KING STUDS AT DOOR FRAMES TO BE 18 GA. UNLESS OTHERWISE NOTED.
J. PROVIDE 5/8" TYPE "X" GYPSUM WALLBOARD FOR ALL OTHER WALL
CONSTRUCTION, UNLESS OTHERWISE NOTED.
K. PROVIDE 5/8" TYPE "X" GYPSUM WALLBOARD IN BULKHEAD CONSTRUCTION.
L. REFER TO LIFE SAFETY PLANS FOR LOCATOINS AND RATINGS OF SMOKE
AND FIRE RATED PARTITIONS. REFERENCE TEST NUMBERS APPLY ONLY TO
PARTITIONS INDICATED TO BE RATED.
M. FIRE RATING TEST NUMBERS ARE FOR UNDERWRITER'S LABORATORIES
(UL) ASSEMBLIES UNLESS OTHERWISE NOTED.
N. FIRE RESISTANT RATED PARTITIONS SHALL EXTEND TO THE INSIDE FACE
OF EXTERIOR SHEATHING, INCLUDING EXTENSIONS THROUGH SOFFITS.
O. SEAL ALL OPENINGS, GAPS, PENETRATIONS, AND JOINTS IN PARTITIONS
TYPES AS FOLLOWS:
a. FIRE RATED PARTITIONS: SEAL IN ACCORDANCE WITH THE
REQUIREMENTS SPECIFIED FOR THROUGH PENETRATION
FIRESTOP SYSTEMS AND FIRE RESISTIVE JOINT SYSTEMS.
b. SMOKE TIGHT PARTITIONS: SEAL COMPLETELY WITH
ELASTOMERIC SEALANT. FOR THE LOCATION AND EXTENT OF
PARTITIONS, DESIGNATED AS "SMOKE TIGHT", REFER TO THE LIFE
SAFETY DRAWINGS.
c. ALL OTHER LOCATIONS: SEAL AS INDICATED AND REQUIRED
ELSEWHERE BY THE CONTRACT DOCUMENTS.
P. INSULATION HEAD CONDITIONS AT FLOOR / ROOF DECK:
a. FIRE RESISTANT RATED PARTITIONS SHALL USE MINERAL WOOL
INSULATION AND APPROPRIATE FIRE RATED SEALANT.
b. NON-RATED PARTITIONS REQUIRING SOUND ATTENUATION SHALL
USE SOUND ATTENUATION BATTS (SAB).
Q. PROVIDE STENCILED IDENTIFICATION FOR RATED PARTITIONS.
R. STC RATING APPLIES WHERE PARTION TAG QUALIFIER INDICATES WITH AN
"i". PROVIDE SOUND ATTENUATION BATTS OF THICKNESS INDICATED ON
SCHEDULE WHERE INDICATED BY QUALIFIER.
S. FOR PARTITIONS WITH STC RATINGS INDICATED SOUND ATTENUATION
BATTS TO EXTEND FULL HEIGHT OF PARTITION UNLESS OTHERWISE
NOTED. FLOOR TRACK TO BE SET IN A CONTINUOUS BED OF SEALANT.
T. WHERE PARTITION TYPE INDICATES SOUND ACOUSTICAL BAT, WITH FINISH
BOARD GOING TO DECK ON ONE SIDE ONLY, PROVIDE VAPOR BARRIER TO
SECURE INSULATION IN PLACE.
U. PROVIDE 5/8" MOISTURE/MOLD RESISTANT GYPSUM BOARD IN SOILED
ROOMS, BATHROOMS, TOILET ROOMS, ON WALLS BEHIND PLUMBING
FIXTURES, AND IN ALL WET LOCATIONS EXCEPT IN SHOWER AREA.
V. PROVIDE 5/8" CEMENTITIOUS BACKER BOARD BEHIND CERAMIC WALL TILE &
SHOWER AREA. COORDINATE LOCATIONS WITH FINISH WALL PLANS.
W. PROVIDE CORNER AND END WALL FRAMING AS DETAILED ON 3/AE002.
X. PROVIDE BLOCKING AT EVERY NEW WALL FROM 2'-6" CENTERED AFF TO
7'-0" CENTERED AFF. SEE DETAIL 4/AE002 FOR MORE INFORMATION.
WALL TYPES LEGEND AND GENERAL NOTES
X#X.#
INDICATES STRUCTURAL MATERIAL
CH = SHAFT WALL
F = FURRING
S = STEEL
M = MASONRY
W = WOOD
INDICATES NOMINAL SIZE
INDICATES STRUCTURE AND
FINISH HEIGHTS
QUALIFIER'S (X-X-X)
G GYPSUM BOARD FINISH
1SB 1 HR RATED SMOKE BARRIER
2SB 2 HR RATED SMOKE BARRIER
1F 1 HR FIRE RATED
2F 2 HR FIRE RATED
i SOUND INSULATION t THERMAL INSULATION
B BULLET RESISTANT
L LEAD LINED
M MESH (STEEL SECURITY MESH)
MR MOIST/MOLD RESISTANT GYPSUM
SP SMOKE PARTITION
TB TILE BACKER CEMENT BOARD
A = STRUCTURE TO DECK, FINISH TO DECK
B = STRUCTURE TO DECK, FINISH ONE SIDE TO DECK
C = STRUCTURE TO DECK, FINISH TO ABOVE CEILING
D = STRUCTURE TO ABOVE CEILING, FINISH TO ABOVE CEILING
P = PARTIAL HEIGHT WALL
U = STRUCTURE TO UNDERSIDE OF CELING, FINISH TO UNDERSIDE OF CEILING
*SEE WALL TYPES FOR PROJECT SPECIFIC CONSTRUCTION
CH
2 1/2" 4" 6"
F 7/8
1 1/2" 2 1/2" 3 5/8"
4" 6" 8" 12"
S
2 1/2" 3 5/8"
4" 6" 8" 12"
M
2 5/8" 3 5/8" 5 5/8" 7 5/8" 11 5/8"
W
3/4"
3 1/2"
5 1/2" 7 1/4" 11 1/4"
" 1 HR FIRE/SMOKE
10'-0" MAX 10'-0" MAX
A. LETTERED STENCILS SHALL BE APPLIED TO EACH SIDE OF RATED PARTITIONS
AT 10'-0" INTERVALS; BUT NO LESS THAN ONCE PER PARTITION LENGTH.
B. USE THE FOLLOWING LANGUAGE FOR STENCILS:
"1 HR FIRE/SMOKE" "1 HR FIRE"
"2 HR FIRE/SMOKE" "2 HR FIRE"
"LIMIT TRANSFER OF SMOKE"
PERMANENT RED PAINT
LETTERING, TYP.
CEILING LINE
STENCILING NOTES
WALL TAG LEGEND
F2D.G 2 1/2"
WALL TAG
STRUCTURAL
SIZE
FINISH DIM FIRE RATING UL DESIGN
MIN STC
RATING
3 1/8" NA NA NA
COMMENTS
F3D.G 3 5/8" 4 1/4"
NA
NANANANA
F6D.G 6" 6 5/8" NANANANA
LINE OF STRUCTURE ABOVE
LINE OF CEILING
LINE OF STRUCTURE BELOW
PLAN
STRUCTURAL DIMENSION
5/8"
FINISH DIMENSION
STEEL STUD BRACING @ 4'-0" O.C.
CEILING
6"
5/8" TYPE X GYP BD
BEAD OF CONT. SEALANT
STEEL STUDS @ 16" O.C.
INSULATION PRESENT WITH QUALIFER (i OR t)
EXISTING WALL / COLUMN, VIF.
F0D.G 7/8" 1 1/2" NA NA NA
F1D.G 1 1/2" 2 1/8"
HAT CHANNEL @ 24" O.C.
NANANA HAT CHANNEL @ 24" O.C.
WALL TYPES
S2A.Gi 2 1/2"
WALL TAG
STRUCTURAL
SIZE
FINISH DIM FIRE RATING UL DESIGN
MIN STC
RATING
3 3/4" NA NA 40
COMMENTS
S3A.Gi 3 5/8" 4 7/8"
NA
NA40NANA
S6A.Gi 6" 7 1/4" NA40NANA
LINE OF STRUCTURE ABOVE
LINE OF CEILING
LINE OF STRUCTURE BELOW
PLAN
5/8"
STRUCTURAL SIZE
5/8"
FINISH DIMENSION
5/8" TYPE X GYP BD
BEAD OF CONT. SEALANT
STEEL STUDS @ 16" O.C.
STEEL STUD BRACING @ 4'-0" O.C.
CEILING
DEEP LEG SLIP TRACK AT DECK
HOLD GYPSUM BACK FROM DECK FOR
DEFLECTION
INSULATION PRESENT WITH QUALIFER (i OR t)
F2B.Gt 2 1/2"
WALL TAG
STRUCTURAL
SIZE
FINISH DIM FIRE RATING UL DESIGN
MIN STC
RATING
3 1/8" NA NA NA
COMMENTS
F3B.Gt 3 5/8" 4 1/4"
NA
NANANANA
F6B.Gt 6" 6 5/8" NANANANA
LINE OF STRUCTURE ABOVE
LINE OF CEILING
LINE OF STRUCTURE BELOW
PLAN
STRUCTURAL DIMENSION
5/8"
CEILING
5/8" TYPE X GYP BD
BEAD OF CONT. SEALANT
STEEL STUDS @ 16" O.C.
INSULATION PRESENT WITH QUALIFER (i OR t)
EXISTING WALL / COLUMN, VIF.
F0B.Gt 7/8" 1 1/2" NA NA NA
F1B.Gt 1 5/8" 2 1/4"
HAT CHANNEL @ 24" O.C.
NANANA NA
STEEL STUD BRACING @ 4'-0" O.C.
DEEP LEG SLIP TRACK AT DECK
FINISH DIMENSION
6"
WALL TAG
STRUCTURAL
SIZE
FINISH DIM FIRE RATING UL DESIGN
MIN STC
RATING
COMMENTS
S3A.2Fi 3 5/8" 6 1/8" SEAL ALL PENETRATIONS60U411-- HR.
LINE OF STRUCTURE ABOVE
LINE OF CEILING
LINE OF STRUCTURE BELOW
PLAN
1 1/4"
STRUCTURAL SIZE
1 1/4"
FINISH DIMENSION
5/8" TYPE X GYP BD (2 LAYERS)
BEAD OF CONT. SEALANT
STEEL STUDS @ 24" O.C.
STEEL STUD BRACING @ 4'-0" O.C.
CEILING
DEEP LEG SLIP TRACK AT DECK
HOLD GYPSUM BACK FROM DECK FOR
DEFLECTION
FILL FLUTES OF DECK WITH FIRE SAFING
AT FIRE RATED WALLS
INSULATION PRESENT WITH QUALIFER (i OR t)
5/8" TYPE X GYP BD (1 LAYERS). STAGGER JOINTS
5/8" SOUND DAMPING GYP BD (1 LAYER)
NOTE:
• TYPICAL LIMITING HEIGHTS-INTERIOR PARTITIONS, L/240
(5 PSF), WITH 5/8"GYPSUM BOARD EACH SIDE.
• PROVIDE DIAGONAL STUD BRACING AT ALL NON FULL
HEIGHT INTERIOR PARTITIONS STAGGERED AT 48" O.C.
TO DECK ABOVE. PROVIDE STUD ATTACHMENT TO DECK
W/ MIN.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .