This document contains a request for information (RFI) and related federal contract opportunity for construction services. The RFI seeks confirmation that only the Contracting Officer can suspend work via written notification for a project to reconfigure the 2nd floor waiting and check-in areas at the VA Medical Center in Cincinnati, Ohio. The response clarifies that the Contracting Officer has authority to verbally suspend work for safety non-compliance, followed by written notification.

The federal contract opportunity involves solicitation 36C25021B0038 for the same project to reconfigure 2nd floor waiting and check-in areas. Work includes general construction, alterations, plumbing, mechanical and electrical work to construct a new radiology check-in, reading room and greeter station, renovate space for a shared breakroom, and renovate the existing nuclear medicine area for a shared check-in. Bidding materials are available at beta.SAM.gov and the solicitation closes on an unspecified date. The Department of Veterans Affairs Veterans Health Administration VISN 10 is the contracting agency.

View the file

Other files

File Type Posted
36C25021B0038 0008.docx DOCX document
Final RFI Responses.pdf PDF
36C25021B0038 0007.docx DOCX document
539-21-210 Addendum 0006 - 7.19.2021.pdf PDF
36C25021B0038 0006.docx DOCX document
36C25021B0038 0005.docx DOCX document
36C25021B0038 0004.docx DOCX document
RFI 3 Received 6-29-21 02.pdf PDF
RFI 21 - Received 6-29-21.pdf PDF
2nd Floor Reconfiguration Asbestos Report.pdf PDF
RFI 17 - Received 6-29-21.pdf PDF
RFI 5 - Received 6-29-21.pdf PDF
RFI 29 - Received 6-29-21.pdf PDF
RFI 6 - Received 6-29-21.pdf PDF
RFI 15 - Received 6-29-21.pdf PDF
36C25021B0038 0003.docx DOCX document
RFI 3 Received 6-29-21.pdf PDF
RFI 1 Received 6-29-21.pdf PDF
2nd Floor Reconfiguration Lead Based Paint Report.pdf PDF
RFI 2 - Received 6-29-21.pdf PDF
RFI 4 - Received 6-29-21.pdf PDF
RFI 11 - Received 6-29-21.pdf PDF
RFI 16 - Received 6-29-21.pdf PDF
RFI 8 - Received 6-29-21.pdf PDF
RFI 7 - Received 6-29-21.pdf PDF
RFI 30 - Received 6-29-21.pdf PDF
RFI 9 - Received 6-29-21.pdf PDF
RFI 10 - Received 6-29-21.pdf PDF
Sign in Sheet.pdf PDF
RFI 28 - Received 6-29-21.pdf PDF
RFI 26 - Received 6-29-21.pdf PDF
RFI 24 - Received 6-29-21.pdf PDF
36C25021B0038 0002.docx DOCX document
Drawings 11-04-2020.pdf PDF
Specifications - 11-04-2020.pdf PDF
36C25021B0038 0001.docx DOCX document
RFI Form.docx DOCX document
539-21-210 Bid Dwgs_2020-10-30.pdf PDF
539-21-210 Bid Specs_2020-10-30.pdf PDF
36C25021B0038.docx DOCX document
Contractor EMR Certification Form.docx DOCX document
Wage Determination OH20210082 5-21-21.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TO:

RFI NO.: DATE: 6/29/2021

REQUEST FOR INFORMATION (RFI)

PROJECT NUMBER: 36C25021B0038 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.

When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the

Government from responding in a timely manner.

PROJECT TITLE: Reconfigure 2nd Floor Waiting and Check-In

PROJECT LOCATION:

VA Medical Center / 3200 Vine Street, Cincinnati, OH yvonne.demorest@va.gov

SUBMITTED BY: CITY/STATE:

PHONE:

Yvonne Demorest, CO - Dept. of VA

(NCO 10)

2780 Airport Dr, Suite 340

Columbus, Oh

SPEC/DWG.

REFERENCE(s):

General

REPLY NEEDED BY: 7/7/21

INFORMATION NEEDED:

We anticipate certain construction activities to generate high levels of noise. Please confirm that only the Contracting Officer can suspend work via written notification to the Contractor.

REPLY:

The Contracting Officer has the authority to suspend work immediately for non-compliance of safety regulations and can be verbally issued followed immediately by written notification. OSHA SAFETY REGULATIONS ARE STRICTLY ENFORCED.

REPLY FROM: DATE:

ATTACHMENTS: COPY TO: