Final RFI Responses.pdf
PDF 173 KB Posted
- Solicitation number
- 36C25021B0038
About this file
This document contains responses to questions regarding a federal construction contract opportunity with the Department of Veterans Affairs for a project to reconfigure waiting and check-in areas on the second floor of Building B1 at the Cincinnati VA Medical Center. Key details include that the scope of work involves general construction, alterations, plumbing, mechanical and electrical work to construct a new Radiology check-in area, renovate part of the existing Radiology waiting area and an unfinished room into a shared breakroom. The contractor will also renovate the existing Nuclear Medicine area for shared check-in and be responsible for safety and infection control in accordance with specified requirements. Bidding materials are available via SAM.gov and the solicitation number is 36C25021B0038.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Yes
2. No
3. These will be addressed in a case by case matter and will be handled by the CO/COR.
4. No this has been answered before. A public bid opening is scheduled and IS “in-person”.
5. No. Follow the procedures outlined in the solicitation.
6. Tax exempt follows State of Ohio tax laws – it is anticipated a tax-exempt form can be submitted.
7. Multiple factors are involved – this will be determined at the pre-construction meeting and receipt of required payment & performance bonds & liability insurance certificate all with original “wet” signatures.
8. See #7
9. See #7
10. Will not be a required position.
11. A QA/QC Super requirement will NOT be added to the required staffing plan.
12. Refer to specification section 01 33 23 Shop Drawings, Product Data & Samples section
1.10 part E which states RFI review period is 10 working days.
13. Refer to specification section 01 33 23 Shop Drawings, Product Data & Samples section
1.10 parts D which states submittal review period is 15 working days.
15. No.
16. No. There will be limited existing drawings provided from projects done in this area in the past.
17. No. There will be limited as-built drawings provided from projects done in this area in the past.
21. No. The contractor may utilize the space under construction as shown on the phasing plans.
28. No.
30. There isn’t one.
31. There aren’t any.
32. No.
35. Refer to section 01
35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
38. There is no existing roof warranty.
43. Fire watch is the responsibility of the contractor performing the hot work.
44. This will be determined on a case by case manner depending on the AHU that is needed to be shutdown.
45. The contractor is responsible for a commissioning plan. Please refer to specification section 23
05 93
47. Honeywell. No.
File details come from the government source that posted it. Updated .