S02 36C25020B0042 0004 - Additional RFI Responses.pdf
PDF 207 KB Posted
- Attached to
- Upgrade HVAC SPS and Hospital Complex Federal contract opportunity
- Solicitation number
- 36C25020B0042_1
About this file
This amendment to solicitation 36C25020B0042 provides additional questions and answers regarding an upgrade to the HVAC system at the Dayton VA Medical Center. The project requires upgrading HVAC equipment to serve the Sterile Processing Service and hospital complex. Relevant details include: tying into the existing Tridium AX building automation system; providing new graphics to match existing; a bid opening date of August 3, 2020; clarifying that a 40HP maximum is allowed for new cooling towers to accommodate potential electrical changes; and attaching revised drawings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract - Upgrade HVAC to SPS.pdf | ||
| S06 Bid Abstract 36C25020B0042 0005.pdf | ||
| Abstract of Offers - OF 1419A Continuation.pdf | ||
| M402 - ENLARGED SECOND FLOOR ROOF PLAN - NEW WORK ISOMETRIC.pdf | ||
| M505 - DETAILS.pdf | ||
| M405 - BUILDING 330 CHILLER PLANT 1ST FLOOR-REMOVALS NEW WORK.pdf | ||
| M504 - DETAILS.pdf | ||
| S02 36C25020B0042 0003 - Bid Instructions.pdf | ||
| S02 36C25020B0042 0002 - RFI Responses.pdf | ||
| Upgrade HVAC Sign in Sheet.pdf | ||
| S02 36C25020B0042 0001.pdf | ||
| S02 36C25020B0042_1.pdf | ||
| Project Drawings.pdf | ||
| BID DOCS PROJECT MANUAL2.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
0004 07-22-2020
552-19-101
36C250
Department of Veterans Affairs Network Contracting Office 10 3140 Governor’s Place Blvd. Suite 210 Kettering OH 45409-1337
36C250
Department of Veterans Affairs Network Contracting Office (NCO) 10
3140 Governor's Place Blvd. Suite 210 Kettering OH 45409-1337
To all Offerors/Bidders
36C25020B0042
06-17-2020
X
X X
August 3, 2020, at 10:00 AM EST
X 1
The purpose of this amendment is to provide the following notices:
1. See additional RFI Questions and Answers on page 2;
2. See attached drawings referenced in the RFI Q&As;
3. The Bid Opening has been amended to Monday, August 3, 2020, at 10AM EST.
Diana Pittman Contracting Officer
RFI Questions and Answers – Part 2
Project 552-19-101, Upgrade HVAC to SPS in the Medical Center, Dayton VA
1. Drawing M402 has two note 10’s. Note 10 seems to be pointing to a housekeeping pad and not a flow meter. Please advise?
The Note 10 pointing to a pad should labelled Note 9. On the Chiller Isometric, this note is shown as Note 21, which should also be labelled Note 9.
2. Drawing M405 there is a note 9 on the removals which looks like a panel or something. There is no Note 9 on the drawing. Please advise.
Note 9 is to be added to the drawing – 9. Remove existing variable frequency drive that serves cooling tower, CT-4 and replace with new. Please see revised drawing with reference to Note 9.
3. M505 has a detail for Water Meter Installation but I do not see anything on drawings which reference this detail or any specification. Is this part of the bid? Please advise.
No, the detail for Water Meter Installation is to be removed.
4. M504 has a detail for an Indirect Glycol Makeup System but I do not see anything on the drawings which references this detail or any glycol associated with the project. Is this part of the bid? Please advise.
No, the detail for an Indirect Glycol Makeup System is to be removed.
5. M405 pump filtration unit 330-CWFS-4 – does this require any kind of housekeeping pad or inertial base?
Yes, the pump filtration skid is to be mounted on a 4” concrete housekeeping pad.
6. 23 65 00 – 2.1 - G. & H. Specification calls for 304 SS hot and cold-water basins, typically we would provide 301L which is what Heapy has specified for years.
Either is fine, 304 or 301L.
7. 23 65 00 – 2.1 - K. Motor out of airstream is specified. Existing towers do not have that feature. Is this required?
Yes.
8. 23 65 00 – 2.1 - L.2.b. – Will belt drive be acceptable? Existing towers are Gear Drive.
Gear drive is preferred. Belt drive should not have been included in specs.
9. 23 65 00 – 2.2.A. & B. – Specification calls for VFD to be provided by electrical contractors. Not sure what the function of the “Control Panel” will be is that required?
No response, function of control panel is detailed in section B.
10. Existing towers are 50 HP, will 50 HP selection for cooling tower be acceptable or is 40 HP the max allowable?
40 HP is max allowable due to potential changes to electrical system required by 50 HP units.
11. This project is specified for the following: ‘The system shall be a BACNet capable Direct Digital Control System utilizing electric actuation and shall be tied into the existing Hospital Automated Logic Controls Building Automation System or Johnson Controls Metasys Building Automation System, including all graphics, trends, alarms.
All new graphics provided under this contract shall match existing graphics – obtain all required graphics files from COR. Provide 14 days’ notice in advance of requiring files.’ However, during the site visit, it was noticed that the Air Handler in this project was controlled by a Tridium AX control system. Given the prior projects bidding as Tridium AX, I would assume this project would require tying into the existing Tridium AX system and not an Automated Logic Controls Building Automation System or Johnson Controls Metasys Building Automation System. Please clarify what Building Automation System the VA wishes to tie into for this project (if any) and what type of BAS system the new panels and controllers shall abide by.
The spec for these two systems was inadvertently included in the Project Manual. This project will require tying into the existing Tridium AX system.
See attached document: M402 - ENLARGED SECOND FLOOR ROOF PLAN - NEW
WORK _ ISOMETRIC.
See attached document: M405 - BUILDING 330 CHILLER PLANT 1ST FLOOR-REMOVALS
_ NEW WORK.
See attached document: M504 - DETAILS.
See attached document: M505 - DETAILS.
File details come from the government source that posted it. Updated .