This document package includes engineering drawings and specifications for an HVAC upgrade project, as well as a presolicitation notice for the related federal contract opportunity. The engineering drawings show details for HVAC system components including pumps, piping, valves, traps, and connections. The federal contract opportunity is set aside exclusively for service-disabled veteran-owned small businesses and involves upgrading the HVAC systems for the Sterile Processing Service and hospital complex at the Dayton VA Medical Center in Dayton, Ohio. The project value is estimated between $2 million and $5 million. The solicitation number is 36C25020B0042_1 and is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. Responses to the presolicitation notice are required by the date specified in the full solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract - Upgrade HVAC to SPS.pdf | ||
| S06 Bid Abstract 36C25020B0042 0005.pdf | ||
| Abstract of Offers - OF 1419A Continuation.pdf | ||
| M402 - ENLARGED SECOND FLOOR ROOF PLAN - NEW WORK ISOMETRIC.pdf | ||
| S02 36C25020B0042 0004 - Additional RFI Responses.pdf | ||
| M405 - BUILDING 330 CHILLER PLANT 1ST FLOOR-REMOVALS NEW WORK.pdf | ||
| M504 - DETAILS.pdf | ||
| S02 36C25020B0042 0003 - Bid Instructions.pdf | ||
| S02 36C25020B0042 0002 - RFI Responses.pdf | ||
| Upgrade HVAC Sign in Sheet.pdf | ||
| S02 36C25020B0042 0001.pdf | ||
| S02 36C25020B0042_1.pdf | ||
| Project Drawings.pdf | ||
| BID DOCS PROJECT MANUAL2.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 1
NOTES:
SEE SPECIFICATION SECTION "PUMPS" FOR Y STRAINER OPTION
FIRST 3 HANGERS FOR EACH PIPE AND
BRANCH SHALL BE SPRING & NEOPRENE
TYPE. TYPE "H" FOR 4" [100mm] DIA. PIPE & SMALLER. TYPE "H-P" FOR 5" [125mm] DIA.
PIPE & LARGER.
RIGID PIPE
HANGER
INSTALL HANGER AS CLOSE TO
PIPE ELBOW AS POSSIBLE
(TYPICAL)
1/2" [15mm]
FLEXIBLE CONNECTOR (TYPICAL)
PUMP
FLOOR
1" [25mm] MIN.
DIA. PIPE STAND
CONCRETE
BASE
DRAIN
SUCTION DIFFUSER
WITH BUILT IN STRAINER.
OPTIONAL: LONG RADIUS
ELBOW AND INLET
STRAINER WITH 3XDIAM
STRAIGHT INLET TO PUMP
1/2" [15mm]
PRESSURE GAUGE
RIGID PIPE
HANGER
OPTIONAL STRAINER
BUTTERFLY OR BALL
SHUT OFF VALVE, TYP.
CHECK VALVE
THERMOMETER
FLOW SWITCH
FLEXIBLE
CONNECTORS
S.S. BRAIDED
TEST PLUGS
CHS
EVAPORATOR
CHR
DDC
TEMPERATURE
SENSOR TO ECC
PRESSURE
GAUGE
UNDER CANOPY
FS
TT TT
FIRST 3 HANGERS FOR EACH PIPE AND
BRANCH SHALL BE SPRING & NEOPRENE
TYPE. TYPE "H" FOR 4" [100mm] DIA. PIPE AND SMALLER. TYPE "H-P" FOR 5" [125mm]
DIA. PIPE AND LARGER.
INSTALL HANGER
AS CLOSE TO
PIPE ELBOW AS
POSSIBLE (TYPICAL)
PRESSURE
GAGE
PUMP
FLOOR
CONCRETE
BASE (SEE
DETAIL)
1/2" [15mm]
FLEXIBLE CONNECTOR
TYP.
NOTE 3
1" [25mm] MIN. DIA.
PIPE STAND
STRAINER
NON SLAM CHECK VALVE
WITH COUNTER WEIGHT
BUTTER OR BALL
SHUT OFF VALVE, TYP.
INLET TO PUMP SHALL BE
MINIMUM OF 3 PIPE DIAMETERS
ECCENTRIC REDUCER
AVAV
NOTE:
1.
2.
3.
4.
Y TYPE STRAINER BLOWDOWN HEIGHT SHALL ACCOMMODATE 55 GALLON DRUM.
PUMP INSTALLATION IS DIAGRAMMATIC AND INTENDED TO SHOW THE MAJOR COMPONENTS REQUIRED FOR INSTALLATION. THE
INSTALLED PIPING CONFIGURATION SHALL BE BASED ON THE ACTUAL PUMP PROVIDED. THE CONTRACTOR SHALL SUBMIT FOR
APPROVAL A COORDINATION DRAWING SHOWING PUMP, PIPING, AND ACCESSORIES AS REQUIRED BY THIS INSTALLATION DETAIL.
ALL PAD, PUMP, AND PIPING DRAINS SHALL BE HARD PIPED TO NEAREST FLOOR DRAIN,
TYPICAL.
PROVIDE P/T TEST PLUGS ADJACENT TO ALL DDC SENSORS AND GAUGES.
(HORIZONTAL SPLIT CASE SHOWN, VERTICAL SPLIT CASE SIMILAR)
MANUAL BALANCING VALVE
REUSE EXISTING SHUT
OFF VALVES UNDER
DEDUCT ALTERNATE #2
SINGLE SUCTION FLOOR-MOUNTED
PUMPS - CONNECTIONS WITH
FLEXIBLE CONNECTORS
1 STEAM HEADER.
2 F & T TRAP.
3 STRAINER.
4 AUTOMATIC MODULATING CONTROL VALVE
FURNISHED BY UNIT MANUFACTURER,
PROVIDE MULTIPLE VALVES WHERE REQUIRED.
5 SOLENOID VALVE (ON/OFF) PROVIDED BY UNIT
MANUFACTURER.
6 2-POSITION CONTROL VALVE.
7 EXTEND CONDENSATE RETURN, PER PLANS.
8 WHEN DIMENSION "a" EXCEEDS 10 L.F., OR WHEN
STEAM CONNECTION TO HUMIDIFIER IS BELOW
STEAM MAIN PIPING, PROVIDE DRIP LEG AND TRAP
ASSEMBLY PER ABOVE.
9 TUBELETS PERPENDICULAR TO AIRFLOW.
10 SHUT-OFF VALVE.
AUTOMATIC FLOW
CONTROL VALVE
0.75"
TO FLOOR DRAIN
1.25"
-C W
F
0.5"
1.25"
310-CWCPF1
1.25"
FILTER
AUTOMATIC
FLOW
CONTROL
VALVE.
(5-60 psi)
FUNNEL
CHEMICAL
FEEDER
CHR
C H
R
1 INSTALL TOP OF CHEMICAL FEEDER NO MORE THAN 4'-0" ABOVE FLOOR.
NOTES :
2 PROVIDE ROOM FOR INSULATING FILTER AND PIPING.
STEAM TRAP ASSEMBLY
PIPE SIZES SAME AS CONNECTION
ON TRAP - 3/4" MIN.
FROM DRIP LEG
OR EQUIPMENT
CONNECTION
DRIP
RETURN
3/8" TEST CONNECTION
FLOAT AND THERMOSTATIC
TRAP (SEE PLANS)
STRAINER
GATE VALVE
CHECK VALVE DIELECTRIC FITTING
(WHERE METAL
MATERIALS ARE
DISSIMILAR)
TO RETURN MAIN - SEE
DRAWINGS FOR PIPE SIZES
GLOBE VALVE
NC
BYPASS - INSTALL IN HORIZONTAL
PLANE LEVEL WITH TRAP OR IN
VERTICAL PLANE AND BELOW TRAP.
12" MIN.
1 SLOPE MAINS AND BRANCHES DOWN 1" PER 40 FEET IN DIRECTION OF
2 LIMIT UNTRAPPED, COUNTERFLOW, RUNOUTS TO 10 FEET MAXIMUM.
3 END OF MAIN SHOWN, LOW POINT IN STEAM MAIN SIMILAR.
FLOW UNLESS SHOWN OTHERWISE.
SAME SIZE AS MAIN
NOTES :
STEAM MAIN
BACK 1/4" PER FOOT.
6" MIN.
TRAP SET - SEE DETAIL ON
THIS SHEET
FLOAT AND THERMOSTATIC
LP & GRAVITY
RETURN (NO LIFTING PERMITTED)
HP & MP RETURN
UNTRAPPED RUNOUT. SLOPE
SEE STEAM TRAP ASSEMBLY
DETAIL ON THIS SHEET
ECCENTRIC REDUCERS ARE
REQUIRED FOR ALL REDUCTIONS
IN SUPPLY STEAM PIPES
(LIFTING PERMITTED)
STEAM
COND. RETURN
TO CONDENSATE
RETURN MAINSTEAM
SUPPLY
MAIN REFER TO
TYPICAL STEAM
DRIP ASSEMBLY
DETAIL
REFER TO BELOW
FOR HUMIDIFIER
PIPING
"a"
"a"
DETAIL NOTES
AIR COOLED CHILLER - PIPING CONNECTIONSCHILLED WATER SYSTEM WATER
FILTER/CHEMICAL FEEDER
SPLIT CASE PUMP FLEXIBLE CONNECTORS
STEAM LINE DRIP POCKET
STEAM TRAP ASSEMBLYTYPICAL STEAM LINE & DRIP PIPING
STEAM INJECTION HUMIDIFIER
STRAINER
(MESH/FREE AREA
PER CHILLER
MANUFACTURER'S
REQUIREMENTS)
LINE SIZE, 2-POSITION AUTO
ISOLATION VALVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FO RM 08 - 6231
A
Office of Construction and Facilities Management
U.S. D epartm ent of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
HEAPY PROJECT No.: 2018-05154 OHIO COA No.: 01528
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN . 46204
317.800.6388 | W W W .GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
/2
/2
:2
:2
P
M
M505
DETAILS UPGRADE HVAC FOR SPS
DAYTON, OHIO
552-19-101
VA Project Director
7/22/2020 DTR BES
BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
| Sheets |
| M505 - DETAILS |
File details come from the government source that posted it. Updated .