M402 - ENLARGED SECOND FLOOR ROOF PLAN - NEW WORK ISOMETRIC.pdf

PDF 613 KB Posted

Attached to
Upgrade HVAC SPS and Hospital Complex Federal contract opportunity
Solicitation number
36C25020B0042_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This file contains a federal solicitation notice and related project documents for an HVAC upgrade opportunity with the Department of Veterans Affairs. The solicitation is for an HVAC upgrade project at the Dayton VA Medical Center involving the Sterile Processing Service and hospital complex. The project magnitude is estimated between $2 million and $5 million. The NAICS code is 236220 for Commercial and Institutional Building Construction with a business size standard of $36.5 million. This procurement is set aside 100% for service-disabled veteran-owned small businesses. The attached project documents include drawings specifying HVAC equipment and piping replacements and modifications to support the chilled water system upgrade.

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade HVAC SPS and Hospital Complex, newest first.
File Type Posted
S06 Bid Abstract 36C25020B0042 0005.pdf PDF
Abstract of Offers - OF 1419A Continuation.pdf PDF
Bid Abstract - Upgrade HVAC to SPS.pdf PDF
M405 - BUILDING 330 CHILLER PLANT 1ST FLOOR-REMOVALS NEW WORK.pdf PDF
M504 - DETAILS.pdf PDF
M505 - DETAILS.pdf PDF
S02 36C25020B0042 0004 - Additional RFI Responses.pdf PDF
S02 36C25020B0042 0003 - Bid Instructions.pdf PDF
S02 36C25020B0042 0002 - RFI Responses.pdf PDF
S02 36C25020B0042 0001.pdf PDF
Upgrade HVAC Sign in Sheet.pdf PDF
S02 36C25020B0042_1.pdf PDF
Project Drawings.pdf PDF
BID DOCS PROJECT MANUAL2.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHS

CHR

C H

R

CHR

CHS

C H

R

C H

S C

H S

C H

R

CHR

CHS

ROOF

310-ACCH1

310-ACCH2

310-CW P3 310-CW P2 310-CW P1

310-CW F1 310-CW CPF1

1.25" - CHS

1.25" - CHR

4" - CHR 5" - CHR

4" - CHR

5" - CHR

MECH. ROOM

3" BYPASS

5"

C H

R

5"

C H

S

5" - CHS

5" - CHR

9 9

T

T

10.5

11.2

D.6 E.1

8 7

330-CW P3

VFD

330-CW P2

VFD

330-CW P1

VFD

310-CW P3

310-CW P2

310-CW P1

CHR

CHR

CHR

CHS

CHS

CHR

5"5"

310-ACCH1

310-ACCH2

4"4"

5"5"

5"

5"

5"

5"

310-CW F1

310-CW CPF1

5"5"

4"4"

4"4"

1.25" - CHS

1.25" - CHR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FO RM 08 - 6231

A

Office of Construction and Facilities Management

U.S. D epartm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

HEAPY PROJECT No.: 2018-05154 OHIO COA No.: 01528

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN . 46204

317.800.6388 | W W W .GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

/2

/2

:1

:4

P

M

M402

ENLARGED SECOND FLOOR ROOF

PLAN - NEW WORK & ISOMETRIC

UPGRADE HVAC FOR SPS

DAYTON, OHIO

552-19-101

VA Project Director

7/22/2020 DTR BES

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"

BUILDING 310 - SECOND FLOOR ROOF PLAN - NEW WORK

GENERAL NOTES

A. REFER TO SHEET M00.1 FOR DRAW ING INDEX, LEGEND, ABBREVIATIONS AND GENERAL

NOTES.

B. REMOVAL OF CHILLED W ATER SYSTEM SHALL BE ACCOMPLISHED DURING NON-PEAK

COOLING SEASON (BETW EEN NOVEMBER 1 AND MARCH 1). REPLACE EQUIPMENT ONE AT

A TIME KEEPING THE OTHER OPERATIONAL. COORDINATE ANY OUTAGES W ITH C .O.R.

C. CHILLERS SHALL BE SELECTED TO RE-USE THE EXISTING STRUCTURAL STEEL SUPPORTS.

ANY REQUIRED MODIFICATIONS TO THE STEEL SHALL BE DETERMINED PRIOR TO BIDDING.

THE COST FOR MODIFICATIONS SHALL BE CARRIED BY THE CHILLER MANUFACTURER AND

MECHANICAL CONTRACTOR.

NOTES

1. EXISTING PIPING TO REMAIN.

2. EXISTING PIPE SUPPORT TO REMAIN.

3. EXISTING EQUIPMENT SUPPORT TO REMAIN.

4. EXISTING EQUIPMENT SERVICE PLATFORM TO REMAIN. MODIFY AS REQUIRED TO

ACCOMODATE NEW CHILLERS.

5. PROVIDE NEW 2-POSITION AUTOMATIC/ISOLATION VALVE AND ALL OTHER HYDRONIC

SPECIALTIES/COMPONENTS SPECIFIED AND INDICATED ON PIPING DETAIL ON SHEET

M505.

6. EXISTING HEAT TRACING TO REMAIN. RE-INSTALL COMPONENTS REMOVED FROM PIPE

REMOVAL.

7. INSTALL TOP OF CHEMICAL POT FEEDER TANK NO MORE THAT 4'-0" ABOVE FLOOR.

8. PROVIDE ROOM FOR INSULATING FILTER AND PIPING.

9. PROVIDE NEW CONCRETE INERTIA BASE PER DETAIL ON SHEET M503.

10. CHILLED W ATER FLOW METER FOR B.T.U. MEASUREMENT. REFER TO SHEET M702 AND

SPECIFICATION SECTION 23 09 23 FOR ADDITIONAL INFORMATION.

11. PROVIDE EQUIPMENT BASE RAILS W ITH RESTRAINED SPRING ISOLATORS AT LOCATIONS

PER MANUFACTURER'S RECOMMENDATIONS.

12. PROVIDE EQUIPMENT SERVICE PLATFORM AND OSHA APPROVED GUARD RAIL/STAIR

ASSEMBLY.

13. DDC TEMPERATURE SENSOR ASSOCIATED W ITH NEW FLOW METER. REFER TO FLOW

METERING CONTROLS ON SHEET M702.

14. REFER TO PARTIAL CHILLED W ATER SYSTEM ISOMETRIC VIEW FOR ADDITIONAL

INFORMATION ON W ORK IN THIS AREA.

15. EXISTING CONCRETE PAD TO REMAIN.

SCALE: NONE

BUILDING 310 - CHILLER ISOMETRIC

N

KEY PLAN

Scale: N.T.S.

Revisions: Date:

Sheets
M402 - ENLARGED SECOND FLOOR ROOF PLAN - NEW WORK & ISOMETRIC

File details come from the government source that posted it. Updated .