M402 - ENLARGED SECOND FLOOR ROOF PLAN - NEW WORK ISOMETRIC.pdf
PDF 613 KB Posted
- Attached to
- Upgrade HVAC SPS and Hospital Complex Federal contract opportunity
- Solicitation number
- 36C25020B0042_1
About this file
This file contains a federal solicitation notice and related project documents for an HVAC upgrade opportunity with the Department of Veterans Affairs. The solicitation is for an HVAC upgrade project at the Dayton VA Medical Center involving the Sterile Processing Service and hospital complex. The project magnitude is estimated between $2 million and $5 million. The NAICS code is 236220 for Commercial and Institutional Building Construction with a business size standard of $36.5 million. This procurement is set aside 100% for service-disabled veteran-owned small businesses. The attached project documents include drawings specifying HVAC equipment and piping replacements and modifications to support the chilled water system upgrade.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 Bid Abstract 36C25020B0042 0005.pdf | ||
| Abstract of Offers - OF 1419A Continuation.pdf | ||
| Bid Abstract - Upgrade HVAC to SPS.pdf | ||
| M405 - BUILDING 330 CHILLER PLANT 1ST FLOOR-REMOVALS NEW WORK.pdf | ||
| M504 - DETAILS.pdf | ||
| M505 - DETAILS.pdf | ||
| S02 36C25020B0042 0004 - Additional RFI Responses.pdf | ||
| S02 36C25020B0042 0003 - Bid Instructions.pdf | ||
| S02 36C25020B0042 0002 - RFI Responses.pdf | ||
| S02 36C25020B0042 0001.pdf | ||
| Upgrade HVAC Sign in Sheet.pdf | ||
| S02 36C25020B0042_1.pdf | ||
| Project Drawings.pdf | ||
| BID DOCS PROJECT MANUAL2.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHS
CHR
C H
R
CHR
CHS
C H
R
C H
S C
H S
C H
R
CHR
CHS
ROOF
310-ACCH1
310-ACCH2
310-CW P3 310-CW P2 310-CW P1
310-CW F1 310-CW CPF1
1.25" - CHS
1.25" - CHR
4" - CHR 5" - CHR
4" - CHR
5" - CHR
MECH. ROOM
3" BYPASS
5"
C H
R
5"
C H
S
5" - CHS
5" - CHR
9 9
T
T
10.5
11.2
D.6 E.1
8 7
330-CW P3
VFD
330-CW P2
VFD
330-CW P1
VFD
310-CW P3
310-CW P2
310-CW P1
CHR
CHR
CHR
CHS
CHS
CHR
5"5"
310-ACCH1
310-ACCH2
4"4"
5"5"
5"
5"
5"
5"
310-CW F1
310-CW CPF1
5"5"
4"4"
4"4"
1.25" - CHS
1.25" - CHR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FO RM 08 - 6231
A
Office of Construction and Facilities Management
U.S. D epartm ent of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
HEAPY PROJECT No.: 2018-05154 OHIO COA No.: 01528
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN . 46204
317.800.6388 | W W W .GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
/2
/2
:1
:4
P
M
M402
ENLARGED SECOND FLOOR ROOF
PLAN - NEW WORK & ISOMETRIC
UPGRADE HVAC FOR SPS
DAYTON, OHIO
552-19-101
VA Project Director
7/22/2020 DTR BES
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"
BUILDING 310 - SECOND FLOOR ROOF PLAN - NEW WORK
GENERAL NOTES
A. REFER TO SHEET M00.1 FOR DRAW ING INDEX, LEGEND, ABBREVIATIONS AND GENERAL
NOTES.
B. REMOVAL OF CHILLED W ATER SYSTEM SHALL BE ACCOMPLISHED DURING NON-PEAK
COOLING SEASON (BETW EEN NOVEMBER 1 AND MARCH 1). REPLACE EQUIPMENT ONE AT
A TIME KEEPING THE OTHER OPERATIONAL. COORDINATE ANY OUTAGES W ITH C .O.R.
C. CHILLERS SHALL BE SELECTED TO RE-USE THE EXISTING STRUCTURAL STEEL SUPPORTS.
ANY REQUIRED MODIFICATIONS TO THE STEEL SHALL BE DETERMINED PRIOR TO BIDDING.
THE COST FOR MODIFICATIONS SHALL BE CARRIED BY THE CHILLER MANUFACTURER AND
MECHANICAL CONTRACTOR.
NOTES
1. EXISTING PIPING TO REMAIN.
2. EXISTING PIPE SUPPORT TO REMAIN.
3. EXISTING EQUIPMENT SUPPORT TO REMAIN.
4. EXISTING EQUIPMENT SERVICE PLATFORM TO REMAIN. MODIFY AS REQUIRED TO
ACCOMODATE NEW CHILLERS.
5. PROVIDE NEW 2-POSITION AUTOMATIC/ISOLATION VALVE AND ALL OTHER HYDRONIC
SPECIALTIES/COMPONENTS SPECIFIED AND INDICATED ON PIPING DETAIL ON SHEET
M505.
6. EXISTING HEAT TRACING TO REMAIN. RE-INSTALL COMPONENTS REMOVED FROM PIPE
REMOVAL.
7. INSTALL TOP OF CHEMICAL POT FEEDER TANK NO MORE THAT 4'-0" ABOVE FLOOR.
8. PROVIDE ROOM FOR INSULATING FILTER AND PIPING.
9. PROVIDE NEW CONCRETE INERTIA BASE PER DETAIL ON SHEET M503.
10. CHILLED W ATER FLOW METER FOR B.T.U. MEASUREMENT. REFER TO SHEET M702 AND
SPECIFICATION SECTION 23 09 23 FOR ADDITIONAL INFORMATION.
11. PROVIDE EQUIPMENT BASE RAILS W ITH RESTRAINED SPRING ISOLATORS AT LOCATIONS
PER MANUFACTURER'S RECOMMENDATIONS.
12. PROVIDE EQUIPMENT SERVICE PLATFORM AND OSHA APPROVED GUARD RAIL/STAIR
ASSEMBLY.
13. DDC TEMPERATURE SENSOR ASSOCIATED W ITH NEW FLOW METER. REFER TO FLOW
METERING CONTROLS ON SHEET M702.
14. REFER TO PARTIAL CHILLED W ATER SYSTEM ISOMETRIC VIEW FOR ADDITIONAL
INFORMATION ON W ORK IN THIS AREA.
15. EXISTING CONCRETE PAD TO REMAIN.
SCALE: NONE
BUILDING 310 - CHILLER ISOMETRIC
N
KEY PLAN
Scale: N.T.S.
Revisions: Date:
| Sheets |
| M402 - ENLARGED SECOND FLOOR ROOF PLAN - NEW WORK & ISOMETRIC |