M405 - BUILDING 330 CHILLER PLANT 1ST FLOOR-REMOVALS NEW WORK.pdf

PDF 768 KB Posted

Attached to
Upgrade HVAC SPS and Hospital Complex
Solicitation number
36C25020B0042_1
Issued by

About this file

This document package includes plans for an HVAC upgrade project and a related presolicitation notice for the opportunity. The plans detail removals and new work required for the chiller plant and pumps in Building 330 at the Dayton VA Medical Center. Notable removals include an existing variable frequency drive, pump, and associated piping. New items include a replacement VFD and inertia base for the pump. The presolicitation notice is for an HVAC upgrade for the Sterile Processing Service and hospital complex at the Dayton VAMC, with a project magnitude between $2-5 million. The opportunity is 100% set aside for Service-Disabled Veteran-Owned Small Businesses. The NAICS code is 236220 for commercial and institutional building construction, with a size standard of $36.5 million. The solicitation number is 36C25020B0042_1.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T

T

T

T

T

FCU-2

UH-3

UH-3

8" - CHR

C

H R

C

W T

T

10" - CW S

10" - CW S

C

W S

C

W S

C

H R

10" -

CW

S 10" -

CW

S

C

H R

8" - CHR

C

W T

T

10" - CW S

10" - CW TT

10" - CW S10" -

CW

S

10" -

CW

S

C

W S

C

H R

8" - CHR

10" - CW TT

2"

H W

S

2"

H W

R

8" - CHR

10" - CW S

C

W T

T

1.

H W

R

1.

H W

S

10" - CW S

10" - CW S

C

W S

C

W S

C

H R

C

H R

10" -

CW

S

10" -

CW

S

10" - CW S

10" - CW S

10" - CHR

C

H R

C

H R

C

H S

12" - CHS

C

H S

12" - CHR

10" - CW S

10" - CW

R

M 405

330-P12

330-P13

330-CH4

330-P8

330-P11

330-CH3

330-CH2

330-CH1

330-P5

330-P9

330-P6

330-P10

330-P7

M 406

FE3 F5

FCU-2

UH-3

UH-3

10" - CW S

10" - CW S

C

H S

12" - CHS

C

H R

C

W S

C

W S

C

H S

C

H R

C

H R

10" - CHR

C

H R

10" - CW S

10" - CW S

C

W S

C

W S

C

H R

8" - CHR 8" - CHR

10" - CW S

10" - CW TT

C

W T

T

10" -

CW

S

10" -

CW

S

10" - CW S

10" - CW S

10" - CW TT

8" - CHR

C

W T

T

C W

T T10" -

CW

S

10" -

CW

S

10" - CW S

10" - CW S

8" - CHR

C

H R

C

W S

C

W S

C

H R

C

H R

C

H R

2"

H W

S

2"

H W

R 1.

H

W R

1.

H W

S

10" -

CW

S 10" -

CW

S

330-CW P-4

12" - CHR

10" - CW S

10" - CW

R

330-CW P-4

VFD

M 405

330-CW FS-4

330-CH4

330-CH3

330-CH2

330-CH1

330-P13

330-P8

330-P11

330-P7

330-P10

330-P6

330-P9

330-P5

M 406

6" - CW S

6" - CW S

CW FS

VFD

FE3 F5

330-CT-4

CFD

330-BASEMENT

954' - 6 1/4"

330-BASEMENT

954' - 6 1/4"

330-CW P-4

12" - CHS

14" - CHR

10" - CW S10" - CW S1

330-BASEMENT

954' - 6 1/4"

330-BASEMENT

954' - 6 1/4"

12" - CHS

14" - CHR

10" - CW S10" - CW S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FO RM 08 - 6231

A

Office of Construction and Facilities Management

U.S. D epartm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

HEAPY PROJECT No.: 2018-05154 OHIO COA No.: 01528

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN . 46204

317.800.6388 | W W W .GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

/2

/2

:3

:1

A

M

M405

BUILDING 330 CHILLER PLANT 1ST

FLOOR-REMOVALS & NEW WORK

UPGRADE HVAC FOR SPS

DAYTON, OHIO

552-19-101

VA Project Director

7/22/2020 DTR BES

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"

BUILDING 330 CHILLER PLANT FIRST FLOOR - REMOVALS

SCALE: 1/4" = 1'-0"

BUILDING 330 CHILLER PLANT FIRST FLOOR - NEW WORK

NOTES

1. EXISTING PIPING TO REMAIN, TYPICAL.

2. EXISTING CHILLER TO REMAIN, TYPICAL.

3. EXISTING PUMP TO REMAIN, TYPICAL.

4. REMOVE EXISTING PUMP AND ASSOCIATED PIPING, VALVES, CONTROLS, ETC.

CONCRETE PAD TO REMAIN. REMOVE EXISTING INERTIAL BASE.

5. PROVIDE NEW INERTIA BASE FOR PUMP. EXTEND EXISTING CONCRETE PAD AS

REQUIRED.

6. REMOVE PIPING BACK TO THIS POINT FOR RECONNECTION IN NEW W ORK. REFER TO

THIS SHEET FOR SECTION.

7. PIPING UP TO COOLING TOW ER BASIN ABOVE. CONNECT TO BASIN DRAIN OUTLET.

8. PIPING UP TO COOLING TOW ER BASIN ABOVE. CONNECT TO BASIN SW EEPER INLET.

9. REMOVE EXISTING VARIABLE FREQUENCY DRIVE THAT SERVES COOLING TOW ER, CT-4

AND REPLACE W ITH NEW . REFER TO NEW W ORK PLAN, THIS SHEET.

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, INDEX AND GENERAL NOTES.

NN

KEY PLAN

Scale: N.T.S.

SCALE: 1/4" = 1'-0"

PUMP NEW WORK

SCALE: 1/4" = 1'-0"

PUMP REMOVALS

NOTES

1. EXISTING PIPING TO REMAIN.

2. REMOVE PIPING BACK TO THIS POINT FOR RECONNECTION IN NEW W ORK. REUSE

EXISTING PIPING ELBOW S/FITTINGS IN NEW W ORK.

3. REMOVE EXISTING PUMP AND ASSOCIATED PIPING, VALVES, CONTROLS, ETC.

CONCRETE HOUSEKEEPING PAD TO REMAIN.

Revisions: Date:

Sheets
M405 - BUILDING 330 CHILLER PLANT 1ST FLOOR-REMOVALS & NEW WORK

File details come from the government source that posted it. Updated .