RLP Amd-1 VA-GrantsPass CBOC-dlg 260422.pdf

PDF 225 KB Posted

Attached to
Request for Lease Proposal (RLP) Grants Pass OR
Solicitation number
36C24W24R0017
Issued by

About this file

This is Amendment No. 1 to Request for Lease Proposal (RLP) No. 36C24W24R0017 issued by the Department of Veterans Affairs for a Community Based Outpatient Clinic (CBOC) facility in Grants Pass, Oregon.

The amendment extends the initial offer due date to June 1, 2026, and provides six clarifications to the RLP requirements. A main entrance canopy is optional and not explicitly required but may be evaluated as exceeding requirements with costs included in the building shell. Perimeter fencing around the entire property is not required; however, fencing for government vehicles must be included with costs incorporated into the Tenant Improvement (TI) and Tenant Improvement Cost Schedule (TICS). An emergency generator is required per Exhibit B with costs included in the TI and TICS. No separate BSAC (Building Systems Asbestos Containing) allowance exists; all BSAC-related work will be included in the TI scope and captured on the TICS, which will be completed post-award after design finalization and subject to DVA negotiation and work authorization. Pre-award plans submitted with offers are evaluated under RLP Section 4 and are not considered pre-award Detailed Implementation Documents (DIDs); final DIDs will be developed post-award during a DID workshop per lease requirements. Parking must meet DVA's minimum requirement of 55 spaces and comply with local jurisdiction code requirements; the 1 space per 200 rentable square feet (RSF) ratio applies only when no on-site parking requirement is specified by local code, and proposed sites will be evaluated on parking quality and quantity shown on submitted site plans.

View the file

Other files

File Type Posted
VA GrantsPass CBOC RLP Amd 2 20260521 Final-dlg.pdf PDF
13. Exhibit K_PastPerf Questionnaire_VA-GP.docx DOCX document
09. Exhibit G - Form 1217 Lessor's Annual Cost Statement vNov16.pdf PDF
21. Exhibit T - Lease - Broker Project (Mar. 2026)_VA-GP.pdf PDF
18. Exhibit P - RLP - Broker Project Mar26_VA-GP.pdf PDF
04A. Exhibit B1_POR Room Listings and Size Reqs 250307.pdf PDF
11. RLP Exhibit I_Seismic Offer Forms_VA-GP.docx DOCX document
06. Exhibit D_GSA FORM 3516 Solicitation Provisions (Dec. 2025).pdf PDF
17. Exhibit O-TICS Template v-Feb26_VA-GP -PDF for Sam Post.pdf PDF
16. Exhibit N _VA HANDBOOK H-18-8 Seismic_VA-GP.pdf PDF
03. ExhA_L100 Clean 260323-TJP.pdf PDF
20. Exhibit R - Sensitive Information Attachment_VA-GP.pdf PDF
15. Exhibit M - SF330 - AE Qualifications_VA-GP.pdf PDF
12. Exhibit J_DB wage 260123_Josephine County_VA-GP.pdf PDF
02. RLP Published 260324_GrantsPass-CBOC.pdf PDF
07. Exhibit E_3517B General Clauses (Dec. 2025).pdf PDF
14. Exhibit L GSA Form 527 GC Qual-Fin_VA-GP.pdf PDF
08. Exhibit F - Form 1364 Proposal to Lease Space vJan23.pdf PDF
04. Exhibit B_ASR-CBOC with Janitorial w-Footer 241202.pdf PDF
19. Exhibit Q - Lease - New Construction (Feb. 2026)_VA-GP.pdf PDF
05. Exhibit C_VA Security Requirements (FSL Level II) (Oct 2024).pdf PDF
10. RLP Exhbit H_Form12000 FLS PartA v-Dec2018_VA-GP.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT NO. 1

TO REQUEST FOR LEASE PROPOSAL NO. 36C24W24R0017

April 22, 2026

Department of Veterans Affairs (DVA) Community Based Outpatient Clinic (CBOC)

Grants Pass, OR

Request for Lease Proposal (RLP) 36C24W24R0017 is amended to extend the due date for initial offers. The cover page is modified to read “Offers due by 06/01/2026”.

In addition to extending the initial offer due date, DVA is providing the following clarifications to the RLP:

[1] Does the RLP require a Main Entry Canopy as part of the design?

A main entrance canopy is not explicitly part of the criteria. A main entry canopy could potentially be evaluated as exceeding the requirements. The cost of the canopy would be part of the building shell.

[2] Does the RLP require perimeter fencing around the entire property?

The perimeter fences is governed by the PSRDM in Exhibit B. An entire perimeter fence is not required. However, Government Vehicles will need to be fenced. The final design addressing the security fencing for GOVs will be addressed during DIDs and the cost associated with the fencing will be part of the TI and included on the TICS table.

[3] Does the RLP require an Emergency Generator?

Yes, it is required per Exhibit B. The cost for the emergency generator is included within the TI and included on the TICS table.

[4] Is there a BSAC allowance?

No, all BSAC related work will be included as part of the TI scope and captured on the TICS. The TICS will be completed post award by the contract awardee after design is finalized. The final TI price will be negotiated and work authorized by DVA per Lease paragraph 4.

[5] Are the final plans submitted pre-award considered pre-award DIDs?

No. The plans submitted as part of the offer will be evaluated per RLP section 4. Final DIDs will be developed post-award during a DID workshop per lease section 4.

[6] Is the parking requirement 55 spaces or 1 space per 200 RSF?

DVA’s minimum requirement for parking is 55 spaces, however the proposal must also meet minimum code requirements of the local jurisdiction. The 1 space per 200 RSF ratio governs if there is no on-site parking requirement specified by local code. Offerors should also keep in mind that the proposed site will be evaluated per RLP Section 4. This evaluation includes the quality and quantity of the parking shown on the site plan submitted.

------------------------------------------------- END OF RLP CHANGES ----------------------------------------

Authorized By: Deborah Greer, Lease Contracting Officer, DVA

Please sign below, acknowledging receipt of this form, and return a copy with your initial offer.

RECEIPT OF AMENDMENT NUMBER 1 IS HEREBY ACKNOWLEDGED

BY THE OFFEROR:

COMPANY (printed)

OFFEROR NAME (printed)

OFFEROR SIGNATURE

2026-04-22T13:48:07-0700
DEBORAH GREER

File details come from the government source that posted it. Updated .