This is a template document for completing a Tenant Improvement Cost Summary (TICS) table for federal real estate leases. The template is designed to capture information for lease proposal 36C24W24R0017 located in Grants Pass, Oregon.

The document requires completion of specific data fields including Assignable Building Occupancy Area (ABOA) square footage, tenant improvement allowance per ABOA SF, and rentable square footage (RSF). Respondents must enter fee information for Tenant Improvement General Contractor fees, Shell General Contractor fees, Tenant Improvement A/E fees, Shell A/E fees, and Lessor's TI Project Management fees. These fees can be structured as either a percentage basis or lump sum amount, with specific instructions that percentage values must be entered as decimals (e.g., 0.06 for 6.00%). A/E fees established as a cost per ABOA SF should be converted to a lump sum. The document notes that if Building Space Acquisition and Cost (BSAC) is applicable, percentage-basis fee amounts will automatically apply to BSAC calculations on the TICS tab, while lump sum amounts will not be applied twice. Additionally, the document specifies that Request for Lease Proposals requires a percentage basis specifically for TI and BSAC project management fees. The template also provides space for entry of other lessor costs established under the lease agreement.

View the file

Other files

File Type Posted
VA GrantsPass CBOC RLP Amd 2 20260521 Final-dlg.pdf PDF
RLP Amd-1 VA-GrantsPass CBOC-dlg 260422.pdf PDF
03. ExhA_L100 Clean 260323-TJP.pdf PDF
12. Exhibit J_DB wage 260123_Josephine County_VA-GP.pdf PDF
02. RLP Published 260324_GrantsPass-CBOC.pdf PDF
11. RLP Exhibit I_Seismic Offer Forms_VA-GP.docx DOCX document
13. Exhibit K_PastPerf Questionnaire_VA-GP.docx DOCX document
09. Exhibit G - Form 1217 Lessor's Annual Cost Statement vNov16.pdf PDF
15. Exhibit M - SF330 - AE Qualifications_VA-GP.pdf PDF
14. Exhibit L GSA Form 527 GC Qual-Fin_VA-GP.pdf PDF
21. Exhibit T - Lease - Broker Project (Mar. 2026)_VA-GP.pdf PDF
06. Exhibit D_GSA FORM 3516 Solicitation Provisions (Dec. 2025).pdf PDF
20. Exhibit R - Sensitive Information Attachment_VA-GP.pdf PDF
08. Exhibit F - Form 1364 Proposal to Lease Space vJan23.pdf PDF
04. Exhibit B_ASR-CBOC with Janitorial w-Footer 241202.pdf PDF
05. Exhibit C_VA Security Requirements (FSL Level II) (Oct 2024).pdf PDF
19. Exhibit Q - Lease - New Construction (Feb. 2026)_VA-GP.pdf PDF
10. RLP Exhbit H_Form12000 FLS PartA v-Dec2018_VA-GP.docx DOCX document
16. Exhibit N _VA HANDBOOK H-18-8 Seismic_VA-GP.pdf PDF
04A. Exhibit B1_POR Room Listings and Size Reqs 250307.pdf PDF
07. Exhibit E_3517B General Clauses (Dec. 2025).pdf PDF
18. Exhibit P - RLP - Broker Project Mar26_VA-GP.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEASE GS-XXP-LXXXXXXX or Project

Location: City, State

ABOA SF =

TENANT IMPROVEMENT ALLOWANCE PER ABOA SF =

RSF=

DATE:

Basis Amount

Tenant Improvement General Contractor Fee percent

Shell General Contractor Fee percent

Tenant Improvement A/E Fees (per Lease) percent

Shell A/E Fees percent

Lessor's TI Project Management Fee (per Lease) percent

TI Shell

Other Lessor Costs Established Under the Lease

Enter percent values as decimals. Ex: 0.06 for 6.00%

For A/E fees established as a cost per ABOA sf, convert rate to lump sum.

If BSAC is applicable, 'Amount' values entered above for TI fees that have a 'percent' basis will automatically be applied to BSAC on the TICS tab. 'Lump Sum' basis amounts will NOT be applied twice; 'lump sum' basis amounts entered above should consider the full scope of both TI and BSAC and will only be displayed once on the TICS tab.

General contractor fee, A/E

Fee and Lessor's Project

Management Fee fields are structured to allow you to choose percentage or a lump sum.

INFORMATION NEEDED TO COMPLETE TICS TABLE

36C24W24R0017

Grants Pass, OR

C16Cell:

Request for Lease Proposals requires a percentage basis for TI and BSAC project management fee.Note: