This is a template document for completing a Tenant Improvement Cost Summary (TICS) table for federal real estate leases. The template is designed to capture information for lease proposal 36C24W24R0017 located in Grants Pass, Oregon.
The document requires completion of specific data fields including Assignable Building Occupancy Area (ABOA) square footage, tenant improvement allowance per ABOA SF, and rentable square footage (RSF). Respondents must enter fee information for Tenant Improvement General Contractor fees, Shell General Contractor fees, Tenant Improvement A/E fees, Shell A/E fees, and Lessor's TI Project Management fees. These fees can be structured as either a percentage basis or lump sum amount, with specific instructions that percentage values must be entered as decimals (e.g., 0.06 for 6.00%). A/E fees established as a cost per ABOA SF should be converted to a lump sum. The document notes that if Building Space Acquisition and Cost (BSAC) is applicable, percentage-basis fee amounts will automatically apply to BSAC calculations on the TICS tab, while lump sum amounts will not be applied twice. Additionally, the document specifies that Request for Lease Proposals requires a percentage basis specifically for TI and BSAC project management fees. The template also provides space for entry of other lessor costs established under the lease agreement.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEASE GS-XXP-LXXXXXXX or Project
Location: City, State
ABOA SF =
TENANT IMPROVEMENT ALLOWANCE PER ABOA SF =
RSF=
DATE:
Basis Amount
Tenant Improvement General Contractor Fee percent
Shell General Contractor Fee percent
Tenant Improvement A/E Fees (per Lease) percent
Shell A/E Fees percent
Lessor's TI Project Management Fee (per Lease) percent
TI Shell
Other Lessor Costs Established Under the Lease
Enter percent values as decimals. Ex: 0.06 for 6.00%
For A/E fees established as a cost per ABOA sf, convert rate to lump sum.
If BSAC is applicable, 'Amount' values entered above for TI fees that have a 'percent' basis will automatically be applied to BSAC on the TICS tab. 'Lump Sum' basis amounts will NOT be applied twice; 'lump sum' basis amounts entered above should consider the full scope of both TI and BSAC and will only be displayed once on the TICS tab.
General contractor fee, A/E
Fee and Lessor's Project
Management Fee fields are structured to allow you to choose percentage or a lump sum.
INFORMATION NEEDED TO COMPLETE TICS TABLE
36C24W24R0017
Grants Pass, OR
C16Cell:
Request for Lease Proposals requires a percentage basis for TI and BSAC project management fee.Note: