This solicitation is for roof replacement services at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The scope of work includes removing the existing roof on Building 77 and installing a new roof over 180 calendar days. The contractor must provide all labor, materials, equipment, supervision, project management, and coordination. The base period of performance is 180 days from the notice to proceed. Work hours are generally Monday through Friday from 7:30am to 4:30pm. The solicitation closes on February 1, 2022 and is a 100% set-aside for service-disabled veteran-owned small businesses. The contractor must adhere to all VA security, privacy and environmental requirements and processes.

View the file

Other files

File Type Posted
36C24921B0013 0006.pdf PDF
36C24921B0013 0005.pdf PDF
36C24921B0013 0004.pdf PDF
36C24921B0013 0003.pdf PDF
32 18 27 -02792-PLAYGROUND SURFACING - POURED RUBBER.pdf PDF
36C24921B0013 0002.pdf PDF
36C24921B0013 0001.pdf PDF
Specifications.pdf PDF
Drawing Part-5.pdf PDF
Drawing Part-7.pdf PDF
Drawing Part-4.pdf PDF
Drawing Part-11.pdf PDF
Drawing Part-1.pdf PDF
36C24921B0013_3.docx DOCX document
Drawing Part-9.pdf PDF
RFI Form - Install Historic Site Enhancements.pdf PDF
Drawing Part-6.pdf PDF
Drawing Part-8.pdf PDF
Drawing Part-12.pdf PDF
Drawing Part-10.pdf PDF
WD 20220191 9-2-2022.pdf PDF
Contractor EMR Certification Form.pdf PDF
Drawing Part-3.pdf PDF
Drawing Part-2.pdf PDF
Header - List of Attachments.txt TXT text file
Drawing Part-13.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10/28/2022

07 31 26 - 1

SECTION 07 31 26

SLATE SHINGLES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Slate shingles over underlayment nailed to roof sheathing.

1.2 RELATED WORK

A. Section 07 60 00, FLASHING AND SHEET METAL; Counterflashing and Flashing of Roof Projections.

B. Section 07 71 00, ROOF SPECIALTIES; Roof Hatches (Scuttles) and Roof

Vents.

C. Section 09 06 00, SCHEDULE FOR FINISHES: Slate Color.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. ASTM International (ASTM):

C406/C406M-15...........Roofing Slate.

D226/D226M-17...........Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing.

D1970/D1970M-19.........Self-Adhering Polymer Modified Bituminous Sheet

Materials Used as Steep Roofing Underlayment for Ice Dam Protection.

D4586/D4586M-07(2018)...Asphalt Roof Cement, Asbestos-Free.

F1667-18a...............Driven Fasteners: Nails, Spikes, and Staples.

1.4 PREINSTALLATION MEETINGS

A. Conduct pre-installation meeting at project site minimum 30 days before beginning Work of this section.

1. Required Participants:

1.5 CONTRACTING OFFICER'S REPRESENTATIVE.

1. Architect/Engineer.

2. Contractor.

a. Installer.

b. Manufacturer's field representative.

c. Other installers responsible for adjacent and intersecting work, including flashing and sheet metal.

07 31 26 - 2

3. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.

a. Installation schedule.

b. Installation sequence.

c. Preparatory work.

d. Protection before, during, and after installation.

e. Installation.

f. Terminations.

g. Transitions and connections to other work.

h. Other items affecting successful completion.

4. Document and distribute meeting minutes to participants to record decisions affecting installation.

1.6 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Manufacturer's Literature and Data:

1. Description of each product.

2. Installation instructions.

C. Samples:

1. Shingles: Full sized, each type and color. Submit quantity required to show full color and texture range.

D. Qualifications: Substantiate qualifications comply with specifications.

1. Installer with project experience list.

1.7 QUALITY ASSURANCE

A. Installer Qualifications:

1. Regularly installs specified products.

2. Installed specified products with satisfactory service on five similar installations.

a. Project Experience List: Provide contact names and addresses for completed projects.

1.8 DELIVERY

A. Deliver products in manufacturer's original sealed packaging.

B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, production run number, and manufacture date.

C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

07 31 26 - 3

1.9 STORAGE AND HANDLING

A. Protect products from damage during handling and construction operations.

1.10 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

PART 2 - PRODUCTS

2.1 PRODUCTS - GENERAL

A. Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES.

B. Provide each product from one manufacturer.

2.2 SLATE SHINGLES

A. Slate Shingles: ASTM C406/C406M, Grade S1, unfading color, with no ribbons.

1. Nail Holes: 2 per shingle, pre-punched or predrilled.

2. Match existing slate in color, size, exposure and texture.

3. Thickness: 6 mm (1/4 inch).

4. Length: 400 mm (16 inches) // 450 mm (18 inches) // 500 mm

(20 inches) //.

5. Width: // 150 mm (6 inches) // 175 mm (7 inches) // 200 mm

(8 inches) // 225 mm (9 inches) // 250 mm (10 inches) // 275 mm

(11 inches) // 300 mm (12 inches) // 350 mm (14 inches) //.

6. Exposure: // 300 mm (12 inches) // 350 mm (14 inches) // 400 mm

(16 inches) // 450 mm (18 inches) //.

7. Texture: Medium // Natural Cleft //.

8. Head Lap: 100 mm (4 inches) minimum.

2.3 ROOFING NAILS

A. Roofing Nails:

1. Nails for Slate Shingles: ASTM F1667, Type 1, Style 23 copper slating nails, 25 mm (1 inch) longer than thickness of slate.

2. Nails for Felt: ASTM F1667, Type I, Style 20, galvanized steel, smooth shanks.

2.4 ROOFING UNDERLAYMENT

A. Organic Felt: ASTM D226/D226M, Type II, No. 30.

B. Self-Adhering Modified Bituminous Underlayment: ASTM D1970/D1970M.

07 31 26 - 4

2.5 METAL FLASHING

A. Provide metal roof flashings, including apron flashings, step flashings, valley flashings, drip edges, and vent pipe flashings specified in Section 07 60 00, FLASHING AND SHEET METAL.

1. Metal: Copper.

a. Valleys: 1 mm (20 oz., 0.039 inches).

b. Other Locations: 0.55 mm (16 oz., 0.022 inches).

2.6 RIDGE VENTS

A. Ridge Vents: Manufacturer's standard ridge vent intended for long-term use under slate shingles.

1. Provide ridge vents with internal filters, internal baffles, or external baffles, for weather protection.

2. Free Area: Minimum 25400 square mm net free area per meter length

(12 square inches per foot).

2.7 SNOW GUARDS

A. Snow Guards: Individual copper snow guards, designed not to penetrate slate shingles.

2.8 ACCESSORIES

A. Asphalt Roof Cement: ASTM D4586/D4586M.

PART 3 - EXECUTION

3.1 PREPARATION

A. Examine and verify substrate suitability for roofing installation.

1. Verify roof substrates are sound, within manufacturer's tolerances, and free from defects which would interfere with roofing installation.

2. Verify roof accessories, vent pipes and other projections through roof are in place and roof flashing is installed, or ready for installation, before installing shingles.

B. Protect existing construction and completed work from damage.

3.2 INSTALLATION - GENERAL

A. Install products according to manufacturer's instructions.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

3.3 METAL DRIP EDGE INSTALLATION

A. At eaves and rakes, install copper drip edges specified in Section

07 60 00, FLASHING AND SHEET METAL.

1. Eaves: Install metal drip edge before underlayment.

07 31 26 - 5

2. Rakes: Install metal drip edge after underlayment.

B. Secure metal drip edges with compatible nails spaced minimum 250 mm (10 inches) on center along inner edges.

3.4 FLASHING INSTALLATION

A. Install copper flashings at intersections of roofs, adjoining walls, roof slope changes, under ridges, hips, and valleys, and at projections through deck such as chimneys and vent stacks. Install metal flashings to comply with requirements in Section 07 60 00, FLASHING AND SHEET

METAL.

B. Install step flashing at intersections with vertical surfaces.

1. Length: Length of shingle plus 50 mm (2 inches).

2. Vertical Leg Height: 200 mm (8 inches) minimum.

3. Horizontal Leg Width: 150 mm (6 inches) minimum.

C. Valley Flashing: Shingle type, as shown and as specified in Section

07 60 00, FLASHING AND SHEET METAL.

1. Secure valley flashing according to shingle manufacturer's instructions.

2. Width: 300 mm (12 inches) minimum, both sides of valley.

D. Hip and Ridge Flashing: Step flashing.

1. Length: Length of shingle plus 50 mm (2 inches).

2. Width: 13 mm (1/2 inch) less than shingle on both sides of hip or ridge.

3. Install step flashing as each course of slate shingles is installed.

Extend upper edge of flashing 50 mm (2 inches) minimum above each course of shingles. Extend lower edge 13 mm (1/2 inch) above butt of shingle forming next course.

3.5 UNDERLAYMENT INSTALLATION

A. Install self-adhering sheet underlayment, working from low point to high point. Lap sides 90 mm (3-1/2 inches) minimum, and lap ends 150 mm

(6 inches) minimum. Install at the following locations:

1. Eaves and Rakes: From edge of eave and rake to 600 mm (24 inches) minimum beyond inside face of exterior wall.

a. Lap underlayment over eave metal drip edge.

2. Valleys, Hips and Roof Slope Transitions: Centered over change in slope, and extended 450 mm (18 inches) minimum on both sides.

3. Ridges: Centered on ridge, and extended 900 mm (36 inches) minimum on both sides. Do not cover ridge vent opening.

07 31 26 - 6

4. Sidewalls and Projections through Roof: Extended 450 mm (18 inches) from projection, and extended up projection 100 mm (4 inches) minimum.

5. Roll underlayment to ensure adhesion to roof deck and metal flashings.

B. Install two layers organic felt underlayment, shingled, on roof deck not covered by self-adhering sheet underlayment, with 100 mm (4 inches) minimum end laps, 50 mm (2 inches) minimum head laps, and 300 mm

(12 inches) minimum ridge laps. Nail felt 125 mm (5 inches) on centers along laps.

3.6 ROOF ACCESSORY INSTALLATION

A. Install roof hatches (scuttles), and roof vents, specified in Section

07 71 00, ROOF SPECIALTIES before installing shingles.

B. Lap underlayment and slate shingles over upslope base flanges of roof accessory flashings.

C. Install underlayment and slate shingles over side slope base flanges of roof accessory flashings.

D. Install downslope base flanges of roof accessories over slate shingles.

3.7 SLATE SHINGLE INSTALLATION

A. Install starter course of roof shingles with 50 mm (2 inch) overhang at eaves. Install first course over starter course.

B. At rake, overhang roof edge 25 mm (1 inch).

C. Install shingles with specified head lap.

D. Fasten shingles using two nails per shingle, concealed by head lap.

E. Valleys: // Open // Closed, to match existing //.

3.8 RIDGE VENT INSTALLATION

A. Construct ridge vents. Fasten with roofing nails to penetrate through roof sheathing.

1. Extent: Continuous along ridges extending to within <distance> of rakes.

3.9 HIP AND RIDGE SHINGLE INSTALLATION

A. Fasten nailing strips to both sides of hip and ridge.

B. Install step flashing at hips and ridges.

1. Begin ridge shingle installation at leeward end of ridge. Cover ridge vents with step flashing and shingles. Do not cover ridge vent openings with ridge shingles.

2. Begin hip shingle installation at eave.

07 31 26 - 7

C. Install hip and ridge shingles in pairs, overstep flashing. Butt shingles together, nail in place, then install the next course of flashing.

D. Seal ridge joint with asphalt roof cement.

3.10 SNOW GUARD INSTALLATION

A. Install snow guards in layout recommended by manufacturer.

1. Fasten snow guards with fasteners concealed by shingles. Do not penetrate shingles.

3.11 PROTECTION

A. Protect slate shingles from construction operations.

B. Repair damage.

- - E N D - -

SECTION 07 31 26 slate SHINGLES
PART 1 - GENERAL
1.1 SUMMARY
1.2 RELATED work
1.3 APPLICABLE PUBLICATIONS
1.4 PREINSTALLATION MEETINGS
1.5 Contracting Officer's Representative.
1.6 SUBMITTALS
1.7 QUALITY ASSURANCE
1.8 DELIVERY
1.9 STORAGE AND HANDLING
1.10 WARRANTY
PART 2 - PRODUCTS
2.1 PRODUCTS - GENERAL
2.2 SLATE SHINGLES
2.3 ROOFING NAILS
2.4 ROOFING UNDERLAYMENT
2.5 METAL FLASHING
2.6 RIDGE VENTS
2.7 SNOW GUARDS
2.8 ACCESSORIES
PART 3 - EXECUTION
3.1 PREPARATION
3.2 INSTALLATION - GENERAL
3.3 METAL DRIP EDGE INSTALLATION
3.4 FLASHING INSTALLATION
3.5 UNDERLAYMENT INSTALLATION
3.6 ROOF ACCESSORY INSTALLATION
3.7 SLATE SHINGLE INSTALLATION
3.8 RIDGE VENT INSTALLATION
3.9 HIP AND RIDGE SHINGLE INSTALLATION
3.10 SNOW GUARD INSTALLATION
3.11 PROTECTION