36C24921B0013 0005.pdf
PDF 220 KB Posted
- Solicitation number
- 36C24921B0013
About this file
This solicitation and related federal contract opportunity document provide details for Project 621-20-104 to install historical site enhancements at East Tennessee State University. The base bid requires general construction, alterations, walks and removal of existing structures to enhance historical sites. Two alternate bids deduct portions of work related to a gazebo and pavilion. The period of performance is 365 calendar days from notice to proceed. The solicitation is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. Offers are due on February 1, 2023 at 1:00 PM Central Time and will be opened via Microsoft Teams call. The work location is the James H. Quillen VA Medical Center in Mountain Home, Tennessee and involves supervision, planning, deliveries and final inspection. COVID-19 protocols and security, privacy and records management training are required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24921B0013 0006.pdf | ||
| 36C24921B0013 0004.pdf | ||
| Specification 073126.pdf | ||
| 36C24921B0013 0003.pdf | ||
| 32 18 27 -02792-PLAYGROUND SURFACING - POURED RUBBER.pdf | ||
| 36C24921B0013 0002.pdf | ||
| 36C24921B0013 0001.pdf | ||
| Specifications.pdf | ||
| Drawing Part-5.pdf | ||
| Drawing Part-7.pdf | ||
| Drawing Part-4.pdf | ||
| Drawing Part-11.pdf | ||
| Drawing Part-1.pdf | ||
| 36C24921B0013_3.docx | DOCX document | |
| Drawing Part-9.pdf | ||
| RFI Form - Install Historic Site Enhancements.pdf | ||
| Drawing Part-6.pdf | ||
| Drawing Part-8.pdf | ||
| Drawing Part-12.pdf | ||
| Drawing Part-10.pdf | ||
| WD 20220191 9-2-2022.pdf | ||
| Contractor EMR Certification Form.pdf | ||
| Drawing Part-3.pdf | ||
| Drawing Part-2.pdf | ||
| Header - List of Attachments.txt | TXT text file | |
| Drawing Part-13.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 5
621-23-1-5111-0001
621-20-104
Department of Veterans Affairs Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 400 Murfreesboro TN 37129
90C
Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129
To all Offerors/Bidders
36C24921B0013
10-05-2022
X
** HOUR & DATE for Receipt of Offers is EXTENDED to:
See CONTINUATION Page
621-3630162-5111-854200-3220 23NR0JA15
x 1
The purpose of this amendment is to answer questions and revise the schedule.
Diana K. Grube Contracting Officer
RFI Clarifications
36C24921B0013 Amendment 0005
Question 1 - RFI 1 says work around ETSU bldgs. are not included, but it also says to include signs, sidewalk, and other work on major roads. Does this mean that all asphalt, and concrete are to be replaced if it is on one of the major roadways even if it is on the ETSU/NIC denoted areas on the plans?
Answer: In our previous answer, the main roads included in the works were mentioned, all the buildings under the use of ETSU and Marked in the drawings are not included in the project, including their parking lots.
Question 2 - RFI 1 says work around ETSU bldgs are not included, but it also says to include signs, sidewalk, and other work on major roads. Sheet L101 shows a large area denoted as ETSU/NIC stretching from Ashe Ave to Dogwood, including buildings 7, 6, 178, etc. a. Do the light posts get refinished within these areas if they are along the side of a major road?
Answer: According to our previous answer, the main roads were mentioned, which include the works, sidewalk, line painting, lighting poles, signs referring to the main streets. Nothing referring to the buildings or their parking lots and interior roads marked on the drawings is not included.
Question 3 - Do the light post lamps get replaced within these areas if they are along the side of a major road?
Answer: Yes
Question 4: In another example, around bldg. 7 on sheet L101, there are light poles between Maple Ave and the building. Do these light poles get refinished, and lamps replaced?
Answer: No, they are within the marked area and those are not main roads mentioned in our previous answer.
Question 5: Do the handrails get replaced within these areas if they are along the side of a major road?
Answer: Yes, if there were any on the following streets, Dogwood Ave, Memorial Ave, and First Street measuring from the curb toward the building everything contained within 15 feet should be included in the price.
Question 6: Do the handrails get refinished within these areas if they are along the side of a major road?
Answer: Yes, if there were any on the following streets, Dogwood Ave, Memorial Ave, and First Street measuring from the curb toward the building everything contained within 15 feet should be included in the price.
Question 7: Do the parking lots get ADA striping within these areas if they are along the side of a major road?
Answer: Yes, if there were any on the following streets, Dogwood Ave, Memorial Ave, and First Street measuring from the curb toward the building everything contained within 15 feet should be included in the price.
Question 8: Do the roadway arrows get installed within these areas if they are along the side of a major road?
Answer: Yes, if there were any on the following streets, Dogwood Ave, Memorial Ave, and First Street measuring from the curb toward the building everything contained within 15 feet should be included in the price.
Question 9: The specs and the RFP state Alternate #1 as the following: “Bid Deduct 1: Perform all work as stated in base bid except remove gazebo historical rehabilitation shown on sheet A103 and E101B.
Period of Performance is 365 calendar days.” However, sheet A103 shows work at the South Gate.
Answer: The gate is independent from the Gazebo; the alternate is not affected by those pages.
Question 10: Additionally, A106 calls for Alternate 1 to delete all work shown on sheet A106. This information is contradictory. Sheet A105 shows repairs to the existing brick walls, concrete slab, and other restoration work to the gazebo, and sheet A106 shows replacing metal handrails with new historically accurate wood balusters, etc. Please provide very clear direction as to what work is in the base bid and what work is in the Alt #1.
Answer: See revised schedule
Question 11: Bid Deduct 2: Perform all work as stated in Bid Deduct 1 except remove pavilion detailed on A104 and E101B. Period of Performance is 365 calendar days. However, sheet A104 shows existing conditions at the band stand. Please provide very clear direction as to what work is in the base bid and what is in Alt #2.
Answer: See revised schedule
Question 12: Detail B/L501 shows the detail for the new asphalt base and rubber play surface at the exercise area. However, it also shows an alternate detail called “deduct alternate” which shows an engineered wood fiber surface on stone bed in lieu of the rubber surface detail. There is no mention of a 3rd alternate in the specs or the RFP. Please clarify, should this work be included as an alternate #3?
Answer: Disregard the alternate detail referencing the engineered wood fiber surface on stone bed and price the asphalt base and rubber play surface at the exercise area.
Question 9: On drawings C101 and C102 the areas around buildings 7, 178, and 60 are all within the area as ETSU and labeled as “NIC”. The answer to the above question #1 specifically states “only work on major roads such as Dogwood, First Street and Memorial are included”. On drawing E102 there are type PL3 fixtures around building 7, there are type PL3a fixtures up the sidewalks leading to Building 78, there are type PL3a fixtures around building 60. None of these fixtures are on “major roads” per the answer to question 1. The other part of the answer to question 1 states that “all works contained around the ETSU building are not included”. This condition exists on many other buildings and electrical drawings of fixtures “around” ETSU buildings where the areas are labeled as “NIC”. Please clarify all light fixtures on all drawings that are to be “included” in the contract and are currently shown in “NIC” areas whether they are near buildings or on major streets.
Answer: According to our previous answer, the main roads were mentioned, which include the works, sidewalk, line painting, lighting poles, signs referring to the main streets. Nothing referring to the buildings or their parking lots and interior roads marked on the drawings is not included.
Question 10: RFI 13 and 14 ask about the slate tile. The responses say there is no slate tile roofing but Amendment 0003.
Answer: The specification was provided, since it is an alternative which must be part of your proposal
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1.00 JB __________________ __________________
Bid Item 0001, Base Bid - Project 621-20-104, Install Historical Site Enhancements - Work includes general construction, alterations, walks, necessary removal of existing structures and construction and certain other items.
Period of Performance is 365 calendar days
Bid Deduct 1: Perform all work as stated in base bid except remove gazebo historical rehabilitation shown on sheet A106 and E101B.
Period of Performance is 365 calendar days.
Bid Deduct 2: Perform all work as stated in Bid Deduct 1 except remove pavilion detailed on A107 and E101B. Period of Performance is 365 calendar days.
GRAND TOTAL __________________
| A.1 PRICE/COST SCHEDULE |
| ITEM INFORMATION |
File details come from the government source that posted it. Updated .