This document provides details for a federal contract solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The solicitation is for Project 621-20-104 to install historic site enhancements at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. Key requirements include furnishing all labor, materials, equipment, supervision and other items to complete the project per drawings and specifications. The scope involves installing primary directional signs made of cut stone, roofing shingles, and integrated sink bowls. The period of performance is 180 calendar days from notice to proceed. The bid opening is scheduled for November 3, 2022. The solicitation is set aside 100% for service-disabled veteran-owned small businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24921B0013 0006.pdf | ||
| 36C24921B0013 0005.pdf | ||
| 36C24921B0013 0004.pdf | ||
| Specification 073126.pdf | ||
| 32 18 27 -02792-PLAYGROUND SURFACING - POURED RUBBER.pdf | ||
| 36C24921B0013 0002.pdf | ||
| 36C24921B0013 0001.pdf | ||
| Specifications.pdf | ||
| Drawing Part-5.pdf | ||
| Drawing Part-7.pdf | ||
| Drawing Part-4.pdf | ||
| Drawing Part-11.pdf | ||
| Drawing Part-1.pdf | ||
| 36C24921B0013_3.docx | DOCX document | |
| Drawing Part-9.pdf | ||
| RFI Form - Install Historic Site Enhancements.pdf | ||
| Drawing Part-6.pdf | ||
| Drawing Part-8.pdf | ||
| Drawing Part-12.pdf | ||
| Drawing Part-10.pdf | ||
| WD 20220191 9-2-2022.pdf | ||
| Contractor EMR Certification Form.pdf | ||
| Drawing Part-3.pdf | ||
| Drawing Part-2.pdf | ||
| Header - List of Attachments.txt | TXT text file | |
| Drawing Part-13.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
621-23-1-5111-0001
621-20-104
Department of Veterans Affairs Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 400 Murfreesboro TN 37129
90C
Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129
To all Offerors/Bidders
36C24921B0013
10-05-2022
X x x
621-3630162-5111-854200-3220 23NR0JA15
x 1
The purpose of this amendment is to answer questions submitted.
The bid opening will be November 3, 2022 at 10:00 AM CT.
Diana K. Grube Contracting Officer
36C24921B0013 Amendment 0003
Question 1 - Detail 1 is for the primary directional signs. Is it correct that these 6 are the only signs that gets cut (real) stone and the rest are cast stone as detailed?
Answer: It is correct
Question 2 - Keynote 5 calls for slate. A0002 calls for no slate but doesn't give alternative material. Can you please clarify what type of shingles are to be used?
Answer: See attached specification 073126, they can use natural or synthetic must be submitted for approval.