VA James A Haley 1 5T MRI -90 CD-Progress Drawings 12-15.pdf

PDF 25 MB Posted

Attached to
Y1DA--FY26: NRM (PROJ: 673-CSI-132) D/B 1. 5T MRI (ICC)
Solicitation number
36C24826Q0128
Issued by

About this file

These are architectural and engineering design documents for a 1.5T MRI (Magnetic Resonance Imaging) renovation project at the James A. Haley Veterans Hospital in Tampa, Florida. The comprehensive set of drawings covers multiple disciplines including architectural, structural, mechanical, electrical, plumbing, and fire protection, detailing a complete interior renovation of approximately 1,000 square feet to replace an administrative area on the ground floor of Building 1. The project involves creating a new MRI scanner suite with a control room, scanner room, system component room, and dressing room, with specific design considerations for RF shielding, medical equipment installation, and maintaining hospital operations during construction.

The design documents specify comprehensive technical requirements, including demolition of existing walls, ceilings, floors, and systems; reconfiguration of fire sprinkler and alarm systems; installation of computer and communication systems; coordination with the MRI equipment vendor; and adherence to multiple codes including NFPA 101, IBC 2021, and VA healthcare design standards. The project is part of VA solicitation 36C24826Q0128, set aside as a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) design-build contract, with the Request for Quote anticipated to be issued on January 10, 2026, and Phase I quotes due on January 6, 2026. The basis of design is a Siemens MAGNETOM SOLA 1.5T MRI system, with the total project focusing on creating a modern, compliant medical imaging environment.

View the file

Other files

File Type Posted
673-CSI-132 SOW RFI update.docx DOCX document
first floor drawing.pdf PDF
673-CSI-132 RFI Responses.docx DOCX document
WD-FL20260208 01-02-26.pdf PDF
36C24826Q0128 0003.pdf PDF
673-CSI-132 - Hazardous Materials Report 60 PERCENTAGE.pdf PDF
second floor drawing - ACM.pdf PDF
sign in sheet.pdf PDF
36C24826Q0128 0002.pdf PDF
VA James A Haley1 5T MRI -90 CD Progress Specifications 12-15.pdf PDF
2510179R0-DRAWINGS.pdf PDF
36C24826Q0128 0001.pdf PDF
36C24826Q0128_1.pdf PDF
Experience information Sheet.pdf PDF
EMR 1 page.pdf PDF
Base Offer Price Breakdown - 1 page.xlsx XLSX spreadsheet
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
WD FL20250208 05232025.pdf PDF
2510179R0-DRAWINGS.pdf PDF
36C24826Q0128.docx DOCX document
673-CSI-132 SOW.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING SYMBOLS

1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE

LOCATION. THEY ARE A COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT

BE SEPARATED FOR DISTRIBUTION. THE GC SHALL REVIEW ALL DRAWINGS AND

PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.

2. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE DRAWINGS AND

THE SPECIFICATIONS. CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THESE

DRAWINGS, THE SPECIFICATIONS, AND IMMEDIATELY NOTIFY THE DESIGN

PROFESSIONAL OF ANY INCONSISTENCIES THAT ARE DISCOVERED.

3. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE A/E.

4. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING

FEDERAL, STATE AND LOCAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED

IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO

SPECIFIC REGULATIONS AS MANDATED BY THE OWNER, THE ARCHITECT/ENGINEER,

AND THE AUTHORITIES HAVING JURISDICTION. THE GENERAL CONTRACTOR IS

RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS AND

CERTIFICATES AND SHALL FURNISH COPIES OF PERMITS, INSPECTIONS, TESTING AND

CERTIFICATES TO THE OWNER.

5. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE

DISRUPTION OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL

CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING

OCCUPANTS, MATERIALS, AND EXISTING CONSTRUCTION THROUGHOUT ALL PHASES

OF CONSTRUCTION. DAMAGE TO EXISTING-TO-REMAIN CONSTRUCTION OR

EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONDITION AT THE CONTRACTOR'S

EXPENSE.

6. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB

SITE ON A DAILY BASIS.

7. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED

TO THE ARCHITECT IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE

PROPOSED IS PROVEN TO BE ADVANTAGEOUS TO THE OWNER WITH RESPECT TO

DELIVERY DATE, QUALITY, OR COST.

8. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND

FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE A/E DOES

NOT ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S MEANS AND METHODS

OR FOR TEMPORARY STRUCTURES.

9. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL

CONTRACTOR. THE CONTRACTOR SHALL EMPLOY ENGINEERING EXPERTISE AS

NEEDED TO ASSIST IN DEMOLITION.

10. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL

CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH CAMPUS AND

LOCAL FIRE AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION

AND SAFETY DURING CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY

RESPONSIBLE FOR MEETING OSHA REGULATIONS DURING CONSTRUCTION.

11. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND

PROTECTION OF BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM

INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL

MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY

COMPLETED WALLS SHALL BE COVERED TO PROTECT FROM WATER INTRUSION.

DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER

INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL

CONTRACTOR'S EXPENSE.

12. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT

DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER

QUANTITY OF WORK, AS DETERMINED BY THE GOVERNMENT, SHALL BE PROVIDED.

13. THE GC SHALL BE RESPONSIBLE FOR COORDINATING THE INSTALLATION OF NEW

UTILITIES WITH EXISTING ADJACENT UTILITIES.

14. ANY WORK NOT SHOWN ON THE DRAWINGS, BUT CONSIDERED NECESSARY FOR THE

COMPLETION OF THE WORK IN A PROPER MANNER SHALL BE PROVIDED BY THE GC

WITHOUT ADDITIONAL CHARGE.

15. WHERE PRESENT WORK IS DAMAGED IN THE EXECUTION OF THE CONTRACT OR

WHERE OPENINGS ARE LEFT DUE TO THE REMOVAL OF PIPES, CONDUITS, CABLE

TRAYS, EQUIPMENT OR APPARATUS. REPAIR OR CLOSE UP CORRESPONDING

MATERIAL FINISH TO MATCH THE ADJOINING WORK. WHERE DAMAGE IS NOT

REPAIRABLE, NEW ITEMS OR EQUIPMENT SHALL BE PROVIDED.

16. CONTRACTOR TO COORDINATE WITH THE COR FOR QUESTIONS REGARDING SITE

ACCESS OF WORKERS, MATERIAL DISPOSAL AND HOURS OF OPERATION.

17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING AND VERIFYING

DIRECTLY WITH THE COR REGARDING ANY OWNER DESIRED CHANGES TO THE

NUMBERING SYSTEM AND/OR NAMING CONVENTION, LABELING AND/OR

IDENTIFICATION FOR (OR ON) THE ELECTRICAL PANELS, MECHANICAL EQUIPMENT,

FIRE ALARM SYSTEMS/PANELS, SIGNAGE, ETC.

OWNER:

Department of Veterans Affairs - Network 23 Contracting Office 13000 Bruce B. Downs Boulevard Tampa, Florida 33612

CONTRACTING OFFICER REP. (COR):

James A. Haley VA Medical Center 13000 Bruce B Downs Boulevard Tampa, Florida 33612

Eric Richardson eric.richardson7@va.gov

PROJECT MANAGER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Rebecca Olson rebecca.olson@romanykconsulting.com

855.424.3838x302

602.430.1265 cell

MECHANICAL ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

JImmy Smith, PE jimmy.smith@romanykconsulting.com

855.424.3838 x329

404.483.1297 Cell

ELECTRICAL ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Ajay Bajracharya, PE ajay.bajracharya@romanykconsulting.com

855.424.3838 x350

301.633.7584 CELL

STRUCTURAL ENGINEER:

RS&H, INC.

10748 Deerwood Park Boulevard South Jacksonville, Florida 32256

Matthew McCaul mathew.mccaul@rsandh.com

904.256.2367

ARCHITECT:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Gary Friedman Gary.Friedman@RomanykConsulting.com

855.424.3838 x322

720.989.8588 cell

ELEVATION NUMBER

SECTION

INTERIOR ELEVATION

ENLARGEMENT,

DETAIL

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

A101

SIM

EXTERIOR ELEVATION

A-101

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

A101

A101

TRUE NORTH

PLAN NORTHNORTH

NORTH ARROW WITH TRUE

NORTH INDICATION

ROOM

ROOM OCCUPANCY

150 SF

ROOM OCCUPANCY & AREA

SPOT ELEVATION

Name Elevation

FLOOR LEVEL &

NAME

SHEET KEYNOTE#

1i

0 GRID / COLUMN LINE DESIGNATOR

EQUIPMENT NUMBER

DOOR NUMBER

Ga5xFB1

WALL TYPE

WINDOW TYPE

ROOM NAME

ROOM NAME / NUMBER

REVISION TAG

EGRESS ROUTE ID AND

SECTION LENGTH

EGRESS : EGRESS ID

Egress Length

GENERAL NOTES PROJECT TEAM VICINITY MAP

INDEX OF DRAWINGS

TRUE NORTH

PLAN NORTHNORTH

A ---------------------

A/E ARCHITECT/ENGINEER

ACT ACOUSTICAL CEILING TILE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZE

APPROX APPROXIMATE

B ---------------------

BLKG BLOCKING

BOS BOTTOM OF STEEL

BSMT BASEMENT

C ---------------------

CD CONSTRUCTION DOCUMENTS

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CPT CARPET

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

D ---------------------

DEMO DEMOLITION

DET DETAIL

DOC DOCUMENT

E ---------------------

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EXP EXPOSED

OFF OFFICE

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

P --------------------

PCC PRECAST CONCRETE

PLYWD PLYWOOD

Q --------------------

QTY QUANTITY

R --------------------

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REC RECESSED

REQD REQUIRED

RM ROOM

RO ROUGH OPENING

S --------------------

SCHED SCHEDULE

SF SQUARE FOOT (FEET)

SIM SIMILAR

SPEC SPECIFICATION

ST STAIRS

STD STANDARD

STOR STORAGE

T --------------------

TEMP TEMPORARY

TFF TOP OF FINISH FLOOR

TN TRUE NORTH

TOF TOP OF FOOTING

TOP TOP OF PARAPET

TOS TOP OF SLAB

NOTES:

1. NOT ALL LISTED ABBREVIATIONS MAY BE USED.

2. SEE OTHER DISCIPLINES FOR ADDITIONAL ABBREVIATIONS.

F ---------------------

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FIN FINISH

FRT FIRE RETARDANT TREATED

G ---------------------

GALV GALVANIZED

GYP BD GYPSUM BOARD

H ---------------------

HB HOSE BIBB

HM HOLLOW METAL

I ---------------------

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

L ---------------------

LAV LAVATORY

LT LIGHT

M ---------------------

MACH RM MACHINE ROOM

MAX MAXIMUM

MECH RM MECHANICAL ROOM

MFR MANUFACTURER

MTL METAL

N ---------------------

N NORTH

NA NOT APPLICABLE

NFPA NATIONAL FIRE PROTECTION ASSOC.

NIC NOT IN CONTRACT

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

O -------------------

OFD OVERFLOW DRAIN

ARCHITECTURAL ABBREVIATIONS

BUILDING LOCATION

DISCIPLINE DESIGNATOR

MAJOR:

GENERAL - G

ARCHITECTURE - A

PLUMBING - P

MECHANICAL - M

ELECTRICAL - E

BUILDING NUMBER

11 - AE101

SHEET TYPE

DESIGNATOR

DISCIPLINE DESIGNATOR

(MINOR):

SHEET NUMBER

WITHIN SERIES

FIRE PROTECTION:

RS&H, INC.

10748 Deerwood Park Boulevard South Jacksonville, Florida 32256

Scott Dubin scott.dubin@rsandh.com

904.256.2336

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

NOT FOR

PERMITTING OR

CONSTRUCTION

Consultant:

Sprinklered

U.S. Department of Veterans Affairs

Sprinklered

A/E

/5

/2

:1

:0

A M

A ut od es k D oc s:

//V

IS

N

T am pa A

E

.5 T

M R

I I C

C /V

A J am es

A H al ey

.5

T M

R I_

A _R

-A

R C

H N

E W

.r vt

COVER SHEET

AW/GF/LN SE

9/05/2025

James A. Haley VA Medical

Center, Tampa, Florida

673-CSI-132

PROJECT NUMBER - 673-CSI-132

1.5T MRI ICC

90% PROGRESS SET 1.5T MRI ICC

VA: _______________

90% PROGRESS SET

9/05/2025

01-GI101James A. Haley VA Medical Center, Tampa, Florida

13000 BRUCE B DOWNS BLVD.

TAMPA, FL 33612

NOTE: These documents were prepared using the Siemens MAGNETOM SOLA 1.5T MRI equipment as a "Basis of Design". If the MRI equipment selected for the project changes, the new equipment will need to be evaluated to verify compatibility with current design and documents

Revisions: Rev: Date:

WELL

x

GATE

GATE

GATE

GATE

GATE

GATE

GATES

GATE

GATE

GATE

GATE

GATE

(3.04 ACRES)

100-YEAR OVERFLOW DEVICE

RETENTION POND "A"

RETENTION POND "C"

CONCRETE

PAD

POLE

TRANS. PAD

EXIT

ENTER

LC OF R/W

18' ASPHALT PAVEMENT

30' R/W (P)

(F

)LC

O F A

SP

HALT

R

C P

S

L

SIGN

SIGN

SIGN

SKY WALK

ISLAND

ISLAND

POST

MC ONLY

F

IS

H E R H

O U S E P

A R K

IN

G A

R E A

E

P S

PLAN TER

PLANTERS

CONC. SL AB

TRASH

S-2

DO WN

' W

ID

E

C O

N C

RE

TE

SID

E

W

ALK

6' WIDE CONC. SIDEWALK

:1

S L

O P

E (T

Y P

IC

A

L

4:1 SLOPE

(TYP ICAL)

:1

S L

O P

E

(T Y

P

IC

A L)

P E

R

IM

E

TE

R

SID

EW

ALK

X X

X X

XXXX

X

X

X

X

X

X X

X

A/C

A/C A/C

A/C

A/C

6' High Brick Enclosure

C O

M P

A C

T

O N

L Y

O N

L Y

C O

M P

A C

T

C O

M P

AC

T

O N

LY

C O

M P

AC

T

O N

LY

O N

LY

C O

M P

AC

T

O N

LY

C O

M P

AC

T

MOTORCYCLE

PARKING

POST

S

S

BB

BB

S

S

S

S

POST

POST

S

S

S

S

SSSS

D

S

KEY NOTES

1. SITE ACCESS FOR CONTRACTOR

PERSONNEL AND MATERIAL

DELIVERY.

2. DESIGNATED PARKING FOR

CONTRACTOR.

3. SECURE, CONTRACTOR STAGING AND

LAYDOWN AREA.

4. CONTRACTOR EQUIPMENT

REPLACEMENT ACCESS AND PATH.

5. BUILDING 1 AREA OF RENOVATION.

6. CONTRACTOR BUILDING ACCESS.

7. CONTRACTOR BUILDING ACCESS TO

ELEVATOR.

8. CONTRACTOR TOILET.

BLDG

NO.

BLDG NAME

BLDG

NO.

BLDG NAME

T33

MAIN HOSPITAL

RESEARCH

GROUNDS

OXYGEN TANKS

VETERNAS BENEFITS

WATER TOWER

COOLING TOWER #2

FLAMMABLE STORAGE

ENG/EMS STORAGE

BOTTLE GAS STORAGE

RECREATION STORAGE

NURSING HOME CARE UNIT

RADIATION THERAPY UNIT

GENERATOR (BLDG #30)

STEAM CLEANING

EYE CLINIC

HAZARDOUS STORAGE

SPINAL CORD INJURY

CENTRAL ENERGY PLANT

ADMINISTRATIVE ANNEX #2

ADMINISTRATIVE ANNEX

BACKFLOW PREVENTOR

GAZEBO

TOTEM POLE

FISHER HOUSE

GENERATOR/ POWER PLANT

PET SCAN

BLDG 32 SUBSTATION

BLDG 30 SUBSTATION

POLYTRAUMA SUPPORT, TRANS HSNG

HAZARDOUS STORAGE #2

NURSING STATION

BLDG

NO.

BLDG NAME

T34 T43 T50 T51 T57 T58 T59 T60 T61 T62 T65 T66 T67 T70 T71 T74

STORAGE TRAILER

SMOKING SHELTER

EMS

BUSINESS OFFICE

COMP & PEN

AGENT ORANGE

DSS/EMPLOYEE TRAVEL

HAS

EEO/UNASSIGNED

CONFERENCE

TRAILER

TRAILER

TRAILER

TRAILER

TRAILER

GERIATRIC CLINIC

1. REGULAR MEDICAL CENTER BUSINESS HOURS ARE 0700 - 1530, SOME AREAS FUNCTION 24

HOURS A DAY, 7 DAYS A WEEK.

2. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED CONSTRUCTION, SAFETY, AND ICRA

BARRIERS APPROVED BY COR BEFORE CONSTRUCTION COMMENCES WITH THE ICRA

PERMIT DISPLAYED DURING CONSTRUCTION FOR EACH PHASE.

3. ANY UTILITY SHUTDOWNS WILL REQUIRE THREE (3) WEEKS OR (21) CALENDAR DAYS NOTICE

AND ANY SHUTDOWNS THAT MAY DISRUPT NORMAL MEDICAL CENTER OPERATIONS MAY

NEED TO BE PERFORMED OUTSIDE REGULAR MEDICAL CENTER BUSINESS HOURS.

MAINTAIN UNINTERRUPTED OPERATION OF THE EXISTING FACILITIES, AND MINIMIZE

DISRUPTIONS TO THE MEDICAL CENTER FOR ALL SWITCH-OVER OF UTILITIES. COR

RESERVES THE RIGHT TO DETERMINE THE SEVERITY OF THE SHUTDOWN.

4. THE GC SHALL COORDINATE WITH THE COR TO DEVELOP A CRITICAL PATH METHOD (CPM)

SCHEDULE, SEQUENCING, COMPLETION DATES FOR RENOVATION AND NEW CONSTRUCTION

FOR THE PROJECT.

5. THE MEDICAL CENTER MUST REMAIN IN FULL OPERATION DURING CONSTRUCTION WITH

MINIMAL INTERRUPTION DUE TO ALL CONSTRUCTION ACTIVITES FOR THE PROJECT,

INCLUDING NOISE, DUST, VIBRATION, ETC., CREATED BY CONSTRUCTION ACTIVITIES

RELATED TO THIS PROJECT.

6. THE GC'S SCHEDULES SHOULD INCLUDE BUT IS NOT LIMITED TO THE FOLLOWING:

A. ALL CONSTRUCTION-ACTIVITIES-RELATED ISSUES WHICH MAY AFFECT THE CONTINUAL

OPERATIONS OF THE MEDICAL CENTER.

B. SCHEDULES FOR SHUTTING DOWN EXISTING SYSTEMS OR ACCESS FOR TIE-INS AND/OR

REPLACEMENT.

C. SCHEDULES FOR AFTER-HOURS OR WEEKEND CONSTRUCTION ACTIVITIES. BARRIERS

AND OTHER PROTECTIVE MEASURES SUCH AS ISOLATING THE HVAC SYSTEM IN AREAS

WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCTS, ETC.IBC (2021)

CHAPTER 33 SAFEGUARDS DURING CONSTRUCTION 3302.1 AND 1007.3.5 MAINTAIN

REQUIRED CORRIDOR EGRESS AT TEMPORARY BARRIERS AND PROVIDE SIGNAGE.

D. THE GC SHALL CONSULT WITH COR FOR SITE ACCESS INCLUDING ELEVATORS AND

DEBRIS/MATERIAL HAUL ROUTES.

7. IF MEDICAL CENTER ACCESS PATHWAYS AND ELEVATORS ARE REQUIRED TO BE BLOCKED

OR USED TEMPORARILY TO ACCOMMODATE CONSTRUCTION, COORDINATE ALTERNATE

PATHWAYS WITH THE COR AND PROVIDE TEMPORARY SIGNAGE AND TEMPORARY

PROTECTIVE BARRIERS TO CREATE ALTERNATE PATHWAYS AS REQUIRED. COORDINATE

AND SCHEDULE ANY DOWNTIME FOR THESE ROUTES WITH THE COR.

8. MAINTAIN ACCESS TO ALL EXISTING BUILDINGS, UTILITIES AND FACILITIES WITHIN THE

CONSTRUCTION LIMITS TO ACCESS EQUIPMENT AND TO PROVIDE SERVICE OR

MAINTENANCE OF EXISTING FACILITIES AND EQUIPMENT SERVING THE MEDICAL CENTER.

9. SOME NON STATIONARY EQUIPMENT (EQUIPMENT SITTING ON A COUNTERTOP OR MOBILE

UNITS) MAY BE MOVED. CONTRACTOR TO IDENTIFY AND REQUEST THE MOVEMENT OF THE

EQUIPMENT WITHIN THEIR CONSTRUCTION SCHEDULE. ONLY MEDICAL CENTER PERSONNEL

WILL BE ALLOWED TO MOVE MOBILE EQUIPMENT.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARILY COVERING, PROTECTION,

MOVING AND/OR STORAGE OF ALL FURNITURE AND EQUIPMENT RELATED TO THE PROJECT.

11. ALL LARGE CONSTRUCTION MATERIAL OR EQUIPMENT DELIVERIES, DEBRIS REMOVAL TO

BE COORDINATED WITH THE COR.

12. THE VA HAS DETERMINED THE RENOVATION AREA IS 100% ASBESTOS FREE.

13. PERSONNEL IN THE PHASED RENOVATION UP-GRADE AREA WILL BE TEMPORARILY

RELOCATED DURING CONSTRUCTION.

PROJECT NOTES CODE ANALYSIS

DEPARTMENT OF VETERANS AFFAIRS

JAMES A. HALEY VETERANS' HOSPITAL

13000 BRUCE B. DOWNS BOULEVARD

TAMPA, FLORIDA 33612

PROJECT CODE DATA

THIS PROJECT WILL PROVIDE AN INTERIOR RENOVATION OF APPROXIMATELY 1000 SF FOR A NEW 1.5T MRI SCANNER SUITE TO REPLACE AN ADMINSTRATIVE AREA ON THE GROUND FLOOR OF BUILDING 1. THE PROGRAM SCOPE INCLUDES THE ADDITION OF A CONTROL ROOM, SCANNER

ROOM, SYSTEM COMPONENT ROOM AND DRESSING ROOM.

THE FOLLOWING IS A SUMMARY OF THE PROJECT SCOPE:

1. THE COMPLETE DEMOLITION OF WALLS, CEILINGS, FLOORS, ELECTRICAL, AND MECHANICAL SYSTEMS.

2. RECONFIGURATION OF THE FIRE SPRINKLER AND ALARM SYSTEMS.

3. THE INSTALLATION OF COMPUTER AND COMMUNICATION SYSTEMS SUCH AS A NURSE CALL.

4. COORDINATION WITH THE MRI EQUIPMENT VENDOR.

5. THE DESIGN OF NEW WALLS, FLOORS, CEILINGS, CASEWORK, ELECTRICAL AND MECHANICAL SYSTEMS.

6. THE AE RADIOLOGY PHYSICIST WILL PROVIDE TEMPLATES FOR THE MRI AND REPORT SPECIFYING THE SHIELDING REQUIREMENTS, ETC. AND

DURING CONSTRUCTION CERTIFY THAT THE SHIELDING HAS BEEN INSTALLED PER THE DOCUMENTS.

7. EQUIPMENT ROUTE AND STRUCTURAL SLAB REVIEW AND ANCHORAGE BY THE AE TEAM.'

8. DESIGN DOCUMENTATION CONSIDERATIONS/ SCHEDULE FOR LIFE SAFETY, PHASING, ICRA BARRIERS, SECURITY AND TIME MANAGEMENT

WHERE PRIMARY WORK IMPACTS PATIENTS AND STAFF WITH MINIMUM DOWNTIME.

9. ADDRESS FIRE AND SMOKE PENETRATIONS THROUGH WALLS AND FLOORS.

10. SITE PLAN AND BUILDING DOCUMENTATION SHOWING PROPOSED CONTRACTOR ACCESS, PARKING, LAYDOWN AREAS, TRAILER, ETC.

11. VA HAS DETERMINED WORK SCOPE DOES NOT CONTAIN ANY HAZARDOUS MATERIALS AND/OR ASBESTOS.

SCOPE OF WORK

APPLICABLE CODES AND DESIGN CRITERIA

2024 NFPA 101 NATIONAL FIRE PROTECTION ASSOCIATION LIFE SAFETY CODE

NATIONAL FIRE CODES, EXCEPT FOR NFPA 5000 AND NFPA 900

2021 IBC INTERNATIONAL BUILDING CODES

7/1/23 OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

2023 NEC NATIONAL ELECTRIC CODE

2021 IPC INTERNATIONAL PLUMBING CODE

11/1/22 ABAAS ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

(PG-18-13)

PG 18-2 IMAGING SERVICE DESIGN GUIDE TABLE 2.3.1: IMAGING ROOM CLASSIFICATION (CLASS 2 INTERVENTIONAL

MODERATE SEDATION/GENERAL ANESTHESIA

PG 18-2 IMAGING SERVICE DESIGN GUIDE CI121:

A. NURSE CALL/CODE BLUE

B. CAMERA AND CEILING MOUNTED MIRROR BEHIDN THE MRI.

C. SOUND SYSTEM

CODES AND LIFE SAFETY STANDARDS

VA MASTER CONSTRUCTION SPECIFICATIONS. (http://www.cfm.va.gov/til/spec.asp) VA DESIGN MANUALS. (https://www.cfm.va.gov/til/dManual.asp) VA DESIGN CRITERIA. (https://www.cfm.va.gov/til/criteria.asp) LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN (LEED) CERTIFICATION. CURRENT REVISION.

IMAGING SERVICES DESIGN GUIDE SEPTEMBER 1, 2020, REV. 8/1/23

VHA DIRECTIVE 1105.05 ON MAGNETIC RESONANCE (MR) SAFETY

CLASS 2 MRI SCANNING ROOM, IMAGING SERVICES (CI121)

VA SEISMIC DESIGN REQUIREMENTS, H-18-8

APPLICABLE VA STANDARDS

IBC OCCUPANCY GROUP INSTITUTIONAL I-2 HOSPITAL SECTION 308.3

NFPA 101 OCCUPANCY GROUP EXISTING HEALTHCARE OCCUPANCIES CHAPTER 19 AMBULATORY HEALTHCARE AND 43 REHABILITIATION

IBC OCCUPANCY LOAD FACTOR TABLE 1004.5 INSTITUTIONAL 1-2 HOSPITAL 100 GSF

NFPA 101 TABLE 7.3.1.2 OCCUPANT LOAD FACTOR EXISTING HEALTHCARE USE AMBULATORY HEALTH CARE 150 GSF

OCCUPANCY LOAD 1020 GSF/100=10

OCCUPANCY GROUP

BASEMENT 1,070 SF

GROUND FLOOR 1,070 SF

BUILDING 1 AREA OF RENOVATION

IBC I-B TABLE 601; FULLY SPRINKLERED

NFPA 101 TYPE I (322) CHAPTER 19 EXISTING HEALTHCARE OCCUPANCY AMBULATORY HEALTHCARE OCCUPANCIES TABLE 19.1.6.1

BUILDING CONSTRUCTION CLASSIFICATION

I-B

3 HR PRIMARY STRUCTURAL FRAME

2 HR BEARING WALLS -- EXTERIOR

2 HR BEARING WALLS -- INTERIOR

NON-BEARING WALLS AND PARTITIONS TABLE 602

O HR NON-BEARING WALLS AND PARTITIONS TABLE 602

2 HR FLOOR CONSTRUCTION AND SECONDARY MEMBERS SECTION 202

1 1/2 HR ROOF CONSTRUCTION AND ASSOCIATE SECONDARY MEMBERS SECTION 202

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS PER IBC TABLE 601

OCCUPANCY SEPARATION NFPA 101 TABLE 6.1.14.4.1(A)

100 FT COMMON PATH OF TRAVEL LIMIT EXISTING HEALTH CARE

20 FT DEAD END LIMIT EXISTING HEALTH CARE

200 FT TRAVEL DISTANCE LIMIT EXISTING HEALTH CARE

NFPA 101 TABLE A.7.6 COMMON PATH, DEAD-END AND TRAVEL DISTANCE LIMITS (BY OCCUPANCY)

CLASS B INTERIOR EXIT STAIRWAYS AND RAMPS (SPRINKLERED)

CLASS B CORRIDORS AND ENCLOSURE FOR EXIT ACCESS STAIRWAYS AND RAMPS (SPRINKLERED)

CLASS B ROOMS AND ENCLOSED SPACES (SPRINKLERED)

INTERIOR FINISHES PER IBC TABLE 803.13

AN INFECTION CONTROL ASSESSMENT 2.0, TABLE 1 (ACTIVITY TYPE D), TABLE 2 (PATIENT RISK GROUP HIGH), TABLE 3 PATIENT RISK GROUP D V)

INFECTION CONTROL -- ICRA

SHEET INDEX

RF SHIELDED GENERAL NOTES /

REQUIREMENTS

1. THE RF SHIELDING WALL ASSEMBLY TO PROVIDE A MINIMUM OF 40 STC.

2. THE VENDOR WILL BE RESPONSIBLE FOR THE DESIGN AND INSTALLATION OF WALLS,

CEILINGS, WALLS, FLOORS, EQUIPMENT, EXHAUST, WINDOWS AND DOORS, ETC.

3. RF SHIELDING VENDOR TO COORDINATE WITH GC FOR HE STRUCTURE, WEIGHT . WALL

TYPES, PLUMBING, MECHANICAL AND ELECTRICAL DISCIPLINES.

4. VERIFY THAT THE SUB FLOOR AND CEILING OF EXISTING STRUCTURE MEET THE RF SHIELD

REQUIREMENTS AND APPLICATION FINISHES

5. COORDINATE ABOVE CEILING CONCEALED MOUNTING FOR SCAN ROOM EQUIPMENT, ETC.

6. PROVIDE SHOP DRAWINGS AND VERIFY BUILDING AREA AND PATH OF MAGNET IS

SUFFICIENT.

7. THE DRAWINGS AND DETAILS SHOW DESIGN INTENT ONLY. VENDOR TO PROVIDE

DELEGATED DESIGN ENGINEERING.

ELEMENTS REQUIRING ITEMS FLORIDA

PRODUCT APPROVALS, NOA

ALL COMPONENTS OF THE PRIMARY ENVELOPE INCLUDING BUT NOT LIMITED TO THE

FOLLOWING REQUIRED FLORIDA PRODUCT APPROVALS (TESTING)

1. LOUVERS

2. MECHANICAL SYSTEMS

3. ROOF SYSTEMS

4. RAILINGS

5. EXTERIOR DOORS AND WINDOWS

DELEGATED DESIGN SUBMITTALS

1. RF SHIELDING

2. FLOOR SHORING (SUBMITTALS SHALL BE SIGNED AND SEALED B A PROFFESSIONAL

ENGINEER REGISTERED IN THE STATE OF FLORIDA.

132ND AVENUE

POND

POND

DO0CTORS

WALK-IN CLINIC

131ST AVENUE

131ST AVENUE

L

IV

IN

G

S T

O N

A V

E N

U E

T

H S

T R

E E

T

T

H S

T R

E E

T

T

H R

O W

T

H S

T R

E E

T

HARTLINE BUS

UNIVERSITY

NORTH

TRANSFER

STATION

WAL-MART BANK

T

H S

T R

E E

T B

R U

C E

B . D

O W

N S

B O

U L

E V

A R

D

T H

S T

R E

E T

WOODED AREA

42A 42B42

35 21

T74

T33T50T51

T34

19T43

T57

T58

T59

T67

T66

T70

T71 T65 T62

T61

T60

TRUE NORTH

PLAN NORTHNORTH

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

910 7 6 5 4 3 2 1

8910 7 6 5 4 3 2 1

NOT FOR

PERMITTING OR

CONSTRUCTION

E

D

C

B

A

F

Sprinklered

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Consultant:

Sprinklered

A/E

A ut od es k D oc s:

//V

IS

N

T am pa A

E

.5 T

M R

I I C

C /V

A J am es

A H al ey

.5

T M

R I_

A _R

-A

R C

H N

E W

.r vt

9/ 5/

:1

2:

A M

SHEET INDEX, OVERALL SITE PLAN, PROJECT

NOTES, AND CODE SUMMARY

AW/GF/LN SE

90% PROGRESS SET 673-CSI-132

1.5T MRI ICC

James A. Haley VA Medical Center, Tampa, Florida

9/05/2025

James A. Haley VA

Medical Center, Tampa, Florida

VA: _______

01-GI102

SCALE: N.T.S.1

OVERALL SITE PLAN

SHEET NUMBER SHEET NAME

01-GI101 COVER SHEET

GI102 SHEET INDEX, OVERALL SITE PLAN, PROJECT NOTES, AND CODE SUMMARY

GI103 ACCESSIBILITY DETAILS

GI104 ICRA NOTES & DETAILS

GI105 GROUND FLOOR OVERALL PLAN

GI106 BASEMENT FLOOR OVERALL PLAN

GI107 ENLARGED GROUND LEVEL & BASMENT LIFE SAFETY TRANSPORT AND DELIVERY ICRA PLAN

GI109 PHASING PLAN

GI110 PARTITION TYPES

GI111 PARTITION DETAILS

AD101 GROUND FLOOR AND REFLECTED CEILING DEMOLITION PLANS

AE101 GROUND FLOOR MRI CONSTRUCTION PLAN AND REFLECTED CEILING PLAN

AE104 ROOF 1 PLANS

AE105 ROOF 2 PLAN

AE106 ROOF 3 PLAN

AE107 ROOF DETAILS

QH101 NEW EQUIPMENT PLAN

AE522 SHIELDING DETAILS

AE523 SHIELDING DETAILS

AE524 SHIELDING DETAILS

AE601 DOOR & WINDOW SCHEDULE, TYPES AND DETAILS

AI701 FINISH PLAN & SCHEDULE

AI702 INTERIOR ELEVATIONS

AI703 MILLWORK DETAILS

AI705 INTERIOR DETAILS

FA101 GROUND FLOOR MRI FIRE ALARM

FX101 GROUND FLOOR MRI FIRE PROTECTION PLAN

P-001 PLUMBING SYMBOLS, NOTES, AND ABBREVIATIONS

PD401 GROUND LEVEL - PLUMBING DEMOLITION - ENLARGED PLAN

PD402 GROUND LEVEL MED GAS DEMOLITION ENLARGED PLAN

PP401 GROUND LEVEL PLUMBING PRESSURE ENLARGED PLAN

PW401 GROUND LEVEL DWV PARTIAL PLAN

PX401 GROUND LEVEL MED GAS ENLARGED PLAN

M-001 MECHANICAL SYMBOLS, NOTES, AND ABBREVIATIONS

MD111 ROOF HVAC DEMOLITION PARTIAL PLAN

MD112 ROOF PIPING DEMOLITION PARTIAL PLAN

MD401 GROUND LEVEL HVAC DEMOLITION ENLARGED PLAN

MD402 GROUND LEVEL PIPING DEMOLITION ENLARGED PLAN

MP101 BASEMENT LEVEL PIPING PARTIAL PLAN

MP102 GROUND LEVEL PIPING PARTIAL PLAN

MP111 ROOF PIPING PARTIAL PLAN

MH111 ROOF HVAC PARTIAL PLAN

MP401 GROUND LEVEL PIPING ENLARGED PLAN

MP402 MECHANICAL PIPING ENLARGED PLANS

M-704 MECHANICAL CONTROLS

MH401 GROUND LEVEL HVAC ENLARGED PLAN

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-505 MECHANICAL DETAILS

M-506 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-701 MECHANICAL CONTROLS

M-702 MECHANICAL CONTROLS

M-703 MECHANICAL CONTROLS

GENERAL NOTES

1. SEE SPECIFICATIONS FOR MANUFACTURERS INFORMATION ON ALL TOILET ACCESSORIES

SPECIFICATION SECTION 10 28 00 TOILET, BATH AND LAUNDRY ACCESSORIES.

2. FOR ALL TOILET ROOM ACCESSORIES REFER TO DRAWINGS FOR PARTITION TYPES, DETAILS AND

BLOCKING REQUIREMENTS.

3. ALL GRAB BARS SHALL COMPLY WITH ANSI A117.1 REINFORCING CONCEALED IN WALL TO RESIST AN APPLIED FORCE OF 250 LB-FT IN ANY DIRECTION. GRAB BARS SHALL NOT ROTATE WITHIN THEIR

FITTINGS.

T-SHAPED TURNING SPACE TURNING RADIUS

5' - 0"

5' - 0"

5'

1'

3'

1'

2' - 0" 3' - 0"

CHANGES IN LEVEL

1/ 4"

M A

X

OUTLETS AT

MILLWORK

4'

CL

PHONE HACK, ELECTRICAL

OUTLET, SWITCH AND

PULL BOX

WINDOW TREATMENT/

PROJECT SCREEN SWITCH

ELECTRIC

OUTLET

PHONE

JACK

1'

CL

CL

MPS

MS

4'

OUTLETS AT

MILLWORK

2'

CL

OUTLETS AT

COUNTERS

OUTLETS AT

COUNTERS W/

BACKSPLASH

2'

" 3'

CL

3'

3'

CL

4" 3'

NOTE:

1. 60" DIAMETER SPACE

MIN.

5' - 0"

M

IN

5'

NOTE:

1. T-SHAPED SPACE FOR 180

DEGREE TURNS

M

IN

3'

"M

IN

5'

MIN.

1' - 0"

MIN.

3' - 0"

MIN.

1' - 0"

NOTE:

1. DIMENSIONS SHOWN APPLY WHEN

'X' IS LESS THAN 48"

2. TURNS AROUND AN OBSTRUCTION

M

IN

4'

MIN.

3' - 6" 1' - 0"

MIN.

3' - 6"

NOTE:

1. 90 DEGREE TURN

M

IN

3'

MIN.

3' - 0" 1' - 0"

MIN.

3' - 0"

NOTE:

1. TWO HINGED DOORS IN SERIES

2' - 6"

4'

NOTE:

1. TWO HINGED DOORS IN SERIES

M

IN

4'

NOTE:

1. TWO HINGED DOORS IN SERIES

M

IN

4'

NOTE:

1. MANEUVERING CLEAR

2. LATCH SIDE APPROACH

MIN.

2' - 0"

PULL SIDE

M

IN

4'

NOTE:

1. MANEUVERING CLEAR

2. FRONT APPROACH

MIN.

1' - 6"

PULL SIDE

M

IN

5'

NOTE:

1. MANEUVERING CLEAR

2. HINGE SIDE APPROACH

MIN.

3' - 0"

PULL SIDE

M

IN

4'

NOTE:

1. MANEUVERING CLEAR

2. HINGE SIDE APPROACH

PUSH SIDE

M

IN

4'

NOTE:

1. MANEUVERING CLEAR

2. FRONT APPROACH

PUSH SIDE

M

IN

4'

NOTE:

1. MANEUVERING CLEAR

2. FRONT APPROACH

PULL SIDE

M

IN

4'

MIN.

4' - 6"

MIN.

1' - 0"

MIN.

2' - 0"

PANIC BAR

CL

5" E

Q E

Q

PANIC BAR

PUSH / PULL

CL

3'

5" E

Q

DEAD BOLT

PUSH PLATE

PULL BAR

4'

4'

/2

CL

NOTES:

1. PROVIDE INTERIOR SIGNAGE FOR EVERY DOOR/ROOM

UNLESS NOTED OTHERWISE (REFER TO FINISH DRAWINGS).

2. ALL FINAL ROOM NAMES SHALL BE APPROVED BY

ARCHITECT/OWNER PRIOR TO SIGN FABRICATION.

3. AT LOCATIONS WHERE THERE ISN'T AVAILABLE WALL SPACE

TO INSTALL THE INTERIOR SIGNAGE AS INDICATED, OBTAIN

ARCHITECT'S INSTRUCTION PRIOR TO INSTALLATION.

4. AT LOCATIONS WHERE THERE ISN'T AVAILABLE WALL SPACE,

BUT AVAILABLE WINDOW SPACE, ADHERE INTERIOR SIGNAGE

WITH DOUBLE SIDED TAPE TO PROVIDE A PERMANENT

INSTALLATION. PROVIDE A BLANK PANEL OF THE SAME

COLOR, SIZE, AND MATERIAL FOR THE BACK SIDE OF THE

SIGN TO BE INSTALLED ON THE GLASS.

T O

P O

F S

IG

N

5'

DOOR FRAME

LATCH SIDE OF

DOOR PANEL

INTERIOR SIGNAGE

TO TOP OF SIGN

3'

M A

X

2'

0"

M A

X

2'

M

IN

TOE CLEARANCE

6" MAX.

DEPTH

17" MIN.

8" MIN. KNEE CLEARANCE

B O

T T

O M

O F

R E

F

LE

C T

IV

E

S U

R F

A C

E

M

IN

3' - 0" ø

'-0

1' - 6"1' - 3"

4"

5' - 9"

1' - 6" 3' - 6"

6"

3' - 10"

M

IN

60" X 56" MIN. CLR.

FLOOR SPACE

(WALL MTD.)

60" X 59" MIN. CLR.

FLOOR SPACE

(FLR. MTD)

30" X 48" MIN. CLR.

FLOOR SPACE AT

LAVATORY

60" X 50" MIN. CLR.

FLOOR SPACE AT

STALL DOOR

STALL DOOR SHALL BE

4" MAX. FROM THE

CORNER OF THE STALL

3' - 0" MIN.

1' - 6"

M

IN

5' - 0" MIN.

4" MAX.

2' - 8" MIN.

M

IN

M

IN

W A

L L M

T D

M

IN

F

L R

M

T D

42" MIN LATCH APPROACH

OTHER APPROACHES 48"

MIN.

5' - 0" MIN.

CLEAR FLOOR

SPACE

MIN.

1' - 6"

M

IN

W

A L

L M

T D

M

IN

F

L R

M

T D

M

IN

MIRROR SOAP DISPENSER PAPER

TOWEL

DISPENSER

TOILET PAPER

DISPENSER

TOILET

PAPER

HOLDER

SANITARY

NAPKIN

DISPOSAL

LAVATORY

INSULATE EXPOSED

PIPING WITH WHITE

PLASTIC PRE-FITTED

INSULATION

MEASURE

TO BOTTOM

OF REFLECTIVE

SURFACE

FIRE

EXTINGUISHERS

AND CABINETS

7-PEG

COAT RACK

2' - 0"

MIN

8"

MIN

11"

KNEE AND TOE

CLEARANCES

E

E

SEALANT

PROVIDE ADA

COMPLIANT FAUCET

WITH WRIST BLADE

CONTROLS

5" MAX

ACCESS HGT. D.F.

SPOUT LOCATION

SPOUT

HEIGHT

STANDING AND

ACCESSIBLE DRINKING

FOUNTAINS

FRONT SIDE

PLAN

ALUM. SEMI-RECESSED CAB.

W/ FULL CLEAR ACRYLIC DOOR

10 LBS

ABC TYPE

BABY CHANGING

TABLE

ROBE

HOOK

"FIRE EXTINGUISHER" IN

RED LETTERS

G

F

F

(ALT)H

J

C

N O O

P

P

MIN

11"

8"

30x48

CLEAR

SPACE

U

TOILET

SEAT COVER

DISPENSER

SIGNAGE

(12" BELOW CEILING)

2"

HANDRAIL

PER NFPA 10

PTD (OF/OI)

PUBLIC TLTS

ONLY

SEMI-

RECESSED

WASTE RECP.

S T

A N

D

IN

G H

E

IG

H T

D .F

A C

C E

S S

H

E

IG

H T

D .F

NOTE: PROVIDE CANE

DETECTABLE APRON AT

THE STANDING HEIGHT

UNIT

MIN

3' - 6"

WATER CLOSET

SIDE WALL

1 1/4" MIN., 2" MAX DIA.

GRAB BAR WITH 1 1/2"

GAP FROM WALL

WATER CLOSET

BACK WALL

TP DISPENSER

MOUNTING AREA

MIN

1' - 0"

MIN

2' - 0"

FLUSH CONTROLS

ON OPEN SIDE

GB42

GB36

A

A

/2

U

CENTER ON

GRAB BAR END

NOTE: GRAB BARS

SHALL BE 33" - 36" TO

TOP OF BAR

MEASURE

TO BOTTOM

OF REFLECTIVE

SURFACE

3' - 0"

MAX

1' - 0"

T .O

B

A R

M

IN

NURSE CALL

& PULL CORD

NURSE CALL

& PULL CORD

NOTES:

1. OBJECTS WITH LEADING EDGES MORE THAN 27

INCHES AND NOT MORE THAN 80 INCHES ABOVE

THE FINISH FLOOR OR GROUND SHALL

PROTRUDE 4 INCHES MAXIMUM HORIZONTALLY

INTO THE CIRCULATION PATH. EXCEPTION:

HANDRAILS SHALL BE PERMITTED TO

PROTRUDE 4 1/2 INCHES MAXIMUM.

2. PROTRUDING OBJECTS SHALL NOT REDUCE THE

CLEAR WIDTH REQUIRED FOR ACCESSIBLE

ROUTES. ABA 307 PRTRUDING OBJECTS.

NOTES:

1. VERTICAL CLEARANCE SHALL BE 80 INCHES

HIGH MINIMUM. GUARDRAILS OR OTHER

BARRIERS SHALL BE PROVIDED WHERE THE

VERTICAL CLEARNACE IS LESS THAN 80 INCHES

HIGH. THE LEADING EDGE OF SUCH GUARDRAIL

OR BARRIER SHALL BE LOCATED 27 INCHES

MAXIMUM ABOVE THE FINISH FLOOR OR

GROUND. EXCEPTION: DOOR CLOSERS AND

DOOR STOPS SHALL BE PERMITTED TO BE 78

INCHES ABOVE THE FINISH FLOOR OR GROUND.

2. PROTRUDING OBJECTS SHALL NOT REDUCE THE

CLEAR WIDTH REQUIRED FOR ACCESSIBLE

ROUTES. ABA 307.4 VERTICAL CLEARANCE

(LIMITS OF PROTRUDING OBJECTS)

4" MAX.

M

IN

M

IN

M

A X

M

IN

(VERTICAL CLEARANCE)

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

910 7 6 5 4 3 2 1

8910 7 6 5 4 3 2 1

NOT FOR

PERMITTING OR

CONSTRUCTION

E

D

C

B

A

F

Sprinklered

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Consultant:

Sprinklered

A/E

A ut od es k D oc s:

//V

IS

N

T am pa A

E

.5 T

M R

I I C

C /V

A J am es

A H al ey

.5

T M

R I_

A _R

-A

R C

H N

E W

.r vt

9/ 5/

:1

2:

A M

ACCESSIBILITY DETAILS

AW/GF/LN SE

90% PROGRESS SET 673-CSI-132

1.5T MRI ICC

James A. Haley VA Medical Center, Tampa, Florida

9/05/2025

James A. Haley VA

Medical Center, Tampa, Florida

VA: _______

01-GI103

SCALE: N.T.S.1

TURNING SPACE REQUIREMENTS

SCALE: 6" = 1'-0"

ACCESSIBLE ROUTE

SCALE: 3/8" = 1'-0"

TYPICAL MOUNTING HEIGHTS - ELECTRICAL

SCALE: 1/4" = 1'-0"

WHEEL CHAIR TURNING CLEARANCES

SCALE: N.T.S.4

WHEEL CHAIR ACCESSIBLE ROUTE

SCALE: 3/8" = 1'-0"

TYPICAL MOUNTING HEIGHTS - EGRESS DOOR HARDWARE

SCALE: N.T.S.6

SIGNAGE

Revisions: Rev: Date:

SCALE: N.T.S.8

LAVATORY CLEARANCE PLAN AND ELEVATION

SCALE: 1/4" = 1'-0"

ACCESSIBLE TOILETS, BATHS & SHOWERS

SCALE: 1/4" = 1'-0"

MOUNTING HEIGHTS

SCALE: 1/4" = 1'-0"

VERTICAL & PROTRUDING OBJECT CLEARANCES

A/C

A/C

M O T O R

GRILL

FRYER

OVEN

TOUNION

KETTLES

CONVECTION

OVEN

CONVECTION

CONVECTION

OVEN

CONVECTION

OVEN

PASS-THRU

D O

W N

UP

DOWN

DOWN

TO PIPE

BASEMENT

DOWN

DOWN UP

DOWN

UP

U P

U P

WHEEL CHAIR RAMP

WHEEL CHAIR RAMP

U P

D N

UP

DOWN

D N

UP

DN

DN

STAIRS

D O

W N

U P

D N

ROLL-UP DOOR

ROLL-UP DOOR

8" CONC. BLK.

8" CONC. BLK.

TO

CLG

CLOSED

OFF

CLOSED

OFF

DN

DN

R

S

T

17 18 19 20

U

Q

P

N.8

16.2161514.914131210987.1765.854.94.143.232.421

N

M

M.1

L

K

J

H

G

F

E

D

C.2

C

B

A

COMPUTER ROOM

GB-026

OFFICE IMS

GB-022

SYSTEMS

MANAGER

GB-025a

ASST.

SYSTEMS

MANAGER

GB-025

CORRIDOR

C0-03-1

OFFICE IMS

GB-024

OFFICE IMS

GB-023

STAIR #5

S0-05-1

OFFICE IMS

GB-024b

SIGNAL

GB-024c

POWER

GB-024d

STAIR #4

S0-04-1 OFFICE EMS

GB-034

OFFICE

STAFF

GB-030

OFFICE STAFF EMS

GB-030a

IMS

GB-029

CONFERENCE ROOM

GB-035 N&FS

GB-033

N&FS

GB-031

LINEN ROOM

GB-036

CORRIDOR

C0-01-1

C O

R R

ID

O

R

C 0-

-1

IMS

GB-027f

IMS

GB-027

UNIFORM EXCHANGE

GB-039

STO.

GB-038

OFFICE EMS

GB-039a

TELE

PHONE

GB-017

ELECTRICAL

GB-015

MECHANICAL

BB-001b

MECHANICAL

BB-001

TEMPORARY STO.

AB-6d

MECHANICAL

BB-001a

SERVICE ROOM

BA-023b

ELECTRICAL

ATS ROOM

AB-6b

ELECTRICAL

GA-023c

ELECTRICAL

GA-023d

RELEASE OF INFORMATION

GA-024

DOCTOR'S

WORKROOM

GA-027s

RR

GA-025

DOCTOR'S

WORKROOM

GA-027r

CORRIDOR

C0-05a-1

WAITING

GA-027a

PATIENT

RECORD

FILE ROOM

GA-027

WOMEN'S

RR

GA-027h

MEN'S

RR

GA-027h

PHYSICAL

THERAPY

TREATMENT

GA-013

MANUAL ARTS

THERAPY

GA-015

ELEC.

GE-002

MECH.

GE-001

EMERGENCY

ELEC.

GE-003

TELECOMMUNICATIONS

GE-004

SIGNAL

GE-005

STAIR #9

S0-09-1

LOBBY

GA-027t

STO.

GA-027w

O.T. ADMIN

GA-013a

O.T. ADMIN

GA-012a

O.T.

ADMIN

GA-014

OCUPATIONAL

THERAPY

GA-013a

OCCUPATIONAL

THERAPY

GA-012

POOL SERVICE ROOM

GA-011a

THERAPEUTIC

POOL

GA-011

EMPLOYEE

GYM

GA-004

M.A.T.

ADMIN.

GA-004a

STAFF

PHYSICIAN

GA-007

MEN'S RR

SHOWERS

AND

LOCKERS

GA-009

WOMEN'S

RR

SHOWERS

AND

LOCKERS

GA-011b

CARDIAC

REHABILITATION

GA-04b

C O

R R

ID

O

R

C 0-b-

CORRIDOR

C0-05c-1

ELEC.

GA-016

EDUCATIONAL

THERAPY

ADMIN.

GA-010

ADL CLINIC

GA-008

STAIR #2

S0-02-1

SECRETARY AND

WAITING PM&RS

GA-002

RESIDENT

PM&RS

GA-003

OFFICE

PM&RS

GA-005

OFFICE

PM&RS

GA-005a

EMG

GA-006a

OFFICE CHIEF

PM&RS

GA-006

OFFICE

PM&RS

GA-018

OFFICE

PM&RS

GD-040

CORRIDOR

C0-05-1

C O

R R

ID

O

R

C 0-d-

MANUAL

ARTS

OFFICE

CLERKS

GA-004

C O

R R

ID

O

R C

0-

-1

PROSTHETICS

STORAGE

GD-010

TELEPHONE

GD-010c

CORRIDOR

C0-09-1

CORRIDOR

C0-09a-1

CORRIDOR

C0-14-1

M E

C H

G B

-0 e

M E

C H

G B

-0 a

OFFICE IMS

GB-023

OFFICE IMS

GB-023b

MS CHIEF OFFICE

GB-027b

IMS

GB-027a

OFFICE IMS

GB-021a

PC REPAIR

GB-021

MECH

GB-021e

IMS

GB-020c

UNION OFFICE

GB-020UNION

OFFICE

GB-020a

C O

R R

ID

O

R

C 0-

-1

C O

R R

ID

O

R

C 0-b-

STO.

GB-020b

WOMEN'S

RR

GB-014 ELECTRICAL

GB-013

CORRIDOR

C0-01c-1

MECH.

GB-011

GB-010

SPD AMMS

GC-003

GC-003

G C

-0 03 C

O R

R

ID

O R

C 0-

-1

AB-6c

A/C &

REFRIGERATION/SHEET

METAL SHOP

BA-023a

CORRIDOR

C0-05-1

OLD GRAPHIC

CONTROL

GA-023

GA-019

ELECTRICAL

GA-021

MANUAL

ARTS

THERAPY

PM&RS

GA-004c

STORAGE

GA-004d

POLICE

GD-010a

PROSTHETICS

ASSISTANT

CHIEF

GD-0121

WOMEN'S RR

GD-009

MEN'S RR

GD-011

PROSTHETICS

GD-012a

PROSTHETICS

GD-012b

PROSTHETICS

GD-012c

PROSTHETICS

GD-012d

PROSTHETICS

GD-012

WOMEN'S

LOUNGE

GD-0123

WOMEN'S

LOCKERS

GD-013a

WOMEN'S RR

AND SHOWERS

GD-013c

GD-014 GD-014

MEN'S RR AND

SHOWERS

GD-015b

MEN'S

LOUNGE

GD-015

SAFETY

GD-017e

SAFETY

GD-017a

MEN'S

LOCKERS

GD-015a ELECTRONICS SHOP

GD-023e

WOMEN'S

LOCKERS

GD-013b

SAFETY

GD-017c

ELECTRONICS SHOP

GD-023d

ELECTRONICS

SHOP

GD-023c

ELECTRONIC

S SHOP

GD-023b

ELECTRONICS

SHOP

GD-023a

STAIR #8

S0-08-1

SAFETY

GD-017f SAFETY

GD-017

SAFETY

GD-017a

C O

R R

ID

O

R

C 0-

-1

SAFETY

GD-017b

BIOMED SHOP

GD-024

BIOMED SHOP

GD-022

BIOMED SHOP

GD-022a

C O

R R

ID

O

R

C 0-

-1

H.A.C.

GD-018

LAB

SPECTOMETER

GD-020

LAB

SPECTOMETER

GD-020a

CORRIDOR

C0-16-1

UNASSIGNED

GD-040

WOMEN'S

RR

GD-030

MEN'S

RR

GD-029

MORGUE

GD-026

ELECTRICAL

MORGUE

GD-026a

MORGUE

GD-031a MORGUE

GD-031 H

.A

.C

G D

-0

CREDIT

UNION

GD-032CREDIT

UNION

GD-033b

MORGUE

GD-027

MECHANICAL

GD-036

CREDIT

UNION

GD-033b

C O

R R

ID

O

R

C 0-

-1

BARBER SHOP

GD-036a

C O

R R

ID

O

R

C 0-

-1

ELECTRICAL

MEZZANINE

GD-036bC O

R R

ID

O

R

C 0-

-1

MEN'S RR

GD-034

C O

R R

ID

O

R

C 0-

-1

PROSTHETICS

GD-038d

PROSTHETICS

GD-038g

STAIR #1

S0-01-1

OFFICE N&FS

GD-037

FOOD

PRODUCTION

OFFICE

GD-007j

ELECTRICAL

GD-039

GD-035

PROSTHETICS

EXAM

GD-038c

PROSTHETICS

GD-038e

PROSTHETICS

WAITING

GD-038

PROSTHETICS

GD-038f

ELECTRICAL

OFFICE N&FS

GD-037c

OFFICE N&FS

GD-037a

DIETETIC

CLASSROOM

GD-037b

CANTEEN

VENDING

GD-008

PROSTHETICS

BRACE SHOP

GD-038b

N&FS OFFICE

GD-007t

N&FS OFFICE

GD-007u

MAIN KITCHEN

GD-007

ELEVATOR LOBBY

GD-001

ELEVATOR LOBBY

GD-002

C O

R R

ID

O

R

C 0-a-

GA-028

GD-007o

DISHWASHER

GD-007m

CART WASH

GA-019

H.A.C.

GA-020

RECEIVING &

DECONTAMINATION

GA-029

ELEVATOR

LOBBY

GD-030

ELECTRICAL

GD-003e

TRAY

CONVEYOR

GD-003d C O

R R

ID

O

R

C 0-a-

CART WASH

GD-007a

ASSEMBLY WORK

ROOM &

STERILATION

GD-003b

SPD AMMS

GC-003

SPD

GD-003a

H.A.C.

GC-006

FREEZER

GC-007w

FROZEN FOOD

HOLDING

GD-007e

DIETETICS

OFFICE

GC-001c

DIETETICS

OFFICE

GC-001b

C O

R R

ID

O

R

C 0-a-

REFRIGERATOR

GC-007v

MEAT

REFRIGERATOR

GD-007d

VEGETABLE

REFRIGERATOR

GD-007c

COOKS

REFRIGERATOR

GD-007b

DIETETICS

OFFICE

GC-001a ELECTRICAL

GC-005

FREEZER

GD-0017a

ELECTRICAL

GC-007a

KITCHEN

STORAGE

GC-007

INGREDIENT

CONTROL

GD-007f

GENERAL

STORAGE

GD-007p

DAIRY & EGG

REFRIGERATOR

GD-007g

PATIENT

LAUNDRY

GD-007

STAIR #3

S0-03-1

C O

R R

ID

O

R

C 0-

-1

CORRIDOR

C0-07a-1

CORRIDOR

C0-07b-1

OFFICE

PHARMACY

GC-008a

OFFICE

PHARMACY

GC-008b

OFFICE

PHARMACY

GC-008c

PHARMACY

OUT PATIENT

GC-008

ELECTRICAL

GC-008d

OFFICE

PHARMACY

GC-008f

MAIL ROOM

GC-008h

CHIEF SPD

GC-008i

MEDICAL

GASES

GC-009

MEDICAL

GASES

GD-010

OFFICE

WAREHOUSE

GC-004c

SILVER

RECOVERY

GC-004d

GC-011

REFRIGERATION

EQUIPMENT

GC-004b

OFFICES

WAREHOUSE

GC-004a

STAIR

S0-XX-1

LOADING

DOCK

TRASH COLLECTION

GC-012

GC-012a

BREAK AREA

GC-004

WAREHOUSE

GC-004

STAIR #7

S0-07-1

STAIR #12

S0-12-1

PROCESS

STORES

GC-004

WAREHOUSE

ADDITION

GC-004f

WAREHOUSE

STORAGE

GC-004

STAIR #6

S0-06-1

WAREHOUSE

STORAGE

GC-004e

REPRODUCTION

GC-008g

STAFF PHYSICIAN

GC-046

NON-PROF. NON-

PHYS.

GC-047

STAIR #20

S0-20-1

LINENS

GC-048

MECHANICAL

GC-050

EXAM

GC-023

S T

A

IR

S 0-

-1

MAGNETIC

TAPE

GC-049

LOBBY

GC-020

RECEPTION

GC-020 DRESS

GC-022A

DRESS

GC-022B

R T

U C

O R

R

ID

O R

CORRIDOR

C0-18-1

RESTROOM

GC-025

SCREENING

GC-024

ELEVATOR

#18

GURNEY

STAGE

GC-032 PREP

HOLD

GC-033

MACHINE

ROOM

GC-036

3T MRI

GC-027

OPEN MRI

GC-034

CONTROL

GC-035 CONTROL ROOM

GC-028

EQUIPMENT

ROOM

GC-028a

MECHANICAL

GC-028b

PLANTER

GI107

SIM.

GI107

GROUND FLOOR PLAN KEYNOTES

SITE ACCESS FOR CONTRACTOR PERSONNEL AND MATERIAL DELIVERY.1

CONTRACTOR BUILDING ACCESS.

CONTRACTOR ELEVATOR ACCESS.

CONTRACTOR TOILET - PROVIDE TEMPORARY SIGNAGE.

OVERALL PLAN LEGEND

SCOPE OF WORK AREA

NO SCOPE OF WORK AREA

TEMPORARILY REMOVE RAILING FOR MRI DELIVERY; REINSTALL TO MATCH EXISTING

CONDITIONS.

CONTRACTOR EQUIPMENT REPLACEMENT ACCESS PATH

NEW NON-RATED PARTITION

EXISTING PARTITION

EXISTING 2 HR FIRE PARTITION

EXISTING 1 HR FIRE PARTITION

NEW SMOKE PARTITION

EXISTING SMOKE PARTITION

VERTICAL CIRCULATION/ ELEVATOR

PLAN N

TRUE N

KEY PLAN

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

910 7 6 5 4 3 2 1

8910 7 6 5 4 3 2 1

NOT FOR

PERMITTING OR

CONSTRUCTION

E

D

C

B

A

F

Sprinklered

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Consultant:

Sprinklered

A/E

A ut od es k D oc s:

//V

IS

N

T am pa A

E

.5 T

M R

I I C

C /V

A J am es

A H al ey

.5

T M

R I_

A _R

-A

R C

H N

E W

.r vt

9/ 5/

:1

2:

A M

GROUND FLOOR OVERALL PLAN

AW/GF/LN SE

90% PROGRESS SET 673-CSI-132

1.5T MRI ICC

James A. Haley VA Medical Center, Tampa, Florida

9/05/2025

James A. Haley VA

Medical Center, Tampa, Florida

VA: ________

01-GI105

SCALE: 1" = 20'-0"

GROUND FLOOR OVERALL PLAN

T

T

TT

T

T

T

UP

UP

UP

UP

UP

U P

DN

UP

UP

UP

UP

UP

U P

UP

UP

UP

UP

UP

T T

T

U P

A C

ID

T

A N

K

AC-17

E-12

R

S

T

17 18 19 20

U

Q

P

N.8

16.2161514.914131210987.1765.854.94.143.232.421

N

M

M.1

L

K

J

H

G

F

E

D

C.2

C

B

A

GI107

VCS STORAGE

CB-6F

VCS

STORAGE

CB-6G

VCS STORAGE

CB-6F

SIGN SHOP

CB-6H

ELEVATOR

#18

CB-6D

CB-6C

TOILET

CB-6B

CB-6A STAIR #20

SB-20-1

PAINT

STORAGE

AND MIX

CB-1

PLUMBING

STORAGE

CB-1C

ELECTRICAL

CB-1H

STORAGE

CB-1B

MECH AREA

CB-2

STAIR #6

SB-06-1

A/C

REFRIGERANT

STORAGE

CB-1A

ELECTRONIC

STORAGE

CB-1E

ELECTRONIC

STORAGE

CB-1E

BIOMED

CB-1G

BULK

MOTOR

STORAGE

CB-1P

BIOMED

STORAGE

PROJECT

WORK ROOM

CB-4B

MECHANICAL

CB-4

STAIR #7

SB-07-1

STAIR #12

SB-12-1

CARPENTRY

SHOP

STORAGE

CB-3D

BULK

MOTOR

STORAGE

CB-1P

CARPENTRY

SHOP STORAGE

CB-3C

STORAGE

CB-3A

MISC

ELECTRICAL

STORAGE

CB-3B

STAIR #3

SB-03-1

STAIR #3

SB-03-1

BOILER ROOM

BIOMED

STORAGE

THERAPEUTIC

POOL ABOVE

POOL SERVICE ROOM

STAIR #8

SB-08-1

S T

A

IR

S B

-0 9-

STAIR #2

SB-02-1

PARTS BINS & WORK TABLES

S T

A

IR

S B

-0 5-

STAIR #4

SB-04-1

WORK BENCHES

BASEMENT FLOOR PLAN KEYNOTES

CONTRACTOR BUILDING ACCESS.

CONTRACTOR BUILDING ACCESS TO ELEVATOR.

CONTRACTOR TOILET - PROVIDE TEMPORARY SIGNAGE.

OVERALL PLAN LEGEND

SCOPE OF WORK AREA

NO SCOPE OF WORK AREA

CONTRACTOR EQUIPMENT REPLACEMENT ACCESS PATH

NEW NON-RATED PARTITION

EXISTING PARTITION

EXISTING 2 HR FIRE PARTITION

EXISTING 1 HR FIRE PARTITION

NEW SMOKE PARTITION

EXISTING SMOKE PARTITION

VERTICAL CIRCULATION/ ELEVATOR

PLAN N

TRUE N

KEY PLAN

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/1 6"

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/3 2"

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

910 7 6 5 4 3 2 1

8910 7 6 5 4 3 2 1

NOT FOR

PERMITTING OR

CONSTRUCTION

E

D

C

B

A

F

Sprinklered

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Consultant:

Sprinklered

A/E

A ut od es k D oc s:

//V

IS

N

T am pa A

E

.5 T

M R

I I C

C /V

A J am es

A H al ey

.5

T M

R I_

A _R

-A

R C

H N

E W

.r vt

9/ 5/

:1

2:

A M

BASEMENT FLOOR OVERALL PLAN

AW/GF/LN SE

90% PROGRESS SET 673-CSI-132

1.5T MRI ICC

James A. Haley VA Medical Center, Tampa, Florida

9/05/2025

James A. Haley VA

Medical Center, Tampa, Florida

VA: _______

01-GI106

SCALE: 1" = 20'-0"

BASEMENT FLOOR OVERALL PLAN

D N

UP

DN

DN

DN

DN

R

S

T

U

Q

P

N.8

14131211

DRESSING

MRI SCANNER

EQUIPMENT ROOM

CONTROL ROOM

MRI COIL

STORAGE

CABINET

GB-010 OFFICE

PHARMACY

GC-008a

OFFICE

PHARMACY

GC-008b

ELECTRICAL

GC-008d

REPRODUCTION

GC-008g

STAFF PHYSICIAN

GC-046

NON-PROF. NON-

PHYS.

GC-047

STAIR #20

S0-20-1

LINENS

GC-048

MECHANICAL

GC-050

EXAM

GC-023

S T

A

IR

S 0-

-1

MAGNETIC

TAPE

GC-049

LOBBY

GC-020

RECEPTION

GC-020

DRESS

GC-022A

DRESS

GC-022B

R T

U C

O R

R

ID

O R

CORRIDOR

C0-18-1

RESTROOM

GC-025

SCREENING

GC-024ELEVATOR

#18

GURNEY

STAGE

GC-032

PREP

HOLD

GC-033

MACHINE

ROOM

GC-036

3T MRI

GC-027

OPEN MRI

GC-034

CONTROL

GC-035

CONTROL ROOM

GC-028

EQUIPMENT

ROOM

GC-028a

MECHANICAL

GC-028b

E T

D : 1

7" E

T D

: 1

5"

PLANTER

CPT: 97' - 10"

CPT: 99' - 6"

42"

M R

I S

A F

E

32"

C O

R R

ID

O

R L

E N

G T

H

6'-0" CLR MIN

C

LR

6'

ICRA PHASING / PROJECT MILESTONES

PHASE 1

1. MRI VENDOR SHOP DRAWINGS AND SHIELDING REPORT REVIEW AND COORDINATION.

2. GC SCHEDULE, SITE ACCESS (CONTRACTOR STAGING AREA, TOILET, ETC.) VERIFIED WITH COR.

3. ICRA PERMIT ISSUED.

PHASE 2 (GROUND FLOOR NEW MRI SCOPE AND DOOR / CORRIDOR RENOVATION FOR EXISTING MRI EQUIPMENT

REMOVAL / TRANSPORT)

PHASE 2.A (GROUND FLOOR NEW MRI SCOPE) CONTROL ROOM, SCAN ROOM, EQUIPMENT ROOM AND DRESSING

1. REMOVAL OF EXISTING VA PERSONNEL, COMPUTERS AND SMALL MEDICAL EQUIPMENT.

2. INSTALLATION OF TEMPORARY WALL AND CEILING ICRA BARRIERS PER PROJECT SCOPE. INCLUDING LIFE

SAFETY SIGNAGE, EGRESS AND PROTECTION OF EXISTING BUILDING AND FINISHES NOT IN SCOPE OF WORK.

REST OF THE FACILITY TO REMAIN FUNCTIONAL FOR PATIENTS, STAFF AND VISITORS. ALARM SYSTEMS, MECHANICAL, ELECTRICAL AND LIFE SAFETY FOR FACILITY TO REMAIN OPERATIONAL.

3. TEMPORARILY RELOCATE CONTROL ROOM AND DOOR TO ACCOMMODATE BARRIER FOR NEW CONTROL

ROOM WORK SCOPE.

PHASE 2.B (GROUND FLOOR EQUIPMENT TRANSPORTATION) CORRIDOR/DOOR ICRA BARRIERS AND OR HEPACART

FOR EQUIPMENT TRANSPORT

1. ICRA BARRIER(S) CEILING AND WALL AND OR HEPACART FOR DOOR ENLARGEMENT, RENOVATION. WORK TO BE DONE AT NIGHT OR WEEKENDS AND PHASED FOR THIS SCOPE. EGRESS TO REMAIN OPERATIONAL DURING

PATIENT, STAFF AND VISITOR HOSPITAL HOURS OF OPERATION.

PHASE 2.C BASEMENT (STRUCTURE AND MEP)

1. INSTALLATION OF TEMPORARY WALL AND CEILING ICRA BARRIERS PER PROJECT SCOPE. INCLUDING LIFE SAFETY SIGNAGE , EGRESS AND PROTECTION OF EXISTING BUILDING UTILITIES AND FINISHES NOT IN SCOPE OF WORK. REST OF THE FACILITLY TO REMAIN FUNTIONAL FOR PATIENTS, STAFF AND VISITORS. ALARM SYSTEMS, MECHANICAL, ELECTRICAL AND LIFE SAFETY FOR FACILITY TO REMAIN OPERATIONAL.

PHASE 3 (EXISTING MRI EQUIPMENT REMOVAL)

1. PHASE 2.B COMPLETED.

2. EXISTING MRI REMOVAL AT NIGHT OR WEEKEND, COORDINATE WITH COR.

PHASE 4 (DEMOLITION GROUND FLOOR AND BASEMENT)

1. DEMOLITION OF EXISTING GROUND FLOOR AREA IN SCOPE (PHASE 2A INCLUDING FINISHES, UTILITIES, ETC.)

TO PREPARE SPACE FOR NEW WORK SCOPE.

2. DEMOLITION OF EXISTING BASEMENT UTILITY SCOPE (PHASE 2C).

3. DEBRIS TO BE REMOVED AT NIGHT IN COVERED CONTAINERS, COORDINATE WITH COR.

PHASE 5 (GROUND FLOOR AND BASEMENT WORK SCOPE)

PHASE 5.A (GROUND FLOOR)

1. COORDINATION WITH NEW MEDICAL EQUIPMENT AND RF SHIELDING.

2. STUD FRAMING, NEW AND EXISTING UTILITIES, SPRINKLRS, ETC. ROUGHED-IN.

3. ABOVE CEILING DUCTS, CABLE TRAYS, EXHAUST TO THE OUTSIDE, ETC. COMPLETED AND TESTED.

4. GYPSUM BOARD WALLS COMPLETED AND SLAB PREPARED FOR NEW RF SHIELDING.

5. RF SHIELDING CONSTRUCTION AT WALLS, CONCEALED ABOVE CEILING, SLAB, MRI ANCHORAGE , EQUIPMENT

CEILING SUPPORT, QUENCHING AND VENTING, WINDOWS AND DOOR WITH INSPECTIONS DURING

CONSTRUCTION AND TESTING.

PHASE 5.B (BASEMENT)

1. STRUCTURE AND UTILITY WORK COMPLETED MEETING ALL FIRE RATED SLAB AND OR WALL

PENETRATIONS.

PHASE 5.C (UTILITIES GROUND FLOOR AND BASEMENT)

1. USE HEPACART TO TAKE ALL UTILITIES IN NEW AREA WORK SCOPE TO MECHANICAL, ELECTRICAL AND IT

ROOMS.

2. TESTING.

PHASE 6 (GROUND FLOOR MRI 1.5 AREA)

1. PROTECT INSTALLED RF SHIELDING.

2. INSTALLATION OF FINISHES, LIGHTS, LUMINOUS CEIING, DIFFUSERS, MILLWORK, ETC. INCLUDING TEMPORARY

EXPANSION OF BARRIERS AT NIGHT FOR WALL PAINTING IN COORIDORS AND INSTALLATION OF WALL GUARDS

AND CRASH BUMPERS.

3. PREPARE, CLEAN AND PROTECT SPACE FOR VA AND VENDOR MRI/EQUIPMENT.

4. REMOVE ICRA BARRIERS.

PHASE 7 (GROUND FLOOR EQUIPMENT INSTALLATION)

1. DELIVERY AND INSTALLATION OF VA VENDOR EQUIPMENT.

PHASE 8 (GROUND FLOOR EQUIPMENT TESTING)

1. COMPLETE COMMISSIONING AND TESTING OF ALL EQUIPMENT AND UTILITES.

PHASE 9

1. TRAINING, WARRANTIES AND RECORD DOCUMENTS TURNED OVER TO THE VA.

PHASE 10

1. TURN OVER SPACE TO THE FACILITY.

1. ISOLATE EXISTING HVAC SYSTEM IN AREAS WHERE WORK IS TO BE PERFORMED. ALL AIR VENTS MUST BE SEALED OFF AND UNDER NEGATIVE PRESSURE NEAR THE CONSTRUCTION AREA AS REQUIRED AFTER COORDINATION WITH COR TO ENSURE NON-INTERFERENCE WITH HVAC AND NEGATIVE PRESSURE SYSTEMS. DUST

TO BE CONTROLLED WITHIN THE WORK SITE FROM FLOOR TO DECK.

2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES WILL BE DEFINED AND CLEARLY ARTICULATED WITH CONSTRUCTION SIGNAGE TO BE PROVIDED BY THE CONTRACTOR. ALL EGRESS WAYS MUST BE MAINTAINED FREE OF DEBRIS AT ALL TIMES. THEY MUST BE UTILIZED AT SCHEDULED TIMES ONLY AS COORDINATED WITH COR. DUST MATS MUST BE PLACED AT ENTRANCES/EXITS OF WORK AREA AND REPLACED DAILY OR MORE FREQUENTLY IF NECESSARY. DEBRIS WHEN TRANSPORTED THROUGH HOSPITAL AREAS MUST BE COMPLETELY TIGHTLY COVERED TO CONTAIN DUST DURING TRANSPORT. DEBRIS SHALL BE REMOVED IN EVENINGS OR NON-DUTY TIMES IF POSSIBLE. ALL CART WHEELS MUST BE CLEANED BEFORE LEAVING THE

CONSTRUCTION AREA.

3. CLEANING: THE CONSTRUCTION ZONE AND ADJACENT ENTRY AREA SHALL BE MAINTAINED IN A CLEAN AND SANITARY MANNER BY THE CONTRACTOR AND WILL BE HIGH EFFICIENCY PARTICULATE AIR (HEPA) VACUUMED AND WET MOPPED WITH DISINFECTANT DAILY OR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST GENERATION. CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS UPON EXITING THE CONSTRUCTION ZONE.

4. CONTRACTOR TO OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.

5. STAGING AREAS WILL BE DESIGNATED BY THE COR. CONTRACTOR TO COORDINATE WITH THE COR PRIOR TO

CONSTRUCTION.

6. CONTRACTOR TO PROVIDE PROTECTION ABOVE CEILING WITHIN THE CONTAINMENT AREA, IF EXISTING WALLS

AND/OR PARTITIONS DO NOT EXTEND TO THE STRUCTURE ABOVE.

7. COORDINATE WITH OTHER ENGINEERING DISCIPLINES.

8. ICRA PLANS DENOTE TOTAL DEFINED AREAS OF WORK ON ALL AFFECTED LEVELS. THE VA MAY, BASED ON

DYNAMIC UNFORESEEN VARIABLES (PATIENT CENSUS, OTHER PROJECTS, ETC.), REQUIRE THE GENERAL CONTRACTOR TO MODIFY EXTENTS AND AREA SIZES OF ICRA BARRIERS. ANY SUCH MODIFICATION WILL REQUIRE THE SAME REQUISITE PROVISIONS REQUIRING CONTAINMENT AIR- PRESSURIZATION CRITERIA, AND

IDENTIFICATION AS NOTED ON INFECTION CONTROL RISK ASSESSMENT.

9. ANY EXCESSIVE NOISE PERCEIVED OUTSIDE THE CONSTRUCTION CONTAINMENT BARRIER ABOVE 85 DECIBELS

SHALL BE COORDINATED WITH COR.

10. ANYTHING THE COR HAS DEEMED EXCESSIVE OR DISRUPTIVE TO PATIENT CARE PROCEDURES. A PLAN OF ACTION WILL BE IMMEDIATELY PUT IN PLACE TO AVOID DISRUPTIONS TO THE CONSTRUCTION SCHEDULE.

ICRA KEYNOTES

TEMPORARY DUST CONTROL BARRIERS FOR DEMOLITION AND NEW CONSTRUCTION.

GC TO COORD. SCHEDULE AND HOURS OF DEMOLITION REMOVAL. REFER TO BARRIER SYSTEM DETAILS

ON SHEET 01-GI110.

ANTE ROOM. 2

USE HEPACART FOR DOOR AND UTILITY CONNECTIONS OUTSIDE OR BARRIER WORK SCOPE.3

ISOLATE HVAC SYSTEM, MAINTAIN NEGATIVE PRESSURE. 4

PROVIDE PROTECTION ABOVE CEILINGS IN CONTAINMENT AREA IF EXISTING WALLS AND PARTITIONS DO

NOT EXTEND TO THE STRUCTURE ABOVE CEILING. 5

MAINTAIN ACCESS TO ALL EXISTING BUILDINGS, UTILITIES AND FACILITIES WITHIN THE CONSTRUCTION

LIMITS SERVING THE MEDICAL CENTER. 6

TEMPORARILIY RELOCATE DOOR FOR NEW WORK SCOPE. 7

INFECTION CONTROL NOTES

1. THE LIFE SAFETY PLANS ARE "DIAGRAMMATIC ONLY" THEIR PURPOSE IS SOLELY TO REPRESENT THE LIFE SAFETY COMPONENTS FOR THE PROJECT. THE GENERAL CONTRACTOR SHALL USE THE CONSTRUCTION DOCUMENTS (NOT THE LIFESAFETY PLANS) FOR THE IMPLEMENTATION OF THE REQUIRED LIFE SAFETY

COMPONENTS INTO THE PROJECT.

LIFE SAFETY NOTES

NO SCOPE OF WORK AREA

LIFE SAFETY LEGEND

EXISTING 2 HR FIRE PARTITION

EXISTING 1 HR FIRE PARTITION

NEW SMOKE PARTITION

ICRA VESTIBULE WITH DUST COLLECTING

MATS

TEMPORARY DUST-PROOF BARRIER. INSTALL

MAGNETIC ACCESS DUST-PROOF DOOR

WHERE REQUIRED (USE ACCESS ZIPPER

DOOR WHERE REQUIRED BY I.C.R.A.)

EXISTING EXIT LIGHT

NEW NON-RATED PARTITION

EXISTING PARTITION

EGRESS WIDTH

FEC (FIRE EXTINGUISHER CABINET)

xx"

PROPOSED MRI TRAVEL & DELIVERY PATH

FEC

EXIT TRAVEL DISTANCE & COMMON

PATH OF TRAVEL

EXISTING SMOKE PARTITION

OCCUPANCY

MACHINE ROOM 235 SF / 300/PERSONS = 1 OCCUPANT

OPEN MRI ROOM 530 SF / 300/PERSONS = 2 OCCUPANTS

3T MRI ROOM 463 SF / 300/PERSONS = 2 OCCUPANTS

CONTROL ROOM 137 SF / 100/PERSONS = 3 OCCUPANTS

SCREENING ROOM 178 SF / 100/PERSONS = 2 OCCUPANTS

GURNEY ROOM 126 SF / 100/PERSONS = 2 OCCUPANTS

PREP HOLD 128 SF / 100/PERSONS = 2 OCCUPANTS

TOTAL (EXIST. FLOOR AREA) 14 OCCUPANTS

EQUIPMENT ROOM 124 SF / 300/PERSONS = 1 OCCUPANT

CONTROL ROOM 126 SF / 100/PERSONS = 3 OCCUPANTS PROVIDED

MRI SCANNER ROOM 618 SF / 300/PERSONS = 3 OCCUPANTS

DRESSING ROOM 67 SF / 300/PERSONS = 1 OCCUPANT

TOTAL (NEW FLOOR AREA) 8 OCCUPANTS

TOTAL EXIT OCCUPANT LOAD 22 OCCUPANTS

EXIT WIDTH PROVIDED 32 INCHES

EXIT CAPACITY UNIT ALLOWED 0.2 INCHES/OCCUPANT

TOTAL EXIT OCCUPANT SIZE PROVIDED 160 OCCUPANTS

EXISTING FLOOR AREA

NEW FLOOR AREA

SCOPE OF WORK AREA EXIT STAIRWELL/PASSAGEWAY

R

S

T

U

Q

P

N.8

1514.9141312

N

VCS STORAGE

CB-6F

VCS

STORAGE

CB-6G

VCS STORAGE

CB-6F

SIGN SHOP

CB-6H

ELEVATOR

#18

CB-6D

CB-6C

TOILET

CB-6B

CB-6A

STAIR #20

SB-20-1

PAINT

STORAGE

AND MIX

CB-1

PLUMBING

STORAGE

CB-1C

ELECTRICAL

CB-1H

STORAGE

CB-1B

A/C

REFRIGERANT

STORAGE

CB-1A

ELECTRONIC

STORAGE

CB-1E

CARPENTRY

SHOP

STORAGE

CB-3D

BULK

MOTOR

STORAGE

CB-1P

STORAGE

CB-3A

ETD: 134' - 0"

SCOPE OF WORK ON

GROUND FLOOR

(ABOVE)

PROJECT PHASING

PRE-CONSTRUCTION 1

1. GC SCHEDULE, SITE ACCESS, CONSTRUCTION FENCING AS REQUIRED (CONTRACTOR STAGING AREA, TOILET, ETC.) VERIFIED WITH COR.

CONSTRUCTION PART 1B

1. CORRIDOR WORK FOR NEW MRI TRANSPORTATION AT CMU WALLS FOR PERMANENT DOOR FRAME OPENING CHANGES. LIMITED HOURS AND

TEMPORARY ACCESS TO ADJACENT AREAS REQUIRED TO BE MAINTAINED.

PRE-CONSTRUCTION 2

1. REMOVAL OF EXISTING VA PERSONNEL, COMPUTER AND SMALL MEDICAL EQUIPMENT.

2. INSTALLATION OF TEMPORARY WALL AND CEILING ICRA BARRIERS PER PROJECT SCOPE. INCLUDING LIFE SAFETY SIGNAGE, EGRESS AND PROTECTION OF EXISTING

BUILDING AND FINISHES NOT IN SCOPE OF WORK. REST OF THE FACILITY TO REMAIN FUNCTIONAL FOR PATIENTS, STAFF AND VISITORS.