Base Offer Price Breakdown - 1 page.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Y1DA--FY26: NRM (PROJ: 673-CSI-132) D/B 1. 5T MRI (ICC)
Solicitation number
36C24826Q0128
Issued by

About this file

This document is a Base Offer Price Breakdown Excel template for a construction project, specifically designed for detailed cost estimation across 34 construction divisions. The template requires offerors to input labor and material costs for each division, with columns for Division 1 (General Requirements) through Division 34 (Transportation), allowing for a comprehensive breakdown of projected expenses. Additional calculation fields are included for overhead percentage, profit percentage, and bonding percentage, with the intention of providing a granular view of the total base offer cost for government price analysis.

The associated federal contract opportunity is a pre-solicitation for a Design-Build (DB) project for a 1.5T MRI Installation at the James A. Haley Veterans Hospital in Tampa, Florida, solicitation number 36C24826Q0128. The procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with a firm fixed-price contract type, under NAICS code 236220 and a small business size standard of $45M. The project involves professional services, equipment, labor, and construction for installing a Siemens 1.5T MRI ICC, with a Phase I quote due on 01/06/2026 at 10:00 AM EST and an anticipated Request for Quote release on or about January 10, 2026.

View the file

Other files

File Type Posted
WD-FL20260208 01-02-26.pdf PDF
673-CSI-132 - Hazardous Materials Report 60 PERCENTAGE.pdf PDF
second floor drawing - ACM.pdf PDF
first floor drawing.pdf PDF
673-CSI-132 SOW RFI update.docx DOCX document
673-CSI-132 RFI Responses.docx DOCX document
36C24826Q0128 0003.pdf PDF
sign in sheet.pdf PDF
36C24826Q0128 0002.pdf PDF
VA James A Haley1 5T MRI -90 CD Progress Specifications 12-15.pdf PDF
VA James A Haley 1 5T MRI -90 CD-Progress Drawings 12-15.pdf PDF
36C24826Q0128 0001.pdf PDF
2510179R0-DRAWINGS.pdf PDF
EMR 1 page.pdf PDF
36C24826Q0128_1.pdf PDF
2510179R0-DRAWINGS.pdf PDF
WD FL20250208 05232025.pdf PDF
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
Experience information Sheet.pdf PDF
36C24826Q0128.docx DOCX document
673-CSI-132 SOW.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number: N/A Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements
Division 2Existing Conditions- 0
Division 3Concrete- 0- 0
Division 4Masonry- 0
Division 5Metals- 0- 0
Division 6Wood and Plastic- 0
Division 7Thermal & Moisture Protect- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis