This document is a Base Offer Price Breakdown Excel template for a construction project, specifically designed for detailed cost estimation across 34 construction divisions. The template requires offerors to input labor and material costs for each division, with columns for Division 1 (General Requirements) through Division 34 (Transportation), allowing for a comprehensive breakdown of projected expenses. Additional calculation fields are included for overhead percentage, profit percentage, and bonding percentage, with the intention of providing a granular view of the total base offer cost for government price analysis.
The associated federal contract opportunity is a pre-solicitation for a Design-Build (DB) project for a 1.5T MRI Installation at the James A. Haley Veterans Hospital in Tampa, Florida, solicitation number 36C24826Q0128. The procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with a firm fixed-price contract type, under NAICS code 236220 and a small business size standard of $45M. The project involves professional services, equipment, labor, and construction for installing a Siemens 1.5T MRI ICC, with a Phase I quote due on 01/06/2026 at 10:00 AM EST and an anticipated Request for Quote release on or about January 10, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WD-FL20260208 01-02-26.pdf | ||
| 673-CSI-132 - Hazardous Materials Report 60 PERCENTAGE.pdf | ||
| second floor drawing - ACM.pdf | ||
| first floor drawing.pdf | ||
| 673-CSI-132 SOW RFI update.docx | DOCX document | |
| 673-CSI-132 RFI Responses.docx | DOCX document | |
| 36C24826Q0128 0003.pdf | ||
| sign in sheet.pdf | ||
| 36C24826Q0128 0002.pdf | ||
| VA James A Haley1 5T MRI -90 CD Progress Specifications 12-15.pdf | ||
| VA James A Haley 1 5T MRI -90 CD-Progress Drawings 12-15.pdf | ||
| 36C24826Q0128 0001.pdf | ||
| 2510179R0-DRAWINGS.pdf | ||
| EMR 1 page.pdf | ||
| 36C24826Q0128_1.pdf | ||
| 2510179R0-DRAWINGS.pdf | ||
| WD FL20250208 05232025.pdf | ||
| PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| Experience information Sheet.pdf | ||
| 36C24826Q0128.docx | DOCX document | |
| 673-CSI-132 SOW.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer Base Offer Cost Breakdown
Project Number: N/A Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
| Edward L Roy: VA assigned Project Title | Project Location | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | |||
| Division 2 | Existing Conditions | - 0 | ||
| Division 3 | Concrete | - 0 | - 0 | |
| Division 4 | Masonry | - 0 | ||
| Division 5 | Metals | - 0 | - 0 | |
| Division 6 | Wood and Plastic | - 0 | ||
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | ||
| Profit % | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | |
| Bond % |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis
File details come from the government source that posted it. Updated .