This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a Department of Veterans Affairs project. The amendment, numbered 0003, covers a DB 1.5T MRI Interstitial Cardiac Center (ICC) project with the number 673-CSI-132, located in Tampa, FL. The purpose of the amendment is to provide several key information updates, including answers to Request for Information (RFI) queries, an updated wage determination, first and second floor drawings, a hazardous materials report, and a Statement of Work (SOW) update. The Phase I quote submission deadline remains unchanged, set for 01/23/2026 at 10:00 AM EST. The amendment was issued by the Network Contracting Office 8 (NCO 8) and signed by the Contracting Officer, David Hernandez, with an effective date of 12-15-2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WD-FL20260208 01-02-26.pdf | ||
| 673-CSI-132 - Hazardous Materials Report 60 PERCENTAGE.pdf | ||
| second floor drawing - ACM.pdf | ||
| first floor drawing.pdf | ||
| 673-CSI-132 SOW RFI update.docx | DOCX document | |
| 673-CSI-132 RFI Responses.docx | DOCX document | |
| 36C24826Q0128 0002.pdf | ||
| sign in sheet.pdf | ||
| VA James A Haley1 5T MRI -90 CD Progress Specifications 12-15.pdf | ||
| VA James A Haley 1 5T MRI -90 CD-Progress Drawings 12-15.pdf | ||
| 36C24826Q0128 0001.pdf | ||
| 2510179R0-DRAWINGS.pdf | ||
| EMR 1 page.pdf | ||
| 36C24826Q0128_1.pdf | ||
| 2510179R0-DRAWINGS.pdf | ||
| WD FL20250208 05232025.pdf | ||
| PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| Experience information Sheet.pdf | ||
| Base Offer Price Breakdown - 1 page.xlsx | XLSX spreadsheet | |
| 673-CSI-132 SOW.docx | DOCX document | |
| 36C24826Q0128.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0003 12-15-2025
673-CSI-132
36C248
Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
Tampa FL 33637
36C248
Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
Tampa FL 33637
To all Offerors/Bidders
36C24826Q0128
12-11-2025
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 01-23-2026 10:00AM EST
X
PROJECT TITLE: DB 1.5T MRI CC
PROJECT NUMBER: 673-CSI-132
THE PURPOSE OF THIS AMENDMENT IS TO PROVIDE THE FOLLOWING INFORMATION CHANGES:
-PROVIDE ANSWERS TO THE RFI's
-PROVIDE UPDATED WAGE DETERMINATION
-FIRST FLOOR DRAWING, 2ND FLOOR DRAWINGS-ACM
-673-CSI-132 HAZARDOUS MATERIALS REPORT.
-673-CSI-132 SOW UPDATE.
THE PHASE I QUOTES DUE DATE STAYS THE SAME 01/23/2026 AT 10:00AM EST.
DAVID HERNANDEZ
CONTRACTING OFFICER
PROJECT TITLE: DB 1.5T MRI ICC
PROJECT NUMBER: 673-CSI-132
THE PURPOSE OF THIS AMENDMENT IS TO PROVIDE THE FOLLOWING INFORMATION
CHANGES:
PROVIDE ANSWERS TO THE RFIs
FIRST FLOOR DRAWINGS
2ND FLOOR DRAWINGS-ACM
HAZARDOUS MATERIALS REPORT
UPDATED SOW
Phase I Quotes due date stays the same 01/23/2026 at 10:00AM EST.
Provide updated Wage determination.
See attached document: 673-CSI-132 - Hazardous Materials Report 60
PERCENTAGE.
See attached document: first floor drawing.
See attached document: 673-CSI-132 RFI Responses.
See attached document: second floor drawing - ACM.
See attached document: 673-CSI-132 SOW RFI update.
See attached document: WD-FL20260208 01-02-26.