Base Offer Price Breakdown - 1 page.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Z2DA--FY26: NRM (PROJ: 516-CSI-142) BB - Site Prep for Emergency Department CT Scanner Replacement
Solicitation number
36C24826Q0004
Issued by

About this file

This document is a Base Offer Price Breakdown template for a construction project at the C.W. Bill Young VA Medical Center in Bay Pines, Florida. The template is designed for contractors to detail labor and material costs across 34 construction divisions, including general requirements, existing conditions, concrete, masonry, electrical, HVAC, and other specialized areas. The spreadsheet includes sections for calculating overhead, profit, and bonding percentages, with placeholders for the offeror to input specific costs for each division.

The associated federal contract opportunity (Solicitation Number: 36C24826Q0004) involves site preparation for an Emergency Department CT Scanner Replacement project, with an estimated project value between $500,000 and $1,000,000. The project requires constructing an approximately 790 SF addition to Building 100, including removing and replacing CT scanner equipment, installing lead-lined walls, and supporting equipment structurally. The solicitation was issued by the Department of Veterans Affairs Network Contracting Office, with quotes originally due on 10/01/2025 but subsequently extended to 01/05/2026 at 2:00 PM EST, with a site visit scheduled for 10/07/2025.

View the file

Other files

File Type Posted
36C24826Q0004 0005.pdf PDF
WD-FL20260222 01-02-26.pdf PDF
Guldmann_GH3_BayPines_VA_Submission_Package.pdf PDF
36C24826Q0004 0004.pdf PDF
36C24826Q0004 0003.docx DOCX document
516-CSI-142 - Bay Pines ED CT_ADD 1.pdf PDF
03 30 00-CAST-IN-PLACE CONCRETE.pdf PDF
01 45 29-TESTING LABORATORY SERVICES.pdf PDF
36C24826Q0004 0002.docx DOCX document
RFI_516-CSI-142 Pre-Bid.docx DOCX document
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
ED CT scanner site walk sign-in sheet 10-07-25.pdf PDF
36C24826Q0004 0001.docx DOCX document
516-CSI-142_Bay Pines_ED CT_ Specs.pdf PDF
VHA Infection Control Risk Assessment.pdf PDF
36C24826Q0004_1.docx DOCX document
EMR 1 page.pdf PDF
WD-FL20250222 05-23-2025.pdf PDF
516-CSI-142_Bay Pines_ED CT_ Drawings.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number: N/A Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements
Division 2Existing Conditions- 0
Division 3Concrete- 0- 0
Division 4Masonry- 0
Division 5Metals- 0- 0
Division 6Wood and Plastic- 0
Division 7Thermal & Moisture Protect- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis