Base Offer Price Breakdown - 1 page.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Z2DA--FY26: NRM (PROJ: 516-CSI-142) BB - Site Prep for Emergency Department CT Scanner Replacement
- Solicitation number
- 36C24826Q0004
About this file
This document is a Base Offer Price Breakdown template for a construction project at the C.W. Bill Young VA Medical Center in Bay Pines, Florida. The template is designed for contractors to detail labor and material costs across 34 construction divisions, including general requirements, existing conditions, concrete, masonry, electrical, HVAC, and other specialized areas. The spreadsheet includes sections for calculating overhead, profit, and bonding percentages, with placeholders for the offeror to input specific costs for each division.
The associated federal contract opportunity (Solicitation Number: 36C24826Q0004) involves site preparation for an Emergency Department CT Scanner Replacement project, with an estimated project value between $500,000 and $1,000,000. The project requires constructing an approximately 790 SF addition to Building 100, including removing and replacing CT scanner equipment, installing lead-lined walls, and supporting equipment structurally. The solicitation was issued by the Department of Veterans Affairs Network Contracting Office, with quotes originally due on 10/01/2025 but subsequently extended to 01/05/2026 at 2:00 PM EST, with a site visit scheduled for 10/07/2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24826Q0004 0005.pdf | ||
| WD-FL20260222 01-02-26.pdf | ||
| Guldmann_GH3_BayPines_VA_Submission_Package.pdf | ||
| 36C24826Q0004 0004.pdf | ||
| 36C24826Q0004 0003.docx | DOCX document | |
| 516-CSI-142 - Bay Pines ED CT_ADD 1.pdf | ||
| 03 30 00-CAST-IN-PLACE CONCRETE.pdf | ||
| 01 45 29-TESTING LABORATORY SERVICES.pdf | ||
| 36C24826Q0004 0002.docx | DOCX document | |
| RFI_516-CSI-142 Pre-Bid.docx | DOCX document | |
| PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| ED CT scanner site walk sign-in sheet 10-07-25.pdf | ||
| 36C24826Q0004 0001.docx | DOCX document | |
| 516-CSI-142_Bay Pines_ED CT_ Specs.pdf | ||
| VHA Infection Control Risk Assessment.pdf | ||
| 36C24826Q0004_1.docx | DOCX document | |
| EMR 1 page.pdf | ||
| WD-FL20250222 05-23-2025.pdf | ||
| 516-CSI-142_Bay Pines_ED CT_ Drawings.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer Base Offer Cost Breakdown
Project Number: N/A Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
| Edward L Roy: VA assigned Project Title | Project Location | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | |||
| Division 2 | Existing Conditions | - 0 | ||
| Division 3 | Concrete | - 0 | - 0 | |
| Division 4 | Masonry | - 0 | ||
| Division 5 | Metals | - 0 | - 0 | |
| Division 6 | Wood and Plastic | - 0 | ||
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | ||
| Profit % | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | |
| Bond % |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis