516-CSI-142 - Bay Pines ED CT_ADD 1.pdf
PDF 1 MB Posted
- Attached to
- Z2DA--FY26: NRM (PROJ: 516-CSI-142) BB - Site Prep for Emergency Department CT Scanner Replacement
- Solicitation number
- 36C24826Q0004
About this file
These structural design documents are for the Bay Pines VA Medical Center Emergency Department CT Replacement project, focusing on site preparation and structural requirements. The project involves replacing an existing CT scan room on the first floor, with specific technical specifications including a 10-inch thick reinforced two-way flat plate concrete slab, seismic design category A, and risk category IV. Key structural design codes include VA Design Manual Structural PG-18-10, International Building Code 2024, and ASCE 7-22, with floor live load requirements ranging from 80 PSF for administrative areas to 150 PSF for mechanical rooms. The documents provide detailed instructions for concrete work, post-installed anchors, equipment installation, and contractor responsibilities, including requirements for GPR scanning the existing slab, verifying existing conditions, and ensuring proper anchor and penetration installations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24826Q0004 0005.pdf | ||
| WD-FL20260222 01-02-26.pdf | ||
| Guldmann_GH3_BayPines_VA_Submission_Package.pdf | ||
| 36C24826Q0004 0004.pdf | ||
| Base Offer Price Breakdown - 1 page.xlsx | XLSX spreadsheet | |
| 36C24826Q0004 0003.docx | DOCX document | |
| 03 30 00-CAST-IN-PLACE CONCRETE.pdf | ||
| 01 45 29-TESTING LABORATORY SERVICES.pdf | ||
| 36C24826Q0004 0002.docx | DOCX document | |
| RFI_516-CSI-142 Pre-Bid.docx | DOCX document | |
| PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| ED CT scanner site walk sign-in sheet 10-07-25.pdf | ||
| 36C24826Q0004 0001.docx | DOCX document | |
| 516-CSI-142_Bay Pines_ED CT_ Specs.pdf | ||
| VHA Infection Control Risk Assessment.pdf | ||
| 36C24826Q0004_1.docx | DOCX document | |
| EMR 1 page.pdf | ||
| WD-FL20250222 05-23-2025.pdf | ||
| 516-CSI-142_Bay Pines_ED CT_ Drawings.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
DESIGN CODES:
VA DESIGN MANUAL STRUCTURAL:
PG-18-10 (OCTOBER 1, 2022 REV JULY 1, 2023)
VA SEISMIC DESIGN REQUIREMENTS:
H18-8 (JULY 1, 2023 REV NOVEMBER 1, 2024)
INTERNATIONAL BUILDING CODE:
IBC 2024
INTERNATIONAL EXISTING BUILDING CODE:
IEBC 2024
MINIMUM BUILDING DESIGN LOADS AND ASSOCIATED CRITERIA FOR
BUILDINGS AND OTHER STRUCTURES:
ASCE 7-22
BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE:
ACI 318-19
SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS:
AISC 14TH EDITION 360-22
SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS:
AISC 341-22
DESIGN CRITERIA:
RISK CATEGORY IV
FLOOR LIVE LOADS:
ADMINISTRATIVE SERVICES, OFFICE AREAS 80 PSF
CLINICAL AND SUPPORT SERVICES 80 PSF
CORRIDOR 100 PSF
LIGHT STORAGE 125 PSF
SUPPLY SERVICE STORAGE 150 PSF
MECHANICAL ROOMS 150 PSF
PARTITIONS 20 PSF
(NOT REQUIRED WITH LIVE LOAD OF 100 PSF OR HIGHER)
EQUIPMENT LOADS AND LAYOUT BASED ON EQUIPMENT DRAWING FOR
REVOLUTION APEX ELITE POWER PRO BY GE DATED 3/31/2025.
SEISMIC DESIGN DATA:
EQUIVALENT LATERAL FORCE PROCEDURE
SOIL SITE CLASS ASSUMED 'D'
SEISMIC DESIGN CATEGORY A
SEISMIC IMPORTANCE FACTOR, Ie = 1.5
MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETERS:
Ss = 0.063g S1 = 0.029g
DESIGN SPECTRAL RESPONSE ACCELERATION PARAMETERS:
Sds = 0.056g Sd1 = 0.041g
RIGGING, HOISTING AND SCAFFOLDING REQUIREMENTS:
1. THE CONTRACTOR SHALL PREPARE AND SUBMIT TO THE COR AND
A/E OF RECORD FOR REVIEW A SITE SPECIFIC RIGGING AND HOISTING
PLAN FOR ALL MAJOR EQUIPMENT THAT WILL BE TRANSPORTED
THROUGH OR HOISTED FROM THE BUILDING. THE PLAN SHALL
INCLUDE THE SEQUENCE OF ERECTION, THE DESCRIPTION OF THE
RIGGING, HOISTING AND TRANSPORTATION EQUIPMENT AND THE SITE
PREPARATIONS THAT WILL BE NEEDED TO COMPLETE THE
INSTALLATION.
2. THE CONTRACTOR SHALL PREPARE AND SUBMIT TO THE COR AND
A/E OF RECORD FOR REVIEW A SITE SPECIFIC PLAN FOR ALL
SCAFFOLDING THAT WILL BE INSTALLED ON FRAMED FLOORS AND
ROOFS.
3. THE PROPOSED RIGGING, HOISTING OR SCAFFOLDING PLAN SHALL BE
REVIEWED BY A PROFESSIONAL ENGINEER REGISTERED IN THE
LOCAL JURISDICTION. THE PROFESSIONAL ENGINEER SHALL PROVIDE
A SIGNED AND SEALED CERTIFICATION STATING THAT THE
PROPOSED PLAN WILL NOT DAMAGE OR OVERSTRESS THE
STRUCTURE. SHORING AND SCAFFOLDING SHALL COMPLY WITH
OSHA REGULATIONS.
4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT THE
LOADS SUPERIMPOSED BY THE RIGGING, HOISTING OR SCAFFOLDING
SYSTEMS WILL NOT EXCEED THE FOLLOWING LOADS:
FRAMED FLOORS = 80 PSF
ROOFS = 30 PSF
5. THE CONTRACTOR SHALL PROVIDE PROTECTION FOR ALL FINISHES,
UTILITIES, AND STRUCTURE. CONTRACTOR SHALL REPLACE AT NO
COST TO THE VA ANY FINISHES DAMAGED DURING CONSTRUCTION.
CONTRACTOR SHALL SUBMIT A REPAIR DRAWING TO A/E OF RECORD
AND VA COR FOR REVIEW PRIOR TO PERFORMING ANY REPAIRS. ALL
REPAIRS SHALL BE COMPLETED AT NO COST TO THE GOVERNMENT.
GENERAL:
1. CONTRACTOR IS SOLELY RESPONSIBLE FOR MEANS AND METHODS
DURING THE COURSE OF THE WORK. DO NOT DAMAGE OR
ENDANGER THE STRUCTURAL INTEGRITY OF THE WORK.
2. LOADS GREATER THAN THE DESIGN LIVE LOADS SHALL NOT BE
PLACED ON THE STRUCTURE.
3. NOTIFY COR IN CASE OF DISCREPANCIES BETWEEN DRAWINGS,
THESE NOTES, AND PROJECT MANUAL BEFORE PROCEEDING WITH
THE WORK.
4. USE ARCHITECTURAL DRAWINGS AND DRAWINGS OF OTHER TRADES
IN CONJUNCTION WITH THE STRUCTURAL DRAWINGS TO PROPERLY
PERFORM THE WORK.
5. IF CONDITIONS DISCLOSED DURING EXCAVATION REVEAL
UNFORESEEN CONDITIONS, PROMPTLY REQUEST DIRECTION IN AN
RFI FORM FROM THE COR AND A/E OF RECORD BEFORE
PROCEEDING.
6. CONTRACTOR IS RESPONSIBLE FOR COORDINATING BETWEEN
TRADES.
7. DO NOT SCALE DRAWINGS.
8. SECTIONS AND DETAILS SHOWN, WHILE DRAWN FOR SPECIFIC
LOCATIONS, ARE INTENDED TO ESTABLISH THE GENERAL TYPES OF
DETAILS THAT WILL APPLY TO OTHER LOCATIONS.
9. THE COR AND A/E OF RECORD'S REVIEW OF A SUBMITTAL SHALL NOT
RELIEVE THE CONTRACTOR OF THEIR RESPONSIBILITY TO FOLLOW
THE INTENT OF THE CONTRACT DRAWINGS.
10. REPRODUCTION OF CONTRACT DOCUMENTS WILL NOT BE ACCEPTED
AS SHOP DRAWINGS.
DELEGATED DESIGN ITEMS:
1. EMPLOY OR RETAIN A LICENSED PROFESSIONAL ENGINEER IN THE
PROJECT JURISDICTION TO DESIGN AND DETAIL THE FOLLOWING
PERFORMANCE SPECIFIED STRUCTURAL COMPONENTS:
A. UNISTRUT SUPPORTS
2. SEE INDIVIDUAL MATERIAL SECTIONS FOR ADDITIONAL
REQUIREMENTS.
3. SHOP DRAWINGS AND CALCULATIONS SHALL BE SIGNED AND SEALED
BY A PROFESSIONAL ENGINEER REGISTERED IN THE LOCAL
JURISDICTION AND SUBMITTED FOR REVIEW.
EXISTING CONSTRUCTION:
1. ABOVE GROUP, INC. HAS PREPARED THESE PLANS BASED ON A
LIMITED AMOUNT OF FIELD EXPLORATION AND ON THE STRUCTURAL
INFORMATION SHOWN IN DRAWINGS PREPARED BY SHS ASSOCIATES
DATED JULY 2, 1979. THE EXISTING MEMBER SIZES ARE NOTED (E)
AND ARE SHOWN IN THE PLANS. THE CONTRACTOR SHALL FIELD
VERIFY THAT THE EXISTING MEMBERS SHOWN IN THE PLANS MATCH
EXISTING AS BUILT CONDITIONS PRIOR TO PREPARING SHOP
DRAWINGS. IF THE AS BUILT CONDITIONS DO NOT CONFORM TO THE
INFORMATION SHOWN IN THE PLANS, OR IF ANY STRUCTURAL
MEMBER IS FOUND TO BE IN POOR CONDITION, THE CONTRACTOR
SHALL INFORM THE COR OF THE ACTUAL SIZES AND/OR CONDITION.
RE-DESIGN AND ADDITIONAL FRAMING MAY BE REQUIRED IN THAT
CASE.
2. ALL NEW PENETRATIONS THROUGH THE EXISTING FRAMED FLOORS,
ROOFS AND WALLS SHALL BE ACCURATELY LOCATED BY THE
CONTRACTOR. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS
SHOWING ALL PROPOSED OPENINGS AND SHALL SUBMIT THESE FOR
REVIEW AND APPROVAL PRIOR TO CUTTING ANY OPENINGS.
3. NEW PENETRATIONS SHOWN IN THE STRUCTURAL DRAWINGS ARE
PRINCIPAL OPENINGS. THE CONTRACTOR SHALL COORDINATE WITH
THE ARCHITECTURAL, MEP AND TELECOMMUNICATION DRAWINGS
FOR ALL PENETRATIONS.
4. ALL NEW PIPE AND DUCT PENETRATIONS SHALL BE LOCATED BY THE
CONTRACTOR TO AVOID CONCRETE SLAB REINFORCEMENT AND
SUPPORTING MEMBERS UNDER THE SLAB OR ROOF. IF CUTTING OF
ANY REINFORCEMENT OR EXISTING SUPPORTING MEMBER CANNOT
BE AVOIDED, THEN PRIOR TO CUTTING, THE CONTRACTOR SHALL
PREPARE A DETAILED DRAWING SHOWING THE PROPOSED
PENETRATION AND ALL THE AFFECTED REINFORCEMENT AND
SUPPORTING MEMBERS AND SHALL SUBMIT THE DRAWING TO THE
COR FOR REVIEW AND APPROVAL. THE CONTRACTOR SHALL NOT
CUT ANY REINFORCEMENT OR MEMBER WITHOUT THE PRIOR
APPROVAL OF ENGINEER.
*WARNING* PRECAST CONCRETE JOISTS HAVE PRESTRESSED
STRANDS. SERIOUS HAZARDS AND DAMAGE CAN RESULT FROM A
STRAND BEING CUT.
POST-INSTALLED ANCHORS:
1. DRILL AND INSTALL POST-INSTALLED ANCHORS ACCORDING TO
MANUFACTURER'S PRINTED INSTALLATION INSTRUCTIONS AND PER
MANUFACTURER'S ON-SITE TRAINING.
2. ALL INSTALLERS OF POST-INSTALLED ANCHORS SHALL BE ACI/CRSI
ADHESIVE ANCHOR INSTALLER CERTIFIED. SUBMIT CERTIFICATES FOR
RECORD.
3. ALL POST-INSTALLED ANCHORS SHALL MEET ICC-ES COMPLIANCE
FOR EACH TYPE OF APPLICATION.
4. SUBMIT PRODUCT INFORMATION AND ICC-ES EVALUATION REPORT
FOR EACH ANCHOR.
5. ALL ANCHOR DESIGNS ARE FOR INSTALLATION IN THE FOLLOWING
CONDITIONS, UNLESS NOTED OTHERWISE. WRITTEN APPROVAL MUST
BE RECEIVED FROM ENGINEER PRIOR TO INSTALLATION OF ADHESIVE
ANCHORS IN ALTERNATE CONDITIONS.
A. DRY CONCRETE, UNLESS NOTED OTHERWISE.
B. CONCRETE TEMPERATURE AT TIME OF INSTALLATION MUST BE
BETWEEN 14° F AND 104° F. SEE MANUFACTURER’S PRINTED
INSTALLATION INSTRUCTION FOR ADHESIVE GEL AND CURE
TIMES.
C. ANCHOR HOLES TO BE HAMMER DRILLED.
D. ANCHOR HOLES TO BE CLEANED PER MANUFACTURER’S PRINTED
INSTALLATION INSTRUCTIONS PRIOR TO ADHESIVE INJECTION.
E. ANCHORS/POST-INSTALLED REINFORCING SHALL NOT BE LOADED
UNTIL CONCRETE OR GROUT HAS BEEN ALLOWED TO CURE FOR
21 DAYS AND/OR HAS ATTAINED 70% OF ITS DESIGN STRENGTH.
6. ALL POST-INSTALLED ANCHORS IN CONCRETE SHALL BE SUITED FOR
USE IN SEISMIC AND CRACKED CONCRETE APPLICATIONS.
7. ADHESIVE ANCHORS IN CONCRETE SHALL BE HILTI HIT HY-200, OR
APPROVED EQUAL.
8. EXPANSION ANCHORS IN CONCRETE SHALL BE HILTI KWIK BOLT TZ2,
OR APPROVED EQUAL.
9. PROVIDE STANDARD AISC HOLES IN ALL STEEL MEMBERS RECEIVING
POST-INSTALLED ANCHORS. IF OVERSIZED HOLES ARE PROVIDED TO
EASE INSTALLATION OF THE ANCHORS, A PLATE WASHER (1/4"X2"X2")
WITH AN AISC STANDARD HOLE SHALL BE INSTALLED AND 1/8" FILLET
WELDED (ALL AROUND) TO THE MEMBER.
10. ALL ANCHORS AND REINFORCING SHALL BE INSTALLED IN
ACCORDANCE WITH THE SPACING AND EDGE DISTANCES SHOWN IN
THE DRAWINGS. THE CONTRACTOR SHALL INFORM THE COR PRIOR
TO INSTALLING THE ANCHORS IF THE SPACING AND EDGE DISTANCES
SHOWN IN THE DRAWINGS CANNOT BE ACHIEVED. IF THIS IS THE
CASE, RE-DESIGN MIGHT BE REQUIRED AND THE ANCHORS SHOULD
NOT BE INSTALLED UNTIL APPROVAL HAS BEEN PROVIDED BY THE
ENGINEER.
11. DO NOT CUT ANY REINFORCING UNLESS IT IS SPECIFICALLY
INDICATED IN THE DRAWINGS OR IS APPROVED BY THE ENGINEER.
12. POST INSTALLED ANCHORS AND REINFORCING SHALL ONLY BE USED
WHERE SPECIFIED IN THE CONTRACT DRAWINGS. THE CONTRACTOR
SHALL OBTAIN APPROVAL FROM THE ENGINEER PRIOR TO INSTALLING
POST INSTALLED ANCHORS WHERE CAST-IN PLACE ANCHORS ARE
MISSING, MISPLACED OR DAMAGED.
13. *WARNING* PRECAST CONCRETE JOISTS HAVE PRESTRESSED
STRANDS. SERIOUS HAZARDS AND DAMAGE CAN RESULT FROM A
STRAND BEING CUT. ATTACHING TO THE UNDERSIDE OF CONCRETE
JOISTS IS NOT PERMITTED AND SLAB SHALL BE GPR SCANNED TO
AVOID CUTTING STRANDS PRIOR TO INSTALLATION OF ANY POST
INSTALLED BOLTS AND ANCHORS.
CONCRETE:
1. CONCRETE, UNLESS OTHERWISE NOTED ON THE PLANS OR
SCHEDULES, SHALL BE NORMAL WEIGHT CONCRETE WITH THE
FOLLOWING 28 DAY COMPRESSIVE STRENGTHS (f'c):
f'c = 4000 PSI, WEIGHT = 145 PCF
ELEVATED SLAB
2. CONCRETE SHALL BE AIR ENTRAINED FOR EXPOSURE CLASS C2 PER
ACI 318 "BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE".
3. ALL REINFORCING STEEL SHALL BE CONFORMING TO ASTM
DESIGNATION A615, GRADE 60. ALL REINFORCING STEEL SHALL BE
DETAILED, FABRICATED AND PLACED IN ACCORDANCE WITH ACI
SP-66, "ACI DETAILING MANUAL".
4. ALL SPLICES IN REINFORCING SHALL BE CLASS "B" SPLICES IN
ACCORDANCE WITH ACI 318, "BUILDING CODE REQUIREMENTS FOR
STRUCTURAL CONCRETE" EXCEPT AS OTHERWISE NOTED.
5. UNLESS OTHERWISE NOTED ON STRUCTURAL DRAWINGS, PROVIDE
CONCRETE PROTECTION FOR REINFORCING AS FOLLOWS:
A. CAST AGAINST EARTH = 3"
B. EXPOSED TO EARTH OR WEATHER:
1. NO. 6 AND LARGER BARS = 2"
2. NO. 5 AND SMALLER BARS = 1 1/2"
C. NOT EXPOSED TO EARTH OR WEATHER:
1. SLABS AND WALLS = 3/4"
2. BEAMS AND COLUMNS = 1 1/2" TO TIES, STIRRUPS OR SPIRALS
6. OPENINGS SHOWN ON THE STRUCTURAL DRAWINGS ARE PRINCIPAL
OPENINGS. SEE MEP AND ARCHITECTURAL DRAWINGS FOR HOLES IN
SLABS NOT SHOWN.
7. THE GENERAL CONTRACTOR SHALL SUBMIT PLANS SHOWING ALL
PENETRATIONS THROUGH THE FRAMED SLABS. THE OPENINGS
SHALL BE ACCURATELY LOCATED AND DIMENSIONED.
8. NO OPENINGS SHALL BE MADE THROUGH CONCRETE FRAMED
FLOORS OR CONCRETE BEAMS UNLESS THESE ARE SPECIFICALLY
SHOWN ON THE STRUCTURAL DRAWINGS OR ON THE APPROVED
STRUCTURAL SHOP DRAWINGS.
9. CONSTRUCTION JOINTS SHALL HAVE THE SURFACE OF THE FIRST
POUR ROUGHENED TO 1/4" AMPLITUDE, UNLESS OTHERWISE NOTED.
10. THE CONTRACTOR MUST SUBMIT A CONCRETE DESIGN MIX IN
ACCORDANCE WITH ACI 318. SUCH DESIGN MIX SHALL BE
ACCOMPANIED BY THE APPROPRIATE GRAPHS AND BACKGROUND
DATA. CONCRETE DESIGN MIX SHALL INDICATE 7 AND 28 DAY
STRENGTHS, CEMENT CONTENT, WATER-CEMENT RATIO, FINE AND
COARSE AGGREGATES AND ADMIXTURES FOR EACH DESIGN
STRENGTH. THE ADDITION OF WATER AT THE PLANT OR IN THE FIELD
GREATER THAN THE SPECIFIED WATER CONTENT IS STRICTLY
PROHIBITED.
11. ALL CONCRETE WORK SHALL CONFORM TO THE LATEST LOCAL
APPROVED EDITIONS OF THE FOLLOWING ACI AND ASTM
DOCUMENTS:
A. ACI-301 SPECIFICATIONS FOR STRUCTURAL CONCRETE
B. ACI-318 CODE
C. ACI-214 COMPRESSIVE TEST
D. ACI-306 COLD WEATHER
E. ACI SP-66 DETAILING
F. ACI-347 FORMWORK
G. ACI-305 HOT WEATHER
H. ACI-211 PROPORTIONS OF CONCRETE
I. ACI-304 PLACING CONCRETE
J. ASTM C-94 READY-MIX CONCRETE
12. ALL FIELD AND LAB TESTING OF CONCRETE SHALL CONFORM TO THE
LATEST LOCAL APPROVED EDITIONS OF ASTM:
A. ASTM C-31 FIELD CYLINDER SPECIMENS
B. ASTM C-143 SLUMP TEST
C. ASTM C-231 AIR CONTENT (WHEN REQUIRED)
D. ASTM C-39 LAB TESTING CYLINDERS
E. ASTM C-172 SAMPLING FRESH CONCRETE
F. ASTM C-42 HARDENED CORES (WHEN REQUIRED)
TEST RESULTS SHALL BE SIGNED AND SEALED BY A
PROFESSIONAL ENGINEER REGISTERED IN THE LOCAL
JURISDICTION.
13. ALL FORMWORK SHALL BE IN ACCORDANCE WITH ACI 347, "GUIDE TO
FORMWORK FOR CONCRETE".
FOUNDATIONS:
1. STRUCTURAL FILL:
A. SHALL BE PLACED IN MAXIMUM OF 8" LOOSE LIFT THICKNESS AND
COMPACTED TO 98% OF STANDARD PROCTOR.
B. ON-SITE OR IMPORTED GRANULAR FILLS INCLUDING GW, GP, GM,
SW, SP, ND, SM CLASSIFIED IN ACCORDANCE WITH THE UNIFIED
SOIL CLASSIFICATION SYSTEM (USCS) AND WITHIN 2% OF
OPTIMUM MOISTURE. FURTHERMORE, THE MATERIAL TO BE
UTILIZED AS STRUCTURAL FILL SHOULD HAVE A PLASTICITY INDEX
(PI) LESS THAN 2, SUBJECT TO FINAL APPROVAL BY THE
GEOTECHNICAL ENGINEER.
2. FILL UNDER SLABS ON GRADE SHALL BE COMPACTED TO 98% OF
STANDARD PROCTOR DENSITY. TESTS SHALL BE PERFORMED FOR
EACH LIFT.
AB ANCHOR BOLT
ABV ABOVE
ACI AMERICAN CONCRETE INSTITUTE
ADDL ADDITIONAL
ADH ADHESIVE
ADJ ADJACENT, ADJUSTMENT
A/E ARCHITECT/ENGINEER
AESS ARCHITECTURALLY EXPOSED STRUCTURAL STEEL
AFF ABOVE FINISHED FLOOR
AGG AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
ALT ALTERNATE
ANCH ANCHOR
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APA ENGINEERED WOOD ASSOCIATION
APRX APPROXIMATE
AR ANCHOR ROD
ARCH ARCHITECT(URAL)
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASD ALLOWABLE STRESS DESIGN
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AWC AMERICAN WOOD COUNCIL
AWPA AMERICAN WOOD PROTECTION AGENCY
AWS AMERICAN WELDING SOCIETY
AVG AVERAGE
B BOTTOM
B/ BOTTOM OF
B-B BACK-TO-BACK
BAL BALANCE
BEL BELOW
BF BRACED FRAME
BLDG BUILDING
BLK(G) BLOCK(ING)
BM BEAM
BOT BOTTOM
BP BASE PLATE, BEARING PLATE
BR BRACE(ING)
BRDG BRIDGING
BRG BEARING
BRK BRICK
BRKT BRACKET
BS BOTH SIDES
BSMT BASEMENT
BT BENT
BTWN BETWEEN
BYD BEYOND
C STEEL CHANNEL
CAIS CAISSON
CALC CALCULATION
CANT CANTILEVER
CAP CAPACITY
C-C CENTER-TO-CENTER
CE CONCRETE ENCASED
CFM COLD FORMED METAL
CHAM CHAMFER
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL/CONTRACTION JOINT
CL CENTERLINE, COLUMN LINE
CLG CEILING
CLR CLEAR
CM CONSTRUCTION MANAGER
CMU CONCRETE MASONRY UNIT
COL COLUMN
COMB COMBINED
COMP COMPOSITE
CONC CONCRETE
COND CONDITION
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COV COVER
CP CAP PLATE
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CSK COUNTERSUNK
CTR CENTER(ED)
CY CUBIC YARD
CYL CYLINDER
d PENNY (AS IN NAIL, Id)
DBL DOUBLE
DD DESIGN DEVELOPMENT
DEF DEFLECTION
DEG DEGREE
DEMO DEMOLITION/DEMOLISH
DEPR DEPRESS(ED)/DEPRESSION
DET(S) DETAIL(S)
DEV DEVELOP/DEVELOPMENT
DIA DIAMETER
DIAG DIAGONAL
DIM(S) DIMENSION(S)
DIR DIRECTION
DK DECK
DL DEAD LOAD
DN DOWN
do DITTO
DP DEEP
DWG(S) DRAWING(S)
DWL DOWEL
(E) EXISTING
E EAST
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EMBED EMBEDMENT/EMBEDDED
ENGR ENGINEER
EO EDGE OF
EOD EDGE OF DECK
EOM EDGE OF MASONRY
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
STRUCTURAL ABBREVIATIONS
ES EACH SIDE
EXCAV EXCAVATE/EXCAVATION
EXP EXPANSION
EXT EXTERIOR
EXIST EXISTING
EW EACH WAY
F/ FACE OF
FAB FABRICATE
FB FLAT BAR
FBO FURNISHED BY OTHERS
FDN FOUNDATION
FFE FINISHED FLOOR ELEVATION
FIN FINISH(ED)
FL(R) FLOOR
FLG FLANGE
FND FOUNDATION
FO FACE OF
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FP FIREPROOFING
FRMG FRAMING
FRP FIBER-REINFORCED POLYMER
FRT FIRE RETARDANT TREATED
FS FAR SIDE
FT FEET
FTG FOOTING
FUT FUTURE
FV FIELD VERIFY
GA GAUGE
GALV GALVANIZE(D)
GB GRADE BEAM
GC GENERAL CONTRACTOR
GLB GLUE LAMINATED BEAM
GR GRADE
GYP GYPSUM
HD HEAVY DUTY
HDR HEADER
HEF HORIZONTAL EACH FACE
HGR HANGER
HI HIGH
HIF HORIZONTAL INSIDE FACE
HK HOOK(ED)
HOF HORIZONTAL OUTSIDE FACE
HORIZ HORIZONTAL
HP HIGH POINT
HS HIGH STRENGTH
HT HEIGHT
H&V HORIZONTAL & VERTICAL
HVAC HEATING, VENTILATING & AIR CONDITIONING
IBC INTERNATIONAL BUILDING COUNCIL
ICC INTERNATIONAL CODE COUNCIL
ID INSIDE DIAMETER
IF INSIDE FACE
IFC ISSUE FOR CONSTRUCTION
IN INCH
INCL INCLUDE(D)(ING)
INFO INFORMATION
INSTL INSTALL/INSTALLATION
INSUL INSULATION
INT INTERIOR
INV INVERT(ED)
JST(S) JOIST(S)
JT JOINT
k KIP (THOUSAND POUNDS)
KB KNEE BRACE
KSI KIPS PER SQUARE INCH
LB, # POUND
LDGR LEDGER (BOARD)
LEN LENGTH
LG LONG
LL LIVE LOAD
LLBB LONG LEGS BACK TO BACK
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOCN LOCATION
LONGIT LONGITUDINAL
LP LOW POINT
LRFD LOAD AND RESISTANCE FACTOR DESIGN
LSL LONG SLOTTED HOLE,
LAMINATED STRAND LUMBER
LVL LAMINATED VENEER LUMBER
LW LONG WAY
LWC LIGHT WEIGHT CONCRETE
M MOMENT
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL & PLUMBING
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MONO MONOLITHIC
MPH MILES PER HOUR
MTL METAL
NA NOT APPLICABLE
NDS NATIONAL DESIGN SPECIFICATION FOR WOOD
CONSTRUCTION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
NWC NORMAL WEIGHT CONCRETE
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
O-O OUT-TO-OUT
OPG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
OSHA OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
OSL OUTSTANDING LEG,
ORIENTED STRAND LUMBER
OVS OVERSIZED HOLE
PAF POWDER ACTUATED FASTENER
PC PRECAST CONCRETE, PIECE
PCF POUNDS PER CUBIC FOOT
PED PEDESTAL
PERP PERPENDICULAR
PREFAB PREFABRICATE(D)
PL PLATE
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PMF PREMOLDED FILLER
PROJ PROJECT(ION)
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSL PARALLEL STRAND LUMBER
PT PRESERVATIVE-TREATED,
POST-TENSIONED
PVC POLYVINYL CHLORIDE
QTY QUANTITY
R RADIUS
RCMU REINFORCED CONCRETE MASONRY UNIT
RCSC RESEARCH COUNCIL ON STRUCTURAL
CONNECTIONS
RD ROOF DRAIN
RDK ROOF DECK
REF REFERENCE
REINF REINFORCE(D)/REINFORCEMENT
REQ(D) REQUIRE(D)
RET RETAINING
REV REVISE(D)/REVISION
RO ROUGH OPENING
RQMT(S) REQUIREMENT(S)
RTU ROOFTOP UNIT
RXN REACTION
SAN SANITARY
SC SLIP-CRITICAL (CONNECTION)
SCHED SCHEDULE
SECT SECTION
SD STORM DRAIN
SDI STEEL DECK INSTITUTE
SF SQUARE FOOT
SHRG SHORING
SHTHG SHEATHING
SIM SIMILAR
SL SLOPE(D)
SLBB SHORT LEGS BACK TO BACK
SLV SLEEVE
SOD SLAB ON DECK
SOG SLAB ON GRADE
SPA SPACE(S)/SPACING
SPEC(S) SPECIFICATION(S)
SQ SQUARE
SS STAINLESS STEEL
SSL SHORT SLOTTED HOLE
STD STANDARD
STIFF STIFFENER
STIR STIRRUP
STL STEEL
STRUC STRUCTURAL
SUPT SUPPORT
SW SHORT WAY, SHEAR WALL
SYM SYMMETRICAL
T TOP
T/ TOP OF
T&B TOP AND BOTTOM
TB TRUSS BEARING
TC TERRA COTTA
TEMP TEMPORARY,TEMPERATURE
T&G TONGUE AND GROOVE
THD THREAD(ED)
THK THICK(NESS)
TMS THE MASONRY SOCIETY
TOS TOP OF SLAB
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
U-P UNDERPINNING
V SHEAR
VAR VARIES
VB VAPOR BARRIER
VEF VERTICAL EACH FACE
VERT VERTICAL
VIF VERTICAL INSIDE FACE,
VERIFY IN FIELD
VOF VERTICAL OUTSIDE FACE
VR VAPOR RETARDER
W/ WITH
W/O WITHOUT
WD WOOD
WI WROUGHT IRON
WP WORK POINT, WATERPROOFING
WT WEIGHT
WWF WELDED WIRE FABRIC
XS EXTRA STRONG
XXS DOUBLE EXTRA STRONG
∅ DIAMETER
± PLUS OR MINUS
ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTION
CONCRETE REBAR MINIMUM SPLICE
LENGTH TABLE (CLASS B)
BAR SIZE
#4 32" 25"
TOP (INCHES) OTHER (INCHES)
#5 40" 31"
#6 48" 38"
#7 70" 53"
#8 80" 61"
#9 90" 70"
NOTE:
1. BASED ON 4,000 PSI NW CONCRETE AND GRADE 60
UNCOATED OR GALVANIZED REINFORCING BAR
2. "TOP" ARE HORIZONTAL BARS LOCATED WHERE MORE THAN
12" OF FRESH CONCRETE IS CAST IN MEMBER BELOW THE
BARS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s /V
A M
C
B a y P in e s /0
B a y P in e s E
D C
T R
S
.r v t
/1 /2
:5
:1
A M
S-001
GENERAL NOTES AND
ABBREVIATIONS
AE Site Prep for ED CT Replacement
BAY PINES VA
0124034
MAY 1, 2025 RAS SLS
100% CONSTRUCTION
DOCUMENTS
516-CSI-142
SHEET LIST
Sheet Number Sheet Name
S-001 GENERAL NOTES AND ABBREVIATIONS
SD101 FIRST FLOOR DEMOLITION PLAN
SS101 FIRST FLOOR FRAMING PLAN
SS102 FIRST FLOOR INTERSTITIAL FRAMING PLAN
S-301 DETAILS AND SECTIONS
Revisions Date
1 ADDENDUM 1 12/12/2025
5 6 7 8
E
F.2
F.1
E.5
TOILET/DRESS
1E222E
CONTROL
1E222B
RAD EXAM
1E274B
DRESS
1E222D
ER EXAM
1E224A
(E
(E
1'
(E
22' - 10" (E)22' - 10" (E)22' - 10" (E)
CT SCAN ROOM
1E222A
7'
2' - 4"
#5
B O
T T
O M
10 #5 TOP
B
O T
T O
M
14 #7 TOP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s /V
A M
C
B a y P in e s /0
B a y P in e s E
D C
T R
S
.r v t
/1 /2
:5
:1
A M
SD101
FIRST FLOOR DEMOLITION PLAN AE Site Prep for ED CT Replacement
BAY PINES VA
0124034
MAY 1, 2025 RAS SLS
100% CONSTRUCTION
DOCUMENTS
516-CSI-142
CODED NOTES:
REMOVE PORTION OF EXISTING 10" THICK CONCRETE SLAB TO PERMIT REMOVAL OF EXISTING AND
INSTALLATION OF NEW ELECTRICAL CONDUIT, REFER TO ELECTRICAL DRAWINGS. ADDED
REINFORCEMENT SHOWN ON PLANS IS AS INDICATED ON THE EXISTING CONSTRUCTION
DOCUMENTS IN ADDITION TO #4 AT 10" O.C. BOTTOM MAT EACH WAY. (THICKNESS OF EXISTING SLAB
MAY VARY, ESTIMATE 20" THICK FOR PRICING)
DRAWING NOTES:
NN
0 2' 4' 8' 12'
1/4" = 1'-0"
1. TOP OF FIRST FLOOR IS 14.00' (DATUM 0.00').
2. EXISTING FIRST FLOOR IS A 10" THICK REINFORCED TWO-WAY FLAT PLATE CONCRETE SLAB. THE
CRAWL SPACE BELOW HAS BEEN INFILLED WITH SOIL.
3. CONTRACTOR TO CONFIRM FLOOR AREA AROUND GANTRY AND PATIENT TABLE MEETS THE
MANUFACTURER'S FLOOR LEVELNESS CRITERIA OF 1/4" / 10'-0" PRIOR TO INSTALLING EQUIPMENT. IF FLOOR DOES NOT MEET THE REQUIREMENT, THE TOP SURFACE WILL NEED TO BE ROUGHENED AND
PATCHED WITH LEVEL TOPPING CONCRETE, SIKA LEVEL 425.
4. CONTRACTOR TO GPR SCAN FIRST FLOOR SLAB PRIOR TO INSTALLING POST INSTALLED ANCHORS.
IF REBAR IS INDICATED WHERE A POST INSTALLED ANCHOR IS TO BE LOCATED, CONTRACTOR TO SUBMIT AN RFI PER GENERAL NOTES. EQUIPMENT MAY NEED TO BE SLIGHTLY RELOCATED TO AVOID
CUTTING EXISTING REBAR.
1/4" = 1'-0"
FIRST FLOOR DEMOLITION PLAN
N.T.S.
KEYPLAN 1ST FLOOR
Revisions Date
1 ADDENDUM 1 12/12/2025 1
5 6 7 8
E
F.2
TOILET/DRESS
1E222E
CONTROL
1E222B
RAD EXAM
1E274B
DRESS
1E222D
ER EXAM
1E224A
F.1
(E
(E
1'
(E
22' - 10" (E)22' - 10" (E)22' - 10" (E)
E.5
CT SCAN ROOM
1E222A
7'
2' - 4"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s /V
A M
C
B a y P in e s /0
B a y P in e s E
D C
T R
S
.r v t
/1 /2
:5
:1
A M
SS101
FIRST FLOOR FRAMING PLAN AE Site Prep for ED CT Replacement
BAY PINES VA
0124034
MAY 1, 2025 RAS SLS
100% CONSTRUCTION
DOCUMENTS
516-CSI-142
CODED NOTES:
GANTRY, 5,900 LBS. BOLTED TO THE EXISTING FIRST FLOOR SLAB WITH POST INSTALLED ANCHORS
PROVIDED BY EQUIPMENT MANUFACTURER, REFER TO EQUIPMENT DRAWINGS FOR ANCHOR BOLT
LAYOUT.
PATIENT TABLE, 1,500 LBS. BOLTED TO THE EXISTING FIRST FLOOR SLAB WITH POST INSTALLED
ANCHORS PROVIDED BY EQUIPMENT MANUFACTURER, REFER TO EQUIPMENT DRAWINGS FOR
ANCHOR BOLT LAYOUT.
SYSTEM CABINET, 410 LBS.
UPS, 610 LBS.
POWER DISTRIBUTION UNIT, 1075 LBS.
STORAGE CABINET, 150 LBS.
BELOW SLAB ELECTRICAL CONDUIT, REFER TO ELECTRICAL DRAWINGS.
REPLACE 10" THICK CONCRETE SLAB WITH REINFORCEMENT TO MATCH EXISTING, REFER TO
DEMOLITION PLAN FOR SIZE AND QUANTITY BASED ON EXISTING CONSTRUCTION DOCUMENTS, TO BE CONFIRMED IN FIELD DURING REMOVAL. ANY BARS CUT SHALL BE DOWELED INTO EXISTING SLAB 2'-0" WITH HILTI HIT HY-200 ADHESIVE AFTER PERFORMING PLUMBING WORK, REPLACE FILL AND
COMPACT PER GENERAL NOTES
DRAWING NOTES:
NN
0 2' 4' 8' 12'
1/4" = 1'-0"
1. TOP OF FIRST FLOOR IS 14.00' (DATUM 0.00').
2. EXISTING FIRST FLOOR IS A 10" THICK REINFORCED TWO-WAY FLAT PLATE CONCRETE SLAB. THE
CRAWL SPACE BELOW HAS BEEN INFILLED WITH SOIL.
3. CONTRACTOR TO CONFIRM FLOOR AREA AROUND GANTRY AND PATIENT TABLE MEETS THE
MANUFACTURER'S FLOOR LEVELNESS CRITERIA OF 1/4" / 10'-0" PRIOR TO INSTALLING EQUIPMENT. IF FLOOR DOES NOT MEET THE REQUIREMENT, THE TOP SURFACE WILL NEED TO BE ROUGHENED AND
PATCHED WITH LEVEL TOPPING CONCRETE, SIKA LEVEL 425.
4. CONTRACTOR TO GPR SCAN FIRST FLOOR SLAB PRIOR TO INSTALLING POST INSTALLED ANCHORS.
IF REBAR IS INDICATED WHERE A POST INSTALLED ANCHOR IS TO BE LOCATED, CONTRACTOR TO SUBMIT AN RFI PER GENERAL NOTES. EQUIPMENT MAY NEED TO BE SLIGHTLY RELOCATED TO AVOID
CUTTING EXISTING REBAR.
1/4" = 1'-0"
FIRST FLOOR FRAMING PLAN
N.T.S.
KEYPLAN 1ST FLOOR
Revisions Date
1 ADDENDUM 1 12/12/2025
A
D
B
C
E
3'-7"
7'-6"
3'-0"
4'-5"
'-2
'-1
1'-2"
2'-4"
3'-7"
2'-6"
4'-4"
9 8
ITEM QTY
ELECTRICAL OUTLET LEGEND
CUSTOMER/CONTRACTOR SUPPLIED AND INSTALLED ITEMS UNLESS OTHERWISE SPECIFIED.
Item ELECTRICAL LAYOUT ITEM LIST
ADDITIONAL CONDUIT RUNS
(CONTRACTOR SUPPLIED AND INSTALLED)
FROM
(BUBBLE # / ITEM)
TO
(BUBBLE # / ITEM) Qty
SIZE
In. mm
DUPLEX HOSPITAL GRADE, DEDICATED WALL OUTLET 120-V, SINGLE PHASE POWER
DEDICATED TELEPHONE LINE(S)
NETWORK OUTLET
SYSTEM EMERGENCY OFF (SEO), (RECOMMENDED HEIGHT 1.2M [48"] ABOVE FLOOR)
X-RAY ROOM WARNING LIGHT CONTROL PANEL
X-RAY ON LAMP (L1) - 24V
DOOR INTERLOCK SWITCH (NEEDED ONLY IF REQUIRED BY STATE/LOCAL CODES)
1 MAIN DISCONNECT PANEL (MDP)
2 GROMMETED OPENING (CONSOLE)
3 GROMMETED OPENING (SYSTEM CABINET)
4 GROMMETED OPENING (POWER DISTRIBUTION UNIT)
5 12" X 12" X 3 1/2" [300 X 0300 X 100] FLUSH BOX
6 6" X 6" X 4" [150 X 150 X 100] BOX (PARTIAL UPS)
7 10" X 3 1/2" [250 X 100] SURFACE WALL DUCT WITH MINIMUM 2 DIVIDERS
8 2 1/2" [64] CONDUIT BELOW FLOOR
9 3 1/2" [89] CONDUIT BELOW FLOOR
10 CABLE INLET ABOVE CEILING (EXPRESS CAMERA)
11 BOX ABOVE CEILING - SIZE PER LOCAL CODE (SCAN ROOM)
12 6" X 6" X 4" [150 X 150 X 100] BOX ABOVE CEILING (INJECTOR)
13 18" X 3 1/2" [450 X 100] SURFACE WALL DUCT WITH MINIMUM 3 DIVIDERS
14 BOX ABOVE CEILING (SMARTVIEW MONITOR - GE SUPPLIED)
15 BOX ABOVE CEILING - SIZE PER LOCAL CODE (TECHINCAL ROOM)
16 2 1/2" [64] CONDUIT ABOVE CEILING
17 3 1/2" [89] CONDUIT ABOVE CEILING
18 12" X 16" X 4" [300 X 400 X 100] BOX (POWER DISTRIBUTION UNIT)
19 18" X 6" [450 X 150] SURFACE WALL DUCT WITH MINIMUM 3 DIVIDERS
3 PHASE POWER 1 MAIN DISCONNECT PANEL 1 2 50
1 MAIN DISCONNECT PANEL
EMERGENCY OFF 1/2 13
18 POWER DISTRIBUTION UNIT 2 50
18 POWER DISTRIBUTION UNIT
DOOR SWITCH 1/2 13
WARNING LIGHT CONTROL
1/2 13
WARNING LIGHT
1/2 13
1 PHASE POWER 1/2 13
10 EXPRESS CAMERA 11 OPERATOR'S CONSOLE 1 1/2 38
1 MAIN DISCONNECT PANEL
6 PARTIAL UPS
1 1/4 30
4 POWER DISTRIBUTION UNIT 2 50
11 OPERATOR'S CONSOLE 6 PARTIAL UPS 1 25
12 INJECTOR 11 INJECTOR CONTROL 2 1/2 64
14 SMARTVIEW MONITOR 11 OPERATORS CONSOLE
1 25
2 50
CABLE LENGTH NOTE: ROUTING OF CABLE DUCTWORK, CONDUITS, ETC.,MUST RUN DIRECT AS
POSSIBLE OTHERWISE MAY RESULT IN THE NEED FOR GREATER THAN STANDARD CABLE LENGTHS (REFER TO THE INTERCONNECTION DIAGRAM FOR MAXIMUM USABLE LENGTHS POINT TO POINT).
20 BOX ABOVE CEILING - SIZE PER LOCAL CODE (EXAM ROOM)1ITEM #20 ADDED
REVISED RACEWAY
LAYOUT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s /V
A M
C
B a y P in e s /0
B a y P in e s E
D C
T
R
M E
P F
A F
P T
.r v t
/1 /2
:5
:4
P M
E-401
ENLARGED CT ROOM PLAN AE Site Prep for ED CT Replacement
BAY PINES VA
124034
05/01/2025 TDB WWS
100% CONSTRUCTION
DOCUMENTS
516-CSI-142
N.T.S.
CT RACEWAY PLAN
Revisions Date
1 ADDENDUM 1 12/12/2025
| Sheets |
| S-001 - GENERAL NOTES AND ABBREVIATIONS |
| SD101 - FIRST FLOOR DEMOLITION PLAN |
| SS101 - FIRST FLOOR FRAMING PLAN |
File details come from the government source that posted it. Updated .