This is an Addendum No. 3 to the drawings and specifications for a construction project at Clark Vinson VA Medical Center in Dublin, Georgia. The addendum, dated August 06, 2026, supplements the original contract documents for the project titled "Correct Safety and FCA Deficiencies in Building 2" (VAMC Project # 557-21-101) and is issued by Valhalla Engineering Group, LLC located in Englewood, Colorado.
The addendum provides updates across four primary areas: revised architectural sheets showing locations of Temporary Construction Barriers and project phasing notes; a new sheet depicting the Temporary Kitchen location and approximate utility locations; updated Specification Section 11 40 00 for Food Service Equipment incorporating equipment information from the QF sheets; and updated QF drawings to ensure coordination with the specification section. The revised clouded drawing sheets include GI001 (Cover), GI010 (Temporary Kitchen Site Plan), AD110 (Demolition Plan - Basement), AD111 (Demolition Plan - Level 1), AE111A (Floor Plan - Level 1 - North), AE111B (Floor Plan - Level 1 - South), and all QF drawings. Proposers are required to acknowledge receipt of this addendum on their proposal forms, and failure to do so may result in disqualification. Prime proposers are responsible for distributing this addendum information to all sub-proposers and suppliers.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
750 W Hampden Ave, Suite #300
Englewood, CO 80110
Ph (720) 550-6307 www.ValhallaEngineering.com
ADDENDUM NO. 3
TO THE DRAWINGS AND SPECIFICATIONS FOR:
Correct Safety and FCA Deficiencies in Building 2 VAMC Project # 557-21-101
Cark Vinson VA Medical Center
Dublin, GA
August 06, 2026
I. GENERAL
A. This narrative addendum supplements and revises the drawings and specifications dated 08/06/2026, as noted within and shall become part of the contract documents.
B. Proposers shall acknowledge receipt of this addendum in the space provided on the proposal form. Failure to do so may subject proposer to disqualification.
C. Each holder of proposal documents registered with the construction manager will receive a copy of the addendum. Each prime proposer is responsible for distribution of information conveyed by this addendum to its sub-proposers and suppliers.
II. DESCRIPTION
A. Updated architectural sheets with locations of Temporary Construction Barriers and notes addressing phasing of the project.
B. New sheet showing proposed location of Temporary Kitchen and approximate utility locations
C. Updated Specification Section 11 40 00 including equipment information from the schedules on the QF sheets.
D. Updated QF drawings to ensure coordination with the 11 40 00 specification section.
III. ATTACHMENTS
A. Revised Clouded Drawing Sheets:
• GI001 – COVER
• GI010 – TEMPORARY KITCHEN SITE PLAN
• AD110 – DEMOLITION PLAN - BASEMENT
• AD111 – DEMOLITION PLAN – LEVEL 1
http://www.valhallaengineering.com/
• AE111A – FLOOR PLAN – LEVEL 1 – NORTH
• AE111B – FLOOR PLAN – LEVEL 1 – SOUTH
• All QF drawings
B. Revised Specification Sections:
• 11 40 00 – Food Service Equipment
END ADDENDUM NARRATIVE