557-21-101 _VEG 26.09_ Addendum 3 Dwgs_ARCH.pdf

PDF 13 MB Posted

Attached to
Y1DZ--FY26 NRM|557-21-101|36C247-26-AP-0572|Correct Safety & FCA Def Bldg. 2| CONSTRUCTION
Solicitation number
36C24726R0033
Issued by

About this file

This is a set of bid documents and construction drawings for a federal construction project at the Carl Vinson VA Medical Center in Dublin, Georgia. The project, identified as VAMC Project #557-21-101, focuses on correcting safety and fire code deficiencies at the facility located at 1826 Veterans Boulevard, Dublin, GA 31021. The documents are dated at 100% Construction Documents stage (issued 03/10/2022) with Addendum 3 issued 08/06/2026, prepared by Valhalla Engineering Group, LLC in Englewood, Colorado.

The scope of work includes demolition and renovation activities in Building 2 (the main kitchen facility) and Building 41, with provisions for a temporary kitchen site plan during construction. Key work areas include comprehensive kitchen renovations encompassing food service equipment planning, plumbing rough-in installations, electrical system upgrades, HVAC modifications, fire protection system updates, and structural modifications. The documents specify detailed demolition plans for basement and multiple levels, architectural floor plans with precise dimensions and partition specifications, equipment layouts for food service areas including walk-in coolers and food preparation zones, and coordination details for mechanical, electrical, and plumbing systems. General notes throughout the drawings indicate that contractors are responsible for verifying exact utility locations, coordinating the temporary kitchen layout with the VA, maintaining existing conditions outside the scope of work, and completing warehouse access work during nights and weekends to minimize operational disruption.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Circuit 2 Gen

7 18 V irginia D riveO rlando, FL. 32803T: (407) 423-5355 F: (407) 422-5994

SF

SF

VAN

ACCESSIBLE

LOADING AREA

Bldg 5 Gen

Bldg 4 Gen

Bldg 8 Gen

2 2

8 86

52 30

2'-6"

UP

UP

DEANE + STRO LLO , LLC

Bldg 27 Gen

F

FF

F

F

BLDG. 21

BLDG. 67

BLDG. 68

GAZEBO

METAL

BLDGS.

SIGN

SIGN

SIGN

STEPS

RAMP

PATIO

R A M P

:1

S L O P E

R A M P

:1

S L O P E

R A M P

:1

S L O P E

L A N D

IN

G

V A N V A N V A N V A N

RAMP

SLAB

SLAB

NEW PARKING

CTCT

AC

AC

AC

AC

OUTPATIENT

PARKING

SOLAR PANELS

STAFF / VISITOR'S /

OUTPATIENT

STAFF /

VISITOR'S

PATIENT/VISITOR'S PARKING

STAFF

STAFF /

VISITOR'S

STAFF /

VISITOR'S

STAFF

STAFF /

VISITOR'S

STAFF /

VISITOR'S

STAFF /

VISITOR'S

STAFF /

VISITOR'S

OUTPATIENT

PATIENT /

VISITOR'S

PATIENT /

VISITOR'S

PATIENT /

VISITOR'S

PATIENT /

VISITOR'S

H.C.

SPECIALIST

STAFF

VISITOR'S /

OUTPATIENT

PARKING

PARKING #8

PARKING

PARKING #5

PARKING #4

PARKING #3

PARKING #7

PARKING #6

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING #1

PARKING

PARKING

PARKING #2

PARKING #2

LOADING

OBSERVATION

MONITORING

WELL

OBSERVATION

MONITORING

WELL

BLDG. 17

BLDG. 63

Bldg 2 Gen

New Chiller Plant

Bldg.10

New Water Tower Location

BLDG.29

ANNEX

FUEL

TANK

BLDG.

BLDG.

BLDG.

BLDG. 44

SUBSTATION

GAZEBO

BLDG. 19

BLDG. 15

BLDG. 29

BLDG. 26

BLDG. 25

BLDG. 86

BLDG. 14

BLDG. 85

BLDG. 12

BLDG. 10

BLDG. 8

BLDG. 6

BLDG. 4

BLDG. 40

BLDG. 2

BLDG. 11

BLDG. 13

BLDG. 9

BLDG. 1BLDG. 3

BLDG. 5

BLDG.

BLDG. 69

BLDG.

BLDG.

BLDG.

BLDG.

BLDG.

BLDG.

BLDG

BLDG.

NE

W

JO

HN

SO

N

ST

RE

ET

W

ES

T

TROJAKOWSKI AVENUE

EV

AN

S

AV

EN

UE

JOH

NSO

N S

TRE

ET

NORTHWEST DRIVE

THOMAS LANE

THOMAS LANE

JOHNSON STREET

BLACKWOOD DRIVE

JOHNSON STREET

VETERANS PARKWAY US HWY 80VETERANS PARKWAY US HWY 80

CR

OW

LE

Y

AV

EN

UE

CR

OW

LE

Y

AV

EN

UE

EV

AN

S

AV

EN

UE

TROJAKOWSKI AVENUE

EV

AN

S

AV

EN

UE

BLACKWOOD DRIVE

ALEX

ANDE

R D

RIVE

JOHN

SON

STR

EET

EX

IS

TI

N G

JO

H N

SO

N S

TR

EE

T

AREA OF WORK, BUILDING 2

AREA OF WORK , BUILDING 41

MODULAR KITCHEN, VV

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

STAMP

SEE REVISION

SCHEDULE

R E

V

IS

IO

N

S C

H E

D U

L E

A ut od es k D oc s:

//2 6.

_D ub lin

_G A

_K itc he n_

R

/2 1.

_A

R C

H _R

.r vt 8/

6/

:3 4:

A

M

GI001

COVER CORRECT SAFETY & FCA

DEFICIENCIES

1826 VETERANS BLVD, DUBLIN, GA 31021

557-21-101

DM AW

BID DOCUMENTS - 100%

VEG 26.09

CARL VINSON VA MEDICAL CENTER

1826 VETERANS BLVD, DUBLIN, GA 31021

VAMC PROJECT #: 557-21-101

CORRECT SAFETY & FCA DEFICIENCIES

DWG 1 of 6 B

ID

D O

C U

M N

E T

S

SHEET INDEXAERIAL IMAGEVICINITY MAP

N o rt h

P la n N or th

True N orth

NUMBER SHEET NAME

GENERAL

GI001 COVER

GI002 GENERAL ABBREVIATIONS, NOTES, & SYMBOLS

GI003 ACCESSIBILITY STANDARDS

GI010 TEMPORARY KITCHEN SITE PLAN

GI110 CODE DATA

GI111 LIFE SAFETY PLAN - LEVEL 1

GI211 DEPARTMENTAL PLAN - LEVEL 1

STRUCTURAL

S-001 STRUCTURAL ABBREVIATIONS, NOTES, &

SYMBOLS

SF101 OVERALL PLAN - LEVEL 1

SF102 OVERALL PLAN - LEVEL 2

SF501 STRUCTURAL DETAILS

ARCHITECTURAL

A-001 ARCHITECTURAL ABBREVIATIONS, NOTES, &

SYMBOLS

AD110 DEMOLITION PLAN - BASEMENT

AD111 DEMOLITION PLAN - LEVEL 1

AD112 DEMOLITION PLAN - LEVEL 2

AE100 OVERALL PLAN - BASEMENT

AE101 OVERALL PLAN - LEVEL 1

AE102 OVERALL PLAN - LEVEL 2

AE111A FLOOR PLAN - LEVEL 1 - NORTH

AE111B FLOOR PLAN - LEVEL 1 - SOUTH

AE121A RCP - LEVEL 1 - NORTH

AE121B RCP - LEVEL 1 - SOUTH

AE141A FINISH PLAN - LEVEL 1 - NORTH

AE141B FINISH PLAN - LEVEL 1 - SOUTH

AE151 FURNITURE PLAN - LEVEL 1

AE211 INTERIOR ELEVATIONS

AE311 WALL SECTIONS

AE401 ENLARGED PLANS

AE402 ENLARGED PLANS - BUILDING 41

AE431 CASEWORK TYPICAL SECTIONS

AE511 PLAN DETAILS

AE521 CEILING DETAILS

AE532 SECTION DETAILS

AE541 FINISH DETAILS

AE601 ROOF & WALL TYPE SCHEDULE & DETAILS

AE611 DOOR & WINDOW SCHEDULES & LEGENDS

AE641 ROOM FINISH SCHEDULE & LEGEND

AE642 MATERIALS & FINISH BOARD OPTIONS

AE901 3D VIEWS - INTERIOR PERSPECTIVES

AE902 3D - RENDERINGS

EQUIPMENT

QF001 FOOD SERVICE NOTES & LEGENDS

QF100 OVERALL FOODSERVICE EQUIPMENT PLAN

QF111 FOOD SERVICE EQUIPMENT PLAN

QF112 BUILDING CONDITIONS & VENTILATION PLAN

QF113 PLUMBING ROUGH-IN PLAN

QF114 ELECTRICAL ROUGH-IN PLAN

QF121 FOOD SERVICE EQUIPMENT PLAN

QF122 BUILDING CONDITIONS @ VENTILATION PLAN

QF123 PLUMBING ROUGH-IN PLAN

QF124 ELECTRICAL ROUGH-IN PLAN

QF131 FOOD SERVICE EQUIPMENT PLAN

QF132 BUILDING CONDITIONS @ VENTILATION PLAN

QF133 PLUMBING ROUGH-IN PLAN

QF134 ELECTRICAL ROUGH-IN PLAN

QF141 FOOD SERVICE EQUIPMENT PLAN

QF142 BUILDING CONDITIONS @ VENTILATION PLAN

QF143 PLUMBING ROUGH-IN PLAN

QF144 ELECTRICAL ROUGH-IN PLAN

QF151 FOOD SERVICE EQUIPMENT PLAN

QF152 BUILDING CONDITIONS @ VENTILATION PLAN

QF153 PLUMBING ROUGH-IN PLAN

QF154 ELECTRICAL ROUGH-IN PLAN

QF161 FOOD SERVICE EQUIPMENT PLAN

QF162 BUILDING CONDITIONS @ VENTILATION PLAN

QF163 PLUMBING ROUGH-IN PLAN

NUMBER SHEET NAME

QF164 ELECTRICAL ROUGH-IN PLAN

QF171 FOOD SERVICE EQUIPMENT PLAN

QF172 BUILDING CONDITIONS @ VENTILATION PLAN

QF173 PLUMBING ROUGH-IN PLAN

QF174 ELECTRICAL ROUGH-IN PLAN

QF181 FOOD SERVICE EQUIPMENT PLAN

QF182 BUILDING CONDITIONS @ VENTILATION PLAN

QF183 PLUMBING ROUGH-IN PLAN

QF184 ELECTRICAL ROUGH-IN PLAN

QF501 FOOD SERVICE EXHAUST HOOD DETAILS

QF502 FOOD SERVICE EXHAUST HOOD DETAILS

QF503 FOOD SERVICE EXHAUST HOOD DETAILS

QF504 FOOD SERVICE EXHAUST HOOD DETAILS

QF505 FOOD SERVICE EXHAUST HOOD DETAILS

QF506 FOOD SERVICE EXHAUST HOOD DETAILS

QF507 FOOD SERVICE EXHAUST HOOD DETAILS

QF508 FOOD SERVICE EXHAUST HOOD DETAILS

QF509 FOOD SERVICE EXHAUST HOOD DETAILS

QF510 FOOD SERVICE EXHAUST HOOD DETAILS

QF511 FOOD SERVICE EXHAUST HOOD DETAILS

QF512 FOOD SERVICE EXHAUST HOOD DETAILS

QF513 FOOD SERVICE EXHAUST HOOD DETAILS

QF521 FOOD SERVICE REFRIGERATION DETAILS

QF522 FOOD SERVICE REFRIGERATION DETAILS

QF531 TRAY MAKE-UP CONVEYOR DETAILS

QF532 TRAY DROP CONVEYOR DETAILS

QF533 SOILED DISH TABLE DETAILS

QF534 SCRAPPING TABLE DETAILS

QF541 COUNTER FABRICATION DETAILS

QF542 COUNTER FABRICATION DETAILS

QF601 FOOD SERVICE EQUIPMENT UTILITY SCHEDULE

QF602 FOOD SERVICE EQUIPMENT UTLITY SCHEDULE

FIRE PROTECTION

FA001 FIRE PROTECTION GENERAL NOTES, LEGEND,

AND DETAILS

FA111 FIRE ALARM PLAN - LEVEL 1

FX001 FIRE PROTECTION NOTES, SYMBOLS, & DETAILS

FX111 FIRE PROTECTION PLAN - LEVEL 1

PLUMBING

P-001 PLUMBING ABBREVIATIONS, SYMBOLS, &

LEGENDS

P-601 SCHEDULES

PD100 DEMOLITION PLAN BASEMENT - NORTH

PD101 DEMOLITION PLAN BASEMENT - SOUTH

PD102 DEMOLITION PLAN - FIRST FLOOR - NORTH

PD103 DEMOLITION PLAN - FIRST FLOOR - SOUTH

PP100 PLUMBING WATER PLAN - BASEMENT - NORTH

PP101 PLUMBING WATER PLAN - BASEMENT - SOUTH

PP102 PLUMBING WATER PLAN - FIRST FLOOR - NORTH

PP103 PLUMBING WATER PLAN - FIRST FLOOR - SOUTH

PP-300 DRAIN - WASTE - VENT RISER DIAGRAM - NORTH

PP-301 DRAIN - WASTE - VENT RISER DIAGRAM - SOUTH

PP-302 DOMESTIC WATER RISER DIAGRAM - NORTH

PP-303 DOMESTIC WATER RISER DIAGRAM - SOUTH

PW100 PLUMBING DRAINAGE PLAN - BASEMENT - NORTH

PW101 PLUMBING DRAINAGE PLAN - BASEMENT - SOUTH

PW102 PLUMBING DRAINAGE PLAN - FIRST FLOOR -

NORTH

PW103 PLUMBING DRAINAGE PLAN - FIRST FLOOR -

SOUTH

MECHANICAL

M-001 MECHANICAL ABBREVIATIONS & NOTES

M-002 MECHANICAL SYMBOLS

M-401 ENLARGED MECHANICAL ROOM - WEST

M-402 ENLARGED BLDG 41

M-501 DETAIL

M-601 SCHEDULE

M-700 CONTROL

M-701 CONTROL

MD100 DEMOLITION PLAN - BASEMENT - NORTH

MD101 DEMOLITION PLAN - LEVEL 1 - NORTH

NUMBER SHEET NAME

MD102 DEMOLITION PLAN - LEVEL 1 - SOUTH

MD103 DEMOLITION PLAN - LEVEL 2 - NORTH

MD104 DEMOLITION PLAN - LEVEL 3 - NORTH

MH100 HVAC PLAN - BASEMENT - NORTH

MH101 HVAC PLAN - LEVEL 1 - NORTH

MH102 HVAC PLAN - LEVEL 1 - SOUTH

MH103 HVAC PLAN - LEVEL 2 - NORTH

MH104 HVAC PLAN - LEVEL 2 - SOUTH

MH105 HVAC PLAN - LEVEL 3 - NORTH

MP100 PIPING PLAN - BASEMENT - NORTH

MP101 PIPING PLAN - LEVEL 1 - NORTH

MP102 PIPING PLAN - LEVEL 1 - SOUTH

ELECTRICAL

E-001 ELECTRICAL ABBREVIATIONS AND GENERAL

NOTES

E-002 ELECTRICAL SYMBOLS

ED100 DEMOLITION PLAN - BASEMENT - OVERALL

ED110 DEMOLITION PLAN - LEVEL 1 - OVERALL

ED120 DEMOLITION PLAN - ATTIC

EL111 LIGHTING PLAN - LEVEL 1 - NORTH

EL112 LIGHTING PLAN - LEVEL 1 - SOUTH

EL113 LIGHTING CONTROLS PLAN - LEVEL 1 - NORTH

EL114 LIGHTING CONTROLS PLAN - LEVEL 1 - SOUTH

EL115 LIGHTING & CONTROLS PLANS

EL501 LIGHTING DETAILS

EL601 LIGHTING SCHEDULES

EL602 LIGHTING CONTROL WIRING DIAGRAMS

EP100 POWER PLAN - BASEMENT - OVERALL

EP101 POWER PLAN - BASEMENT - MECHANICAL

EQUIPMENT

EP110 POWER PLAN - LEVEL 1 - OVERALL

EP111 POWER PLAN - LEVEL 1 - NORTH - MECHANICAL

EQUIPMENT

EP112 POWER PLAN - LEVEL 1 - SOUTH - MECHANICAL

EQUIPMENT

EP113 POWER PLAN - LEVEL 2 & ATTIC - MECHANICAL

EQUIPMENT

EP114 POWER & DATA PLAN - BUILDING 41

EP201 STORAGE AREAS

EP202 PREP & DISHWASH

EP203 PREP AREA

EP204 PREP & COOKING

EP205 PATIENT TRAY ASSEMBLY

EP206 SERVING AREA

EP207 WARE/CART WASH & DEMO KITCHEN

EP601 EQUIPMENT SCHEDULE

EP602 POWER ONE-LINE DIAGRAM - MEDIUM VOLTAGE

EP603 POWER ONE-LINE DIAGRAM - LOW VOLTAGE -

DEMOLITION

EP604 POWER ONE-LINE DIAGRAM - LOW VOLTAGE -

NEW WORK

EP604 (1) POWER ONE-LINE DIAGRAM - LOW VOLTAGE -

NEW WORK

EP605 PANEL SCHEDULES

EP606 PANEL SCHEDULES

EP607 PANEL SCHEDULES

ET111 TELECOM PLAN - LEVEL 1

ET112 SECURITY PLAN - LEVEL 1

ET113 TELECOM AND SECURITY PLANS - LEVEL 1 -

BUILDING 41

EK501 ELECTRICAL DETAILS

EK502 ELECTRICAL DETAILS

Number: Issued: Date:

0 100% CONSTRUCTION DOCUMENTS 03/10/2022

A3 ADDENDUM 3 08/06/2026

A3

ZMiller Snapshot

ZMiller Snapshot

Bldg 4 Gen

RAMP

AC

AC

AC

AC

STAFF

STAFF /

VISITOR'S

STAFF /

VISITOR'S

PARKING #8

PARKING #7

PARKING #6

PARKING

LOADING

MONITORING

WELL

Bldg 2 Gen

BLDG.

BLDG. 15

BLDG. 26

BLDG. 12

BLDG. 10

BLDG. 8

BLDG. 4

BLDG. 40

BLDG. 2

BLDG. 11

BLDG. 9

BLDG. 1BLDG. 3

BLDG. 69 BLDG.

CR

OW

LE

Y

AV

EN

UE

TROJAKOWSKI AVENUE

A. UTILITY LOCATION ARE APPROXIMATIONS BASED ON CAMPUS UTILITY SITE

PLAN. CONTRACTOR IS RESPONSIBLE FOR EXACT LOCATIONS AND TIE-IN

LOCATIONS TO ALL UTILITIES.

B. TEMPORARY KITCHEN LAYOUT IS BASED ON VA PROVIDED BASIS OF DESIGN.

ACTUALLY TEMPORARY KITCHEN SIZE AND LOCATION WILL NEED TO BE

COORDINATED BY THE CONTRACTOR ONCE THE TEMPORARY KITCHEN

LAYOUT HAS BEEN APPROVED.

00KEYNOTES

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

STAMP

SEE REVISION

SCHEDULE

R E

V

IS

IO

N

S C

H E

D U

L E

A ut od es k D oc s:

//2 6.

_D ub lin

_G A

_K itc he n_

R

/2 1.

_A

R C

H _R

.r vt 8/

6/

:3 4:

A

M

GI010

TEMPORARY KITCHEN SITE PLAN CORRECT SAFETY & FCA

DEFICIENCIES

1826 VETERANS BLVD, DUBLIN, GA 31021

557-21-101

DM ZAM

BID DOCUMENTS - 100%

VEG 26.09 DWG 3 of 6 B

ID

D O

C U

M N

E T

S

1" = 40'-0"F4

TEMPORARY KITCHEN SITE PLAN

Number: Issued: Date:

A3 ADDENDUM 3 08/06/2026

1. PROPOSED LOCATION FOR TEMPORARY KITCHEN

2. APPROXIMATE LOCATION OF DOMESTIC WATER SUPPLY LINE

3. APPROXIMATE LOCATION OF 10" SANITARY SEWER MAIN

A3

SPS SVC

SPD STOR

BM129A

SPS SVC

SPD STOR

BM129

SPS SVC

OFF

BM129B

ENGINEERING

BM128C

ENGINEERING

CORR

BM128D

ENGINEERING

MECH RM

BM128B

ENGINEERING

MECH RM

BM128A

COMMON

ELEV RM

BM130

VERTICAL SPACE

ELEV

EL D-1

VERTICAL SPACE

STAIR

ST D-1

COMMON

BM131

COMMON

ELEV LOBBY

BM100-2

ENGINEERING

MED AIR COMPRESSOR

BM101

ENGINEERING

STOR

BM102

ENGINEERING

MECH RM

BM103

ENGINEERING

MECH RM

BM103A

ENGINEERING

MECH RM

BM103B

ENGINEERING

TLT

BM104A

SPS SVC

BM127F

LOGISTICS

STOR

BM127C

ENGINEERING

MECH RM

BM127D

PHARMACY

SECURE STOR

BM127A

PHARMACY

SECURE STOR

BM127E

ENGINEERING

MECH RM

BM127B

LOGISTICS

STOR

BM127

COMMON

FIRE CLO

BM127G

VERTICAL SPACE

STAIR

ST D-2

VERTICAL SPACE

ELEV

EL D-2

ENGINEERING

MECH RM

BM125

ENGINEERING

ELEC RM

BM126

ENGINEERING

ELEC RM

BM124A

ENGINEERING

REFRIGERATION COMPRESSOR RM

BM121

ENGINEERING

ELEC RM

BM124

ENGINEERING

STOR

BM123

ENVIR MGMT

STOR

BM123A

ENGINEERING

A/C SHOP

BM122

ENGINEERING

BM120

VERTICAL SPACE

STAIR

ST D-3

COMMON

CORR

CRB4-2

ENGINEERING

OFF

BM119A

COMMON

BM119B

ENGINEERING

ELEC SHOP

BM119

VERTICAL SPACE

STAIR

ST D-5

ENGINEERING

ELEC SHOP STOR

BM117

ENGINEERING

STOR

BM117A

COMMON

TUNNEL

CRB3-2

COMMON

CORR

CRB1-2

ENGINEERING

MECH RM

BM115

ENGINEERING

STOR

BM116

CANTEEN SVC

CANTEEN STOR

BM111

ENVIR MGMT

EMS STOR

BM110

VERTICAL SPACE

ELEV

EL D-3

COMMON

CORR

CRB2-2

CANTEEN SVC

CANTEEN STOR

BM111A

CANTEEN SVC

BM111C

CANTEEN SVC

TLT

BM111B

CENTRL STAFF FAC

TLT

BM110B

HEALTHCARE ADMIN SVC

MAIL RM

BM114

HEALTHCARE ADMIN SVC

MECH RM

BM114A

HEALTHCARE ADMIN SVC

OFF

BM113

HEALTHCARE ADMIN SVC

REPRODUCTION RM

BM112

VERTICAL SPACE

STAIR

ST D-4

CENTRL STAFF FAC

STOR

BM110A

CENTRL STAFF FAC

BM110C

INFO MGMT

IRM STOR

BM108D

INFO MGMT

MECH RM

BM108C

INFO MGMT

IRM STOR

BM108

INFO MGMT

STOR

BM108A

INFO MGMT

IRM STOR

BM108B

ENGINEERING

PIPE RM

BM107

LOGISTICS

FORM RM PROCESS STOR

BM106

LOGISTICS

CLO

BM106A

ENGINEERING

ELEC RM

BM105

VERTICAL SPACE

CHASE

RCCBO1C

ENGINEERING

MECH RM

BM104

56 62

78 80

71A 49A

28 42A

126A

K 164A

133 156A144143

142 155

IT

DEMOLITION LEGEND

EXISTING LINE TYPE

DEMO LINE TYPE

NOT IN SCOPE

SUGGESTED CONSTRUCTION BARRIERS

A. REFER TO FIRE PROTECTION, MECHANICAL, ELECTRICAL AND PLUMBING

DRAWINGS FOR ADDITIONAL DEMOLITION INFORMATION

B. FIELD VERIFY ALL EXISTING CONDITIONS AND REPORT ANY DISCREPANCIES

TO THE VHA COR BEFORE PROCEEDING WITH THE WORK

C. ENSURE THAT ALL EXISTING CONDITIONS WHICH ARE NOT IN CONTRACT

REMAIN UNDAMAGED THROUGHOUT THE DURATION OF CONSTRUCTION. ANY

DAMAGED EXISTING CONDITIONS MUST BE REPLACED IN-KIND

D. CONFIRM WITH VHA COR WHAT DEMOLISHED COMPONENTS ARE TO BE

SALVAGED AND RETURNED TO THE VHA

E. PROVIDE TEMPORARY UPRIGHT SPRINKLER HEADS DURING THE DURATION

OF CONSTRUCTION AFTER REMOVAL OF EXISTING CEILINGS AS REQUIRED

PER NFPA 241 PARAGRAPH 8.6.2.

F. REMOVE ALL EQUIPMENT. RETURN TO VA

G. REMOVE ALL SIGNAGE. RETURN TO VA

H. REMOVE CEILING ASSEMBLIES WITHIN SCOPE OF WORK, UNLESS NOTED

OTHERWISE

I. EXISTING EXTERIOR WALLS TO REMAIN, UNLESS NOTED OTHERWISE

48'24'12'6'3'0'

3/32" = 1'-0"

DEMOLITION PLAN - BASEMENT

F6

1. CEILING PLUMBING TO REMAIN

2. DEMOLISH PARTITIONS AND DOOR

3. DEMOLISH SINK AND EMERGENCY EYE WASH

4. DEMOLISH CONCRETE CURB

5. DEMOLISH LOUVER

00KEYNOTES

KEY PLAN

GENERAL NOTES

P la n N or th

True North

BLDG 02

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

STAMP

SEE REVISION

SCHEDULE

R E

V

IS

IO

N

S C

H E

D U

L E

A ut od es k D oc s:

//2 6.

_D ub lin

_G A

_K itc he n_

R

/2 1.

_A

R C

H _R

.r vt 8/

6/

:3 4:

A

M

AD110

DEMOLITION PLAN - BASEMENT CORRECT SAFETY & FCA

DEFICIENCIES

1826 VETERANS BLVD, DUBLIN, GA 31021

557-21-101

DM AW

BID DOCUMENTS - 100%

VEG 26.09 DWG 2 of 29 B

ID

D O

C U

M N

E T

S

A3

Number: Issued: Date:

0 100% CONSTRUCTION DOCUMENTS 03/10/2022

A3 ADDENDUM 3 08/06/2026

ZMiller Snapshot

A. REFER TO FIRE PROTECTION, MECHANICAL, ELECTRICAL AND PLUMBING

DRAWINGS FOR ADDITIONAL DEMOLITION INFORMATION

B. FIELD VERIFY ALL EXISTING CONDITIONS AND REPORT ANY DISCREPANCIES

TO THE VHA COR BEFORE PROCEEDING WITH THE WORK

C. ENSURE THAT ALL EXISTING CONDITIONS WHICH ARE NOT IN CONTRACT

REMAIN UNDAMAGED THROUGHOUT THE DURATION OF CONSTRUCTION. ANY

DAMAGED EXISTING CONDITIONS MUST BE REPLACED IN-KIND

D. CONFIRM WITH VHA COR WHAT DEMOLISHED COMPONENTS ARE TO BE

SALVAGED AND RETURNED TO THE VHA

E. PROVIDE TEMPORARY UPRIGHT SPRINKLER HEADS DURING THE DURATION

OF CONSTRUCTION AFTER REMOVAL OF EXISTING CEILINGS AS REQUIRED

PER NFPA 241 PARAGRAPH 8.6.2.

F. REMOVE ALL EQUIPMENT. RETURN TO VA

G. REMOVE ALL SIGNAGE. RETURN TO VA

H. REMOVE CEILING ASSEMBLIES WITHIN SCOPE OF WORK, UNLESS NOTED

OTHERWISE

I. EXISTING EXTERIOR WALLS TO REMAIN, UNLESS NOTED OTHERWISE

CONFERENCE

ROOM

126A

OFFICE

OFFICE

OFFICE

OFFICE

STORAGE

STORAGE

STORAGE

STORAGE

STORAGE

ST12-1

STAIR

LOUNGE

WAREHOUSE

OFFICE

100-2

ALCOVE

RETAIL

STORE

PATIENT

DINING

ROOM

SCULLERY

103B

CLEANING

AREA

103A

CLOSET

OFFICE

KITCHEN

STORAGE

OFFICE

STORAGE

FREEZER

CLOSET

ALCOVE

WAREHOUSE

WAREHOUSE

STORAGE 129

STORAGE

STORAGE

STORAGE

AIR LOCK

DAIRY

REFRIGERATOR

CLOSET

SALAD

PREPARATION

STORAGE

PAPERV

SUPPLY

SALAD

PREPARATION

CLOSET

OFFICE

OFFICE

OFFICE

FOOD

AREA

FOOD

COURT

CR14-2

CORRIDOR

CR14-2

CORRIDOR

CR12-2

CORRIDOR

D-2

STAIR

D-3

STAIR

D-4

STAIR

114A

LOCKER

ROOM

114B

TOILET

113B

TOILET

113A

LOCKER

ROOM

130A

REFRIGERATOR

130B

REFRIGERATOR

133B

MEAT

REFRIGERATOR

133A

SUPPLY

REFRIGERATOR

117B

TOILET 118A

CLOSET

117A

CLOSET

D-3

ELEVATOR

107C

CLOSET

107B

CLOSET

107A

TOILET

110A

CLOSET

100-2

CORRIDOR

117C

PASSAGE

CR15-2

CORRIDOR

CR16-2

CORRIDOR

CR17-2

CORRIDOR

D-1

ELEVATOR

ST11-2

STAIR D-1

CR11-2

CORRIDOR

D-2

ELEVATOR

FIRE CLOSET

56 62

78 80

71A 49A

28 42A

126A

K 164A

156A

144143

142 155

3 1

146A-2

VENDING

30' - 0" MAX

30' - 0" MAX

DEMOLITION LEGEND

EXISTING LINE TYPE

DEMO LINE TYPE

NOT IN SCOPE

DEMOLISH FLOOR FINISH, AND COVE BASE.

ALTERNATE: DEMOLISH TOPPING SLAB

DEMOLISH WALK-IN COOLER FLOOR DOWN TO

STRUCTURAL FLOOR

DEMOLISH FLOOR FINISH

SUGGESTED CONSTRUCTION BARRIERS

00KEYNOTES

KEY PLAN

GENERAL NOTES

P la n N or th

True North

BLDG 02

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

STAMP

SEE REVISION

SCHEDULE

R E

V

IS

IO

N

S C

H E

D U

L E

A ut od es k D oc s:

//2 6.

_D ub lin

_G A

_K itc he n_

R

/2 1.

_A

R C

H _R

.r vt 8/

6/

:3 4:

A

M

AD111

DEMOLITION PLAN - LEVEL 1 CORRECT SAFETY & FCA

DEFICIENCIES

1826 VETERANS BLVD, DUBLIN, GA 31021

557-21-101

DM AW

BID DOCUMENTS - 100%

VEG 26.09 DWG 3 of 29 B

ID

D O

C U

M N

E T

S

24'12'6'3'1'-6"0'

3/32" = 1'-0"

DEMOLITION PLAN - LEVEL 1

F6

1. DEMOLISH WINDOW ASSEMBLY FOR DOOR AND FRAME

2. DEMOLISH WALK-IN COOLER AND ALL ASSOCIATED EQUIPMENT

3. DEMOLISH FLOOR FINISH

4. EXISTING CONCRETE TO REMAIN

5. EXISTING GB EXTERIOR WALLS AND CEILING TO REMAIN

6. DEMOLISH PLUMBING AND EMERGENCY EYE WASH

7. EXISTING ROOM TO REMAIN. FLOOR, WALLS & CEILING TO REMAIN

8. REMOVE WINDOW ASSEMBLY

9. COORDINATE EXTERIOR OPENINGS WITH MECHANICAL AND OTHER

DISCIPLINES

A3

A3

A3

A3

Number: Issued: Date:

0 100% CONSTRUCTION DOCUMENTS 03/10/2022

A3 ADDENDUM 3 08/06/2026

ZMiller Snapshot

A

LI

G N

ALIGN

ALIGN

ALIGN

A

LI

G N

A. REFER TO SHEETS G-001 AND A-001 FOR APPLICABLE GENERAL NOTES,

ABBREVIATIONS, AND SYMBOLS.

B. REFER TO MECHANICAL, STRUCTURAL, ELECTRICAL, AND PLUMBING

DRAWINGS FOR ADDITIONAL INFORMATION.

C. REFER TO FOOD SERVICE EQUIPMENT DRAWINGS FOR ADDITIONAL

INFORMATION.

D. DIMENSIONS INDICATED ARE FROM FACE OF STUD AND TO FACE OF

MASONRY, OR CENTERLINE OF COLUMN UNLESS NOTED OTHERWISE.

E. INTERIOR PARTITIONS ARE TO BE TYPE S3A.W UNLESS NOTED OTHERWISE.

F. FURR OUT STRUCTURAL CONCRETE COLUMNS WITH PARTITION TYPE F0A

UNLESS NOTED OTHERWISE.

G. ALIGN PARTITIONS WITH EXISTING PARTITIONS, UNLESS NOTED OTHERWISE.

H. ALIGN PARTITIONS WITH FINISH FACE OF FURRED PARTITION AT COLUMNS,

UNLESS NOTED OTHERWISE.

I. LOCATE DOOR FRAMES PER AE611. DOOR FRAMES NOT DIMENSIONED ARE

TO BE CENTERED IN PARTITION, UNLESS NOTED OTHERWISE.

J. PHASE 1 INCLUDES ALL WORK TO THE WALLS ENCLOSING CORRIDOR CR14-2

TO PROVIDE ACCESS TO WAREHOUSE RM 116-2 FROM THE HOSPITAL.

K. ALL WORK DISRUPTING ACCESS TO/FROM WAREHOUSE RM 116-2 IS TO BE

COMPLETED ON NIGHTS AND WEEKENDS TO LIMIT THE INTERRUPTION TO

THE WAREHOUSE OPERATIONS.

78 80

71A

126A

136-2

COLD/

SALAD

KITCHEN

137-2

DRY

STORAGE

CR15-2

FOOD

SERVICE

CORRIDOR

141-2

SUPERVISORS

OFFICE

102B-2

KITCHEN

140-2

CLOSET

142-2

SUPERVISORS

OFFICE

143-2

HEALTHY

DEMO

KITCHEN

145-2

PATIENT/ DOM

DINING

101B-2

PATRIOT

STORE

DRY

STORAGE

106-2

ACSS.

TOILET

105-2

ACSS.

TOILET

103A-2

CART

WASHING

CR14-2

SERVICE

CORRIDOR

109-2

SUPERVISORS

OFFICE

110-2

SUPPLY

COOLER

111-2

DIETITIANS

OFFICE

PATRIOT

STORE

102A-2

CART

STAGING

ST D-2

STAIRS

102A

101A

2C

10910 2D

EL D-2

ELEVATOR

139-2

WAREWASH (DISH)

146-2

PATIENT / DOM

SERVING

146A-2

VENDING

CR14-2

SERVICE CORRIDOR

2B

103C

CR14B

1B

7A

108-2

SOILED BREAK

DOWN

107A-2

DISH DROP

AE401

F1

S 6A

.A

S3A.A21

3A 10

3B

8'

8'

22' - 0" 4' - 0" 19' - 6 1/2" 6' - 2"

8'

/2

1' - 7"

5' - 10 1/2" 26' - 5" 7' - 9" 45' - 1 1/2" 8' - 3 5/8" 14' - 7 5/8" 17' - 6"

6' - 10 3/4" 20' - 0 1/4"

6' - 10 3/4" 25' - 8"

1'

6'

1"

/4

9'

/2

9'

/2

EQ EQ

EQ EQ

8"

1/

2"

9' - 5 1/4" 10' - 2"

1' - 0" MIN

3'

S3A.1

S 3A

.1

S 3A

.1 S

3A .1

S6A.W S6A.W

S6A.W S6A.W

S 6A

.W

S 6A

.W

S 6A

.W S

3A .1

W

S3A.1

S 3A

.1 W

S 3A

.1 W

S 6A

.W

S6A.A21S6A.A21

2' - 6"

12' - 0" 2' - 6" 4' - 6" 2' - 6" 12' - 0"

2' - 6"

9' - 2"

S6A.W S6A.W

S3A.A21S 3A

.A

S 3A

.A

S3A.A21

S 3A

.A

S3A.A21

S3A.1

S3A.A21

S 3A

.A

A

LI

G N

3'

10' - 10" 13' - 8"

3' - 2"

8'

3'

6' - 10" 26' - 3 1/2"

ALIGN

2' - 6"

FEC

F E

B

FEB

FEB

FEB

S3A.1

S 3A

.1 S

3A .1

18' - 8 1/4"19' - 0 1/4"

144-2

SERVING KITCHEN

AE511

C7

4'

S 6A

.W S

6A .W

S6A.W

S3A.1

S3A.1

S3A.1W

AE511

E4

TYP

AE511

B5 F5

AE311

4' - 10"

107B-2

ELECT CLOSET

107B

F7

AE311

TYP

4 TYP

F5

AE311

TYP

S3A.1

F7

AE311

F7

AE311

S3A.W

S3A.W

26' - 0"

4'

S3A.1W

SIM

AE511

E4

4' - 0 1/2"3' - 8 1/2"

138-2

FOOD BANK

2'

" 2'

1'

3'

7'

1/ 4"

/4

TYP

AE511

F6

AE511

B4

TYP

AE511

F2

S 6A

.1 S

6A .1

S 3A

.1 S

3A .1

S 3A

.W

S3A.W

TYP

F0A

TYP

S 6A

.W

S3A.W

S 6A

.W

S3A.W S3A.W

S3A.1W

S 3A

.W

S3A.W

S3A.W

S3A.W

S3A.W

S6A.W

LEGEND

NOT IN SCOPE

FOOD SERVICE EQUIPMENT -

WALK-IN COOLER, RE: QF SHEETS

00KEYNOTES

KEY PLAN

GENERAL NOTES

P la n N or th

True North

BLDG 02

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

STAMP

SEE REVISION

SCHEDULE

R E

V

IS

IO

N

S C

H E

D U

L E

A ut od es k D oc s:

//2 6.

_D ub lin

_G A

_K itc he n_

R

/2 1.

_A

R C

H _R

.r vt 8/

6/

:3 4:

A

M

AE111A

FLOOR PLAN - LEVEL 1 - NORTH CORRECT SAFETY & FCA

DEFICIENCIES

1826 VETERANS BLVD, DUBLIN, GA 31021

557-21-101

DM AW

BID DOCUMENTS - 100%

VEG 26.09 DWG 8 of 29 B

ID

D O

C U

M N

E T

S

32'16'8'4'2'0'

1/8" = 1'-0"

FLOOR PLAN - LEVEL 1 - NORTH

F6

1. +/-2” SELF-LEVELING CEMENTITIOUS UNDERLAYMENT (ALTERNATE NO.1),

2. ACCORDION FOLDING PARTITION, BASIS OF DESIGN: MODERNFOLD,

ACOUSTI-SEAL LEGACY, MATERIAL: FABRIC (PLAN NORTH SIDE) COLOR:

GRAY AND VINYL (SOUTH SIDE) COLOR: WHITE, SM2, PANEL TRIM: DARK

BRONZE

3. EXISTING ROOM TO REMAIN

4. INSTALL GB AT JAMBS AND HEAD OF WINDOW OPENING. INSTALL QUARTZ

SURFACE AT STOOLS.

5. ACCORDION FOLDING PARTITION PASS DOOR: HARDWARE : PUSH BAR &

EXIT SIGN ABOVE DOOR, ON PUSH SIDE

6. EXPANSION JOINT COVER AT FLOOR

7. EXPANSION JOINT COVER AT WALL

A3

Number: Issued: Date:

0 100% CONSTRUCTION DOCUMENTS 03/10/2022

A3 ADDENDUM 3 08/06/2026

ZMiller Snapshot

DN

DN

DN

ALIGN

ALIGN

A

LI

G N

56 62

49A

28 42A

125-2

TRAINING

126A-2

CLINICAL

MANAGERS

OFFICE

126-2

RECEPTION

127-2

AO

OFFICE

128-2

CHIEF

OFFICE

129A-2

LOCKERS/

RESTROOM

130A-2

LOCKERS/

RESTROOM

131-2

JANITOR/

CLEANING

CHEMICALS

132-2

DRY

STORAGE

136-2

COLD/

SALAD

KITCHEN

137-2

DRY

STORAGE

CR15-2

FOOD SERVICE

CORRIDOR

CR14-2

SERVICE

CORRIDOR

110-2

SUPPLY

COOLER

111-2

DIETITIANS

OFFICE

112-2

INGREDIENT

STORAGE

113-2

FREEZER

STORAGE

115A-2

WAREHOUSE

116-2

WAREHOUSE

119-2

FOOD

PANTRY/

HOMELESS

STAGING

120-2

WATER

STAGING C

R

A -2

C O

R R

ID

O

R

123-2

BREAK

LOUNGE

ST12-2

STAIRS

EL D-3

ELEVATOR

ST D-4

STAIRS

ST D-3

STAIRS40

LOCKERS

LOCKERS

129A

2D

130A

9B

0B

5D

CR15

5A

5C

5B

5E

CR14A

C

R

A -2

122A

CR16A-1

S 3A

.1 S

3A .1

S 3A

.1

S 3A

.1

S3A.1

AE401

D6

AE401

D4

134A-2

BREAKDOWN

133B-2

PRODUCE COOLER

134B-2

DAIRY COOLER

133A-2

MEAT/FISH COOLER

135-2

CONDIMENTS

S 3A

.1

W9

S 3A

.1

S3A.1 S3A.1W

S 3A

.1

100-2

NUTRITION / FOOD

SERVICE RECEIVING

CORRIDOR

129B-2

TOILET

130B-2

TOILET

ALIGN

8 1/4" 19' - 4 1/4" 24' - 0 1/2" 14' - 0" 16' - 6 1/2" 10' - 10 1/4" 15' - 1"

122A-2

PASSAGE

S3A.1W

5' - 10 1/2"11' - 1 1/4"5' - 8 3/4" 32' - 4" 9' - 5" 8' - 6" 15' - 5 1/4"

2' - 11 3/8"

8'

0"

10' - 1"

8'

/4

1'-6" CLR MIN

1' - 7"

8'

/8

13' - 9 3/4"

8'

7' - 4 7/8"18' - 10 3/4"9' - 3 1/2"19' - 2"6' - 10 1/2"3' - 6"

3'

/4

18' - 9 5/8"

/4

23' - 3 1/4"

/4

17' - 8"

/4

15' - 8 3/4"

1/ 4"

/4

1/ 4"

5'

/4

F E

C

FEB

FEB

4B 114B-2

TOILET

114A

ACSS.

TOILET

AE401

F4

AE401

F5

TYP

AE511

F6

AE511

E7

TYP

AE511

F8

S6A.W

S3A.1

T Y

P 2"

TYP

AE511

F7

AE511

C7

TYP

AE511

F7

TYP

AE511

F7

7"

SLOPE

F7

AE311

T Y

P 2"

T Y

P 2"

S 3A

.W

A

LI

G N

M

IN

1'

A

LI

G N

S 3A

.W

S 3A

.W

S3A.W

S3A.W

S3A.W

S3A.W

AE511

C2

LEGEND

NOT IN SCOPE

FOOD SERVICE EQUIPMENT -

WALK-IN COOLER, RE: QF SHEETS

A. REFER TO SHEETS G-001 AND A-001 FOR APPLICABLE GENERAL NOTES,

ABBREVIATIONS, AND SYMBOLS.

B. REFER TO MECHANICAL, STRUCTURAL, ELECTRICAL, AND PLUMBING

DRAWINGS FOR ADDITIONAL INFORMATION.

C. REFER TO FOOD SERVICE EQUIPMENT DRAWINGS FOR ADDITIONAL

INFORMATION.

D. DIMENSIONS INDICATED ARE FROM FACE OF STUD AND TO FACE OF

MASONRY, OR CENTERLINE OF COLUMN UNLESS NOTED OTHERWISE.

E. INTERIOR PARTITIONS ARE TO BE TYPE S3A.W UNLESS NOTED OTHERWISE.

F. FURR OUT STRUCTURAL CONCRETE COLUMNS WITH PARTITION TYPE F0A

UNLESS NOTED OTHERWISE.

G. ALIGN PARTITIONS WITH EXISTING PARTITIONS, UNLESS NOTED OTHERWISE.

H. ALIGN PARTITIONS WITH FINISH FACE OF FURRED PARTITION AT COLUMNS,

UNLESS NOTED OTHERWISE.

I. LOCATE DOOR FRAMES PER AE611. DOOR FRAMES NOT DIMENSIONED ARE

TO BE CENTERED IN PARTITION, UNLESS NOTED OTHERWISE.

J. PHASE 1 INCLUDES ALL WORK TO THE WALLS ENCLOSING CORRIDOR CR14-2

TO PROVIDE ACCESS TO WAREHOUSE RM 116-2 FROM THE HOSPITAL.

K. ALL WORK DISRUPTING ACCESS TO/FROM WAREHOUSE RM 116-2 IS TO BE

COMPLETED ON NIGHTS AND WEEKENDS TO LIMIT THE INTERRUPTION TO

THE WAREHOUSE OPERATIONS.

00KEYNOTES

KEY PLAN

GENERAL NOTES

P la n N or th

True North

BLDG 02

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

STAMP

SEE REVISION

SCHEDULE

R E

V

IS

IO

N

S C

H E

D U

L E

A ut od es k D oc s:

//2 6.

_D ub lin

_G A

_K itc he n_

R

/2 1.

_A

R C

H _R

.r vt 8/

6/

:3 4:

A

M

AE111B

FLOOR PLAN - LEVEL 1 - SOUTH CORRECT SAFETY & FCA

DEFICIENCIES

1826 VETERANS BLVD, DUBLIN, GA 31021

557-21-101

DM AW

BID DOCUMENTS - 100%

VEG 26.09 DWG 9 of 29 B

ID

D O

C U

M N

E T

S

32'16'8'4'2'0'

1/8" = 1'-0"

FLOOR PLAN - LEVEL 1 - SOUTH

F6

1. 2” TOPPING SLAB (DEDUCTIVE ALTERNATE), SEE FINISH FINISH SCHEDULE

FOR FINISHES

2. MATCH EXISTING WALL TO INFILL OPENING, TYP

3. INSTALL FRP AT JAMBS AND HEAD OF WINDOW OPENING. INSTALL SOLID

SURFACE (S-1) AT SILL FLUSH W/ WALL FINISH BELOW AND AT JAMBS

A3

Number: Issued: Date:

0 100% CONSTRUCTION DOCUMENTS 03/10/2022

A3 ADDENDUM 3 08/06/2026

ZMiller Snapshot

Sheets
AD110 - DEMOLITION PLAN - BASEMENT
AD111 - DEMOLITION PLAN - LEVEL 1
AE111A - FLOOR PLAN - LEVEL 1 - NORTH
AE111B - FLOOR PLAN - LEVEL 1 - SOUTH
GI001 - COVER
GI010 - TEMPORARY KITCHEN SITE PLAN

File details come from the government source that posted it. Updated .