Mech Response - RFI 007 REV.pdf
PDF 1 MB Posted
- Solicitation number
- 36C24725R0071
About this file
This document is a Pre-Bid Request for Information (RFI) form from Dominguez & Persons, LLC regarding the VA project to Correct FCA Deficiencies in Boiler Plant, Building #14 at Montgomery, AL. The RFI (Number 007) asks for clarification on the number of Guy Wire Supports included in the project, specifically referencing structural drawing S501 detail 12. The architectural/engineering response, provided by Jerry Williamson from Toland-Mizell-Molnar on 04/01/2025, recommends a minimum of 3 guy wires per boiler flue, based on manufacturer recommendations. The solicitation number is 36C24725R0071, and the project involves mechanical and structural modifications to the boiler plant facility.
The accompanying structural and roof mechanical drawings provide detailed specifications for the project, including roof mechanical piping plans, guy wire support details, and specific installation notes. Key installation requirements include providing new roof curbs, reusing existing openings where possible, installing guy wires, and coordinating roof equipment locations with other discipline drawings. The project is located in Montgomery, AL, and is being managed by the U.S. Department of Veterans Affairs Office of Construction and Facilities Management, with Toland-Mizell-Molnar serving as the consultant and architect/engineer of record.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24725R0071 0005.docx | DOCX document | |
| Attachment - Stair Treads.pdf | ||
| Attachment - Door Hardware.pdf | ||
| RFI Response 2.docx | DOCX document | |
| 36C24725R0071 0004.docx | DOCX document | |
| 36C24725R0071 0003.docx | DOCX document | |
| RFI Response.docx | DOCX document | |
| 36C24725R0071 0002.docx | DOCX document | |
| 36C24725R0071 0001.docx | DOCX document | |
| Attendance sheet 619-20-103.pdf | ||
| Attachment 8b - Specs - Vol 2.pdf | ||
| Attachment 1 - Experience Modification Rate Form.pdf | ||
| Attachment 5 - DBA Wages AL20250093 01-03-2025.pdf | ||
| Attachment 4 - Itemized Cost Breakdown.xlsx | XLSX spreadsheet | |
| Attachment 2 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting Jan 2023 Dev.pdf | ||
| 36C24725R0071 Solicitation.docx | DOCX document | |
| Attachment 3 - Past Performance Questionnaire -PPQ.docx | DOCX document | |
| Attachment 8c - Specs - Vol 3.pdf | ||
| Attachment 8a - Specs - Vol 1.pdf | ||
| Attachment 7 - Combined Drawings 619-20-103.pdf | ||
| Attachment 6 - Invoicing.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-BID REQUEST FOR INFORMATION FORM
Date: ____________________ _
Company Submitting Request: _________________________ _
Contact Name: _______________________ _ Phone: ____ _
E-Mail-----------------------------------
Project Name: --------------------------------
RFINO.
RESPONSE:
For Architect's Use:
Reviewed By/ Date: ______________________ _ Responded By/ Date: ____________ _ Processed by Addendum No. _ ________________ _
Comments: ---------------------------------
03/31/2025
Dominguez & Persons, LLC
Rafe Stewart 850-665-2993 rafe@ddbconstruct.com
Correct FCA Deficiencies in Boiler Plant, Building #14
36C24725R0071Solicitation #
Please advise how many Guy Wire Supports are included.
(Detail is located on structural drawing S501 detail 12). I'm having trouble locating them on drawings.
A/E Response
Per manufacturer recommendations. We would recommend a minimum of 3 guy wires per boiler flue.
Jerry Williamson - Toland-Mizell-Molnar - 04/01/2025
AA
CC
DD
BB
14-EF-07
(E)5"Ø E/A
14-EF-08
19"Ø E/A19"Ø E/A 19"Ø E/A
14-EF-01 14-EF-02 14-EF-03 14-EF-04
HOOD (3TYP)
8" SV
1 1
4" V4" V
ROOF HATCH
LADDER ACCESS
6" SV
4" V
TRUE
NORTH
PLAN
NORTH
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
ROOF MECHANICAL PIPING NEW WORK
PLAN - PHASE 2
CORRECT FCA
DEFICIENCIES IN BOILER
PLANT, BUILDING 14
MONTGOMERY, AL
MP142
619-20-103
JMK JSW/RCP09-20-2023
BID DOCUMENTS
1/4" = 1'-0"MP142
1 OVERALL ROOF MECHANICAL NEW WORK PLAN - PHASE 2
0 4' 8'2'
MP142 NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 CONTRACTOR SHALL PROVIDE NEW ROOF CURB FOR NEW FAN.
THE DESIGN INTENT IS TO REUSE EXISTING OPENING.
2 CONTRACTOR SHALL REUSE EXISTING OPENING WHERE POSSIBLE.
3 PROVIDE GUY WIRES.
22 10 11
B
A202
A203
A201
S
LO
P E
D O
W
NSLOPE DOWN
A301
A
D
C
A302
A121
A121
TYP2
A121
A121
A121
SIM
A121
SIM
A121
TYP
MIN
2'-0"
TYP
ROOF PLAN GENERAL NOTES
A. INSTALL NEW TPO ROOF SYSTEM PER DETAILS AND APPROVED
MANUFACTURER'S INSTALLATION INSTRUCTIONS AND SHOP DRAWINGS.
B. INSTALL NEW LIGHTNING PROTECTION SYSTEM. REFER TO LIGHTNING
PROTECTION DRAWINGS FOR ADDITIONAL INFORMATION.
C. COORDINATE ROOF EQUIPMENT LOCATIONS AND PENETRATIONS WITH ALL
DISCIPLINES DRAWINGS.
ROOF PLAN KEY NOTES #
PROVIDE NEW SCUPPER, OVERFLOW AND DOWNSPOUT AS INDICATED. SEE
DETAIL 6/A121 THIS SHEET.
(NOT ALL KEY NOTES USED ON ALL SHEETS)
PROVIDE NEW COATING AT EXISTING LADDER AS INDICATED.2
PROVIDE NEW COPING STONE TO MATCH EXISTING AT DAMAGED LOCATIONS.3
PROVIDE GUY WIRE AND GUY WIRE SUPPORTS AS INDICATED. SEE DETAIL 8/A121
THIS SHEET. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION AND REQUIRMENTS.
REWORK EXISTING CURB WHERE METAL CAP WAS REMOVED TO PROVIDE ROOF
CURB AND SUPPORT FOR EXHAUST FAN AS INDICATED. SEE DETAIL 7/A121 THIS
SHEET. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION AND REQUIRMENTS.
PROVIDE ROOF CURB FOR EXHAUST FAN AS INDICATED. SEE DETAIL 7/A121 THIS
SHEET. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION AND REQUIRMENTS.
EXISTING ROOF DECK
COVER BOARD
RIGID INSULATION
TPO ROOF SYSTEM
CONT. MEMBRANE COATED
METAL FLASHING
CONT. METAL CAP WITH
COUNTER FLASHING
P.T. 2 x 4 WOOD NAILER
ANCHOR TO DECK
CONT SEALANT AT ROOF
TERMINATION POINTS
CONT. BACKER ROD
AND SEALANT
EXISTING BRICK VENEER
EXISTING ROOF DECK
COVER BOARD
R-20 RIGID INSULATION
COVER BOARD
TPO ROOF SYSTEM
CONT SEALANT
TPO FLASHING BOOT
STAINLESS STEEL
HOSE CLAMP
PIPE
EXISTING MASONRY WALL
PREFINISHED METAL FASCIA
EXISTING ROOF DECK
EXISTING STEEL JOIST
PREFINISHED METAL
GUTTER AND DOWNSPOUT;
MATCH EXISTING PROFILE
TPO ROOF SYSTEM
RIGID INSULATION
WOOD BLOCKING AS REQUIRED
16 GAUGE BENT STEEL PLATE
1/2" COVER BOARD
TPO ROOF SYSTEM TURNED UP AT WALL
8"
WELDED SEAM
6"
STONE COPING CAP, REPAIR/
REPLACE EXISTING AS REQUIRED
ROOF FLASHING
FI
E
LD
V
E R
IF
Y
1'
3/
4"
METAL THROUGH WALL CAP FLASHING
CONT SEALANT
EXISTING ROOF DECK
1/2" COVER BOARD
RIGID INSULATION
6"
1/
2"
10"
1"
TRUE
NORTH
PLAN
NORTH
TPO FLASHING SYSTEM
FASTENERS PER MFG
RECOMMENDATION
METAL SCUPPER
EXTEND PAST WALL 3" MIN.
TPO ROOF SYSTEM.
CONTINUOUS
SEALANT, TYP.
SCUPPER
LIP OF SCUPPER TO
OVERLAP TOP OF
RAINWATER BASIN 1"
MIN. PROVIDE CONT.
SEALANT BEHIND
JOINT.
EXISTING
LEADER HEAD
TO REMAIN
DOWNSPOUT
EXISTING ROOF
DECK
P.T. 2 x 4 WOOD NAILER
ANCHOR TO DECK
OVERFLOW
OPENING
EXISTING CONCRETE
ROOF DECK
COVER BOARD
POLYISO INSULATION
COVER BOARD
TPO ROOF SYSTEM
TURN ROOFING UP
UNDER FLASHING
1/2" SHEATHING ON 2x4 PT
FRAMING @ 16" OC W/ BATT
INSULATION
METAL FLASHING
METAL COUNTERFLASHING
ROOFTOP EQUIPMENT
NOTES:
1. REFER TO MECHANICAL AND STRUCTURAL DRAWINGS AND SPECIFICATIONS FOR
ADDITIONAL INFORMATION AND REQUIREMENTS.
2. LOCATE GUY WIRE SUPPORTS 2'-0" MINIMUM AWAY FROM EXISTING STEEL BEAM AND
TRUSS STRUCTURE BELOW ROOF. COORDINATE GUY WIRE SUPPORT LOCATIONS WITH
EXISTING CONDITIONS PRIOR TO FABRICATION.
0 L
B
LO
AD M
AX
NON-HARDENING SEALANT
TPO ROOF SYSTEM.
WATERTIGHT SHEET METAL RAIN
COLLAR FLASHING, OVERLAPPING
PENETRATION POCKET, MIN 24 GA.
SET IN SEALANT
BASE FLASHING PER ROOF MFR
INSTALLATION REQUIREMENTS.
GUY WIRE ROOF SUPPORT,
SEE STRUCTURAL
GUY WIRE AS REQUIRED
EXISTING ROOF DECK
RIGID INSULATION
STEEL CHANNEL,
SEE STRUCTURAL
STEEL PLATE, SEE STRUCTURAL
3" M
IN
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
BID DOCUMENTS
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
YK/AW/SJ/
DB
JH
ROOF PLAN AND DETAILS CORRECT FCA DEFICIENCIES IN
BOILER PLANT, BUILDING 14
MONTGOMERY, AL
A121
619-20-103
09-20-2023
1/4" = 1'-0"A121
1 ROOF PLAN
1 1/2" = 1'-0"A121
5 TYPICAL ROOF TO WALL FLASHING DETAIL
1 1/2" = 1'-0"A121
4 TYPICAL PIPE PENETRATION DETAIL
1 1/2" = 1'-0"A121
2 ROOF EDGE DETAIL AT LOW ROOF GUTTER
1 1/2" = 1'-0"A121
3 TYPICAL PARAPET DETAIL
0' 2' 4' 8' 12'
SCALE: 1/4" = 1' - 0"
1 1/2" = 1'-0"A121
6 SCUPPER AND DOWNSPOUT DETAIL (TYP)
1 1/2" = 1'-0"A121
7 EQUIPMENT CURB DETAIL
1 1/2" = 1'-0"A121
8 TYPICAL GUY WIRE DETAIL
MP142 from TMM2014-MECH23 -09.20.2023 - Mechancial Final