Attachment 1 - Experience Modification Rate Form.pdf

PDF 205 KB Posted

Attached to
Replace Repair Roofs for Buildings 4, 15, 90, 93
Solicitation number
36C24725R0018
Issued by

About this file

This is an Experience Modification Rate (EMR) Form that contractors must complete and return with their response to the solicitation for the VA roof repair project. The form requires contractors to provide three years of safety performance data (2021-2023) including total man-hours worked, number of cases involving days away from work or restricted activity (from OSHA 300 form), DART rate calculations, and any OSHA violations.

The form requires submission of OSHA 300 and 300a forms as attachments and the company's EMR rates for the past three years. Notable disqualification criteria includes having four serious violations, one repeat violation, or one willful OSHA violation within the last three years. The information provided will be verified against government systems including OSHA and EPA inspection databases to ensure contractors meet the EMR requirements specified in the solicitation.

View the file

Other files

File Type Posted
1352.011 Roof Replace Repair Bldgs 4 15 90 and 93 Addenda 2.pdf PDF
Combined Pre-Bid RFIs - 2-LL.docx DOCX document
1352.011 Asbestos Testing Report.pdf PDF
1352.011 Section 02 82 13.21 Asbestos Roofing Abatement - Add 2.pdf PDF
1352.011 Section 01 00 00 General Requirements - Add 2.pdf PDF
1352.011 Section 07 01 50.19 Preparation for Re-Roofing - Add 2.pdf PDF
Amendment 0008 36C24725R0018.pdf PDF
1352.011 Section 01 11 00 Summary of Work - ADD 2.pdf PDF
1352.011 Section 01 22 13 Unit Prices and Allowances - Add 2.pdf PDF
Amendment 36C24725R0018 0007.pdf PDF
Amendment 006 36C24725R0018.pdf PDF
Combined Pre-Bid RFIs - 2 -.pdf PDF
amendment 36C24725R0018 0005.pdf PDF
36C24725R0018 0004.pdf PDF
619A4-23-101 Site Visit Sign In 1-16.pdf PDF
36C24725R0018 0003.pdf PDF
619A4-23-101 Site Visit Sign In.pdf PDF
Site Visit Attendance Sheet - 6194A-23-101.pdf PDF
S06 36C24725R0018 0002.pdf PDF
Amended submition date 36C24725R0018 0001.pdf PDF
Attachment 6 - INVOICING.docx DOCX document
Attachment 8 - Bldg 4 90 Roof Replacement Construction Drawings.pdf PDF
Attachment 2 - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING Jan 2023 Dev form.pdf PDF
Attachment 5 - DBA AL20240078 SAM.gov.pdf PDF
Attachment 7 - Bldg 4 90 Roof Replace CD Specificaitons.pdf PDF
Attachment 4 - Itemized Cost Breakdown.xlsx XLSX spreadsheet
Attachment 3 - Past Performance Questionnaire -PPQ.docx DOCX document
36C24725R0018_1.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 Experience Modification Rate Form

Offeror To Complete & return with response to solicitation

Company Name: ______________________________________________________________________

Address: _____________________________________________________________________________

Telephone: _______________________ Email: _____________________________________________

Contact: ______________________________________________________

1. Utilizing your OSHA 300 Forms, please complete the following information:

Category 2021 2022 2023 Number of man hours (jobsite and office).

Number of cases involving days away from work, restricted activity, or both (Column H and I of OSHA 300).

Days away, restricted, or transferred rate (# of days away, restricted, or transferred cases x 200,000/# of man hours) (DART Rate).

Number of serious, willful, or repeat violations from OSHA within the last 3 years. Please attach explanation for any violations. (Four serious, one repeat, or one willful disqualifies the contractor.)

Please attach copies of the following documents: OSHA 300 and 300a Forms. These forms can be accessed through the OSHA publications search page: http://www.osha.gov/pls/publications/publication.html.

2. Company’s Insurance Experience Modification Rate (EMR) for the past 3 years :

The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases will be used to ensure the contractor meets Experience Modification Rate indicated in the solicitation.

http://www.osha.gov/pls/publications/publication.html VHAV07PowerJ1 Cross-Out

File details come from the government source that posted it. Updated .