36C24718B0636 0007 Several drawings are missing from the solicitation package 02.pdf

View the file

Other files for this federal contract opportunity

Other files attached to #521-16-101 Replace Pressure Piping and Hot Water Distribution System, newest first.
File Type Posted
36C24718B0636-0008001.pdf PDF
36C24718B0636-0008000.docx DOCX document
36C24718B0636-0007000.docx DOCX document
36C24718B0636-0006001.pdf PDF
36C24718B0636-0006000.docx DOCX document
36C24718B0636-0006003.pdf PDF
36C24718B0636-0006002.pdf PDF
36C24718B0636-0005018.pdf PDF
36C24718B0636-0005019.pdf PDF
36C24718B0636-0005017.pdf PDF
36C24718B0636-0005016.docx DOCX document
36C24718B0636-0004002.pdf PDF
36C24718B0636-0004001.pdf PDF
36C24718B0636-0004004.pdf PDF
36C24718B0636-0004000.docx DOCX document
36C24718B0636-0004005.pdf PDF
36C24718B0636-0004003.pdf PDF
36C24718B0636-0003005.pdf PDF
36C24718B0636-0003001.pdf PDF
36C24718B0636-0003000.docx DOCX document
36C24718B0636-0003002.pdf PDF
36C24718B0636-0003004.pdf PDF
36C24718B0636-0003003.pdf PDF
36C24718B0636-0003006.pdf PDF
36C24718B0636-0002005.pdf PDF
36C24718B0636-0002006.pdf PDF
36C24718B0636-0002002.pdf PDF
36C24718B0636-0002004.pdf PDF
36C24718B0636-0002003.pdf PDF
36C24718B0636-0002000.docx DOCX document
36C24718B0636-0002001.pdf PDF
36C24718B0636-0001000.docx DOCX document
36C24718B0636-0001001.pdf PDF
36C24718B0636-0001002.pdf PDF
36C24718B0636-001.docx DOCX document
36C24718B0636-000.docx DOCX document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.) Several drawings are missing from the solicitation package. (Missing PP108 - PP501). Please provide missing drawings. Please see the FBO amendment.

2.) Specification Divisions 01, 02, 04, 06, 07, 08, 09, 12, and 13 are all listed in the table of contents but not provided. The specifications start with Division 22 . Please provide missing specification sections. Please see the FBO amendment.

3.) Can the RFI deadline be extended for at least (2) days after the rest of the drawings and specifications are provided? RFI Deadline will not be extended.

Will tax exempt certificate be provided for this project? Yes.

4.) Ref: Spec 22 05 11-14 - Is contractor responsible for providing stamped engineered drawings for all pipe equipment supports and restraints? Yes

5.) Ref: Spec 22 05 11 – 21 – Is contractor responsible for providing rigging plan designed by

Registered Professional Engineers. Yes

6.) Is a full-time Site Superintendent required? Yes

7.) Is a full time Site Safety Health Office (SSHO) required? Yes

8.) Can the Superintendent and SSHO have multiple responsibilities on this project. No

9.) Is asbestos present in any areas that contractor will be working in? Not sure

10.) Will any work be in confined spaces that will require permit and retrieval Possible

11.) How much time should be allotted for overtime since most of this work will be in the hospital with occupancy 24/7/365 ? As much as required to meet contract

12.) Will any temporary equipment be required for this project scope? If yes, please define. Refer to contract documents

13.) During the site visit, it was mentioned that the facility has Hepa filters that can be used by contractors for infection control. Please confirm.? Yes, but availability is not 100% confirmed.