About this file

36C24718B0636 0001 Final Specifications - Vol 1 REVISED.pdf

View the file

Other files for this federal contract opportunity

Other files attached to #521-16-101 Replace Pressure Piping and Hot Water Distribution System, newest first.
File Type Posted
36C24718B0636-0008001.pdf PDF
36C24718B0636-0008000.docx DOCX document
36C24718B0636-0007001.pdf PDF
36C24718B0636-0007000.docx DOCX document
36C24718B0636-0006001.pdf PDF
36C24718B0636-0006000.docx DOCX document
36C24718B0636-0006003.pdf PDF
36C24718B0636-0006002.pdf PDF
36C24718B0636-0005018.pdf PDF
36C24718B0636-0005019.pdf PDF
36C24718B0636-0005017.pdf PDF
36C24718B0636-0005016.docx DOCX document
36C24718B0636-0004000.docx DOCX document
36C24718B0636-0004005.pdf PDF
36C24718B0636-0004003.pdf PDF
36C24718B0636-0004002.pdf PDF
36C24718B0636-0004001.pdf PDF
36C24718B0636-0004004.pdf PDF
36C24718B0636-0003005.pdf PDF
36C24718B0636-0003000.docx DOCX document
36C24718B0636-0003002.pdf PDF
36C24718B0636-0003004.pdf PDF
36C24718B0636-0003003.pdf PDF
36C24718B0636-0003006.pdf PDF
36C24718B0636-0003001.pdf PDF
36C24718B0636-0002005.pdf PDF
36C24718B0636-0002006.pdf PDF
36C24718B0636-0002002.pdf PDF
36C24718B0636-0002004.pdf PDF
36C24718B0636-0002003.pdf PDF
36C24718B0636-0002000.docx DOCX document
36C24718B0636-0002001.pdf PDF
36C24718B0636-0001000.docx DOCX document
36C24718B0636-0001001.pdf PDF
36C24718B0636-001.docx DOCX document
36C24718B0636-000.docx DOCX document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Replace/Upgrade Pressure Piping & Hot Water Distribution at the

Birmingham VA Medical Center Birmingham, AL

May 11, 2017

100% Submittal Specifications – Vol 1

Project No.: 521-16-101

Replace/Upgrade Pressure Piping & Hot Water Distribution 08-01-16

Replace/Upgrade Pressure Piping & Hot Water Distribution 00 01 10-1 Birmingham VAMC, Birmingham, AL

DEPARTMENT OF VETERANS AFFAIRS

SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-15 01 27 50 Unit Prices 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13 01 33 23 Shop Drawings, Product Data, and Samples 07-15 01 35 26 Safety Requirements 10-14 01 42 19 Reference Standards 05-16 01 45 29 Testing Laboratory Services 06-16 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 02-15

DIVISION 04 – MASONRY

04 20 00 Unit Masonry 02-16

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-15 06 04 00 Plastic Paneling 06-14

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 02-16 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-15

DIVISION 08 - OPENINGS

08 31 13 Access Doors and Frames 02-16

DIVISION 09 – FINISHES

09 22 16 Non-Structural Metal Framing 05-16 09 29 00 Gypsum Board 11-14 09 30 13 Ceramic/Porcelain Tiling 09-15

Replace/Upgrade Pressure Piping & Hot Water Distribution 08-01-16

Replace/Upgrade Pressure Piping & Hot Water Distribution 00 01 10-2 Birmingham VAMC, Birmingham, AL

09 51 00 Acoustical Ceilings 08-16 09 91 00 Painting 01-16

DIVISION 12 – FURNISHINGS

12 32 00 Manufactured Wood Casework 09-15

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components 01-14

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16 22 05 12 General Motor Requirements for Plumbing Equipment 09-15 22 05 19 Meters and Gages for Plumbing Piping 09-15 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-15 22 08 00 Commissioning of Plumbing Systems 06-13 22 11 00 Facility Water Distribution 09-15 22 11 23 Domestic Water Pumps 09-15 22 35 00 Domestic Water Heat Exchangers 09-15 22 40 00 Plumbing Fixtures 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 08 00 Commissioning of HVAC Systems 06-13 23 09 24 Continuous Water Quality Monitoring and Instrumentation 23 22 13 Steam and Condensate Heating Pipe 02-15 23 22 23 Steam Condensate Pumps

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 07-15 26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-13 26 05 26 Grounding and Bonding for Electrical Systems 12-12 26 05 33 Raceway and Boxes for Electrical Systems 05-14 26 27 26 Wiring Devices 08-14 26 29 21 Enclosed Switches and Circuit Breakers 12-12

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 06-15 27 05 26 Grounding and Bonding for Communications 06-15 27 05 33 Raceways and Boxes for Communications Systems 06-15 27 15 00 Communications Structured Cabling 01-16

Replace/Upgrade Pressure Piping & Hot Water Distribution 07-01-15

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWINGS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

G001 Cover Sheet

G002 Index of Drawings

G003 Legends, Abbreviations and Notes

ARCHITECTURAL

A0SB-0 Overall Sub-Basement Plan

A0SB-1 Quadrant 1 Sub-Basement Plan

A0SB-2 Quadrant 2 Sub-Basement Plan

A0SB-3 Quadrant 3 Sub-Basement Plan

A0SB-4 Quadrant 4 Sub-Basement Plan

A0BF-0 Overall Basement Plan

A0BF-1 Quadrant 1 Basement Plan

A0BF-2 Quadrant 2 Basement Plan

A0BF-3 Quadrant 3 Basement Plan

A0BF-4 Quadrant 4 Basement Plan

A0GF-0 Overall Ground Floor Plan

A0GF-1 Quadrant 1 Ground Floor Plan

A0GF-2 Quadrant 2 Ground Floor Plan

A0GF-3 Quadrant 3 Ground Floor Plan

A0GF-4 Quadrant 4 Ground Floor Plan

A101-0 Overall First Floor Plan

A101-1 Quadrant 1 First Floor Plan

A101-2 Quadrant 2 First Floor Plan

A101-3 Quadrant 3 First Floor Plan

A101-4 Quadrant 4 First Floor Plan

A102-0 Overall Second Floor Plan

A102-1 Quadrant 1 Second Floor Plan

A102-2 Quadrant 2 Second Floor Plan

A102-3 Quadrant 3 Second Floor Plan

A102-4 Quadrant 4 Second Floor Plan

A103-0 Overall Third Floor Plan

00 01 15 - 2

A103-1 Quadrant 1 Third Floor Plan

A103-2 Quadrant 2 Third Floor Plan

A103-3 Quadrant 3 Third Floor Plan

A103-4 Quadrant 4 Third Floor Plan

A104-0 Overall Fourth Floor Plan

A104-1 Quadrant 1 Fourth Floor Plan

A104-2 Quadrant 2 Fourth Floor Plan

A104-3 Quadrant 3 Fourth Floor Plan

A104-4 Quadrant 4 Fourth Floor Plan

A105-0 Overall Fifth Floor Plan

A105-1 Quadrant 1 Fifth Floor Plan

A105-2 Quadrant 2 Fifth Floor Plan

A105-3 Quadrant 3 Fifth Floor Plan

A105-4 Quadrant 4 Fifth Floor Plan

A106-0 Overall Sixth Floor Plan

A106-1 Quadrant 1 Sixth Floor Plan

A106-2 Quadrant 2 Sixth Floor Plan

A106-3 Quadrant 3 Sixth Floor Plan

A106-4 Quadrant 4 Sixth Floor Plan

A107-0 Overall Seventh Floor Plan

A107-1 Quadrant 1 Seventh Floor Plan

A107-2 Quadrant 2 Seventh Floor Plan

A107-3 Quadrant 3 Seventh Floor Plan

A107-4 Quadrant 4 Seventh Floor Plan

A108-0 Overall Eighth Floor Plan

A108-1 Quadrant 1 Eighth Floor Plan

A108-2 Quadrant 2 Eighth Floor Plan

A108-3 Quadrant 3 Eighth Floor Plan

A108-4 Quadrant 4 Eighth Floor Plan

A109-0 Overall Ninth Floor Plan

A109-1 Quadrant 1 Ninth Floor Plan

A109-2 Quadrant 2 Ninth Floor Plan

A109-3 Quadrant 3 Ninth Floor Plan

A109-4 Quadrant 4 Ninth Floor Plan

A110-0 Overall Tenth Floor Plan

A110-1 Quadrant 1 Tenth Floor Plan

A111-0 Overall Eleventh Floor Plan

00 01 15 - 3

A111-1 Quadrant 1 Eleventh Floor Plan

A501 Details

PLUMBING

P001 Legend and Notes

P002 Instrumentation

PD101 Quadrant 1 Partial Sub-Basement Domestic Water

Demolition Plan

PD102 Quadrant 2 Partial Sub-Basement Domestic Water

Demolition Plan

PD103 Quadrant 3 Partial Sub-Basement Domestic Water

Demolition Plan

PD104 Quadrant 4 Partial Sub-Basement Domestic Water

Demolition Plan

PD105 Quadrant 1 Partial Basement Domestic Water

Demolition Plan

PD106 Quadrant 2 Partial Basement Domestic Water

Demolition Plan

PD107 Quadrant 3 Partial Basement Domestic Water

Demolition Plan

PD108 Quadrant 4 Partial Basement Domestic Water

Demolition Plan

PD109 Quadrant 1 Partial Ground Floor Domestic Water

Demolition Plan

PD110 Quadrant 2 Partial Ground Floor Domestic Water

Demolition Plan

PD111 Quadrant 3 Partial Ground Floor Domestic Water

Demolition Plan

PD112 Quadrant 4 Partial Ground Floor Domestic Water

Demolition Plan

PD113 Quadrant 1 Partial First Floor Domestic Water

Demolition Plan

PD114 Quadrant 2 Partial First Floor Domestic Water

Demolition Plan

PD115 Quadrant 3 Partial First Floor Domestic Water

Demolition Plan

PD116 Quadrant 4 Partial First Floor Domestic Water

00 01 15 - 4

PD117 Quadrant 1 Partial Second Floor Domestic Water

Demolition Plan

PD118 Quadrant 2 Partial Second Floor Domestic Water

Demolition Plan

PD119 Quadrant 3 Partial Second Floor Domestic Water

Demolition Plan

PD120 Quadrant 4 Partial Second Floor Domestic Water

Demolition Plan

PD121 Quadrant 1 Partial Third Floor Domestic Water

Demolition Plan

PD122 Quadrant 2 Partial Third Floor Domestic Water

Demolition Plan

PD123 Quadrant 3 Partial Third Floor Domestic Water

Demolition Plan

PD124 Quadrant 4 Partial Third Floor Domestic Water

Demolition Plan

PD125 Quadrant 1 Partial Fourth Floor Domestic Water

Demolition Plan

PD126 Quadrant 2 Partial Fourth Floor Domestic Water

Demolition Plan

PD127 Quadrant 3 Partial Fourth Floor Domestic Water

Demolition Plan

PD128 Quadrant 4 Partial Fourth Floor Domestic Water

Demolition Plan

PD129 Quadrant 1 Partial Fifth Floor Domestic Water

Demolition Plan

PD130 Quadrant 2 Partial Fifth Floor Domestic Water

Demolition Plan

PD131 Quadrant 3 Partial Fifth Floor Domestic Water

Demolition Plan

PD132 Quadrant 4 Partial Fifth Floor Domestic Water

Demolition Plan

PD133 Quadrant 1 Partial Sixth Floor Domestic Water

Demolition Plan

PD134 Quadrant 2 Partial Sixth Floor Domestic Water

00 01 15 - 5

PD135 Quadrant 3 Partial Sixth Floor Domestic Water

Demolition Plan

PD136 Quadrant 4 Partial Sixth Floor Domestic Water

Demolition Plan

PD137 Quadrant 1 Partial Seventh Floor Domestic Water

Demolition Plan

PD138 Quadrant 2 Partial Seventh Floor Domestic Water

Demolition Plan

PD139 Quadrant 3 Partial Seventh Floor Domestic Water

Demolition Plan

PD140 Quadrant 4 Partial Seventh Floor Domestic Water

Demolition Plan

PD141 Quadrant 1 Partial Eighth Floor Domestic Water

Demolition Plan

PD142 Quadrant 2 Partial Eighth Floor Domestic Water

Demolition Plan

PD143 Quadrant 3 Partial Eighth Floor Domestic Water

Demolition Plan

PD144 Quadrant 4 Partial Eighth Floor Domestic Water

Demolition Plan

PD145 Quadrant 1 Partial Ninth Floor Domestic Water

Demolition Plan

PD146 Quadrant 2 Partial Ninth Floor Domestic Water

Demolition Plan

PD147 Quadrant 3 Partial Ninth Floor Domestic Water

Demolition Plan

PD148 Quadrant 4 Partial Ninth Floor Domestic Water

Demolition Plan

PD149 Partial Tenth and Eleventh Floor Domestic Water

Demolition Plan

PD201 Large Scale Sub-Basement Mechanical Room

Demolition Plan

PD202 Large Scale Ground Floor Mechanical Room

Demolition Plan

PD203 Large Scale Tenth Floor Mechanical Room

PP101 Quadrant 1 Partial Sub-Basement Domestic Water

00 01 15 - 6

New Work Plan

PP102 Quadrant 2 Partial Sub-Basement Domestic Water

New Work Plan

PP103 Quadrant 3 Partial Sub-Basement Domestic Water

New Work Plan

PP104 Quadrant 4 Partial Sub-Basement Domestic Water

New Work Plan

Pp105 Quadrant 1 Partial Basement Domestic Water New

Work Plan

PP106 Quadrant 2 Partial Basement Domestic Water New

Work Plan

PP107 Quadrant 3 Partial Basement Domestic Water New

Work Plan

PP108 Quadrant 4 Partial Basement Domestic Water New

Work Plan

PP109 Quadrant 1 Partial Ground Floor Domestic Water

New Work Plan

PP110 Quadrant 2 Partial Ground Floor Domestic Water

New Work Plan

PP111 Quadrant 3 Partial Ground Floor Domestic Water

New Work Plan

PP112 Quadrant 4 Partial Ground Floor Domestic Water

New Work Plan

PP113 Quadrant 1 Partial First Floor Domestic Water

New Work Plan

PP114 Quadrant 2 Partial First Floor Domestic Water

New Work Plan

PP115 Quadrant 3 Partial First Floor Domestic Water

New Work Plan

PP116 Quadrant 4 Partial First Floor Domestic Water

New Work Plan

PP117 Quadrant 1 Partial Second Floor Domestic Water

New Work Plan

PP118 Quadrant 2 Partial Second Floor Domestic Water

New Work Plan

PP119 Quadrant 3 Partial Second Floor Domestic Water

00 01 15 - 7

PP120 Quadrant 4 Partial Second Floor Domestic Water

New Work Plan

PP121 Quadrant 1 Partial Third Floor Domestic Water

New Work Plan

PP122 Quadrant 2 Partial Third Floor Domestic Water

New Work Plan

PP123 Quadrant 3 Partial Third Floor Domestic Water

New Work Plan

PP124 Quadrant 4 Partial Third Floor Domestic Water

New Work Plan

PP125 Quadrant 1 Partial Fourth Floor Domestic Water

New Work Plan

PP126 Quadrant 2 Partial Fourth Floor Domestic Water

New Work Plan

PP127 Quadrant 3 Partial Fourth Floor Domestic Water

New Work Plan

PP128 Quadrant 4 Partial Fourth Floor Domestic Water

New Work Plan

PP129 Quadrant 1 Partial Fifth Floor Domestic Water

New Work Plan

PP130 Quadrant 2 Partial Fifth Floor Domestic Water

New Work Plan

PP131 Quadrant 3 Partial Fifth Floor Domestic Water

New Work Plan

PP132 Quadrant 4 Partial Fifth Floor Domestic Water

New Work Plan

PP133 Quadrant 1 Partial Sixth Floor Domestic Water

New Work Plan

PP134 Quadrant 2 Partial Sixth Floor Domestic Water

New Work Plan

PP135 Quadrant 3 Partial Sixth Floor Domestic Water

New Work Plan

PP136 Quadrant 4 Partial Sixth Floor Domestic Water

New Work Plan

PP137 Quadrant 1 Partial Seventh Floor Domestic Water

PP138 Quadrant 2 Partial Seventh Floor Domestic Water

00 01 15 - 8

PP139 Quadrant 3 Partial Seventh Floor Domestic Water

New Work Plan

PP140 Quadrant 4 Partial Seventh Floor Domestic Water

New Work Plan

PP141 Quadrant 1 Partial Eighth Floor Domestic Water

New Work Plan

PP142 Quadrant 2 Partial Eighth Floor Domestic Water

New Work Plan

PP143 Quadrant 3 Partial Eighth Floor Domestic Water

New Work Plan

PP144 Quadrant 4 Partial Eighth Floor Domestic Water

New Work Plan

PP145 Quadrant 1 Partial Ninth Floor Domestic Water

New Work Plan

PP146 Quadrant 2 Partial Ninth Floor Domestic Water

New Work Plan

PP147 Quadrant 3 Partial Ninth Floor Domestic Water

New Work Plan

PP148 Quadrant 4 Partial Ninth Floor Domestic Water

New Work Plan

PP149 Partial Tenth and Eleventh Floor Domestic Water

New Work Plan

PP201 Large Scale Sub-Basement Mechanical Room

New Work Plan

PP202 Large Scale Ground Floor Mechanical Room

New Work Plan

PP203 Large Scale Tenth Floor Mechanical Room

New Work Plan

PP401 Details

PP402 Details

PP501 Schedules

- - - E N D - - -

Replace/Upgrade Pressure Piping & Hot Water Distribution 11-01-15 i

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

1.10 RESTORATION

1.11 PHYSICAL DATA

1.12 PROFESSIONAL SURVEYING SERVICES

1.13 LAYOUT OF WORK

1.14 AS-BUILT DRAWINGS

1.15 USE OF ROADWAYS

1.16 RESIDENT ENGINEER'S FIELD OFFICE

1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.18 TEMPORARY USE OF EXISTING ELEVATORS

1.19 TEMPORARY USE OF NEW ELEVATORS

1.20 TEMPORARY TOILETS

1.21 AVAILABILITY AND USE OF UTILITY SERVICES

1.22 NEW TELEPHONE EQUIPMENT

ii

1.23 TESTS

1.24 INSTRUCTIONS

1.25 GOVERNMENT-FURNISHED PROPERTY

1.26 RELOCATED EQUIPMENT ITEMS

1.27 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT

1.28 CONSTRUCTION SIGN

1.29 SAFETY SIGN

1.30 PHOTOGRAPHIC DOCUMENTATION

1.31 FINAL ELEVATION Digital Images

1.32 HISTORIC PRESERVATION

1.33 VA TRIRIGA CPMS

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for replacement and upgrades to the pressure piping and hot water distribution systems as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

Medical Center Engineering Officer.

C. Offices of Toland Mizell Molnar, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. BID ITEM I (BASE BID), GENERAL CONSTRUCTION: Work includes general construction, plumbing, steam and condensate piping, electrical, monitoring equipment, controls, architectural, and related trades as

01 00 00 -2 necessary for a complete removal and replacement of piping, fixtures, water heaters, and related items for complete and operable plumbing system installation and commissioning. Included in this bid item is the complete removal and replacement of all domestic water pipe insulation in the entire building crawl space, a quantity of additional installed ball valves, blocking valves, and access panels listed on contract drawings.

Period of Performance: All construction work shall be completed within

900 calendar days.

BID ITEM II (DEDUCT ALTERNATE NO. 1), Provide all work described in Bid

Item I except the following items:

1. Delete 1/3rd of all hot water temperature sensors, monitoring, and all associated items for a complete installation.

Period of Performance: All construction work shall be completed within

880 calendar days.

BID ITEM III (DEDUCT ALTERNATE NO. 2), Provide all work as described in

Bid Item II, except the following items:

1. Deduct DEDUCT ALTERNATE NO. 1.

2. Delete additional 1/3rd of all hot water temperature sensors, monitoring, and all associated items for a complete installation.

Period of Performance: All construction work shall be completed within

860 calendar days.

BID ITEM IV (DEDUCT ALTERNATE NO. 3), Provide all work as described in Bid

Item III, except the following items:

1. Deduct DEDUCT ALTERNATE NO. 1.

2. Deduct DEDUCT ALTERNATE NO. 2.

3. Delete Final 1/3rd of all hot water temperature sensors, monitoring, and all associated items for a complete installation.

01 00 00 -3

Period of Performance: All construction work shall be completed within

840 calendar days.

BID ITEM V (DEDUCT ALTERNATE NO. 4), Provide all work as described in Bid

Item IV, except the following items:

1. Deduct DEDUCT ALTERNATE NO. 1.

2. Deduct DEDUCT ALTERNATE NO. 2.

3. Deduct DEDUCT ALTERNATE NO. 3.

4. Delete Domestic hot water heater and return pump monitoring, and all associated items for a complete installation.

Period of Performance: All construction work shall be completed within

820 calendar days.

BID ITEM VI (DEDUCT ALTERNATE NO. 5), Provide all work as described in Bid

Item V, except the following items:

1. Delete all chlorine monitoring stations, and all associated items for a complete installation.

2. Deduct DEDUCT ALTERNATE NO. 1.

3. Deduct DEDUCT ALTERNATE NO. 2.

4. Deduct DEDUCT ALTERNATE NO. 3.

5. Deduct DEDUCT ALTERNATE NO. 4.

Period of Performance: All construction work shall be completed within

800 calendar days.

D. UNIT PRICE ITEMS:

1. FAR clause 52.211-18 Variation in Estimated Quantity - If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or

01 00 00 -4 decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgment of the Contracting Officer, is justified.

2. Unit Prices for each of the following items shall be included in the

Bid Form. Refer to Section 01 27 50 – UNIT PRICES for additional information:

GENERAL CONSTRUCTION – SCHEDULE OF UNIT PRICES

a. UNIT PRICE G-1: ACOUSTICAL CEILINGS

b. UNIT PRICE G-2: GYPSUM BOARD CEILINGS

c. UNIT PRICE G-3: GYPSUM PARTITION ASSEMBLIES

d. UNIT PRICE G-4: CERAMIC/PORCELAIN WALL TILE ASSEMBLY

e. UNIT PRICE G-5: PAINTING

f. UNIT PRICE G-6: FIBERGLASS REPAIR

g. BASE CABINETS (for sink location)

h. UNIT PRICE G-8: GLAZED MASONRY UNITS

i. UNIT PRICE G-9: GYPSUM PARTITION FINISHING

PLUMBING CONSTRUCTION - SCHEDULE OF UNIT PRICES

a. UNIT PRICE P-1: ADDITIONAL 1/2” PIPE BLOCK VALVE

b. UNIT PRICE P-2: ADDITIONAL 3/4” PIPE BLOCK VALVE

01 00 00 -5

c. UNIT PRICE P-3: ADDITIONAL 1” PIPE BLOCK VALVE

d. UNIT PRICE P-4: ADDITIONAL 1-1/4” PIPE BLOCK VALVE

e. UNIT PRICE P-5: ADDITIONAL 1-1/2” PIPE BLOCK VALVE

f. UNIT PRICE P-6: ADDITIONAL 2” PIPE BLOCK VALVE

g. UNIT PRICE P-7: ADDITIONAL 3/4” RETURN VALVE GROUP

h. UNIT PRICE P-8: ADDITIONAL THERM-O-WELL TEE

i. UNIT PRICE P-9: ADDITIONAL P-302 PLUMBING FIXTURE

j. UNIT PRICE P-10: ADDITIONAL P-401 PLUMBING FIXTURE

k. UNIT PRICE P-11: ADDITIONAL P-402 PLUMBING FIXTURE

l. UNIT PRICE P-12: ADDITIONAL P-403 PLUMBING FIXTURE

m. UNIT PRICE P-13: ADDITIONAL P-501 PLUMBING FIXTURE

n. UNIT PRICE P-14: ADDITIONAL P-505 PLUMBING FIXTURE

o. UNIT PRICE P-15: ADDITIONAL P-516 PLUMBING FIXTURE

p. UNIT PRICE P-16: ADDITIONAL P-711 PLUMBING FIXTURE

q. UNIT PRICE P- 17: ADDITIONAL 1/2” COPPER PIPING

r. UNIT PRICE P-18: ADDITIONAL 3/4” COPPER PIPING

s. UNIT PRICE P- 19: ADDITIONAL 1” COPPER PIPING

t. UNIT PRICE P-20: ADDITIONAL 1-1/4” COPPER PIPING

u. UNIT PRICE P-21: ADDITIONAL 1-1/2” COPPER PIPING

v. UNIT PRICE P-22: ADDITIONAL 2” COPPER PIPING

w. UNIT PRICE P-23: ADDITIONAL 2-1/2” COPPER PIPING

x. UNIT PRICE P-24: ADDITIONAL 3” COPPER PIPING

HVAC CONSTRUCTION - SCHEDULE OF UNIT PRICES

01 00 00 -6

a. UNIT PRICE H-1: ADDITIONAL CHLORINE MONITORING STATION

b. UNIT PRICE H-2: ADDITIONAL DOMESTIC WATER TEMPERATURE SENSOR

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Guards:

01 00 00 -7

1. Not Used.

2. The Contractor shall provide the VA police with communication devices as directed.

3. Not Used.

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

E. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

01 00 00 -8

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of (2 to 5) permits shall be issued for General

Contractor and its employees for parking in designated areas only.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

01 00 00 -9

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workmen are subject to rules of Medical Center applicable to their conduct.

F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

01 00 00 -10

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

G. Phasing:

The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

To insure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. The Contractor should schedule three to four areas of potential work each day. The facility will be in full operation during construction and certain areas may not be able to shut down as initially scheduled. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to

COR and Contractor, as follows:

All Phases: See phasing plans. Phasing plans are intended as a larger order of priority for the VA. The scope of work within each phase will need to be coordinated by the Contractor through the COR. The Contractor is responsible for pre-planning work in increments that are acceptable to the COR.

H. Not Used.

I. Not Used.

J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

01 00 00 -11

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

K. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR [Chief Engineer] [Chief of

Facilities Management]. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the

Medical Center Director’s prior knowledge and written approval.

Refer to specification Sections 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR COMMUNICATIONS

INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC

SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least

01 00 00 -12 inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

01 00 00 -13

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government.

Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4 and VAAR 852.236-88).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

01 00 00 -14

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workmen in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by

01 00 00 -15 the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS: (NOT USED)

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2).

01 00 00 -16

1.11 PHYSICAL DATA (NOT USED)

1.12 PROFESSIONAL SURVEYING SERVICES

A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections.

The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.13 LAYOUT OF WORK (NOT USED)

1.14 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR’s review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.15 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

B. When new permanent roads are to be a part of this contract, Contractor may construct them immediately for use to facilitate building

01 00 00 -17 operations. These roads may be used by all who have business thereon within zone of building operations.

C. When certain buildings (or parts of certain buildings) are required to be completed in advance of general date of completion, all roads leading thereto must be completed and available for use at time set for completion of such buildings or parts thereof.

1.16 RESIDENT ENGINEER'S FIELD OFFICE (NOT USED)

1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the

COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.

Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014

Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned.

Vibrations must be eliminated.

01 00 00 -18

4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.

6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.

Boilers, pumps, feedwater heaters and auxiliary equipment must be operated as a complete system and be fully maintained by operating personnel. Boiler water must be given complete and continuous chemical treatment.

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.

1.18 TEMPORARY USE OF EXISTING ELEVATORS

A. Use of existing elevator for handling building materials and

Contractor's personnel will be permitted subject to following provisions:

1. Contractor makes all arrangements with the COR for use of elevators.

The COR will ascertain that elevators are in proper condition.

Contractor may use elevators Nos. TBD in Building Nos. TBD for exclusive use for daily use between the hours of TBD and for special nonrecurring time intervals when permission is granted. Personnel

01 00 00 -19 for operating elevators will not be provided by the Department of

Veterans Affairs.

2. Contractor covers and provides maximum protection of following elevator components:

a. Entrance jambs, heads soffits and threshold plates.

b. Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.

c. Finish flooring.

3. Government will accept hoisting ropes of elevator and rope of each speed governor if they are worn under normal operation. However, if these ropes are damaged by action of foreign matter such as sand, lime, grit, stones, etc., during temporary use, they shall be removed and replaced by new hoisting ropes at the contractor’s expense.

4. If brake lining of elevators are excessively worn or damaged during temporary use, they shall be removed and replaced by new brake lining at the contractor’s expense.

5. All parts of main controller, starter, relay panel, selector, etc., worn or damaged during temporary use shall be removed and replaced with new parts at the contractor’s expense, if recommended by elevator inspector after elevator is released by Contractor.

6. Place elevator in condition equal, less normal wear, to that existing at time it was placed in service of Contractor as approved by Contracting Officer.

1.19 TEMPORARY USE OF NEW ELEVATORS (NOT USED)

1.20 TEMPORARY TOILETS

A. Provide where directed, (for use of all Contractor's workmen) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR, provide suitable dry closets where directed. Keep such places clean and free from flies, and all

01 00 00 -20 connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.

1.21 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.

B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair/restore the infrastructure as required.

C. Contractor shall install meters at Contractor's expense and furnish the

Medical Center a monthly record of the Contractor's usage of electricity as hereinafter specified.

D. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:

1. Obtain heat by connecting to Medical Center heating distribution system.

E. Electricity (for Construction and Testing): Furnish all temporary electric services.

1. Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for

01 00 00 -21 electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Electricity for all other uses is available to the Contractor.

F. Water (for Construction and Testing): Furnish temporary water service.

1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available to the Contractor.

2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at COR’s discretion) of use of water from Medical Center's system.

G. Fuel: Natural and LP gas and burner fuel oil required for boiler cleaning, normal initial boiler-burner setup and adjusting, and for performing the specified boiler tests will be furnished by the

Government. Fuel required for prolonged boiler-burner setup, adjustments, or modifications due to improper design or operation of boiler, burner, or control devices shall be furnished and paid by the

Contracto…