About this file

36C24718B0636 0006 Final Asbestos Survey_Part4.pdf

View the file

Other files for this federal contract opportunity

Other files attached to #521-16-101 Replace Pressure Piping and Hot Water Distribution System, newest first.
File Type Posted
36C24718B0636-0008001.pdf PDF
36C24718B0636-0008000.docx DOCX document
36C24718B0636-0007001.pdf PDF
36C24718B0636-0007000.docx DOCX document
36C24718B0636-0006001.pdf PDF
36C24718B0636-0006000.docx DOCX document
36C24718B0636-0006003.pdf PDF
36C24718B0636-0005019.pdf PDF
36C24718B0636-0005017.pdf PDF
36C24718B0636-0005016.docx DOCX document
36C24718B0636-0005018.pdf PDF
36C24718B0636-0004003.pdf PDF
36C24718B0636-0004000.docx DOCX document
36C24718B0636-0004005.pdf PDF
36C24718B0636-0004002.pdf PDF
36C24718B0636-0004001.pdf PDF
36C24718B0636-0004004.pdf PDF
36C24718B0636-0003003.pdf PDF
36C24718B0636-0003006.pdf PDF
36C24718B0636-0003000.docx DOCX document
36C24718B0636-0003002.pdf PDF
36C24718B0636-0003004.pdf PDF
36C24718B0636-0003001.pdf PDF
36C24718B0636-0003005.pdf PDF
36C24718B0636-0002003.pdf PDF
36C24718B0636-0002000.docx DOCX document
36C24718B0636-0002001.pdf PDF
36C24718B0636-0002004.pdf PDF
36C24718B0636-0002005.pdf PDF
36C24718B0636-0002006.pdf PDF
36C24718B0636-0002002.pdf PDF
36C24718B0636-0001002.pdf PDF
36C24718B0636-0001000.docx DOCX document
36C24718B0636-0001001.pdf PDF
36C24718B0636-001.docx DOCX document
36C24718B0636-000.docx DOCX document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EMSL Analytical, Inc.

3029 S. Jefferson, Saint Louis, MO 63118 Phone/Fax: (314) 577-0150 / (314) 776-3313 http://www.EMSL.com saintlouislab@emsl.com

391309695 CustomerID: FDLS42 CustomerPO: cc 00637G ProjectID:

EMSL Order:

Attn: Berej (BJ) Patel Fidelis, LLC

1608 13TH AVE S STE 150

Birmingham, AL 35205

Received: 11/11/13 8:10 AM

VA Survey

Fax:

Phone: (630) 853-5826

Project:

11/14/2013Analysis Date:

Collected:

Sample Description Appearance % Type AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

565 FT 8-1-Floor Tile 391309695-0020A

Tan Non-Fibrous

Homogeneous

Chrysotile4%Non-fibrous (other)96%

565 FT 8-1-

Adhesive 391309695-0020B

Black Non-Fibrous

Homogeneous

Chrysotile9%Non-fibrous (other)91%

No analysis of paint layer or mineral wool layer per client request.

4THIS IS THE LAST PAGE OF THE REPORT.Test Report PLM-7.28.9 Printed: 11/15/2013 9:14:25 AM

Jeff Siria, Laboratory Manager or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1% Samples analyzed by EMSL Analytical, Inc. Saint Louis, MO NVLAP Lab Code 200742-0

Initial report from 11/14/2013 19:53:05

Sue Ferrario (26) http://www.EMSL.com mailto:saintlouislab@emsl.com

Phone/Fax: (314) 577-0150 / (314) 776-3313 http://www.EMSL.com saintlouislab@emsl.com

391310101 CustomerID: FDLS42 CustomerPO:

ProjectID:

EMSL Order:

Attn: Berej (BJ) Patel Fidelis, LLC

1608 13TH AVE S STE 150

Birmingham, AL 35205

Received: 11/25/13 9:50 AM

VA Survey

Fax:

Phone: (630) 853-5826

Project:

11/29/2013Analysis Date:

Collected:

Sample Description Appearance % Type AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

266 PR26-1

391310101-0001

Various None Detected Fibrous Heterogeneous

Cellulose39% Glass19%

Non-fibrous (other)42%

266 PR26-2

391310101-0002

Various None Detected Fibrous Heterogeneous

Cellulose39% Glass19%

Non-fibrous (other)42%

266 PR26-3

391310101-0003

Various None Detected Fibrous Heterogeneous

Cellulose39% Glass19%

Non-fibrous (other)42%

267 PR27-1

391310101-0004

Various None Detected Fibrous Heterogeneous

Cellulose39% Glass19%

Non-fibrous (other)42%

268 RI1-1

391310101-0005

Brown None Detected Fibrous Homogeneous

Cellulose96% Non-fibrous (other)4%

268 RI1-2

391310101-0006

Brown None Detected Fibrous Homogeneous

Cellulose96% Non-fibrous (other)4%

268 RI1-3

391310101-0007

Brown None Detected Fibrous Homogeneous

Cellulose96% Non-fibrous (other)4%

269 PR28-1

391310101-0008

Various None Detected Fibrous Heterogeneous

Cellulose39% Glass19%

Non-fibrous (other)42%

1Test Report PLM-7.28.9 Printed: 11/29/2013 9:56:22 AM

Jeff Siria, Laboratory Manager or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1% Samples analyzed by EMSL Analytical, Inc. Saint Louis, MO NVLAP Lab Code 200742-0

Initial report from 11/29/2013 09:56:22

Sue Ferrario (22)

Phone/Fax: (314) 577-0150 / (314) 776-3313 http://www.EMSL.com saintlouislab@emsl.com

391310101 CustomerID: FDLS42 CustomerPO:

ProjectID:

EMSL Order:

Attn: Berej (BJ) Patel Fidelis, LLC

1608 13TH AVE S STE 150

Birmingham, AL 35205

Received: 11/25/13 9:50 AM

VA Survey

Fax:

Phone: (630) 853-5826

Project:

11/29/2013Analysis Date:

Collected:

Sample Description Appearance % Type AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

269 PR28-2

391310101-0009

Various None Detected Fibrous Heterogeneous

Cellulose39% Glass19%

Non-fibrous (other)42%

269 PR28-3

391310101-0010

Various None Detected Fibrous Heterogeneous

Cellulose39% Glass19%

Non-fibrous (other)42%

270 PR29-1

391310101-0011

Cream None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

270 PR29-2

391310101-0012

Cream None Detected Non-Fibrous Homogeneous

Wollastonite2% Non-fibrous (other)98%

270 PR29-3

391310101-0013

Cream None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

271 PR30-1-Wrap

391310101-0014

Cream None Detected Non-Fibrous Homogeneous

Non-fibrous (other)100%

271 PR30-1-Wrap

391310101-0014A

Various None Detected Fibrous Heterogeneous

Cellulose39% Glass19%

Non-fibrous (other)42%

271 PR30-2

391310101-0015

Various None Detected Fibrous Heterogeneous

Cellulose39% Glass19%

Non-fibrous (other)42%

2Test Report PLM-7.28.9 Printed: 11/29/2013 9:56:22 AM

Jeff Siria, Laboratory Manager or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1% Samples analyzed by EMSL Analytical, Inc. Saint Louis, MO NVLAP Lab Code 200742-0

Initial report from 11/29/2013 09:56:22

Sue Ferrario (22)

Phone/Fax: (314) 577-0150 / (314) 776-3313 http://www.EMSL.com saintlouislab@emsl.com

391310101 CustomerID: FDLS42 CustomerPO:

ProjectID:

EMSL Order:

Attn: Berej (BJ) Patel Fidelis, LLC

1608 13TH AVE S STE 150

Birmingham, AL 35205

Received: 11/25/13 9:50 AM

VA Survey

Fax:

Phone: (630) 853-5826

Project:

11/29/2013Analysis Date:

Collected:

Sample Description Appearance % Type AsbestosNon-Asbestos

% Fibrous % Non-Fibrous

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy

271 PR30-3

391310101-0016

Various None Detected Fibrous Heterogeneous

Cellulose39% Glass19%

Non-fibrous (other)42%

272 FP9-1

391310101-0017

Tan None Detected Non-Fibrous Homogeneous

Cellulose19% Glass9%

Mica29% Non-fibrous (other)43%

272 FP9-2

391310101-0018

Tan None Detected Non-Fibrous Homogeneous

Cellulose19% Glass9%

Mica29% Non-fibrous (other)43%

272 FP9-3

391310101-0019

Tan None Detected Non-Fibrous Homogeneous

Cellulose19% Glass9%

Mica29% Non-fibrous (other)43%

272 FP9-4

391310101-0020

Tan None Detected Non-Fibrous Homogeneous

Cellulose19% Glass9%

Mica29% Non-fibrous (other)43%

272 FP9-5

391310101-0021

Tan None Detected Non-Fibrous Homogeneous

Cellulose19% Glass9%

Perlite29% Non-fibrous (other)43%

No analysis of paint or mineral wool.

3THIS IS THE LAST PAGE OF THE REPORT.Test Report PLM-7.28.9 Printed: 11/29/2013 9:56:22 AM

Jeff Siria, Laboratory Manager or other approved signatory

Analyst(s)

EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1% Samples analyzed by EMSL Analytical, Inc. Saint Louis, MO NVLAP Lab Code 200742-0

Initial report from 11/29/2013 09:56:22

Sue Ferrario (22)

BBIIRRMMIINNGGHHAAMM VVAAMMCC AASSBBEESSTTOOSS SSUURRVVEEYY RREEPPOORRTT

Fidelis Project No.: 2013-09-001 March 2014 Appendix F

Appendix F

Homogeneous Areas Sampled during the 2013 Sampling Event

VAMC – Birmingham 700 South 19th Street Asbestos-Re-Inspection Evaluation

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Sub-Basement, Main Building SB1-CH1 7 Oct 13

Homogeneous Area Description White textured jacket over black foam insulation on chiller line joint

Inspector Comments Samples were taken from the chiller line insulation in the northwest corner of the sub-basement

Recommended Response Action The samples were not shown to contain asbestos; no response action is necessary.

Physical Assessment ☐ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage ☐ 7. Any remaining friable ACBM ☒ 8. No asbestos detected.

Sub-Basement, Main Building SB2-CH2 7 Oct 13

White paste wrap over mineral wool insulation

☐ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sub-Basement, Main Building SB3-CH2E 7 Oct 13

Woven tape and mastic over mineral wool insulation

Samples were taken from the chiller line elbows in the northwest corner of the sub-basement

☐ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sub-Basement, Main Building SB4-LD1 7 Oct 13

Tape and mastic on large duct

The large duct is suspended in the northwest corner of the sub-basement

☐ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sub-Basement, Main Building SB5-CHIR 7 Oct 13

Woven tape and mastic over mineral wool insulation

☐ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sub-Basement, Main Building SB6-FP1 7 Oct 13

Fire Proofing - Grey

Grey fire proofing on electrical room ceiling in sub-basement. Fire proofing is within electrical room ceiling, and the ceiling below the raised electrical room.

Sub-Basement, Main Building SB7-PE1 7 Oct 13

Physical Assessment ☐ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Plastic cover over mineral wool insulation

Sample was taken on the pipe elbow in the northwest section of the sub-basement, suspended from the ceiling.

☐ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sub-Basement, Main Building SB8-PE2 7 Oct 13

Woven tape over mineral wool insulation

Pipe elbow samples taken in the northwest part of the sub-basement from the catwalk

☐ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sub-Basement, Main Building SB9-CHP1 7 Oct 13

Plaster patch over mineral wool insulation

Chiller pipe patch sampled in northwest section of the sub-basement from the catwalk

Sub-Basement, Main Building SB10-DW1 7 Oct 13

Physical Assessment ☐ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Drywall

Drywall samples were taken under the raised electrical closet in the northwest portion of the sub-basement.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Sub-Basement, Main Building 2SB11-PE3 7 Oct 13

Pipe elbow insulation

Hard plaster over pipe elbow insulation, samples taken in southwest corner of sub-basement.

☐ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sub-Basement, Main Building 2SB12-PJ1 7 Oct 13

Pipe joint – metal jacket over cementitious insulation

Pipe joint samples were taken in the southwest corner of the sub-basement.

☐ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sub-Basement, Main Building 2SB13-PR1 7 Oct 13

Pipe run insulation, fiberous paper over mineral wool insulation

Pipe run insulation samples were taken from the southwest corner of the sub-basement

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Sub-Basement, Main Building 2SB14-PR2 7 Oct 13

Grey cementitious insulation covered by metal sleeve

Pipe run insulation samples were taken from the southwest corner of the sub-basement

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Sub-Basement, Main Building 2SB15-PJ2 7 Oct 13

Pipe joint – covered by a putty material

Pipe joint samples were taken from the southwest corner of the sub-basement.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Sub-Basement, Main Building 2SB16-PE4 7 Oct 13

Pipe elbow – woven mesh pipe elbow over mineral wool insulation

Pipe elbow samples were taken from the southwest corner of the sub-basement.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Sub-Basement, Main Building 2SB17-PE5 7 Oct 13

Pipe elbow – woven paper with fibers over mineral wool insulation

Pipe elbow sample was taken from the southwest corner of the sub-basement.

This sample contains asbestos in the wrap of the pipe elbow insulation.

☒ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

☐ 8. No asbestos detected.

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Sub-Basement, Main Building 2SB18-PR3 7 Oct 13

Pipe Run – woven paper over black insulation

Pipe run samples were taken from the southern section of the sub-basement.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Sub-Basement, Main Building 2SB19-PE6 7 Oct 13

Pipe elbow – white plaster over black insulation

Pipe joint samples were taken from the southern section of the sub-basement.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Sub-Basement, Main Building 2SB20-PR4 7 Oct 13

Pipe run – mastic, woven fabric, cellulose fabric over mineral wool insulation

Pipe run samples were taken from the southern section of the sub-basement, taken from catwalk.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Sub-Basement, Main Building 2SB21-PR5 7 Oct 13

Pipe run – woven paper over mineral wool insulation

Pipe run samples were taken from the southern section of the sub-basement, taken from the catwalk.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Sub-Basement, Main Building 2SB22-DM1 7 Oct 13

Duct mastic over duct joint

Duct mastic samples were taken from the southern section of the sub-basement from vertical duct near the corridor leading to the northern section of the sub-basement.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Basement, Main Building B23-FT1 8 Oct 13

12” x 12” Brown floor tile with black mastic

Floor tile samples were taken from SPB103A-BH, similar floor tile found in other areas of basement.

The samples were shown to contain asbestos in the mastic.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☒ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Basement, Main Building B24-DI2 8 Oct 13

Duct insulation – green – mineral wool insulation

Duct insulation samples were taken from SPB103E-BH.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Basement, Main Building B25-DI3 8 Oct 13

Duct insulation – green – black foam insulation

Duct insulation samples were taken from SPB103E-BH.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Basement, Main Building B26-PR6 8 Oct 13

Pipe run insulation – woven paper (purple) over mineral wool insulation

Pipe run insulation samples were taken from SPB103E-BH.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Basement, Main Building B27-VJ1 8 Oct 13

Vibration joint – woven fabric (green) over vibration joint

Vibration joint samples were taken from SPB103E-BH.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Basement, Main Building B28-CP1 8 Oct 13

Ceiling paint – thick flaking black paint with white backing on ceiling of incinerator room

Ceiling paint samples taken from basement incinerator room.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Basement, Main Building B29-PC1 8 Oct 13

Pipe cloth – woven fabric on pipe run in basement incinerator room

Pipe cloth samples taken from basement incinerator room, pipe cloth is above door leading into the incinerator room.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Basement, Main Building B30-PR7 8 Oct 13

Pipe run insulation – brown woven paper with aluminum backing over mineral wool insulation

Pipe run insulation samples taken from basement incinerator room, pipe run is above door leading into the incinerator room.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Basement, Main Building B31-PR8 8 Oct 13

Pipe run insulation – woven paper (purple) with aluminum backing over mineral wool insulation

Pipe run insulation samples taken from SPB100C-BH.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Basement, Main Building B32-PR9 8 Oct 13

Pipe run insulation – woven paper (purple) with aluminum backing over hard foam insulation

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Basement, Main Building B33-PR10 8 Oct 13

Pipe run insulation – woven paper (yellow) and woven cloth over mineral wool insulation

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Ground Floor, Main Building G34-PR11 4 Nov 13

Pipe run insulation – 4” pipe insulation (white) woven plastic over mineral wool insulation

Pipe run insulation samples taken in ground floor corridor outside of room SPG415-BH.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Ground Floor, Main Building G35-PR12 4 Nov 13

Pipe run insulation – woven cloth over aluminum tape over mineral wool

Pipe run insulation samples taken in ground floor corridor outside of room SPG415-BH, pipes suspended from ceiling.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Ground Floor, Main Building G36-FP2 4 Nov 13

Fire proofing - grey

Fire proofing samples taken from SPG415-BH

The samples were shown to contain asbestos.

☒ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Ground Floor, Main Building G37-PJ3 4 Nov 13

Pipe joint – Orange painted mastic over aluminum tape and mineral wool insulation

Pipe joint samples were taken from SPGD120-BH.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Ground Floor, Main Building G38-PR13 4 Nov 13

Pipe run insulation – woven paper (white) with aluminum backing over mineral wool insulation.

Pipe run insulation samples taken in SPG509-BH.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Ground Floor, Main Building G39-PR14 4 Nov 13

Pipe run insulation – woven paper (purple) with aluminum backing over mineral wool insulation.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Ground Floor, Main Building G40-PR15 4 Nov 13

Pipe run insulation – painted yellow mastic over pipe run insulation

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Ground Floor, Main Building G41-FP3 4 Nov 13

Fire proofing - grey

Fire proofing samples taken in SPG514-BH.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Ground Floor, Main Building G42-PR16 4 Nov 13

Pipe run insulation – woven paper (purple) with aluminum backing over mineral wool insulation.

Pipe run insulation samples taken M-R-1.

The samples were shown to contain asbestos in the sealant.

☒ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Ground Floor, Main Building G43-PR17 4 Nov 13

Homogeneous Area Description Pipe run insulation – woven paper (orange) with aluminum backing over mineral wool insulation.

Pipe run insulation samples taken in M-R-1.

☐ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Ground Floor, Main Building G44-FT3 4 Nov 13

Floor tile – flooring compound and adhesive from research elevator floor

Flooring samples taken from Research elevator floor.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

2nd Floor, Main Building 266-PR26 19 Nov 13

Pipe run insulation – woven paper (purple) with aluminum backing

Pipe run insulation samples taken in SP2319-BH.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

2nd Floor, Main Building 267-PR27 19 Nov 13

Pipe run insulation – woven paper (orange) with aluminum backing

Pipe run insulation samples taken in SP2319-BH.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

2nd Floor, Main Building 268-RI1 19 Nov 13

Roof Insulation – insulation between 2 metal layers making up the roof

Roof insulation samples taken in SP2319-BH.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

2nd Floor, Main Building 269-PR28 19 Nov 13

Pipe run insulation – woven paper (purple) with aluminum backing

Pipe run insulation samples taken in SP2332-BH.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

2nd Floor, Main Building 270-PR29 19 Nov 13

Pipe run insulation – hard plaster (orange) over mineral wool insulation

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

2nd Floor, Main Building 271-PR30 19 Nov 13

Pipe run insulation – woven paper (white) over aluminum backing over mineral wool insulation.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

2nd Floor, Main Building 272-FP9 19 Nov 13

Fire proofing – white/light grey

Fire proofing samples taken in SP2332-BH.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

5th Floor, Main Building 560-CT1 7 Nov 13

Ceiling tile – ceiling tile and mastic

Ceiling tile samples taken in 5403-BH.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

5th Floor, Main Building 561-FP6 7 Nov 13

Fire proofing - white

Fire proofing samples taken in 5D103.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

5th Floor, Main Building 562-FP7 7 Nov 13

Fire proofing – light grey

Fire proofing samples taken in 5D104.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

5th Floor, Main Building 563-FP8 7 Nov 13

Fire proofing – dark grey

Fire proofing samples taken in 5D107.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

5th Floor, Main Building 564-VJ2 7 Nov 13

Vibration joint

Vibration joint sample taken in 5D107.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

5th Floor, Main Building 565-FT8 7 Nov 13

Floor tile – 12” x 12” floor tile with black mastic – 5th floor chase next to service elevator

Floor tile sample was taken in 5th floor chase next to service elevator.

The samples were shown to contain asbestos in the floor tile and adhesive.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☒ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

9th Floor, Main Building 952-FP5 7 Nov 13

Fire proofing samples were taken in 9th floor patient care service main office mechanical room

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

9th Floor, Main Building 953-PR23 7 Nov 13

Pipe run insulation – woven paper over aluminum backed tape over mineral wool insulation

Pipe run insulation samples were taken from 9th floor chase access next to service elevator

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

9th Floor, Main Building 954-PR24 7 Nov 13

Pipe run insulation – cloth fabric over mineral wool insulation

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

9th Floor, Main Building 955-PR25 7 Nov 13

Pipe run insulation – woven fabric over mineral wool insulation

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

9th Floor, Main Building 956-FT5 7 Nov 13

Floor tile – 12” x 12” floor tile (two layers) and adhesive

Floor tile sample was taken on the 9th floor closet – 9209 – similar floor tile throughout 9th floor corridors

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

9th Floor, Main Building 957-FT6 7 Nov 13

Floor tile – 12” x 12” floor tile and adhesive

Floor tile sample was taken on the 9th floor electrical closet – 9207

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

9th Floor, Main Building 958-WM1 7 Nov 13

Wall mastic – 9th floor electrical closet

Wall mastic samples were taken in 9th floor electrical closet – 9207 – wall mastic is allegedly on every exterior wall throughout the VAMC

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☒ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

9th Floor, Main Building 959-FT7 7 Nov 13

Floor tile – 12” x 12” floor tile with black mastic over leveling compound

Floor tile sample was taken on the 9th floor electrical closet near door jamb – 9207

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

10th Floor, Main Building 1049-FT4 7 Nov 13

Floor tile – 12” x 12” brown floor tile with black mastic

Floor tile samples were taken in SP10THA-BH

The samples were shown to contain asbestos in the floor tile and mastic.

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☒ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

10th Floor, Main Building 1050-FP4 7 Nov 13

Fire proofing samples were taken in SP10THD-BH

No Photograph Available

Physical Assessment ☐ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

11th Floor, Main Building 1145-PR18 7 Nov 13

Pipe run insulation – woven paper (orange) with aluminum backing

Pipe run insulation samples were taken from 11th floor tank room

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

11th Floor, Main Building 1146-PR19 7 Nov 13

Pipe run insulation – painted cloth (yellow) over mineral wool insulation

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

11th Floor, Main Building 1147-PR20 7 Nov 13

Homogeneous Area Description Pipe run insulation – woven cloth (yellow) over two layers of aluminum backed tape over mineral wool insulation

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

11th Floor, Main Building 1148-PR21 7 Nov 13

Homogeneous Area Description Pipe run insulation – woven paper (purple) over aluminum backed tape over mineral wool insulation

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

11th Floor, Main Building 1151-PR22 7 Nov 13

Homogeneous Area Description Pipe run insulation – woven cloth (white) over cardboard over woven cloth over mineral wool insulation

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

BBIIRRMMIINNGGHHAAMM VVAAMMCC AASSBBEESSTTOOSS SSUURRVVEEYY RREEPPOORRTT

Fidelis Project No.: 2013-09-001 March 2014 Appendix G

Appendix G

Inspector Information

Birmingham VAMC – Asbestos Survey Report

Fidelis Project No.: 2013-09-001 March 2014

Inspector Contact Information

Berej Patel Fidelis, LLC 1608 13th Ave South Suite 225 Birmingham, AL 35205

(630) 853-5826 bpatel@fidelisusa.com

Dana Tilton Bhate Environmental Associates, Inc.

1608 13th Ave South Suite 300 Birmingham, AL 35205

(205) 918-4000 dtilton@bhate.com mailto:bpatel@fidelisusa.com mailto:dtilton@bhate.com

Fidelis - Birmingham VAMC Asbestos Survey Report
Appendix E - Laboratory Results and Chains of Custody
Fidelis - Birmingham VAMC Asbesetos Survey Report - Chain of Custody
Appendix F - Homogeneous Areas Sampled during the 2013 Sampling Event
Sub-Basement, Main Building
Basement, Main Building
Ground Floor, Main Building
2nd Floor, Main Building
5th Floor, Main Building
9th Floor, Main Building
10th Floor, Main Building
11th Floor, Main Building