36C24718B0636 0005 Final Asbestos Survey_Part2.pdf

View the file

Other files for this federal contract opportunity

Other files attached to #521-16-101 Replace Pressure Piping and Hot Water Distribution System, newest first.
File Type Posted
36C24718B0636-0008001.pdf PDF
36C24718B0636-0008000.docx DOCX document
36C24718B0636-0007001.pdf PDF
36C24718B0636-0007000.docx DOCX document
36C24718B0636-0006002.pdf PDF
36C24718B0636-0006001.pdf PDF
36C24718B0636-0006000.docx DOCX document
36C24718B0636-0006003.pdf PDF
36C24718B0636-0005017.pdf PDF
36C24718B0636-0005016.docx DOCX document
36C24718B0636-0005018.pdf PDF
36C24718B0636-0004003.pdf PDF
36C24718B0636-0004000.docx DOCX document
36C24718B0636-0004005.pdf PDF
36C24718B0636-0004002.pdf PDF
36C24718B0636-0004001.pdf PDF
36C24718B0636-0004004.pdf PDF
36C24718B0636-0003003.pdf PDF
36C24718B0636-0003006.pdf PDF
36C24718B0636-0003000.docx DOCX document
36C24718B0636-0003002.pdf PDF
36C24718B0636-0003004.pdf PDF
36C24718B0636-0003001.pdf PDF
36C24718B0636-0003005.pdf PDF
36C24718B0636-0002003.pdf PDF
36C24718B0636-0002000.docx DOCX document
36C24718B0636-0002001.pdf PDF
36C24718B0636-0002004.pdf PDF
36C24718B0636-0002005.pdf PDF
36C24718B0636-0002006.pdf PDF
36C24718B0636-0002002.pdf PDF
36C24718B0636-0001002.pdf PDF
36C24718B0636-0001000.docx DOCX document
36C24718B0636-0001001.pdf PDF
36C24718B0636-001.docx DOCX document
36C24718B0636-000.docx DOCX document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VAMC – Birmingham 700 South 19th Street Asbestos-Re-Inspection Evaluation

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

5th Floor, Research Building R5-03 6 Feb 14

Homogeneous Area Description TSI behind access panel

Inspector Comments TSI behind locked access panel in 5th floor Research corridor. Assumed positive from previous reports.

Recommended Response Action In good condition

Physical Assessment ☒ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage ☐ 7. Any remaining friable ACBM ☐ 8. No asbestos detected.

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

5th Floor, Research Building R5-04 6 Feb 14

Lab hood in SP5719

Lab hood in SP5719 assumed positive from previous reports

☐ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☒ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

5th Floor, Research Building R5-05 6 Feb 14

Transite pipes (cut and capped) from Lab hood in SP5719

Transite pipes (cut and capped) from Lab hood in SP5719 assumed positive from previous reports

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☒ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

5th Floor, Research Building R5-06 6 Feb 14

TSI on large vertical pipe in room 5716

TSI is on large vertical pipe in room 5716 assumed positive from previous report. Approx. 50 LF

☒ 1. Damaged or significantly damaged thermal system insulation (TSI) ACM ☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☐ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

5th Floor, Research Building R5-07 6 Feb 14

Transite Wall Panels – contains more than 50% Chrysotile Asbestos

Transite wall panels on the exterior of Research wing on all levels – approximately 4,000 SF

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☒ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

Assessed by: Berej Patel / Dana Tilton

Sample Location: Homogeneous Area ID: Date:

Research Building - Roof RR-01 6 Feb 14

Transite Pipe (cut and capped) on roof of Research wing

Transite pipes (cut and capped) on roof of Research wing – visual inspection, in good condition

☐ 2. Damaged friable surfacing ACM ☐ 3. Significantly damaged friable surfacing ACM ☐ 4. Damaged or significantly damaged friable miscellaneous ACM ☒ 5. ACBM with potential for damage ☐ 6. ACBM with potential for significant damage

BBIIRRMMIINNGGHHAAMM VVAAMMCC AASSBBEESSTTOOSS SSUURRVVEEYY RREEPPOORRTT

Fidelis Project No.: 2013-09-001 March 2014 Appendix B

Appendix B Drawings

BBIIRRMMIINNGGHHAAMM VVAAMMCC AASSBBEESSTTOOSS SSUURRVVEEYY RREEPPOORRTT

Fidelis Project No.: 2013-09-001 March 2014 Appendix C

Appendix C Photographs

SB1-CH1-1 – Sub-basement Northwest corner – Chiller line insulation sample

SB1-CH1-2 – Sub-basement northwest corner – chiller line insulation sample

SB1-CH1-3 – Sub-basement northwest corner – chiller line insulation sample

SB2-CH2 – Sub-basement northwest corner – chiller line insulation samples

SB2-CH2-1 – Sub-basement northwest corner – chiller line insulation sample

SB2-CH2-2 – Sub-basement northwest corner – chiller line insulation sample

SB2-CH2-3 – Sub-basement northwest corner – chiller line insulation sample

SB3-CH2E – Sub-basement northwest corner – chiller line elbow insulation sample

SB3-CH2E-2 – Sub-basement northwest corner – chiller line elbow insulation sample

SB3-CH2E-3 – Sub-basement northwest corner – chiller line elbow insulation sample

SB3-CH2E-1 – Sub-basement northwest corner – chiller line elbow insulation sample

SB4-LD1 – Sub-basement northwest corner – large duct insulation sample

SB4-LD1-1 – Sub-basement northwest corner – large duct insulation sample

SB4-LD1-2 – Sub-basement northwest corner – large duct insulation sample

SB4-LD1-3 – Sub-basement northwest corner – large duct insulation sample

SB5-CH1R-1 – Sub-basement northwest corner – chiller line return pipe insulation sample

SB5-CH1R-2 – Sub-basement northwest corner – chiller line return pipe insulation sample

SB5-CH1R-3 – Sub-basement northwest corner – chiller line return pipe insulation sample

SB6-FP1-1 – Sub-basement raised electrical room in northwest section of sub-basement – fire proofing sample

SB6-FP1-2 – Sub-basement raised electrical room in northwest section of sub-basement – fire proofing

SB6-FP1-3 – Sub-basement raised electrical room in northwest section of sub-basement – fire proofing

SB6-FP1-4 – Sub-basement raised electrical room in northwest section of sub-basement – fire proofing

SB6-FP1-5 – Sub-basement raised electrical room in northwest section of sub-basement – fire proofing

SB6-FP1-6 – Sub-basement from under raised electrical room in northwest section of sub-basement – fire proofing sample

SB6-FP1-1 – Sub-basement from under raised electrical room in northwest section of sub-basement – fire proofing sample

Sub-basement – northwest corner looking southeast

Northern section of sub-basement looking towards the northwest corner of the sub-basement

SB7-PE1-1 – Sub-basement northern section of sub-basement – pipe elbow sample taken from pipe suspended from ceiling

Sub-basement northern section catwalk

SB8-PE2-1 – Sub-basement northern section catwalk – pipe elbow sample

SB8-PE2-2 – Sub-basement northern section catwalk – pipe elbow sample

SB8-PE2-3 – Sub-basement northern section catwalk – pipe elbow sample

SB9-CHP1-1 – Sub-basement northern section catwalk – plaster patch on chiller line

Dry wall from northern section of sub-basement under the raised electrical room

SB10-DW1-1 – Sub-basement northern section of sub-basement under raised electrical room – dry wall

SB10-DW1-2 – Sub-basement northern section of sub-basement under raised electrical room – dry wall

SB10-DW1-3 – Sub-basement northern section of sub-basement under raised electrical room – dry wall

Southwest corner of sub-basement

Southwest corner of the sub-basement

2SB11-PE3-1 – Sub-basement southwest corner of sub-basement – pipe elbow insulation sample

2SB11-PE3-2 – Sub-basement southwest corner of sub-basement – pipe elbow insulation sample

2SB11-PE3-3 – Sub-basement southwest corner of sub-basement – pipe elbow insulation sample

2SB12-PJ1-1 – Sub-basement in southwest corner of sub-basement – pipe joint sample

2SB12-PJ1-2 – Sub-basement in southwest corner of sub-basement – pipe joint sample

2SB12-PJ1-3 – Sub-basement in southwest corner of sub-basement – pipe joint sample

2SB13-PR1 – Sub-basement southwest section of sub-basement – pipe run sample location

2SB13-PR1-1 – Sub-basement southwest section of sub-basement – pipe run insulation sample

2SB13-PR1-2 – Sub-basement southwest section of sub-basement – pipe run insulation sample

2SB14-PR2-1 – Sub-basement southwest section of sub-basement – pipe run insulation sample

2SB15-PJ2 – Sub-basement southwest section of sub-basement – pipe joint sample location

2SB15-PJ2-1 – Sub-basement southwest section of sub-basement – pipe joint insulation sample

2SB15-PJ2-2 – Sub-basement southwest section of sub-basement – pipe joint insulation sample

2SB15-PJ2-3 – Sub-basement southwest section of sub-basement – pipe joint insulation sample

2SB16-PE4 – Sub-basement southeast section of sub-basement – pipe elbow sample location

2SB16-PE4-1 – Sub-basement southeast section of sub-basement – pipe elbow insulation sample

2SB16-PE4-2 – Sub-basement southeast section of sub-basement – pipe elbow insulation sample

2SB17-PE5-1 – Sub-basement in southeast section of sub-basement – pipe elbow insulation sample –

CONTAINS ASBESTOS

2SB18-PR3-2 – Sub-basement southern section of sub-basement – pipe run sample location

2SB18-PR3-1 – Sub-basement southern section of sub-basement – pipe run insulation sample

2SB18-PR3-2 – Sub-basement southern section of sub-basement – pipe run insulation sample

2SB19-PE6-1 – Sub-basement southern section of sub-basement – pipe elbow insulation sample

2SB19-PE6-2 – Sub-basement southern section of sub-basement – pipe elbow insulation sample

2SB20-PR4-1 – Sub-basement southern section of sub-basement on catwalk – pipe run insulation sample

2SB20-PR4-3 – Sub-basement southern section of sub-basement on catwalk – pipe run insulation sample

2SB21-PR5-1 – Sub-basement southern section of sub-basement on catwalk – pipe run insulation sample

2SB21-PR5-1 – Sub-basement southern section of sub-basement on catwalk – pipe run insulation sample

2SB22-DM1 – Sub-basement southern section near corridor leading to northern section of sub-basement – duct mastic sample location

2SB22-DM1-1 – Sub-basement southern section near corridor leading to northern section of sub-basement – duct mastic sample

2SB22-DM1-2 – Sub-basement southern section near corridor leading to northern section of sub-basement – duct mastic sample

Basement closet B-17A-W next to incinerator room

Basement closet next to band of 4 elevators – black mastic under 12” x 12” floor tile – assumed to contain asbestos

Basement closet – floor tiles sample location – SPB103A-BH – CONTAINS ASBESTOS

B23-FT1-1 – Basement closet – SPB103A-BH – Floor tile sample – CONTAINS ASBESTOS

B23-FT1-2 – Basement closet – SPB103A-BH – Floor tile sample – CONTAINS ASBESTOS

B24-DI2 – Basement mechanical room B103E – Duct insulation sample location

B24-DI2-1 – Basement mechanical room B103E – Duct insulation sample

B24-DI2-2 – Basement mechanical room B103E – Duct insulation sample

B25-DI3-1 – Basement mechanical room B103E – Duct insulation sample

B25-DI3-2 – Basement mechanical room B103E – Duct insulation sample

B25-DI3-3 – Basement mechanical room B103E – Duct insulation sample

B26-PR6 – Basement mechanical room B103E – pipe run insulation sample location

B26-PR6-1 – Basement mechanical room B103E – pipe run insulation sample

B26-PR6-2 – Basement mechanical room B103E – pipe run insulation sample

B26-PR6-3 – Basement mechanical room B103E – pipe run insulation sample

B27-VJ – Basement mechanical room B103E – vibration joint sample location

B27-VJ1 – Basement mechanical room B103E – vibration joint sample

Basement incinerator room

B28-CP1 – Basement incinerator room – ceiling paint sample location

B28-CP1 – Basement incinerator room – ceiling paint sample location

B28-CP1 – Basement incinerator room – ceiling paint sample

B29-PC1 – Basement incinerator room – pipe cloth insulation sample location

B29-PC1 – Basement incinerator room – pipe cloth insulation

B30-PR7 – Basement incinerator room – pipe run insulation sample location

B30-PR7 – Basement incinerator room – pipe run insulation sample

Basement mechanical room – SPB100C-BH

B31-PR8 – Basement mechanical room – SPB100C-BH – pipe run insulation sample

B32-PR9 – Basement mechanical room – SPB100C-BH – pipe run insulation sample

B33-PR10 – Basement mechanical room – SPB100C-BH – pipe run insulation sample

Basement crawlspace – 1 – no samples taken – similar TSI sampled elsewhere in basement or sub-basement

Basement crawlspace – 2 – no samples taken – similar TSI sampled elsewhere in basement or sub-

Basement crawlspace – 3 – no samples taken – similar TSI sampled elsewhere in basement or sub-

Basement crawlspace – 4 – no samples taken – similar TSI sampled elsewhere in basement or sub-

Basement crawlspace – 5 – no samples taken – similar TSI sampled elsewhere in basement or sub-

Basement crawlspace – 6 – no samples taken – similar TSI sampled elsewhere in basement or sub-

Basement crawlspace – 7 – no samples taken – similar TSI sampled elsewhere in basement or sub-

Basement crawlspace – 8 – no samples taken – similar TSI sampled elsewhere in basement or sub-

Basement crawlspace – 9 – no samples taken – similar TSI sampled elsewhere in basement or sub-

Basement crawlspace – 10 – no samples taken – similar TSI sampled elsewhere in basement or sub-

Basement crawlspace – 11 – no samples taken – similar TSI sampled elsewhere in basement or sub-

Basement crawlspace – 12 – no samples taken – similar TSI sampled elsewhere in basement or sub-

Basement closet above drop ceiling – piping – no samples collected

Basement closet above drop ceiling – piping – no samples collected

Basement flooring layers

Basement floor tile layers

Basement - morgue

G34-PR11-1 – Ground Floor corridor outside of SPG415-BH – pipe run insulation sample – pipe

G34-PR11-2 – Ground Floor corridor outside of SPG415-BH – pipe run insulation sample – pipe

G34-PR11-3 – Ground Floor corridor outside of SPG415-BH – pipe run insulation sample – pipe

G35-PR12-1 – Ground Floor corridor outside of SPG415-BH – pipe run insulation sample – pipe

G35-PR12-2 – Ground Floor corridor outside of SPG415-BH – pipe run insulation sample – pipe

G35-PR12-3 – Ground Floor corridor outside of SPG415-BH – pipe run insulation sample – pipe

G36-FP2 – Ground floor mechanical room SPG415-BH – fire proofing sample – CONTAINS ASBESTOS

G37-PJ3-1 – Ground floor mechanical room SPGD120-BH – pipe joint insulation sample

G37-PJ3-2 – Ground floor mechanical room SPGD120-BH – pipe joint insulation sample

G37-PJ3-3 – Ground floor mechanical room SPGD120-BH – pipe joint insulation sample

G38-PR13-1 – Ground floor mechanical space SPG509-BH – pipe run insulation sample

G38-PR13-2 – Ground floor mechanical space SPG509-BH – pipe run insulation sample

G38-PR13-3 – Ground floor mechanical space SPG509-BH – pipe run insulation sample

G39-PR14-1 – Ground floor mechanical space SPG509-BH – pipe run insulation sample

G39-PR14-2 – Ground floor mechanical space SPG509-BH – pipe run insulation sample

G39-PR14-3 – Ground floor mechanical space SPG509-BH – pipe run insulation sample

G40-PR15 – Ground floor mechanical space SPG509-BH – pipe run insulation sample

G41-FP3 – Ground floor mechanical space SPG514-BH – fire proofing samples

Ground floor mechanical space under Research – M-R-1

G42-PR16-1 – Ground floor mechanical space under Research M-R-1 – pipe run insulation – CONTAINS

ASBESTOS

G42-PR16-2 – Ground floor mechanical space under Research M-R-1 – pipe run insulation – CONTAINS

G42-PR16-3 – Ground floor mechanical space under Research M-R-1 – pipe run insulation – CONTAINS

G43-PR17-1 – Ground floor mechanical space under Research M-R-1 – pipe run insulation

G43-PR17-2 – Ground floor mechanical space under Research M-R-1 – pipe run insulation

G44-FT3 – Flooring sample taken from elevator within Research

266-PR26-1 – 2nd floor mechanical room SP2319-BH – pipe run insulation sample

266-PR26-2 – 2nd floor mechanical room SP2319-BH – pipe run insulation sample

Fidelis - Birmingham VAMC Asbestos Survey Report
Appendix B - Drawings
Figure 1 - Sub-basement
Figure 2 - Basement
Figure 3 - Ground Floor
Figure 4 - 1st Floor
Figure 5 - 2nd Floor
Figure 6 - 3rd Floor
Figure 7 - 4th Floor
Figure 8 - 5th Floor
Figure 9 - 6th Floor
Figure 10 - 7th Floor
Figure 11 - 8th Floor
Figure 12 - 9th Floor
Figure 13 - 10th Floor
Figure 14 - 11th Floor
Appendix C - Photographs
Sub-Basement Photographs
Basement Photographs
Ground Floor Photographs
2nd Floor Photographs