About this file

36C24718B0636 0006 Final Asbestos Survey_Part5.pdf

View the file

Other files for this federal contract opportunity

Other files attached to #521-16-101 Replace Pressure Piping and Hot Water Distribution System, newest first.
File Type Posted
36C24718B0636-0008001.pdf PDF
36C24718B0636-0008000.docx DOCX document
36C24718B0636-0007001.pdf PDF
36C24718B0636-0007000.docx DOCX document
36C24718B0636-0006001.pdf PDF
36C24718B0636-0006000.docx DOCX document
36C24718B0636-0006002.pdf PDF
36C24718B0636-0005018.pdf PDF
36C24718B0636-0005019.pdf PDF
36C24718B0636-0005017.pdf PDF
36C24718B0636-0005016.docx DOCX document
36C24718B0636-0004000.docx DOCX document
36C24718B0636-0004005.pdf PDF
36C24718B0636-0004003.pdf PDF
36C24718B0636-0004002.pdf PDF
36C24718B0636-0004001.pdf PDF
36C24718B0636-0004004.pdf PDF
36C24718B0636-0003000.docx DOCX document
36C24718B0636-0003002.pdf PDF
36C24718B0636-0003004.pdf PDF
36C24718B0636-0003005.pdf PDF
36C24718B0636-0003003.pdf PDF
36C24718B0636-0003006.pdf PDF
36C24718B0636-0003001.pdf PDF
36C24718B0636-0002004.pdf PDF
36C24718B0636-0002005.pdf PDF
36C24718B0636-0002006.pdf PDF
36C24718B0636-0002002.pdf PDF
36C24718B0636-0002003.pdf PDF
36C24718B0636-0002000.docx DOCX document
36C24718B0636-0002001.pdf PDF
36C24718B0636-0001002.pdf PDF
36C24718B0636-0001000.docx DOCX document
36C24718B0636-0001001.pdf PDF
36C24718B0636-001.docx DOCX document
36C24718B0636-000.docx DOCX document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BBIIRRMMIINNGGHHAAMM VVAAMMCC AASSBBEESSTTOOSS SSUURRVVEEYY RREEPPOORRTT

Fidelis Project No.: 2013-09-001 March 2014 Appendix H

Appendix H

Hazard Analysis and Abatement Estimates

VAMC – Birmingham 700 South 19th Street Risk Evaluation and Estimated Abatement Cost

Assessed by: Berej Patel / Dana Tilton

Fidelis used the following decision tree to classify the Hazard Potential of each of the identified positive homogeneous areas that remain at the VA Medical Center.

Assessed by: Berej Patel / Dana Tilton

Below is a table of positive homogeneous areas and their associated hazard potential.

Additionally, the abatement estimates for each area is included in the table.

Homogeneous Area

Condition of Material

Disturbance Potential

Hazard Ranking

Removal Priority

Estimated Abatement

Cost Sub-Basement

2SB17-PE5 Poor Low 7 1 $45.00 Basement

B23-FT1 Fair Low 4 $30.00 Ground Floor

G36-FP2 Fair Low 4 $5,600.00 G42-PR16 Poor Low 7 1 $2,700.00 G-01 Fair Low 4 4 $50.00 G-02 Good Low 1 7 $4.00/sq ft G-03 Good Low 1 7 $30.00 G-04 Good Low 1 7 $600.00 each

1st Floor 1-01 Fair Low 4 4 $50.00 1-02 Good Low 1 7 $4.00/sq ft 1-03 Good Low 1 7 $1,080.00 1-04 Good Low 1 7 $600.00 each

2nd Floor 2-01 Fair Low 4 4 $50.00 2-02 Good Low 1 7 $4.00/sq ft 2-03 Poor Low 7 1 $450.00 2-04 Good Low 1 7 $1,540.00 2-05 Good Low 1 7 $600.00 each 2-06 Good Low 1 7 $500.00

3rd Floor 3-01 Fair Low 4 4 $50.00 3-02 Good Low 1 7 $4.00/sq ft 3-03 Poor Low 7 1 $450.00 3-04 Good Low 1 7 $700.00 3-05 Good Low 1 7 $500.00 3-06 Good Low 1 7 $500.00 3-07 Good Low 1 7 $600.00 each 3-08 Good Low 1 7 $55.00

4th Floor 4-01 Fair Low 4 4 $50.00 4-02 Good Low 1 7 $4.00/sq ft 4-03 Good Low 1 7 $50.00

Assessed by: Berej Patel / Dana Tilton

Homogeneous Area

Condition of Material

Disturbance Potential

Hazard Ranking

Removal Priority

Estimated Abatement

Cost 4-04 Fair Low 4 4 $12.00 4-05 Poor Low 7 1 $450.00 4-06 Good Low 1 7 $600.00 each

5th Floor 565-FT8 Fair Low 4 4 $20.00 5-01 Fair Low 4 4 $50.00 5-02 Good Low 1 7 $4.00/sq ft 5-03 Good Low 1 7 $600.00 each

6th Floor 6-01 Fair Low 4 4 $50.00 6-02 Good Low 1 7 $4.00/sq ft 6-03 Good Low 1 7 $600.00 each

7th Floor 7-01 Fair Low 4 4 $50.00 7-02 Good Low 7 1 $30.00 7-03 Good Low 1 7 $4.00/sq ft 7-04 Good Low 1 7 $600.00 each

8th Floor 8-01 Fair Low 4 4 $50.00 8-02 Good Low 1 7 $4.00/sq ft 8-03 Good Low 1 7 $360.00 8-04 Good Low 1 7 $600.00 each 8-05 Good Low 1 7 $2.00/sq ft

9th Floor 958-WM1 Good Low 1 7 $4.00/sq ft 9-02 Fair Low 4 4 $50.00 9-03 Fair Low 4 4 $30.00 9-04 Good Low 1 7 $2.00/sq ft 9-01 Good Low 1 7 $45.00/panel 9-05 Good Low 1 7 $600.00 each

10th Floor 1049-FT4 Fair Low 4 4 $30.00

Z Wing 1st Floor Z1-01 Good Low 1 7 $1,500.00

Z Wing 2nd Floor Z2-01 Good Low 1 7 $1,500.00 Z202 Good Moderate 2 6 $600.00

Z Wing 6th Floor Z6-01 Good High 3 5 $2.00/sq ft

Assessed by: Berej Patel / Dana Tilton

Homogeneous Area

Condition of Material

Disturbance Potential

Hazard Ranking

Removal Priority

Estimated Abatement

Cost Research 2nd Floor

R2-01 Good Low 1 7 $45.00/panel R2-02 Good Moderate 2 6 $100.00 R2-03 Fair Low 4 4 $9.00/ ln ft R2-04 Good Low 1 7 $50.00 R2-05 Good Low 1 7 $315.00 R2-06 Poor Low 7 1 $30.00 R2-07 Good Low 1 7 $12,000*

Research 3rd Floor R3-01 Good Low 1 7 $45.00/panel R3-02 Good Moderate 2 6 $100.00 R3-03 Fair Low 4 4 $9.00/ ln ft R3-04 Good Low 1 7 $450.00 R3-05 Good Low 1 7 $12,000*

Research 4th Floor R4-01 Good Moderate 2 6 $30.00 R4-02 Good Low 1 7 $45.00/panel R4-03 Good Moderate 2 6 $100.00 R4-04 Fair Low 4 4 $9.00/ ln ft R4-05 Good Low 1 7 $450.00 R4-06 Good Low 1 7 $12,000*

Research 5th Floor R5-01 Good Low 1 7 $45.00/panel R5-02 Good Moderate 2 6 $100.00 R5-03 Fair Low 4 4 $9.00/ ln ft R5-04 Good Low 1 7 $500.00 R5-05 Good Low 1 7 $500.00 R5-06 Good Low 1 7 $450.00 R5-07 Good Low 1 7 $12,000*

Research Roof RR-01 Good Low 1 7 $500.00 *Estimate includes all floors

BBIIRRMMIINNGGHHAAMM VVAAMMCC AASSBBEESSTTOOSS SSUURRVVEEYY RREEPPOORRTT

Fidelis Project No.: 2013-09-001 March 2014 Appendix I

Appendix I Regulations

Asbestos in Construction Standard

29 CFR §1926.1101

General Industry Standard for Asbestos

29 CFR §1910.1001

Fidelis - Birmingham VAMC Asbestos Survey Report
Appendix H - Hazard Analysis and Abatement Estimates
Appendix I - Regulations
Asbestos in Construction Standard
General Industry Standard for Asbestos