36C24718B0635-0010009.pdf

PDF 14 MB Posted

Attached to
Replace/Upgrade Electrical Switchgear Phase 3 Federal contract opportunity
Solicitation number
36C24718B0635
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7

About this file

36C24718B0635 0010 MEP Files Combined.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace/Upgrade Electrical Switchgear Phase 3, newest first.
File Type Posted
36C24718B0635-0011001.pdf PDF
36C24718B0635-0011000.docx DOCX document
36C24718B0635-0010006.docx DOCX document
36C24718B0635-0010008.pdf PDF
36C24718B0635-0010007.pdf PDF
36C24718B0635-0009000.docx DOCX document
36C24718B0635-0009001.pdf PDF
36C24718B0635-0009002.pdf PDF
36C24718B0635-0008000.docx DOCX document
36C24718B0635-0007000.docx DOCX document
36C24718B0635-0007001.pdf PDF
36C24718B0635-0007002.pdf PDF
36C24718B0635-0007003.pdf PDF
36C24718B0635-0006001.pdf PDF
36C24718B0635-0006000.docx DOCX document
36C24718B0635-0006002.pdf PDF
36C24718B0635-0005000.docx DOCX document
36C24718B0635-0005001.pdf PDF
36C24718B0635-0004002.pdf PDF
36C24718B0635-0004001.pdf PDF
36C24718B0635-0004000.docx DOCX document
36C24718B0635-0002001.pdf PDF
36C24718B0635-0002000.docx DOCX document
36C24718B0635-0002002.pdf PDF
36C24718B0635-0002003.pdf PDF
36C24718B0635-0001007.pdf PDF
36C24718B0635-0001008.pdf PDF
36C24718B0635-0001006.docx DOCX document
36C24718B0635-001.docx DOCX document
36C24718B0635-000.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

LEGEND, SCHEDULES,

AND DETAILS

E101

RBP EGL

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

MEDIUM VOLTAGE SYSTEM

ONE-LINE DIAGRAM

DEMOLITION AND NEW WORK

E102

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

MCC N5D

WORK PLAN

E204

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

MCC Q5D

WORK PLAN

E205

VARIOUS PUMPS

AND EQUIPMENT

AREA

CHILLER

CHILLER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

MCC-QSBD

WORK PLAN

E206

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

T-1A & T-1N

TRANSFORMER WORK PLAN

E207

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

T-4A & T-4N

TRANSFORMER WORK PLAN

E208

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

T-3A, T-3N, T-5A & T-5N

TRANSFORMER WORK PLAN

E209

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

T-2A & T-2N

TRANSFORMER WORK PLAN

E210

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

NEW GENERATOR

WORK PLAN - 2ND FLOOR

E212

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

MEDIUM VOLTAGE CABLE

ROUTING COMPOSITE PLAN

E213

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

MCC-QOH

WORK PLAN

E214

EXIT

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

FUEL OIL PIPING FOR

NEW GENERATOR

F101

RWC WHP/PW

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

LEGEND AND GENERAL NOTES

PM001

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

PARTIAL FIRST AND SECOND

FLOOR PLUMBING AND

MECHANICAL PLANS

PM101

CTH DB

6948 E101 LEGEND, SCHEDULES, AND DETAILS
6948 E101 LEGEND, SCHEDULES, AND DETAILS
Layout
6948 E102 MEDIUM VOLTAGE SYSTEM ONE-LINE DIAGRAM - DEMOLITION AND NEW WORK
6948 E102 MEDIUM VOLTAGE SYSTEM ONE-LINE DIAGRAM - DEMOLITION AND NEW WORK
Layout
6948 E201 MCC-NSBD WORK PLAN
6948 E202 MCC-NSDB2 WORK PLAN
6948 E203 MCC-NSBDA WORK PLAN
6948 E204 MCC-N5D WORK PLAN
6948 E204 MCC-N5D WORK PLAN
Layout
6948 E205 MCC-Q5D WORK PLAN
6948 E205 MCC-Q5D WORK PLAN
Layout
6948 E206 MCC-QSBD WORK PLAN
6948 E206 MCC-QSBD WORK PLAN
Layout
6948 E207 T-1A & T-1N TRANSFORMER WORK PLAN
6948 E207 T-1A & T-1N TRANSFORMER WORK PLAN
Layout
6948 E208 T-4A & T-4N TRANSFORMER WORK PLAN
6948 E208 T-4A & T-4N TRANSFORMER WORK PLAN
Layout
6948 E209 T-3A, T-3N, T-5A & T-5N TRANSFORMER WORK PLAN
6948 E209 T-3A, T-3N, T-5A & T-5N TRANSFORMER WORK PLAN
Layout
6948 E210 T-2A & T-2N TRANSFORMER WORK PLAN
6948 E210 T-2A & T-2N TRANSFORMER WORK PLAN
Layout
6948 E211 EXISTING GENERATOR AND SWB WORK PLAN
6948 E212 NEW GENERATOR WORK PLAN
6948 E212 NEW GENERATOR WORK PLAN
Layout
6948 E213 MV CABLE ROUTING PLAN
6948 E213 MV CABLE ROUTING PLAN
Layout
6948 E214 MCC-QOH WORK PLAN
6948 E214 MCC-QOH WORK PLAN
Layout(1)
6948 F101FUEL OIL PIPING
6948 F101FUEL OIL PIPING
Layout
6948 PM001 LEGEND AND GENERAL NOTES
6948 PM001 LEGEND AND GENERAL NOTES
Layout(1)
6948 PM101 MECHANICAL 1ST FLOOR
6948 PM101 MECHANICAL 1ST FLOOR
Layout

File details come from the government source that posted it.