36C24718B0635-0005001.pdf

PDF 388 KB Posted

Attached to
Replace/Upgrade Electrical Switchgear Phase 3 Federal contract opportunity
Solicitation number
36C24718B0635
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7

About this file

36C24718B0635 0005 6948 E214 MCC-QOH WORK PLAN.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace/Upgrade Electrical Switchgear Phase 3, newest first.
File Type Posted
36C24718B0635-0011001.pdf PDF
36C24718B0635-0011000.docx DOCX document
36C24718B0635-0010006.docx DOCX document
36C24718B0635-0010009.pdf PDF
36C24718B0635-0010008.pdf PDF
36C24718B0635-0010007.pdf PDF
36C24718B0635-0009000.docx DOCX document
36C24718B0635-0009001.pdf PDF
36C24718B0635-0009002.pdf PDF
36C24718B0635-0008000.docx DOCX document
36C24718B0635-0007000.docx DOCX document
36C24718B0635-0007001.pdf PDF
36C24718B0635-0007002.pdf PDF
36C24718B0635-0007003.pdf PDF
36C24718B0635-0006001.pdf PDF
36C24718B0635-0006000.docx DOCX document
36C24718B0635-0006002.pdf PDF
36C24718B0635-0005000.docx DOCX document
36C24718B0635-0004002.pdf PDF
36C24718B0635-0004001.pdf PDF
36C24718B0635-0004000.docx DOCX document
36C24718B0635-0002001.pdf PDF
36C24718B0635-0002000.docx DOCX document
36C24718B0635-0002002.pdf PDF
36C24718B0635-0002003.pdf PDF
36C24718B0635-0001007.pdf PDF
36C24718B0635-0001008.pdf PDF
36C24718B0635-0001006.docx DOCX document
36C24718B0635-001.docx DOCX document
36C24718B0635-000.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FOR CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPLACE / UPGRADE

ELECTRICAL SWITCHGEAR

PHASE 3

BIRMINGHAM, AL

521-16-103

N/A

Project Director

02-09-18Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

MCC-QOH

WORK PLAN

E214

RBP EGL

6948 E214 MCC-QOH WORK PLAN
Layout(1)

File details come from the government source that posted it.