36C24718B0635-0007002.pdf
PDF 145 KB Posted
- Attached to
- Replace/Upgrade Electrical Switchgear Phase 3 Federal contract opportunity
- Solicitation number
- 36C24718B0635
About this file
36C24718B0635 0007 RFI Response 36C24718B0635.pdf
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Bid Item #2 (Alternate Bid Deducts), solicitation page #1, Questions.
a. Alternate #1 – Delete all work associated with drawings E214.
i. There is no drawing E214. Please clarify what work should be deleted. Refer to Amendment 0005.
b. Alternate #3 – Delete work associated with Demo and New work for Transformers (T-5A and T-5N Only) on drawing E214. Refer to Amendment 0005.
i. There is no drawing E214 and if there was, all work on this drawing was to be deleted on Alternate #1. T-5A and T-5N are shown on drawing E-209. Please clarify what work should be deleted in alternate #3. Refer to Amendment 0005.
2. Is lightning protection or grounding required for the new generator or any of the items on the roof? Should be included with Generator Manufacturer Enclosure.
3. Can the prevailing wage rate be posted for the project? See the attached wage rates
4. Can the existing manufacturer information be provided for each of the existing busway between the MV transformers and the subs? No. Intent of the site visit was for information gathering as required.
a. MV T-5N to Sub 5N MB
b. MV T-3N to Sub 3N MB
c. MV T-4N to Sub 4N MB
d. MV T-1N to Sub 1N MB
e. MV T-2N to Sub 2N MB
f. MV T-2A to Sub 5A MB
g. MV T-1A to Sub 3A MB
h. MV T-4A to Sub 4A MB
i. MV T-3A to Sub 3A MB
j. MV T-5A to Sub 5A MB
File details come from the government source that posted it.