This is an Amendment to Solicitation No. 36C24626B0009 for roof repair services at the Hampton VA Medical Center in Hampton, Virginia. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 issued this amendment on January 22, 2026, to extend the proposal due date to January 28, 2026, at 4:00 PM EST and announce the bid opening via Microsoft Teams on January 29, 2026, at 10:00 AM EST. The amendment updates Block 11 of the solicitation to clarify performance requirements: the contractor must commence work within 10 calendar days after receiving notice to proceed and complete all roof repair work within 60 calendar days, with this timeline designated as mandatory. The project requires the contractor to furnish all labor, materials, travel, and equipment to repair the flat roof over the sunroom and office, complete second-floor cornice work, and address standing seam roofing areas of Building 114.

The amendment incorporates updated contracting clauses, including VAAR 852.243-70 (Construction Contract Changes-Supplement) which establishes procedures for change order requests and cost adjustments. For changes exceeding $500,000, contractors must submit itemized proposals within 15 calendar days of receiving a written change order. For changes of $500,000 or less, overhead and profit allowances are capped at 10 percent on the first $20,000, declining to 7.5 percent on the next $30,000, and 5 percent on amounts exceeding $50,000. The amendment references updated attachments including RFI responses (Attachment C) and a revised Statement of Work effective January 20, 2026 (Attachment E), addressing previously submitted questions and providing clarifications on project scope and requirements.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 01-22-2026

NA

36C246 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667

To all Offerors/Bidders

36C24626B0009 12-17-2025

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 01-28-2026 16:00 EST The purpose of this amendment is to provide responses to the submitted request for information (RFI) and provide updates. Make sure to read this amendment in its entirety.

See continuation page.

The proposal due date has been extended.

PROPOSAL DUE: 1600 EST, January 28, 2026

The bid opening will be conducted via Microsoft (MS) Teams at 1000 EST on January 29, 2026.

Gina Moriarty Contracting Officer

BLOCK 14 CONTINUATION PAGE

Solicitation 36C24626B0009 block 11 has been updated to the following:

11. The Contractor shall begin performance withing 10 calendar days and complete it within 60 calendar days after receiving |_| award, |X| notice to proceed. This performance period is |X| mandatory |_| negotiable. (See 52.211-10 below).

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days. The time stated for completion shall include final cleanup of the premises.

VAAR 852.243-70 has been updated to the following:

VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)

The FAR clauses 52.236-2, Differing Site Conditions; 52.243-4, Changes; and 52.243-5, Changes and Changed Conditions, are supplemented as follows:

(a) Submission of request for equitable adjustment proposals. When directed by the Contracting Officer or requested by the Contractor, the Contractor shall, in accordance with FAR 15.403-5, submit proposals for changes in the work exceeding $500,000 in writing to the Contracting Officer or Administrative Contracting Officer (ACO), and to the resident engineer.

(1) The Contractor must provide an itemized breakdown for changes exceeding the micro-purchase threshold (see FAR 2.101).

(2) The itemized breakdown shall include materials, quantities, unit prices, labor costs (separated into trades), construction equipment, etc. Labor costs shall be identified with specific material placed or operation performed.

(3) Proposals shall be submitted to the Contracting Officer or ACO as expeditiously as possible, but not later than 15 calendar days, after receipt of a written change order by the Contracting Officer.

(4) Proposals shall be signed by each subcontractor participating in the change.

(5) The Contracting Officer will consider issuing a settlement by determination to the contract if the Contractor’s proposal required by paragraph (3) is not received within 30 calendar days, or if agreement has not been reached.

(b) Paragraphs (a)(1) through (5) and the following apply to proposed contract changes costing $500,000 or less:

(1) As a basis for negotiation, allowances not to exceed 10 percent each for overhead and profit for the party performing the work will be based on the value of labor, material, and equipment required to accomplish the change. As the value of the change increases, a declining scale will also be used in negotiating the percentage of overhead and profit. This declining scale will also be used to negotiate the prime Contractor’s or upper-tier subcontractor’s fee when work is performed by lower-tier subcontractors (to a maximum of three tiers) and will be based on the net increased cost to the prime or upper-tier subcontractor, as applicable. Profit (fee) shall be computed by multiplying the profit percentage by the sum of the direct costs and computed overhead costs. Allowable percentages on changes will not exceed the following:

(i) 10 percent overhead and/or 10 percent profit (fee) on the first $20,000;

(ii) 7.5 percent overhead and/or 7.5 percent profit (fee) on the next $30,000;

(iii) 5 percent overhead and/or 5 percent profit (fee) on a balance over $50,000.

(2) The Contracting Officer will consider issuing a settlement by determination to the contract if the Contractor’s proposal required by paragraph (3) is not received within 30 calendar days, or if agreement has not been reached.

(c)(1) Overhead and Contractor’s fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security policy, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the Contractor’s overhead and/or fee percentage.

(2) Where the Contractor’s or subcontractor’s portion of a change involves credit items, such items must be deducted prior to adding overhead and profit for the party performing the work. The Contractor’s fee is limited to the net increase to Contractor or subcontractor’s portions of cost computed in accordance with this clause.

(3) Where a change involves credit items only, a proper measure of the amount of downward adjustment in the contract price is the reasonable cost to the Contractor if it had performed the deleted work. A reasonable allowance for overhead and profit are properly includable as part of the downward adjustment for a deductive change. The amount of such allowance is subject to negotiation.

(End of clause) Responses to the request for information (RFI) is provided in attachment C.

The statement of work has been updated (attachment E).

The proposal due date has been extended to January 28, 2026, at 1600 EST.

The bid opening will take place via MS Teams on January 29, 2026, at 1000 EST.

Link to bid opening:

https://teams.microsoft.com/l/meetup-join/19%3ameeting_OWJhNDFjMzYtYzdjNy00YThlLTgwMjEtZjY3N2Q4Yzk3ZGI5%40thread.v2/0?context=%7b%22Tid%22%3a%22e95f1b23-abaf-45ee-821d-b7ab251ab3bf%22%2c%22Oid%22%3a%22d9401088-431b-4f3b-a380-e9aa380e39c4%22%7d

ATTACHMENTS:

See attached document: Attachment C - RFIs 001 - 007_responses.

See attached document: Attachment E - SOW_Roof Repair-114_Rev1_20Jan2026.