This document is an Infection Prevention and Control Construction/Renovation/Maintenance Permit for a VHA (Veterans Health Administration) project involving renovation of radiology floors in Building 2A. The permit specifies Level IV infection control precautions for a high-risk activity category C project, which requires extensive dust control, containment, and safety measures including hard barriers, an anteroom, negative air pressure maintenance, and strict protocols for worker movement and equipment handling.

Key requirements include maintaining continuous negative pressurization using HEPA exhaust systems, constructing critical barriers extending to the ceiling, sealing all penetrations, installing differential pressure monitoring devices, and implementing rigorous cleaning and protective measures. The project details include a contact phone number for the project manager Wayne Switzer, though specific start and completion dates are marked as "TBD". The permit mandates comprehensive infection control steps across four levels of precautions, with Level IV representing the most stringent requirements for renovation activities in a healthcare environment.

View the file

Other files

File Type Posted
S07 SF 1409_Abstract of Offers.pdf PDF
S07 SF 1409_Abstract of Offers (004).pdf PDF
Amendment 0007.pdf PDF
36C24625B0021 0006.docx DOCX document
S07 Bid ABSTRACT.pdf PDF
36C24625B0021 0005.docx DOCX document
36C24625B0021 0003.pdf PDF
36C24625B0021 0004.pdf PDF
Balco 2HEXBF-1-2-MBF Expansion Joint.pdf PDF
ICRA Alternative to Outdoor Air Discharge - ICRA.pdf PDF
Added Spec 093013 Ceramic and Porcelain Tile 658-25-103.pdf PDF
Asbestos report.pdf PDF
Questions with responses 36C24625B0021 Radiology Floors.docx DOCX document
36C24625B0021 0002.docx DOCX document
36C24625B0021 0002.pdf PDF
36C24625B0021 0001.docx DOCX document
S04 Renovate Radiology Flooring.pdf PDF
36C24625B0021_1.docx DOCX document
Drawings-Final.pdf PDF
Specification- Final.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA ICRA-1.3 (December 2024)

Infection Prevention and Control Construction/Renovation/Maintenance Permit

This page must be posted at the entrance to the project area for Level III and Level IV activities.

Unique permit number:

Location of construction/renovation/maintenance

Project manager Project start date

Contact phone number Completion date

Contractor Permit expiration date

Activity Category (A, B, C, or D)

Overall Patient Risk Category (Low, Medium, High, or Highest)

Level of Infection Prevention and Control Precautions (I, II, III, or IV)

Level of Precautions

Control measures to be in place for the duration of the activity (Check the box for the activity’s Level of Precautions to indicate the Control Measures)

Level I

1. Perform work activity in a manner that does not create dust.

2. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.

3. Any materials and equipment being brought into the facility must be free of contaminants and loose material.

Level II

All control measures in Level I and the following:

1. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system).

2. Ensure worker clothing is clean and free of visible dust before leaving the work area.

3. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation.

4. When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system

5. Seal doors, to prevent dust migration.

6. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.

7. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area.

8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

9. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily.

Level III

All control measures in Levels I and II and the following:

1. Ensure availability of equipment for cleaning hands.

2. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

3. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.

4. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop i f applicable for barrier type).

5. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors, or comply with the alternative method outline in Appendix A of the VHA ICRA template. These control measures must be maintained continuously 24/7 for the duration of the project. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited.

Check box to indicate exhaust method: Exterior ☐ Alternative Interior Method ☐

6. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

Level IV

All control measures in Levels I, II and III and the following:

1. Barriers must be hard barriers unless temporary to install final barrier.

2. Containment must include an anteroom to ensure pressure control, Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.

3. Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable.

4. Workers must wear shoe covers or have a method to clean shoes in anteroom Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.

Additional requirements:

Project Manager signature Date

Infection Preventionist signature Date

Unique permit number:
Project manager: Wayne Switzer
Check box to indicate exhaust method Exterior: Off
Additional requirements:
Location of Construction/renovation/maintenance: Radiology, Building 2A - Renovate Floors
Project Start Date: TBD
Date:
Phone Number: 540-824-5087
Contractor: TBD
Completion Date: TBD
Permit Expiration Date: TBD
Check Box3: Yes
Check Box4: Yes
Check Box5: Yes
Check Box1: Yes
Check Box2: Yes
Dropdown1: [C]
Dropdown2: [High]
Dropdown3: [IV]

File details come from the government source that posted it. Updated .