This document is an Asbestos Reinspection Report for the Salem VA Medical Center, conducted by Castle Hill Associates, LLC in August 2019. The comprehensive report details an extensive asbestos survey of 59 buildings on the medical center's campus, built between 1845 and 2014, using EPA and OSHA protocols for identifying and assessing asbestos-containing materials (ACM). The inspection identified asbestos in multiple forms across various buildings, including pipe insulation, vinyl floor tiles, mastic, transite boards, window and door caulking, ceiling tiles, and other building materials. Key findings include asbestos presence in buildings such as the Medical Center Admin, NHCU Dental Nuclear Medicine, Boiler Plant, Laundry, and various administrative and residential structures, with recommended actions ranging from operations and maintenance (O&M) plans to potential removal during future renovations.
The report provides detailed documentation including building-specific asbestos locations, quantities, sampling data, laboratory analysis results, photographs of asbestos materials, and an Operations & Maintenance (O&M) Plan for managing existing asbestos-containing materials. The O&M Plan outlines regulatory history, purpose, roles and responsibilities, communication protocols, training requirements, emergency response procedures, and guidelines for planned activities and periodic surveillance. The primary goal is to prevent potential asbestos fiber exposure to building occupants by maintaining ACM in good condition and ensuring proper handling and potential abatement by licensed contractors. The document emphasizes that all abatement activities will be conducted by licensed professionals, not VA personnel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S07 SF 1409_Abstract of Offers.pdf | ||
| S07 SF 1409_Abstract of Offers (004).pdf | ||
| Amendment 0007.pdf | ||
| 36C24625B0021 0006.docx | DOCX document | |
| S07 Bid ABSTRACT.pdf | ||
| 36C24625B0021 0005.docx | DOCX document | |
| 36C24625B0021 0003.pdf | ||
| 36C24625B0021 0004.pdf | ||
| Balco 2HEXBF-1-2-MBF Expansion Joint.pdf | ||
| ICRA Alternative to Outdoor Air Discharge - ICRA.pdf | ||
| Added Spec 093013 Ceramic and Porcelain Tile 658-25-103.pdf | ||
| ICRA Level IV Requirements.pdf | ||
| Questions with responses 36C24625B0021 Radiology Floors.docx | DOCX document | |
| 36C24625B0021 0002.docx | DOCX document | |
| 36C24625B0021 0002.pdf | ||
| 36C24625B0021 0001.docx | DOCX document | |
| S04 Renovate Radiology Flooring.pdf | ||
| 36C24625B0021_1.docx | DOCX document | |
| Drawings-Final.pdf | ||
| Specification- Final.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS REINSPECTION REPORT
LOCATION:
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD.
SALEM, VA 24153
PROJECT NO.: V06-18-102
CONTRACT: 36C24619N0872
INSPECTION DATES:
AUGUST 13-15, 2019
PRIME CONTRACTOR:
CASTLE HILL ASSOCIATES, LLC
218-A MECHANIC ST.
WATERVILLE, OH 43566
567-952-0212
SALEM VA MEDICAL CENTER – SALEM, VA
AUGUST 2019
TABLE OF CONTENTS
1.0 ASBESTOS INSPECTION REPORT
• Table 1 – List of Acronyms
• Table 2 - Removal Priority Protocols
2.0 APPENDICES
Appendix A – Asbestos Sampling Data
Appendix B – Asbestos Quantities, Assessments, & Remediation Cost Estimate
Appendix C – Photographs of Asbestos Materials
Appendix D – Asbestos Laboratory Reports
Appendix E - Inspector Certifications
Appendix F - Lab Certifications
Appendix G – Asbestos Locations and Sample Location Drawings
Appendix H – O&M Plan (Operations & Maintenance)
1.0 EXECUTIVE SUMMARY
On August 13-15, 2019, Castle Hill Associates, LLC was contracted by the US Department of Veterans Affairs (VA) to perform asbestos re-inspections of 59 buildings on the site of the Salem VA Medical Center in Salem, VA. The survey was performed as part of the VA Project Number V06-18-102 under Contract 36C24618Q0693. The Performance Work Statement (PWS) issued by the VA defined the scope of work for the asbestos survey. The buildings that were surveyed as part of this project included:
Building Number
Building Name/Description Total Square
Footage Year Built
CC Connecting Corridors 26300 1934
1 Medical Center Admin 16627 1934
2 NHCU Dental Nuclear Medicine 84163 1934 Renovated 1995
2A ER Lab Radiology CLC Dining 57977 1979
4 N&F Service Canteen Med Media 68991 1934 Renovated 1992
5 Auditorium 24252 1934
7 Psych Units Social Work Admin 41243 1934 Renovated 1994
8 Bio Med Shops 40742 1938 Renovated 1980
9 Psych Unit PTSD Unit Psych Off 40315 1941
10 Network Payment Office 43503 1940
11 Outpatient Psychiatry Psych Off 39771 1938
12 Prosthetics & Admin 41103 1939 Renovated 1987
13 Boiler Plant 20153 1934 Renovated 1992
14 Laundry 19240 1934
15 Laundry CWT Storage 17142 1934
16 VISN CO Offices 9039 1934
18 Residential Quarters 3511 1934
19 Residential Duplex Quarters 7023 1934
23 Pump House 240 1934
25 Quarters 6975 1845
31 FMS Paint Shop 1835 1936
46 Engineering Recreation Storage 1184 1937
72 Engineering Storage 1344 1942
74 Administration 46697 1944
75 VISN Tenant Space Education 47015 1944 Renovated 1972
76 FMS Shops AFGE 44517 1944
77 FMS Shops Student Quarters 47115 1944 Renovated 1980
80 Greenhouse 1303 1943
85 FMS Sheet Metal Shop 960 1945
116 Storage 228 1930
117 Storage 2436 1956
121 Greenhouse 844 1956
125 Water Tower N/A 1956
Building Name/Description Total Square
Footage Year Built
138 Emergency Generator 280 1980
139 Emergency Generator 280 1980
140 Emergency Generator 280 1980
141 Emergency Generator 280 1980
142 Emergency Generator 280 1980
143 Clinical Addition Main Hospital 343997 1992
144 Chapel Offices 4275 1985
145 FMS Plumbing Shop 3035 1987
146 Chapel Offices 670 1988
150 Smoking shelter
151 Smoking shelter
152 Smoking shelter
154 Emergency Generator #4 830 1980
155 Pool Pump House 130 1975
156 Emergency Generator 589 1993
157 Emergency Generator 840 1993
158 Smoking shelter
159 Smoking shelter
160 Smoking shelter
161 Smoking shelter
162 Water Main Building 168 1998
163 Water Main Building 130 1999
165 Smoking shelter
168 PTSD Outpatient Building 5000 2010
169 SCM Storage 3430 2010
170 Inpatient Mental Health 28016 2014
The inspection was conducted by Brett Brumbaugh and Sam Ansara. The project manager was Mr.
Brumbaugh who has been conducting asbestos surveys, sampling, and consulting work since 1987. He is a Commonwealth of Virginia certified Asbestos Inspector. Sam Ansara has been conducting asbestos surveys, sampling, and consulting work since 1989. There was a previous asbestos reinspection and sampling conducted at the facility most recently in 2018 and those reports were reviewed and utilized by Castle Hill prior to this inspection. There were no limitations or exceptions to the PWS for the surveys conducted.
All accessible functional areas in the facilities were surveyed. All previous asbestos survey information and sampling conducted at the facilities were evaluated and incorporated into this survey. All confirmed asbestos-containing materials were verified. This report can be incorporated into the facility’s management plan for asbestos-containing materials.
2.0 STATE AND LOCAL REGULATIONS
The Commonwealth of Virginia asbestos inspection and licensing regulations are similar to the Federal regulations. Commonwealth asbestos regulations include requirements for licensing and certification of personnel who will perform asbestos-related work activities. All personnel who engage in asbestos-related activities must comply with the state licensing/certification requirements as well as with all Federal requirements.
3.0 ANALYTICAL METHODS AND LIMITATIONS
3.1 Asbestos Sampling Protocol
EPA and OSHA define an ACBM as any material which contains greater than 1 percent asbestos. The ACBM inspection and bulk sampling were performed in accordance with the methods outlined in the EPA guidance document titled Guidance for Controlling Asbestos-Containing Materials in Buildings (Document No. 560/5- 85/024). In addition, bulk sampling of asbestos was performed in accordance with 40 CFR Part 763, AHERA requirements for number of samples and types of ACBM to be sampled. According to these requirements, materials are classified as either surfacing (e.g., decorative plaster, spray-applied fireproofing), thermal system insulation (e.g., pipe insulation, pipe fitting insulation, boiler insulation), or miscellaneous materials (e.g., floor tile, ceiling tile, plaster, wallboard, mastics).
The number of samples collected from each material varies based on the classification of the material and increases as the potential for a non-uniform mixture of asbestos in the material increases. Typically, regulations require a minimum number of samples to be collected from the different classifications of suspect
ACBM.
All bulk samples were analyzed utilizing current EPA methods for PLM (Polarized Light Microscopy) by EMLab/P&K in Marlton, NJ. EMLab/P&K is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.
4.0 SUMMARY OF FINDINGS
4.1 Asbestos-Containing Building Materials
The following is a summary of the asbestos containing materials, locations, quantities of materials in each inspected building for this project:
Building Name/Description Asbestos Present
No Asbestos Present
CC Connecting Corridors X
1 Medical Center Admin X
2 NHCU Dental Nuclear Medicine X
2A ER Lab Radiology CLC Dining X
4 N&F Service Canteen Med Media X
5 Auditorium X
7 Psych Units Social Work Admin X
8 Bio Med Shops X
9 Psych Unit PTSD Unit Psych Off X
10 Network Payment Office X
11 Outpatient Psychiatry Psych Off X
12 Prosthetics & Admin X
13 Boiler Plant X
14 Laundry X
15 Laundry CWT Storage X
16 VISN CO Offices X
17 Residential Quarters X
18 Residential Quarters X
19 Residential Duplex Quarters X
23 Pump House X
25 Quarters X
26 Garage X
27 Garage X
28 Garage X
29 Swimming Pool X
31 FMS Paint Shop X
34 Engineering Storage Barn X
46 Engineering Recreation Storage X
72 Engineering Storage X
74 Administration X
75 VISN Tenant Space Education X
76 FMS Shops AFGE X
77 FMS Shops Student Quarters X
80 Greenhouse X
85 FMS Sheet Metal Shop X
Building Name/Description Asbestos Present
No Asbestos Present
116 Engineering Storage X
117 Storage X
121 Greenhouse X
125 Water Tower X
133 Golf Clubhouse X
138 Emergency Generator X
139 Emergency Generator X
140 Emergency Generator X
141 Emergency Generator X
142 Emergency Generator X
143 Clinical Addition Main Hospital X
144 Chapel Offices X
145 FMS Plumbing Shop X
146 Chapel Offices X
150 Smoking shelter X
151 Smoking shelter X
152 Smoking shelter X
154 Emergency Generator #4 X
155 Pool Pump House X
156 Emergency Generator X
157 Emergency Generator X
158 Smoking shelter X
159 Smoking shelter X
160 Smoking shelter X
161 Smoking shelter X
162 Water Main Building X
163 Water Main Building X
165 Smoking shelter X
168 PTSD Outpatient Building X
169 SCM Storage X
170 Inpatient Mental Health X
4.2 Asbestos-Containing Building Summaries
The following is a summary of the asbestos containing materials, locations, quantities of materials in each building which contains asbestos:
Building 1 - Medical Center Admin
Asbestos Containing Materials Locations (see Appendix G for exact locations on each floor)
Quantity
Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown
12” vinyl floor tile (all colors) and black mastic 1st and 2nd floor hallways; stairwells 2,380 sf
Black mastic under carpeting Basement, 1st, and 2nd floors 11,720 sf
Exterior door caulking All exterior entry doors 3 doors
Building 2 - NHCU Dental Nuclear Medicine
Asbestos Containing Materials Locations Quantity
Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown
9” vinyl floor tile (red & black) 2nd floor walkway/hall to Building 1 990 sf
Building 4 - N&F Service Canteen Med Media
Assumed behind inaccessible wall and pipe chases; steam tunnels unknown
Mud fittings on fiberglass insulated pipes Basement Mech. Room; pipe chases;
basement ceiling plenum
220 fittings
Transite board behind radiators Under windows (Basement, 1st, and 2nd floors) 1,200 sf 9” vinyl floor tile (red & white) Hall C1-111, storage room 224, 220 1,120 sf Linoleum sheet flooring Training room 102E 660 sf Ceramic wall tile mastic Basement Room 4 450 sf 2x4 lay-in ceiling tile Room 102C, 102D 360 sf Window caulking Under new caulking on all windows 2,110 lf
Building 5 – Auditorium
Assumed behind inaccessible wall and pipe chases; steam tunnels unknown
9” vinyl floor tile (red & white) Corridors 211 and 212 560 sf Glue pods for 12” ceiling tile Stairwells 6A, 04C, and 200 480 sf Spot light wire insulation Auditorium stage and catwalk 16 lights
Building 7 – Psych Units Social Work Admin
Assumed behind inaccessible wall and pipe chases; steam tunnels unknown
Window caulking (exterior) All exterior windows 5,500 lf Door caulking (exterior) All exterior doors 7 doors
Building 8 - Bio Med Shops
Assumed behind inaccessible wall and pipe chases; steam tunnels; Basement
12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 34,856 sf
Building 9 - Psych Unit PTSD Unit Psych Office
Assumed behind inaccessible wall and pipe chases; steam tunnels unknown
Pipe insulation debris in crawl space under poly sheeting
Crawl spaces 5,620 sf
9” vinyl floor tile (red & white) Rooms 3, 3A. 3C, and 4B 924 sf 12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 26,740 sf Door caulking (exterior) All exterior doors 8 doors Transite board behind radiators Under windows (Basement, 1st, and 2nd floors) 1,200 sf
Building 10 - Network Payment Office
Assumed behind inaccessible wall and pipe chases; steam tunnels unknown
Pipe insulation debris in crawl space under poly sheeting
Crawl spaces 3,840 sf
12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 26,740 sf Door caulking (exterior) All exterior doors 7 doors Transite board behind radiators Under windows (Basement, 1st, and 2nd floors) 1,200 sf Vertical caulk on exterior porches wood pillars Exterior porches of 111a, 125d, 211a, 224a) 320 lf
Building 11 - Outpatient Psychiatry Psych Office
Assumed behind inaccessible wall and pipe chases; steam tunnels; 11E, 11F, 106B, and 206B unknown
Pipe insulation debris in crawl space under poly sheeting
Crawl spaces 4,220 sf
Mud fittings on fiberglass insulated piping Attic, 106B 110 fittings
12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 36,646 sf
Building 12 - Prosthetics & Admin
Assumed behind inaccessible wall and pipe chases; steam tunnels unknown
Pipe insulation debris in crawl space under poly sheeting
Crawl spaces 4,020 sf
Mud fittings on fiberglass insulated pipe Attic 75 fittings
12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 36,144 sf
Building 13 - Boiler Plant
Window glazing and caulking All original metal windows and frames 24 windows Black lab table top and sink Water lab area 60 sf + sink
12” vinyl floor tile and/or black mastic Boiler Room offices & Locker/Toilet area 320 sf
Building 14 - Laundry
Window frame caulking All original metal window frames 33 windows Door frame caulking All original metal door frames 10 doors Cloth duct vibration isolation cloths 1st floor overhead air handling units 7 units Transite restroom stall partitions Men’s and Women’s Restrooms in basement 210 sf
Building 15 - Laundry CWT Storage
Pipe insulation Basement storage rooms; 1st floor room 115 2,460 lf
Window frame caulking All original metal window frames 22 windows Door frame caulking All original metal door frames 5 doors
Building 16 - VISN CO Offices
Assumed behind inaccessible wall and pipe chases; steam tunnels unknown
Window frame caulking Original basement windows 13 windows Door frame caulking All original metal door frames 6 doors 12” vinyl floor tile and/or black mastic B8, B8A, and B8C 760 sf
Building 18 - Residential Quarters
In inaccessible wall and pipe chases; steam tunnels unknown
Window frame caulking All original windows 19 windows Door frame caulking All original door frames 3 doors Transite wall panels Basement wall 210 sf
Building 19 - Residential Duplex Quarters
In inaccessible wall and pipe chases; steam tunnels unknown
Window frame caulking All original windows 41 windows Door frame caulking All original door frames 6 doors Paper duct wrap insulation Inside walls from basement to attic 220 sf 12” vinyl floor tile and/or black mastic Unit A (basement & 1st floor) 1,320 sf
Building 23 - Pumphouse
Pipe insulation N.W. corner of pumphouse at floor 3 lf
Building 25 - Quarters
In inaccessible wall and pipe chases; steam tunnels; crawl space
Window frame caulking All original windows 24 windows
Building 46 - Engineering Recreation Storage
Window glazing Windows 4 windows
Building 72 - Engineering Storage
Transite sheets Garage area 100 sf
Building 74 - Administration
Assumed behind inaccessible wall and pipe chases; steam tunnels unknown
Transite sheets behind radiators Basement, 1st, and 2nd floors under all windows 1,200 sf
12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors (most under carpeting)
10,010 sf
Transite black ebony board Attic elevator control panel 10 sf
Building 75 - VISN Tenant Space Education
Basement Rooms 7, 8, 8A, 10, 13, 13C;
assumed behind inaccessible wall and pipe chases; steam tunnels
140 lf + inaccessible lf
Mud fittings on fiberglass insulated piping Attic 72 fittings
Transite sheets behind radiators Basement, 1st, and 2nd floors under all windows 1,280 sf
12” vinyl floor tile and/or black mastic Basement Room 12 700 sf
Building 76 - FMS Shops AFGE
Basement Rooms 7, 8, 8A, 10, 13, 13C;
assumed behind inaccessible wall and pipe chases; steam tunnels
140 lf + inaccessible lf
Transite sheets behind radiators Basement, 1st, and 2nd floors under all windows 1,280 sf
12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 15,586 sf
Door frame caulking All original door frames 8 doors
Building 77 - FMS Shops Student Quarters
Basement; behind inaccessible wall and pipe chases; steam tunnels; crawl space
1,260 lf + inaccessible lf
Pipe insulation debris in crawl space under poly sheeting
Crawl spaces 6,820 sf
12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 31,616 sf Tar coating on HVAC drip pans Above ceilings on 1st and 2nd floor hallways 110 sf Roof paper and tar Floor in attic 15,110 sf
Building 80 - Greenhouse
Door frame caulk Metal entry doors 2 doors
Building 116 - Engineering Storage
Window glazing Windows 2 windows Window frame caulk Windows 2 windows
5.0 Explanation of Assessment of Asbestos Containing Materials
Re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700. The tabular listing included in this report contains Building Number, Floor, Room Number, Material Category (i.e., TSI, SM or MM), Material Type, quantity, a numerical priority ranking, condition, potential for damage, potential for human exposure, drawing number, hazard ranking, recommended response action and associated cost estimate for implementation of those response actions.
The material assessment categories of the ACM identified in the building is formatted in the following order for the summary tables enclosed in this report:
• Material Category - Surfacing Material (SUR); Thermal System Insulation (TSI); Miscellaneous (MM)
• Material Type - Friable (F); Non-Fable (NF)
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
• Recommended Response Action - 1 through 7
Material category is the type of material such as surfacing material (SUR), thermal system insulation (TSI), and miscellaneous (MM)
• Surfacing Material (SUR) - Surfacing ACM means surfacing material that is ACM. Surfacing material means material in a school building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
• Thermal System Insulation (TSI) - Thermal system insulation ACM means thermal system insulation that is ACM. Thermal system insulation means material in a school building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.
• Miscellaneous (MM) - Miscellaneous ACM means miscellaneous material that is ACM Miscellaneous material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.
Material type refers to the hardness of a material to be crumbled, pulverized, or reduced to powder by hand pressure as friable (F), and includes previously non-friable (NF) material after such previously non-friable material becomes damaged to the extent that when dry it may be crumbled, pulverized, or reduced to powder by hand pressure.
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
Seven Categories define in the AHERA regulation one of which must be assigned to each friable surfacing and miscellaneous ACBM and each asbestos-containing TSI during the inspection/re-inspection.
1. Damaged or significantly damaged TSI ACBM - Damaged or significantly damaged thermal system insulation ACM means thermal system insulation ACM on pipes, boilers, tanks, ducts, and other thermal system insulation equipment where the insulation has lost its structural integrity, or its covering, in whole or in part, is crushed, water-stained, gouged, punctured, missing, or not intact such that it is not able to contain fibers. Damage may be further illustrated by occasional punctures, gouges or other signs of physical injury to ACM; occasional water damage on the protective coverings/jackets; or exposed ACM ends or joints. Asbestos debris originating from the ACBM in question may also indicate damage.
2. Damaged friable surfacing ACBM - Damaged friable surfacing ACM means friable surfacing ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or which has delaminated such that its bond to the substrate (adhesion) is inadequate, or which, for any other reason, lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.
3. Significantly damaged friable surfacing ACBM - Significantly damaged friable surfacing ACM means damaged friable surfacing ACM in a functional space where the damage is extensive and severe.
4. Damaged or significantly damaged friable miscellaneous ACBM - Damaged friable miscellaneous ACM means friable miscellaneous ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or, if applicable, which has delaminated such that its bond to the substrate (adhesion) is inadequate or which for any other reason lacks fiber cohesion or adhesion qualities.
Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.
5. ACBM with Potential for Damage - Potential damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
6. ACBM with potential for significant damaged - Potential significant damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
7. Any remaining friable ACBM or Friable Suspected ACBM
6.0 EXPLANATION OF REMEDIATION COST ESTIMATES
All remediation cost (removal and repair) estimates are based upon RS Means data. Since RS Means does not account for work in VA Medical Centers, all cost estimates are adjusted to reflect the VA specific requirements for abatement. In addition, the cost estimates reflect the quantity and location of the asbestos materials. For example, abatement work in crawl spaces is expected to be much costlier than work in more accessible areas of building. Also, the costs for each material in each building are intended to be for “stand alone” projects and the combination of areas for removal will reduce the costs due to an economy of scale.
7.0 CONCLUSION/RECOMMENDATIONS
An operations and maintenance (O&M) program has been developed by the VAMC specifically for the positively identified ACBM in the facilities. Any renovation/demolition work which may impact these positive materials should be conducted in accordance with the O&M program and all applicable Federal, state, and local regulations by appropriately trained and VA-approved personnel and contractors. Since demolition was not performed as part of the inspection work at the facilities, certain areas such as pipe chases and areas above fixed permanent ceilings, fire-door interiors, and vault/safe wall and door linings were not inspected or tested. Prior to renovation and alteration work which could impact these areas, Castle Hill recommends that exploratory demolition be performed and a qualified inspector be utilized to examine the areas and collect samples as needed. Castle Hill recommends sampling of roofing materials and electrical components (not specifically examined as part of this survey) if renovation activities are planned which may disturb these materials.
Respectfully Submitted:
Brett L. Brumbaugh, REPA, CESCO Commonwealth of Virginia Asbestos Inspector License Number 3303004018
TABLE 1
LIST OF ACRONYMS
ACBM Asbestos Containing Building Material ACM Asbestos Containing Material AHERA Asbestos Hazard Emergency Response Act AIHA American Industrial Hygiene Association CAA Clean Air Act CFR Code of Federal Regulations EPA United States Environmental Protection Agency HazCom Hazard Communication HEPA High Efficiency Particulate Air Filter HVAC Heating, Ventilation, and Air Conditioning MISC Miscellaneous Asbestos Containing Material NESHAP National Emission Standards for Hazardous Air Pollutants NIOSH National Institute for Occupational Safety and Health NIST National Institute of Standards and Technology NOB Non-friable Organically Bound NVLAP National Voluntary Laboratory Accreditation Program OSHA Occupational Safety and Health Administration PAT AIHA Proficiency Analytical Testing Program PCM Phase Contrast Microscopy PEL Permissible Exposure Limit PLM Polarized Light Microscopy TEM Transmission Electron Microscopy TSCA Toxic Substances Control Act TSI Thermal Systems Insulation Castle Hill Castle Hill Associates, LLC VA United States Department of Veterans Affairs VAMC VA Medical Center XRD X-Ray Diffraction
TABLE 2
ASBESTOS REMOVAL PRIORITY PROTOCOLS
HAZARD
RANK
REMOVAL
PRIORITY
AHERA
CATEGORY
RESPONSE ACTION
RECOMMENDATION
7 1 Significantly Damaged
Evacuate or isolate the area.
Remove or repair if feasible.
O&M for all friable ACM.
6 2 Damaged with potential for significant damage
Evacuate or isolate the area.
Remove, encapsulate, or repair if feasible. O&M for all friable
ACM.
5 3 Damaged with potential for damage
Remove, encapsulate, or repair. O&M for all friable ACM.
4 4 Damaged Remove, encapsulate, or repair. O&M for all friable ACM.
3 5 Potential for significant damage
Take steps to reduce potential for damage. O&M for all friable
ACM.
2 6 Potential for damage O&M for all friable ACM.
1 7 No problem O&M for all friable ACM.
APPENDIX A
ASBESTOS BULK SAMPLING DATA
ASBESTOS BULK SAMPLING INFORMATION
Facility: Salem VAMC - Salem, VA Building: Building 2 - NHCU Dental Nuclear Medicine Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0 Sampler: Brett Brumbaugh Accreditation: Commonwealth of Virginia – Asbestos Inspector #3303004018
PLM Laboratory Analysis Result
SAMPLE
NUMBER
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
29 12” gray floor tile and yellow mastic Stair 2A No Asbestos Detected
30 12” gray floor tile and yellow mastic Stair 3 No Asbestos Detected
31 Drywall mud/joint compound Stair 2A No Asbestos Detected
32 Door frame caulk Stair 2A door No Asbestos Detected
33 Door frame caulk Stair 3 door No Asbestos Detected
34 12” gray floor tile and yellow mastic Room 1 No Asbestos Detected
35 Drywall mud/joint compound Room 1 No Asbestos Detected
36 2x4 lay-in ceiling tile Corridor CB-2 No Asbestos Detected
37 2x4 lay-in ceiling tile Corridor C1-1 No Asbestos Detected
38 Gunnite wall coating Mech Room 38 No Asbestos Detected 39 Gunnite wall coating Mech Room 38 No Asbestos Detected
40 Gunnite wall coating Mech Room 38 No Asbestos Detected
41 Drywall mud/joint compound Stair 174 No Asbestos Detected
42 Cove base and tan mastic 1A-1034 No Asbestos Detected
43 Mud fitting on fiberglass pipe insulation 1A-1034 No Asbestos Detected
44 Mud fitting on fiberglass pipe insulation 1A-1034 No Asbestos Detected
45 Mud fitting on fiberglass pipe insulation 1A-1034 No Asbestos Detected
46 Tan duct mastic 244A No Asbestos Detected
47 12” gray floor tile and yellow mastic 244A No Asbestos Detected
48 Cove base and tan mastic 244A No Asbestos Detected
49 Hard plaster Stair 315 No Asbestos Detected
50 Hard plaster Stair 305B No Asbestos Detected
51 Hard plaster Stair 215 No Asbestos Detected
52 Hard plaster Stair 205B No Asbestos Detected
53 Hard plaster Stair 174 No Asbestos Detected 54 Hard plaster Stair 3 No Asbestos Detected
55 Hard plaster Stair 2A No Asbestos Detected
56 2x2 lay-in ceiling tile Corridor C3-12 No Asbestos Detected
57 2x2 lay-in ceiling tile Corridor C3-2 No Asbestos Detected
58 9” black floor tile and black mastic Walkway on 2nd to Bldg. 1 Tile 3% Chrysotile
Mastic – No asbestos
59 9” black floor tile and black mastic Walkway on 2nd to Bldg. 1 Tile 4% Chrysotile
Mastic – No asbestos
60 9” red floor tile and black mastic Walkway on 2nd to Bldg. 1 No Asbestos Detected
• EPA Definition of an asbestos containing material: Greater than 1% asbestos
Building: Building 2A - ER Lab Radiology CLC Dining Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
61 12” tan floor tile and mastic Basement No Asbestos Detected
62 Mud fittings on fiberglass insulated pipe Basement mech. room No Asbestos Detected
63 Mud fittings on fiberglass insulated pipe Basement mech. room No Asbestos Detected
64 Mud fittings on fiberglass insulated pipe Basement mech. room No Asbestos Detected
65 12” gray/blue floor tile and mastic Basement hallway No Asbestos Detected
66 12” gray/blue floor tile and mastic 1st floor No Asbestos Detected
67 Drywall mud/joint compound 1st floor No Asbestos Detected
68 Drywall mud/joint compound 1st floor No Asbestos Detected
69 Drywall mud/joint compound 1st floor No Asbestos Detected
70 Spray-on fireproofing 1st floor mechanical room No Asbestos Detected 71 Spray-on fireproofing 1st floor mechanical room No Asbestos Detected
72 Spray-on fireproofing 1st floor mechanical room No Asbestos Detected
73 2x2 lay-in ceiling tile Basement No Asbestos Detected
74 2x2 lay-in ceiling tile 1st floor No Asbestos Detected
75 2x2 lay-in ceiling tile 1st floor No Asbestos Detected
76 2x2 lay-in ceiling tile 3rd floor No Asbestos Detected
77 2x2 lay-in ceiling tile 2nd floor No Asbestos Detected
78 2x2 lay-in ceiling tile 2nd Floor No Asbestos Detected
Building: Building 7 - Psych Units Social Work Admin Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
23 Fire door core insulation 2nd floor S.E. stairwell door No Asbestos Detected
Building: Building 8 - Bio Med Shops Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
24 Mud fitting on fiberglass pipe insulation Attic No Asbestos Detected
25 Mud fitting on fiberglass pipe insulation Attic No Asbestos Detected
26 Mud fitting on fiberglass pipe insulation Attic No Asbestos Detected
27 Black duct tar insulation Attic No Asbestos Detected
Building: Building 74 - Administration Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
1 Transite panel behind radiator 1st floor lobby/entrance 15% Chrysotile Asbestos
Building: Building 76 - FMS Shops AFGE Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
2 Transite panel behind radiator 2nd floor men’s restroom 15% Chrysotile Asbestos
Building: Building 77 - FMS Shops Student Quarters Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
3 Mag block pipe insulation on steam line Crawl space 45% Chrysotile/Amosite
Asbestos
4 Black tar roof asphalt paper Attic 5% Chrysotile Asbestos
Building: Building 80 - Greenhouse Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
5 Door frame caulk East entry door frame 3% Chrysotile Asbestos
6 Window glazing East window No asbestos detected
7 Window glazing North window No asbestos detected
Building: Building 143 - Clinical Addition Main Hospital Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
8 12” tan floor tile and black/tan mastic Hall by BD-118 No asbestos detected
9 Tan duct seam caulk BB-165 mech. room No asbestos detected
10 12” tan floor tile and black/tan mastic Corridor C1-2 No asbestos detected
11 12” tan floor tile and black/tan mastic Corridor C1-23 No asbestos detected
12 2x4 lay-in ceiling tile Corridor C1-2 No asbestos detected
13 2x4 lay-in ceiling tile Corridor C1-23 No asbestos detected
14 2x4 lay-in ceiling tile Corridor C1-47 No asbestos detected
15 12” tan floor tile and black/tan mastic Corridor C1-47 No asbestos detected
16 Fire door core insulation (wood door) Stored in Room BG-119 No asbestos detected
17 Tan duct seam caulk BB-119 mech. room No asbestos detected
Building: Building 144 - Chapel Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
28 12” tan floor tile and black/tan mastic Riser room/storage No asbestos detected
Building: Building 148 - Shop Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
18 12” tan floor tile and tan mastic Kitchen No asbestos detected
19 12” tan floor tile and tan mastic Office No asbestos detected
20 2x2 lay-in ceiling tile Break Room No asbestos detected
Building: Building 157 - Generator Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
21 Generator exhaust insulation Above generator No asbestos detected
22 Generator exhaust insulation Above generator No asbestos detected
APPENDIX B
Asbestos Quantities, Assessments, & Remediation Cost Estimates
Salem VA Medical Center - Salem, VA
Building 1 - Medical Center Admin
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation
Removal
Priority
Repair Cost
Estimate
Removal Cost
Estimate
Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage unknown
12” vinyl floor tile (all colors) and black mastic 1st and 2nd floor hallways; stairwells 2,880 sf MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $14,400
Black mastic under carpeting Basement, 1st, and 2nd floors 11,720 sf MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $58,600
Exterior door caulking All exterior entry doors 3 doors MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $3,000
TOTALS 0 $76,000
Note: The start date for all response actions is October of 2019
Building 2 - NHCU Dental Nuclear Medicine
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation
Removal
Priority
Repair Cost
Estimate
Removal Cost
Estimate
Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage unknown
9” vinyl floor tile (red & black) 2nd floor walkway/hall to Building 1 990 sf MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $9,900
TOTALS 0 $9,900
Building 4
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation
Removal
Priority
Repair Cost
Estimate
Removal Cost
Estimate
Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage unknown
Mud fittings on fiberglass insulated pipes Basement Mech. Room; pipe chases; basement ceiling plenum 220 fittings TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $16,500
Transite board behind radiators Under windows (Basement, 1st, and 2nd floors) 1,200 sf MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $30,000
9” vinyl floor tile (red & white) Hall C1-111, storage room 224, 220 1,120 sf MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $5,600
Linoleum sheet flooring Training room 102E 660 sf MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $4,620
Ceramic wall tile mastic Basement Room 4 450 sf MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $11,250
2x4 lay-in ceiling tile Room 102C, 102D 360 sf MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $7,200
Window caulking Under new caulking on all windows 2,110 lf MISC Non-friable
0% 1 O&M; Remove at renovation or demolition 7 No damage $80,000
TOTALS 0 $155,170
Building 5 – Auditorium
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation
Removal
Priority
Repair Cost
Estimate
Removal Cost
Estimate
Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1
O&M; Remove at renovation or demolition 7 No damage unknown
9” vinyl floor tile (red & white) Corridors 211 and 212 560 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $8,400
Glue pods for 12” ceiling tile Stairwells 6A, 04C, and 200 480 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,200
Spot light wire insulation Auditorium stage and catwalk 16 lights MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $3,200
TOTALS 0 $18,800
Building 7 – Psych Units Social Work Admin
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation
Removal
Priority
Repair Cost
Estimate
Removal Cost
Estimate
Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1
O&M; Remove at renovation or demolition 7 No damage unknown
Window caulking (exterior) All exterior windows 5,500 lf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $80,000
Door caulking (exterior) All exterior doors 7 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,000
TOTALS 0 $87,000
Building 8 - Bio Med Shops
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation
Removal
Priority
Repair Cost
Estimate
Removal Cost
Estimate
Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels; Basement unknown TSI Friable 0% 1
O&M; Remove at renovation or demolition 7 No damage unknown
12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 34,976 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $174,880
TOTALS 0 $174,880
Building 9 - Psych Unit PTSD Unit Psych Office
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation
Removal
Priority
Repair Cost
Estimate
Removal Cost
Estimate
Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1
O&M; Remove at renovation or demolition 7 No damage unknown
Pipe insulation debris in crawl space under poly sheeting Crawl spaces 5,620 sf TSI Friable 100% 7
Isolate crawl spaces and place signs at all entrances.
Require PPE for entrance to crawl. Encapsulate soil with spray foam or lightweight concrete, or remove soil to depth of 3".
1 $84,300 $122,000
9” vinyl floor tile (red & white) Rooms 3, 3A. 3C, and 4B 924 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $4,600
12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 26,740 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $133,600
Door caulking (exterior) All exterior doors 8 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $8,000
Transite board behind radiators Under windows (Basement, 1st, and 2nd floors) 1,200 sf MISC Non-friable 0% 1
O&M; Remove at renovation or demolition 7 No damage $30,000
TOTALS $84,300 $298,200
Building 10 - Network Payment Office
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation
Removal
Priority
Repair Cost
Estimate
Removal Cost
Estimate
Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1
O&M; Remove at renovation or demolition 7 No damage unknown
Pipe insulation debris in crawl space under poly sheeting Crawl spaces 3,840 sf TSI Friable 100% 7
Isolate crawl spaces and place signs at all entrances.
Require PPE for entrance to crawl. Encapsulate soil with spray foam or lightweight concrete, or remove soil to depth of 3".
1 $57,600 $96,000
12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 26,740 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $133,500
Door caulking (exterior) All exterior doors 7 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,000
Transite board behind radiators Under windows (Basement, 1st, and 2nd floors) 1,200 sf MISC Non-friable 0% 1
O&M; Remove at renovation or demolition 7 No damage $30,000
Vertical caulk on exterior porches wood pillars Exterior porches of 111a, 125d, 211a, 224a) 320 lf MISC Non-friable 0% 1
O&M; Remove at renovation or demolition 7 No damage $6,400
TOTALS $57,600 $272,900
Building 11 - Outpatient Psychiatry Psych Office
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
Pipe insulation
Assumed behind inaccessible wall and pipe chases; steam tunnels; 11E, 11F, 106B, and 206B unknown TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage unknown
Pipe insulation debris in crawl space under poly sheeting Crawl spaces 4,220 sf TSI Friable 100% 7
Isolate crawl spaces and place signs at all entrances. Require PPE for entrance to crawl. Encapsulate soil with spray foam or lightweight concrete, or remove soil to depth of 3".
1 $63,300 $105,000
Mud fittings on fiberglass insulated piping Attic, 106B 110 fittings MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $8,250
12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 36,802 sf MISC Non-friable 0% 1
O&M; Remove at renovation or demolition 7 No damage $184,000
Door caulking (exterior) All exterior doors 7 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,000
TOTALS $63,300 $304,250
Building 12 - Prosthetics Admine
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1
O&M; Remove at renovation or demolition 7 No damage unknown
Pipe insulation debris in crawl space under poly sheeting Crawl spaces 4,020 sf TSI Friable 100% 7
Isolate crawl spaces and place signs at all entrances. Require PPE for entrance to crawl. Encapsulate soil with spray foam or lightweight concrete, or remove soil to depth of 3".
1 $60,000 $100,000
Mud fittings on fiberglass insulated pipe Attic 75 fittings TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $5,625
12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 36,144 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $180,720
Door caulking (exterior) All exterior doors 7 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,000
TOTALS $60,000 $293,345
Building 13 - Boiler Plant
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
Window glazing and caulking All original metal windows and frames 24 windows MISC Friable 20% 4
Cleanup loose glazing and encapsulate all loose window glazing; Continue O&M until removal at renovation or demolition
4 $7,000 $24,000
12” vinyl floor tile and/or black mastic Offices, restroom, corridor, and break room 960 sf MISC Non-friable 0% 1
O&M; Remove at renovation or demolition 7 No damage $4,800
TOTALS $7,000 $28,800
Building 14 - Laundry
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
Window frame caulking All original metal window frames 33 windows MISC Non-friable 0% 1
O&M; Remove at renovation or demolition 7 No damage $33,000
Door frame caulking All original metal door frames 10 doors MISC Non-friable 0% 1
O&M; Remove at renovation or demolition 7 No damage $10,000
Cloth duct vibration isolation cloths 1st floor overhead air handling units 7 units MISC Non-friable 0% 1
O&M; Remove at renovation or demolition 7 No damage $7,000
Transite restroom stall partitions Men’s and Women’s
Restrooms in basement 210 sf MISC Non-friable 0% 1
O&M; Remove at renovation or demolition 7 No damage $3,000
TOTALS $0 $53,000
Building 15 - Laundry CWT Storage
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
Pipe insulation
Basement storage rooms; 1st floor room
2,460 lf TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $123,000
Window frame caulking All original metal window frames 22 windows MISC Non-friable 0% 1
O&M; Remove at renovation or demolition 7 No damage $22,000
Door frame caulking All original metal door frames 5 doors MISC Non-friable 0% 1
O&M; Remove at renovation or demolition 7 No damage $5,000
TOTALS $0 $150,000
Building 16 - VISN CO Offices
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
Pipe insulation
Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage unknown
Window frame caulking Original basement windows 13 windows MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $6,500
Door frame caulking All original metal door frames 6 doors MISC Non-friable 0% 1
O&M; Remove at renovation or demolition 7 No damage $6,000
12” vinyl floor tile and/or black mastic B8, B8A, and B8C 760 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $3,800
TOTALS $0 $16,300
Building 18 - Residential Quarters
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
Pipe insulation In inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1
O&M; Remove at renovation or demolition 7 No damage $9,000
Window frame caulking All original windows 19 windows MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $9,500
Door frame caulking All original door frames 3 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $3,000
Transite wall panels Basement wall 210 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $2,100
TOTALS $0 $23,600
Building 19 - Residential Duplex Quarters
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
Pipe insulation In inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1
O&M; Remove at renovation or demolition 7 No damage $9,000
Window frame caulking All original windows 41 windows MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $20,500
Door frame caulking All original door frames 6 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $6,000
Paper duct wrap insulation Inside walls from basement to attic 220 sf TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,700
12” vinyl floor tile and/or black mastic Unit A (basement & 1st floor) 1,320 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $6,600
TOTALS $0 $49,800
Building 23 - Pumphouse
Asbestos Assessments and Cost Estimates
August 2019
Asbestos Material Locations Quantity
AHERA
Category
Friability
%Damage
AHERA
Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
Pipe insulation N.W. corner of pumphouse at floor 3 lf TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $1,500
TOTALS 0 $1,500
Building 25 -…