Asbestos report.pdf

PDF 19 MB Posted

Attached to
Y1DA--Renovate Radiology Floors |658-25-103
Solicitation number
36C24625B0021
Issued by

About this file

This document is an Asbestos Reinspection Report for the Salem VA Medical Center, conducted by Castle Hill Associates, LLC in August 2019. The comprehensive report details an extensive asbestos survey of 59 buildings on the medical center's campus, built between 1845 and 2014, using EPA and OSHA protocols for identifying and assessing asbestos-containing materials (ACM). The inspection identified asbestos in multiple forms across various buildings, including pipe insulation, vinyl floor tiles, mastic, transite boards, window and door caulking, ceiling tiles, and other building materials. Key findings include asbestos presence in buildings such as the Medical Center Admin, NHCU Dental Nuclear Medicine, Boiler Plant, Laundry, and various administrative and residential structures, with recommended actions ranging from operations and maintenance (O&M) plans to potential removal during future renovations.

The report provides detailed documentation including building-specific asbestos locations, quantities, sampling data, laboratory analysis results, photographs of asbestos materials, and an Operations & Maintenance (O&M) Plan for managing existing asbestos-containing materials. The O&M Plan outlines regulatory history, purpose, roles and responsibilities, communication protocols, training requirements, emergency response procedures, and guidelines for planned activities and periodic surveillance. The primary goal is to prevent potential asbestos fiber exposure to building occupants by maintaining ACM in good condition and ensuring proper handling and potential abatement by licensed contractors. The document emphasizes that all abatement activities will be conducted by licensed professionals, not VA personnel.

View the file

Other files

File Type Posted
S07 SF 1409_Abstract of Offers.pdf PDF
S07 SF 1409_Abstract of Offers (004).pdf PDF
Amendment 0007.pdf PDF
36C24625B0021 0006.docx DOCX document
S07 Bid ABSTRACT.pdf PDF
36C24625B0021 0005.docx DOCX document
36C24625B0021 0003.pdf PDF
36C24625B0021 0004.pdf PDF
Balco 2HEXBF-1-2-MBF Expansion Joint.pdf PDF
ICRA Alternative to Outdoor Air Discharge - ICRA.pdf PDF
Added Spec 093013 Ceramic and Porcelain Tile 658-25-103.pdf PDF
ICRA Level IV Requirements.pdf PDF
Questions with responses 36C24625B0021 Radiology Floors.docx DOCX document
36C24625B0021 0002.docx DOCX document
36C24625B0021 0002.pdf PDF
36C24625B0021 0001.docx DOCX document
S04 Renovate Radiology Flooring.pdf PDF
36C24625B0021_1.docx DOCX document
Drawings-Final.pdf PDF
Specification- Final.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS REINSPECTION REPORT

LOCATION:

SALEM VA MEDICAL CENTER

1970 ROANOKE BLVD.

SALEM, VA 24153

PROJECT NO.: V06-18-102

CONTRACT: 36C24619N0872

INSPECTION DATES:

AUGUST 13-15, 2019

PRIME CONTRACTOR:

CASTLE HILL ASSOCIATES, LLC

218-A MECHANIC ST.

WATERVILLE, OH 43566

567-952-0212

SALEM VA MEDICAL CENTER – SALEM, VA

AUGUST 2019

TABLE OF CONTENTS

1.0 ASBESTOS INSPECTION REPORT

• Table 1 – List of Acronyms

• Table 2 - Removal Priority Protocols

2.0 APPENDICES

Appendix A – Asbestos Sampling Data

Appendix B – Asbestos Quantities, Assessments, & Remediation Cost Estimate

Appendix C – Photographs of Asbestos Materials

Appendix D – Asbestos Laboratory Reports

Appendix E - Inspector Certifications

Appendix F - Lab Certifications

Appendix G – Asbestos Locations and Sample Location Drawings

Appendix H – O&M Plan (Operations & Maintenance)

1.0 EXECUTIVE SUMMARY

On August 13-15, 2019, Castle Hill Associates, LLC was contracted by the US Department of Veterans Affairs (VA) to perform asbestos re-inspections of 59 buildings on the site of the Salem VA Medical Center in Salem, VA. The survey was performed as part of the VA Project Number V06-18-102 under Contract 36C24618Q0693. The Performance Work Statement (PWS) issued by the VA defined the scope of work for the asbestos survey. The buildings that were surveyed as part of this project included:

Building Number

Building Name/Description Total Square

Footage Year Built

CC Connecting Corridors 26300 1934

1 Medical Center Admin 16627 1934

2 NHCU Dental Nuclear Medicine 84163 1934 Renovated 1995

2A ER Lab Radiology CLC Dining 57977 1979

4 N&F Service Canteen Med Media 68991 1934 Renovated 1992

5 Auditorium 24252 1934

7 Psych Units Social Work Admin 41243 1934 Renovated 1994

8 Bio Med Shops 40742 1938 Renovated 1980

9 Psych Unit PTSD Unit Psych Off 40315 1941

10 Network Payment Office 43503 1940

11 Outpatient Psychiatry Psych Off 39771 1938

12 Prosthetics & Admin 41103 1939 Renovated 1987

13 Boiler Plant 20153 1934 Renovated 1992

14 Laundry 19240 1934

15 Laundry CWT Storage 17142 1934

16 VISN CO Offices 9039 1934

18 Residential Quarters 3511 1934

19 Residential Duplex Quarters 7023 1934

23 Pump House 240 1934

25 Quarters 6975 1845

31 FMS Paint Shop 1835 1936

46 Engineering Recreation Storage 1184 1937

72 Engineering Storage 1344 1942

74 Administration 46697 1944

75 VISN Tenant Space Education 47015 1944 Renovated 1972

76 FMS Shops AFGE 44517 1944

77 FMS Shops Student Quarters 47115 1944 Renovated 1980

80 Greenhouse 1303 1943

85 FMS Sheet Metal Shop 960 1945

116 Storage 228 1930

117 Storage 2436 1956

121 Greenhouse 844 1956

125 Water Tower N/A 1956

Building Name/Description Total Square

Footage Year Built

138 Emergency Generator 280 1980

139 Emergency Generator 280 1980

140 Emergency Generator 280 1980

141 Emergency Generator 280 1980

142 Emergency Generator 280 1980

143 Clinical Addition Main Hospital 343997 1992

144 Chapel Offices 4275 1985

145 FMS Plumbing Shop 3035 1987

146 Chapel Offices 670 1988

150 Smoking shelter

151 Smoking shelter

152 Smoking shelter

154 Emergency Generator #4 830 1980

155 Pool Pump House 130 1975

156 Emergency Generator 589 1993

157 Emergency Generator 840 1993

158 Smoking shelter

159 Smoking shelter

160 Smoking shelter

161 Smoking shelter

162 Water Main Building 168 1998

163 Water Main Building 130 1999

165 Smoking shelter

168 PTSD Outpatient Building 5000 2010

169 SCM Storage 3430 2010

170 Inpatient Mental Health 28016 2014

The inspection was conducted by Brett Brumbaugh and Sam Ansara. The project manager was Mr.

Brumbaugh who has been conducting asbestos surveys, sampling, and consulting work since 1987. He is a Commonwealth of Virginia certified Asbestos Inspector. Sam Ansara has been conducting asbestos surveys, sampling, and consulting work since 1989. There was a previous asbestos reinspection and sampling conducted at the facility most recently in 2018 and those reports were reviewed and utilized by Castle Hill prior to this inspection. There were no limitations or exceptions to the PWS for the surveys conducted.

All accessible functional areas in the facilities were surveyed. All previous asbestos survey information and sampling conducted at the facilities were evaluated and incorporated into this survey. All confirmed asbestos-containing materials were verified. This report can be incorporated into the facility’s management plan for asbestos-containing materials.

2.0 STATE AND LOCAL REGULATIONS

The Commonwealth of Virginia asbestos inspection and licensing regulations are similar to the Federal regulations. Commonwealth asbestos regulations include requirements for licensing and certification of personnel who will perform asbestos-related work activities. All personnel who engage in asbestos-related activities must comply with the state licensing/certification requirements as well as with all Federal requirements.

3.0 ANALYTICAL METHODS AND LIMITATIONS

3.1 Asbestos Sampling Protocol

EPA and OSHA define an ACBM as any material which contains greater than 1 percent asbestos. The ACBM inspection and bulk sampling were performed in accordance with the methods outlined in the EPA guidance document titled Guidance for Controlling Asbestos-Containing Materials in Buildings (Document No. 560/5- 85/024). In addition, bulk sampling of asbestos was performed in accordance with 40 CFR Part 763, AHERA requirements for number of samples and types of ACBM to be sampled. According to these requirements, materials are classified as either surfacing (e.g., decorative plaster, spray-applied fireproofing), thermal system insulation (e.g., pipe insulation, pipe fitting insulation, boiler insulation), or miscellaneous materials (e.g., floor tile, ceiling tile, plaster, wallboard, mastics).

The number of samples collected from each material varies based on the classification of the material and increases as the potential for a non-uniform mixture of asbestos in the material increases. Typically, regulations require a minimum number of samples to be collected from the different classifications of suspect

ACBM.

All bulk samples were analyzed utilizing current EPA methods for PLM (Polarized Light Microscopy) by EMLab/P&K in Marlton, NJ. EMLab/P&K is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.

4.0 SUMMARY OF FINDINGS

4.1 Asbestos-Containing Building Materials

The following is a summary of the asbestos containing materials, locations, quantities of materials in each inspected building for this project:

Building Name/Description Asbestos Present

No Asbestos Present

CC Connecting Corridors X

1 Medical Center Admin X

2 NHCU Dental Nuclear Medicine X

2A ER Lab Radiology CLC Dining X

4 N&F Service Canteen Med Media X

5 Auditorium X

7 Psych Units Social Work Admin X

8 Bio Med Shops X

9 Psych Unit PTSD Unit Psych Off X

10 Network Payment Office X

11 Outpatient Psychiatry Psych Off X

12 Prosthetics & Admin X

13 Boiler Plant X

14 Laundry X

15 Laundry CWT Storage X

16 VISN CO Offices X

17 Residential Quarters X

18 Residential Quarters X

19 Residential Duplex Quarters X

23 Pump House X

25 Quarters X

26 Garage X

27 Garage X

28 Garage X

29 Swimming Pool X

31 FMS Paint Shop X

34 Engineering Storage Barn X

46 Engineering Recreation Storage X

72 Engineering Storage X

74 Administration X

75 VISN Tenant Space Education X

76 FMS Shops AFGE X

77 FMS Shops Student Quarters X

80 Greenhouse X

85 FMS Sheet Metal Shop X

Building Name/Description Asbestos Present

No Asbestos Present

116 Engineering Storage X

117 Storage X

121 Greenhouse X

125 Water Tower X

133 Golf Clubhouse X

138 Emergency Generator X

139 Emergency Generator X

140 Emergency Generator X

141 Emergency Generator X

142 Emergency Generator X

143 Clinical Addition Main Hospital X

144 Chapel Offices X

145 FMS Plumbing Shop X

146 Chapel Offices X

150 Smoking shelter X

151 Smoking shelter X

152 Smoking shelter X

154 Emergency Generator #4 X

155 Pool Pump House X

156 Emergency Generator X

157 Emergency Generator X

158 Smoking shelter X

159 Smoking shelter X

160 Smoking shelter X

161 Smoking shelter X

162 Water Main Building X

163 Water Main Building X

165 Smoking shelter X

168 PTSD Outpatient Building X

169 SCM Storage X

170 Inpatient Mental Health X

4.2 Asbestos-Containing Building Summaries

The following is a summary of the asbestos containing materials, locations, quantities of materials in each building which contains asbestos:

Building 1 - Medical Center Admin

Asbestos Containing Materials Locations (see Appendix G for exact locations on each floor)

Quantity

Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown

12” vinyl floor tile (all colors) and black mastic 1st and 2nd floor hallways; stairwells 2,380 sf

Black mastic under carpeting Basement, 1st, and 2nd floors 11,720 sf

Exterior door caulking All exterior entry doors 3 doors

Building 2 - NHCU Dental Nuclear Medicine

Asbestos Containing Materials Locations Quantity

Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown

9” vinyl floor tile (red & black) 2nd floor walkway/hall to Building 1 990 sf

Building 4 - N&F Service Canteen Med Media

Assumed behind inaccessible wall and pipe chases; steam tunnels unknown

Mud fittings on fiberglass insulated pipes Basement Mech. Room; pipe chases;

basement ceiling plenum

220 fittings

Transite board behind radiators Under windows (Basement, 1st, and 2nd floors) 1,200 sf 9” vinyl floor tile (red & white) Hall C1-111, storage room 224, 220 1,120 sf Linoleum sheet flooring Training room 102E 660 sf Ceramic wall tile mastic Basement Room 4 450 sf 2x4 lay-in ceiling tile Room 102C, 102D 360 sf Window caulking Under new caulking on all windows 2,110 lf

Building 5 – Auditorium

Assumed behind inaccessible wall and pipe chases; steam tunnels unknown

9” vinyl floor tile (red & white) Corridors 211 and 212 560 sf Glue pods for 12” ceiling tile Stairwells 6A, 04C, and 200 480 sf Spot light wire insulation Auditorium stage and catwalk 16 lights

Building 7 – Psych Units Social Work Admin

Assumed behind inaccessible wall and pipe chases; steam tunnels unknown

Window caulking (exterior) All exterior windows 5,500 lf Door caulking (exterior) All exterior doors 7 doors

Building 8 - Bio Med Shops

Assumed behind inaccessible wall and pipe chases; steam tunnels; Basement

12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 34,856 sf

Building 9 - Psych Unit PTSD Unit Psych Office

Assumed behind inaccessible wall and pipe chases; steam tunnels unknown

Pipe insulation debris in crawl space under poly sheeting

Crawl spaces 5,620 sf

9” vinyl floor tile (red & white) Rooms 3, 3A. 3C, and 4B 924 sf 12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 26,740 sf Door caulking (exterior) All exterior doors 8 doors Transite board behind radiators Under windows (Basement, 1st, and 2nd floors) 1,200 sf

Building 10 - Network Payment Office

Assumed behind inaccessible wall and pipe chases; steam tunnels unknown

Pipe insulation debris in crawl space under poly sheeting

Crawl spaces 3,840 sf

12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 26,740 sf Door caulking (exterior) All exterior doors 7 doors Transite board behind radiators Under windows (Basement, 1st, and 2nd floors) 1,200 sf Vertical caulk on exterior porches wood pillars Exterior porches of 111a, 125d, 211a, 224a) 320 lf

Building 11 - Outpatient Psychiatry Psych Office

Assumed behind inaccessible wall and pipe chases; steam tunnels; 11E, 11F, 106B, and 206B unknown

Pipe insulation debris in crawl space under poly sheeting

Crawl spaces 4,220 sf

Mud fittings on fiberglass insulated piping Attic, 106B 110 fittings

12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 36,646 sf

Building 12 - Prosthetics & Admin

Assumed behind inaccessible wall and pipe chases; steam tunnels unknown

Pipe insulation debris in crawl space under poly sheeting

Crawl spaces 4,020 sf

Mud fittings on fiberglass insulated pipe Attic 75 fittings

12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 36,144 sf

Building 13 - Boiler Plant

Window glazing and caulking All original metal windows and frames 24 windows Black lab table top and sink Water lab area 60 sf + sink

12” vinyl floor tile and/or black mastic Boiler Room offices & Locker/Toilet area 320 sf

Building 14 - Laundry

Window frame caulking All original metal window frames 33 windows Door frame caulking All original metal door frames 10 doors Cloth duct vibration isolation cloths 1st floor overhead air handling units 7 units Transite restroom stall partitions Men’s and Women’s Restrooms in basement 210 sf

Building 15 - Laundry CWT Storage

Pipe insulation Basement storage rooms; 1st floor room 115 2,460 lf

Window frame caulking All original metal window frames 22 windows Door frame caulking All original metal door frames 5 doors

Building 16 - VISN CO Offices

Assumed behind inaccessible wall and pipe chases; steam tunnels unknown

Window frame caulking Original basement windows 13 windows Door frame caulking All original metal door frames 6 doors 12” vinyl floor tile and/or black mastic B8, B8A, and B8C 760 sf

Building 18 - Residential Quarters

In inaccessible wall and pipe chases; steam tunnels unknown

Window frame caulking All original windows 19 windows Door frame caulking All original door frames 3 doors Transite wall panels Basement wall 210 sf

Building 19 - Residential Duplex Quarters

In inaccessible wall and pipe chases; steam tunnels unknown

Window frame caulking All original windows 41 windows Door frame caulking All original door frames 6 doors Paper duct wrap insulation Inside walls from basement to attic 220 sf 12” vinyl floor tile and/or black mastic Unit A (basement & 1st floor) 1,320 sf

Building 23 - Pumphouse

Pipe insulation N.W. corner of pumphouse at floor 3 lf

Building 25 - Quarters

In inaccessible wall and pipe chases; steam tunnels; crawl space

Window frame caulking All original windows 24 windows

Building 46 - Engineering Recreation Storage

Window glazing Windows 4 windows

Building 72 - Engineering Storage

Transite sheets Garage area 100 sf

Building 74 - Administration

Assumed behind inaccessible wall and pipe chases; steam tunnels unknown

Transite sheets behind radiators Basement, 1st, and 2nd floors under all windows 1,200 sf

12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors (most under carpeting)

10,010 sf

Transite black ebony board Attic elevator control panel 10 sf

Building 75 - VISN Tenant Space Education

Basement Rooms 7, 8, 8A, 10, 13, 13C;

assumed behind inaccessible wall and pipe chases; steam tunnels

140 lf + inaccessible lf

Mud fittings on fiberglass insulated piping Attic 72 fittings

Transite sheets behind radiators Basement, 1st, and 2nd floors under all windows 1,280 sf

12” vinyl floor tile and/or black mastic Basement Room 12 700 sf

Building 76 - FMS Shops AFGE

Basement Rooms 7, 8, 8A, 10, 13, 13C;

assumed behind inaccessible wall and pipe chases; steam tunnels

140 lf + inaccessible lf

Transite sheets behind radiators Basement, 1st, and 2nd floors under all windows 1,280 sf

12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 15,586 sf

Door frame caulking All original door frames 8 doors

Building 77 - FMS Shops Student Quarters

Basement; behind inaccessible wall and pipe chases; steam tunnels; crawl space

1,260 lf + inaccessible lf

Pipe insulation debris in crawl space under poly sheeting

Crawl spaces 6,820 sf

12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 31,616 sf Tar coating on HVAC drip pans Above ceilings on 1st and 2nd floor hallways 110 sf Roof paper and tar Floor in attic 15,110 sf

Building 80 - Greenhouse

Door frame caulk Metal entry doors 2 doors

Building 116 - Engineering Storage

Window glazing Windows 2 windows Window frame caulk Windows 2 windows

5.0 Explanation of Assessment of Asbestos Containing Materials

Re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700. The tabular listing included in this report contains Building Number, Floor, Room Number, Material Category (i.e., TSI, SM or MM), Material Type, quantity, a numerical priority ranking, condition, potential for damage, potential for human exposure, drawing number, hazard ranking, recommended response action and associated cost estimate for implementation of those response actions.

The material assessment categories of the ACM identified in the building is formatted in the following order for the summary tables enclosed in this report:

• Material Category - Surfacing Material (SUR); Thermal System Insulation (TSI); Miscellaneous (MM)

• Material Type - Friable (F); Non-Fable (NF)

• Condition of Material - Good; Fair; Poor

• Potential for Damage - Low; Medium; High

• Physical Assessment - Low; Medium; High

• Recommended Response Action - 1 through 7

Material category is the type of material such as surfacing material (SUR), thermal system insulation (TSI), and miscellaneous (MM)

• Surfacing Material (SUR) - Surfacing ACM means surfacing material that is ACM. Surfacing material means material in a school building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.

• Thermal System Insulation (TSI) - Thermal system insulation ACM means thermal system insulation that is ACM. Thermal system insulation means material in a school building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.

• Miscellaneous (MM) - Miscellaneous ACM means miscellaneous material that is ACM Miscellaneous material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.

Material type refers to the hardness of a material to be crumbled, pulverized, or reduced to powder by hand pressure as friable (F), and includes previously non-friable (NF) material after such previously non-friable material becomes damaged to the extent that when dry it may be crumbled, pulverized, or reduced to powder by hand pressure.

• Condition of Material - Good; Fair; Poor

• Potential for Damage - Low; Medium; High

• Physical Assessment - Low; Medium; High

Seven Categories define in the AHERA regulation one of which must be assigned to each friable surfacing and miscellaneous ACBM and each asbestos-containing TSI during the inspection/re-inspection.

1. Damaged or significantly damaged TSI ACBM - Damaged or significantly damaged thermal system insulation ACM means thermal system insulation ACM on pipes, boilers, tanks, ducts, and other thermal system insulation equipment where the insulation has lost its structural integrity, or its covering, in whole or in part, is crushed, water-stained, gouged, punctured, missing, or not intact such that it is not able to contain fibers. Damage may be further illustrated by occasional punctures, gouges or other signs of physical injury to ACM; occasional water damage on the protective coverings/jackets; or exposed ACM ends or joints. Asbestos debris originating from the ACBM in question may also indicate damage.

2. Damaged friable surfacing ACBM - Damaged friable surfacing ACM means friable surfacing ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or which has delaminated such that its bond to the substrate (adhesion) is inadequate, or which, for any other reason, lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.

3. Significantly damaged friable surfacing ACBM - Significantly damaged friable surfacing ACM means damaged friable surfacing ACM in a functional space where the damage is extensive and severe.

4. Damaged or significantly damaged friable miscellaneous ACBM - Damaged friable miscellaneous ACM means friable miscellaneous ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or, if applicable, which has delaminated such that its bond to the substrate (adhesion) is inadequate or which for any other reason lacks fiber cohesion or adhesion qualities.

Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.

5. ACBM with Potential for Damage - Potential damage means circumstances in which:

(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.

(2) There are indications that there is a reasonable likelihood that the material or its covering will become damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.

6. ACBM with potential for significant damaged - Potential significant damage means circumstances in which:

(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.

(2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.

7. Any remaining friable ACBM or Friable Suspected ACBM

6.0 EXPLANATION OF REMEDIATION COST ESTIMATES

All remediation cost (removal and repair) estimates are based upon RS Means data. Since RS Means does not account for work in VA Medical Centers, all cost estimates are adjusted to reflect the VA specific requirements for abatement. In addition, the cost estimates reflect the quantity and location of the asbestos materials. For example, abatement work in crawl spaces is expected to be much costlier than work in more accessible areas of building. Also, the costs for each material in each building are intended to be for “stand alone” projects and the combination of areas for removal will reduce the costs due to an economy of scale.

7.0 CONCLUSION/RECOMMENDATIONS

An operations and maintenance (O&M) program has been developed by the VAMC specifically for the positively identified ACBM in the facilities. Any renovation/demolition work which may impact these positive materials should be conducted in accordance with the O&M program and all applicable Federal, state, and local regulations by appropriately trained and VA-approved personnel and contractors. Since demolition was not performed as part of the inspection work at the facilities, certain areas such as pipe chases and areas above fixed permanent ceilings, fire-door interiors, and vault/safe wall and door linings were not inspected or tested. Prior to renovation and alteration work which could impact these areas, Castle Hill recommends that exploratory demolition be performed and a qualified inspector be utilized to examine the areas and collect samples as needed. Castle Hill recommends sampling of roofing materials and electrical components (not specifically examined as part of this survey) if renovation activities are planned which may disturb these materials.

Respectfully Submitted:

Brett L. Brumbaugh, REPA, CESCO Commonwealth of Virginia Asbestos Inspector License Number 3303004018

TABLE 1

LIST OF ACRONYMS

ACBM Asbestos Containing Building Material ACM Asbestos Containing Material AHERA Asbestos Hazard Emergency Response Act AIHA American Industrial Hygiene Association CAA Clean Air Act CFR Code of Federal Regulations EPA United States Environmental Protection Agency HazCom Hazard Communication HEPA High Efficiency Particulate Air Filter HVAC Heating, Ventilation, and Air Conditioning MISC Miscellaneous Asbestos Containing Material NESHAP National Emission Standards for Hazardous Air Pollutants NIOSH National Institute for Occupational Safety and Health NIST National Institute of Standards and Technology NOB Non-friable Organically Bound NVLAP National Voluntary Laboratory Accreditation Program OSHA Occupational Safety and Health Administration PAT AIHA Proficiency Analytical Testing Program PCM Phase Contrast Microscopy PEL Permissible Exposure Limit PLM Polarized Light Microscopy TEM Transmission Electron Microscopy TSCA Toxic Substances Control Act TSI Thermal Systems Insulation Castle Hill Castle Hill Associates, LLC VA United States Department of Veterans Affairs VAMC VA Medical Center XRD X-Ray Diffraction

TABLE 2

ASBESTOS REMOVAL PRIORITY PROTOCOLS

HAZARD

RANK

REMOVAL

PRIORITY

AHERA

CATEGORY

RESPONSE ACTION

RECOMMENDATION

7 1 Significantly Damaged

Evacuate or isolate the area.

Remove or repair if feasible.

O&M for all friable ACM.

6 2 Damaged with potential for significant damage

Evacuate or isolate the area.

Remove, encapsulate, or repair if feasible. O&M for all friable

ACM.

5 3 Damaged with potential for damage

Remove, encapsulate, or repair. O&M for all friable ACM.

4 4 Damaged Remove, encapsulate, or repair. O&M for all friable ACM.

3 5 Potential for significant damage

Take steps to reduce potential for damage. O&M for all friable

ACM.

2 6 Potential for damage O&M for all friable ACM.

1 7 No problem O&M for all friable ACM.

APPENDIX A

ASBESTOS BULK SAMPLING DATA

ASBESTOS BULK SAMPLING INFORMATION

Facility: Salem VAMC - Salem, VA Building: Building 2 - NHCU Dental Nuclear Medicine Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0 Sampler: Brett Brumbaugh Accreditation: Commonwealth of Virginia – Asbestos Inspector #3303004018

PLM Laboratory Analysis Result

SAMPLE

NUMBER

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

29 12” gray floor tile and yellow mastic Stair 2A No Asbestos Detected

30 12” gray floor tile and yellow mastic Stair 3 No Asbestos Detected

31 Drywall mud/joint compound Stair 2A No Asbestos Detected

32 Door frame caulk Stair 2A door No Asbestos Detected

33 Door frame caulk Stair 3 door No Asbestos Detected

34 12” gray floor tile and yellow mastic Room 1 No Asbestos Detected

35 Drywall mud/joint compound Room 1 No Asbestos Detected

36 2x4 lay-in ceiling tile Corridor CB-2 No Asbestos Detected

37 2x4 lay-in ceiling tile Corridor C1-1 No Asbestos Detected

38 Gunnite wall coating Mech Room 38 No Asbestos Detected 39 Gunnite wall coating Mech Room 38 No Asbestos Detected

40 Gunnite wall coating Mech Room 38 No Asbestos Detected

41 Drywall mud/joint compound Stair 174 No Asbestos Detected

42 Cove base and tan mastic 1A-1034 No Asbestos Detected

43 Mud fitting on fiberglass pipe insulation 1A-1034 No Asbestos Detected

44 Mud fitting on fiberglass pipe insulation 1A-1034 No Asbestos Detected

45 Mud fitting on fiberglass pipe insulation 1A-1034 No Asbestos Detected

46 Tan duct mastic 244A No Asbestos Detected

47 12” gray floor tile and yellow mastic 244A No Asbestos Detected

48 Cove base and tan mastic 244A No Asbestos Detected

49 Hard plaster Stair 315 No Asbestos Detected

50 Hard plaster Stair 305B No Asbestos Detected

51 Hard plaster Stair 215 No Asbestos Detected

52 Hard plaster Stair 205B No Asbestos Detected

53 Hard plaster Stair 174 No Asbestos Detected 54 Hard plaster Stair 3 No Asbestos Detected

55 Hard plaster Stair 2A No Asbestos Detected

56 2x2 lay-in ceiling tile Corridor C3-12 No Asbestos Detected

57 2x2 lay-in ceiling tile Corridor C3-2 No Asbestos Detected

58 9” black floor tile and black mastic Walkway on 2nd to Bldg. 1 Tile 3% Chrysotile

Mastic – No asbestos

59 9” black floor tile and black mastic Walkway on 2nd to Bldg. 1 Tile 4% Chrysotile

Mastic – No asbestos

60 9” red floor tile and black mastic Walkway on 2nd to Bldg. 1 No Asbestos Detected

• EPA Definition of an asbestos containing material: Greater than 1% asbestos

Building: Building 2A - ER Lab Radiology CLC Dining Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

61 12” tan floor tile and mastic Basement No Asbestos Detected

62 Mud fittings on fiberglass insulated pipe Basement mech. room No Asbestos Detected

63 Mud fittings on fiberglass insulated pipe Basement mech. room No Asbestos Detected

64 Mud fittings on fiberglass insulated pipe Basement mech. room No Asbestos Detected

65 12” gray/blue floor tile and mastic Basement hallway No Asbestos Detected

66 12” gray/blue floor tile and mastic 1st floor No Asbestos Detected

67 Drywall mud/joint compound 1st floor No Asbestos Detected

68 Drywall mud/joint compound 1st floor No Asbestos Detected

69 Drywall mud/joint compound 1st floor No Asbestos Detected

70 Spray-on fireproofing 1st floor mechanical room No Asbestos Detected 71 Spray-on fireproofing 1st floor mechanical room No Asbestos Detected

72 Spray-on fireproofing 1st floor mechanical room No Asbestos Detected

73 2x2 lay-in ceiling tile Basement No Asbestos Detected

74 2x2 lay-in ceiling tile 1st floor No Asbestos Detected

75 2x2 lay-in ceiling tile 1st floor No Asbestos Detected

76 2x2 lay-in ceiling tile 3rd floor No Asbestos Detected

77 2x2 lay-in ceiling tile 2nd floor No Asbestos Detected

78 2x2 lay-in ceiling tile 2nd Floor No Asbestos Detected

Building: Building 7 - Psych Units Social Work Admin Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

23 Fire door core insulation 2nd floor S.E. stairwell door No Asbestos Detected

Building: Building 8 - Bio Med Shops Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

24 Mud fitting on fiberglass pipe insulation Attic No Asbestos Detected

25 Mud fitting on fiberglass pipe insulation Attic No Asbestos Detected

26 Mud fitting on fiberglass pipe insulation Attic No Asbestos Detected

27 Black duct tar insulation Attic No Asbestos Detected

Building: Building 74 - Administration Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

1 Transite panel behind radiator 1st floor lobby/entrance 15% Chrysotile Asbestos

Building: Building 76 - FMS Shops AFGE Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

2 Transite panel behind radiator 2nd floor men’s restroom 15% Chrysotile Asbestos

Building: Building 77 - FMS Shops Student Quarters Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

3 Mag block pipe insulation on steam line Crawl space 45% Chrysotile/Amosite

Asbestos

4 Black tar roof asphalt paper Attic 5% Chrysotile Asbestos

Building: Building 80 - Greenhouse Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

5 Door frame caulk East entry door frame 3% Chrysotile Asbestos

6 Window glazing East window No asbestos detected

7 Window glazing North window No asbestos detected

Building: Building 143 - Clinical Addition Main Hospital Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

8 12” tan floor tile and black/tan mastic Hall by BD-118 No asbestos detected

9 Tan duct seam caulk BB-165 mech. room No asbestos detected

10 12” tan floor tile and black/tan mastic Corridor C1-2 No asbestos detected

11 12” tan floor tile and black/tan mastic Corridor C1-23 No asbestos detected

12 2x4 lay-in ceiling tile Corridor C1-2 No asbestos detected

13 2x4 lay-in ceiling tile Corridor C1-23 No asbestos detected

14 2x4 lay-in ceiling tile Corridor C1-47 No asbestos detected

15 12” tan floor tile and black/tan mastic Corridor C1-47 No asbestos detected

16 Fire door core insulation (wood door) Stored in Room BG-119 No asbestos detected

17 Tan duct seam caulk BB-119 mech. room No asbestos detected

Building: Building 144 - Chapel Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

28 12” tan floor tile and black/tan mastic Riser room/storage No asbestos detected

Building: Building 148 - Shop Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

18 12” tan floor tile and tan mastic Kitchen No asbestos detected

19 12” tan floor tile and tan mastic Office No asbestos detected

20 2x2 lay-in ceiling tile Break Room No asbestos detected

Building: Building 157 - Generator Sampling Date: August 13, 2019 Analysis Dates: August 20-21, 2019 Laboratory: EMLAB/P&K - Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 200844-0

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

21 Generator exhaust insulation Above generator No asbestos detected

22 Generator exhaust insulation Above generator No asbestos detected

APPENDIX B

Asbestos Quantities, Assessments, & Remediation Cost Estimates

Salem VA Medical Center - Salem, VA

Building 1 - Medical Center Admin

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation

Removal

Priority

Repair Cost

Estimate

Removal Cost

Estimate

Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage unknown

12” vinyl floor tile (all colors) and black mastic 1st and 2nd floor hallways; stairwells 2,880 sf MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $14,400

Black mastic under carpeting Basement, 1st, and 2nd floors 11,720 sf MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $58,600

Exterior door caulking All exterior entry doors 3 doors MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $3,000

TOTALS 0 $76,000

Note: The start date for all response actions is October of 2019

Building 2 - NHCU Dental Nuclear Medicine

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation

Removal

Priority

Repair Cost

Estimate

Removal Cost

Estimate

Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage unknown

9” vinyl floor tile (red & black) 2nd floor walkway/hall to Building 1 990 sf MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $9,900

TOTALS 0 $9,900

Building 4

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation

Removal

Priority

Repair Cost

Estimate

Removal Cost

Estimate

Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage unknown

Mud fittings on fiberglass insulated pipes Basement Mech. Room; pipe chases; basement ceiling plenum 220 fittings TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $16,500

Transite board behind radiators Under windows (Basement, 1st, and 2nd floors) 1,200 sf MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $30,000

9” vinyl floor tile (red & white) Hall C1-111, storage room 224, 220 1,120 sf MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $5,600

Linoleum sheet flooring Training room 102E 660 sf MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $4,620

Ceramic wall tile mastic Basement Room 4 450 sf MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $11,250

2x4 lay-in ceiling tile Room 102C, 102D 360 sf MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $7,200

Window caulking Under new caulking on all windows 2,110 lf MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $80,000

TOTALS 0 $155,170

Building 5 – Auditorium

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation

Removal

Priority

Repair Cost

Estimate

Removal Cost

Estimate

Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1

O&M; Remove at renovation or demolition 7 No damage unknown

9” vinyl floor tile (red & white) Corridors 211 and 212 560 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $8,400

Glue pods for 12” ceiling tile Stairwells 6A, 04C, and 200 480 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,200

Spot light wire insulation Auditorium stage and catwalk 16 lights MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $3,200

TOTALS 0 $18,800

Building 7 – Psych Units Social Work Admin

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation

Removal

Priority

Repair Cost

Estimate

Removal Cost

Estimate

Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1

O&M; Remove at renovation or demolition 7 No damage unknown

Window caulking (exterior) All exterior windows 5,500 lf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $80,000

Door caulking (exterior) All exterior doors 7 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,000

TOTALS 0 $87,000

Building 8 - Bio Med Shops

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation

Removal

Priority

Repair Cost

Estimate

Removal Cost

Estimate

Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels; Basement unknown TSI Friable 0% 1

O&M; Remove at renovation or demolition 7 No damage unknown

12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 34,976 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $174,880

TOTALS 0 $174,880

Building 9 - Psych Unit PTSD Unit Psych Office

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation

Removal

Priority

Repair Cost

Estimate

Removal Cost

Estimate

Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1

O&M; Remove at renovation or demolition 7 No damage unknown

Pipe insulation debris in crawl space under poly sheeting Crawl spaces 5,620 sf TSI Friable 100% 7

Isolate crawl spaces and place signs at all entrances.

Require PPE for entrance to crawl. Encapsulate soil with spray foam or lightweight concrete, or remove soil to depth of 3".

1 $84,300 $122,000

9” vinyl floor tile (red & white) Rooms 3, 3A. 3C, and 4B 924 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $4,600

12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 26,740 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $133,600

Door caulking (exterior) All exterior doors 8 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $8,000

Transite board behind radiators Under windows (Basement, 1st, and 2nd floors) 1,200 sf MISC Non-friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $30,000

TOTALS $84,300 $298,200

Building 10 - Network Payment Office

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation

Removal

Priority

Repair Cost

Estimate

Removal Cost

Estimate

Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1

O&M; Remove at renovation or demolition 7 No damage unknown

Pipe insulation debris in crawl space under poly sheeting Crawl spaces 3,840 sf TSI Friable 100% 7

Isolate crawl spaces and place signs at all entrances.

Require PPE for entrance to crawl. Encapsulate soil with spray foam or lightweight concrete, or remove soil to depth of 3".

1 $57,600 $96,000

12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 26,740 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $133,500

Door caulking (exterior) All exterior doors 7 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,000

Transite board behind radiators Under windows (Basement, 1st, and 2nd floors) 1,200 sf MISC Non-friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $30,000

Vertical caulk on exterior porches wood pillars Exterior porches of 111a, 125d, 211a, 224a) 320 lf MISC Non-friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $6,400

TOTALS $57,600 $272,900

Building 11 - Outpatient Psychiatry Psych Office

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

Pipe insulation

Assumed behind inaccessible wall and pipe chases; steam tunnels; 11E, 11F, 106B, and 206B unknown TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage unknown

Pipe insulation debris in crawl space under poly sheeting Crawl spaces 4,220 sf TSI Friable 100% 7

Isolate crawl spaces and place signs at all entrances. Require PPE for entrance to crawl. Encapsulate soil with spray foam or lightweight concrete, or remove soil to depth of 3".

1 $63,300 $105,000

Mud fittings on fiberglass insulated piping Attic, 106B 110 fittings MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $8,250

12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 36,802 sf MISC Non-friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $184,000

Door caulking (exterior) All exterior doors 7 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,000

TOTALS $63,300 $304,250

Building 12 - Prosthetics Admine

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

Pipe insulation Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1

O&M; Remove at renovation or demolition 7 No damage unknown

Pipe insulation debris in crawl space under poly sheeting Crawl spaces 4,020 sf TSI Friable 100% 7

Isolate crawl spaces and place signs at all entrances. Require PPE for entrance to crawl. Encapsulate soil with spray foam or lightweight concrete, or remove soil to depth of 3".

1 $60,000 $100,000

Mud fittings on fiberglass insulated pipe Attic 75 fittings TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $5,625

12” vinyl floor tile and/or black mastic Basement, 1st, and 2nd floors 36,144 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $180,720

Door caulking (exterior) All exterior doors 7 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,000

TOTALS $60,000 $293,345

Building 13 - Boiler Plant

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

Window glazing and caulking All original metal windows and frames 24 windows MISC Friable 20% 4

Cleanup loose glazing and encapsulate all loose window glazing; Continue O&M until removal at renovation or demolition

4 $7,000 $24,000

12” vinyl floor tile and/or black mastic Offices, restroom, corridor, and break room 960 sf MISC Non-friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $4,800

TOTALS $7,000 $28,800

Building 14 - Laundry

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

Window frame caulking All original metal window frames 33 windows MISC Non-friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $33,000

Door frame caulking All original metal door frames 10 doors MISC Non-friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $10,000

Cloth duct vibration isolation cloths 1st floor overhead air handling units 7 units MISC Non-friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $7,000

Transite restroom stall partitions Men’s and Women’s

Restrooms in basement 210 sf MISC Non-friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $3,000

TOTALS $0 $53,000

Building 15 - Laundry CWT Storage

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

Pipe insulation

Basement storage rooms; 1st floor room

2,460 lf TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $123,000

Window frame caulking All original metal window frames 22 windows MISC Non-friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $22,000

Door frame caulking All original metal door frames 5 doors MISC Non-friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $5,000

TOTALS $0 $150,000

Building 16 - VISN CO Offices

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

Pipe insulation

Assumed behind inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage unknown

Window frame caulking Original basement windows 13 windows MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $6,500

Door frame caulking All original metal door frames 6 doors MISC Non-friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $6,000

12” vinyl floor tile and/or black mastic B8, B8A, and B8C 760 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $3,800

TOTALS $0 $16,300

Building 18 - Residential Quarters

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

Pipe insulation In inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $9,000

Window frame caulking All original windows 19 windows MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $9,500

Door frame caulking All original door frames 3 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $3,000

Transite wall panels Basement wall 210 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $2,100

TOTALS $0 $23,600

Building 19 - Residential Duplex Quarters

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

Pipe insulation In inaccessible wall and pipe chases; steam tunnels unknown TSI Friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $9,000

Window frame caulking All original windows 41 windows MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $20,500

Door frame caulking All original door frames 6 doors MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $6,000

Paper duct wrap insulation Inside walls from basement to attic 220 sf TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $7,700

12” vinyl floor tile and/or black mastic Unit A (basement & 1st floor) 1,320 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $6,600

TOTALS $0 $49,800

Building 23 - Pumphouse

Asbestos Assessments and Cost Estimates

August 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

Pipe insulation N.W. corner of pumphouse at floor 3 lf TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $1,500

TOTALS 0 $1,500

Building 25 -…

This is the start of the file's text. The full file is on GovTribe.