RFI 16 -17 - 18- M-001.pdf
PDF 638 KB Posted
- Attached to
- Z2DZ--Renovate And Replace Pharmacy AHUs Federal contract opportunity
- Solicitation number
- 36C24620R0152
About this file
This document contains mechanical drawings and notes for the replacement of pharmacy air handler units at the Durham VAMC located in Durham, North Carolina. The project involves renovating areas F1204 and N1004 to compounding pharmacies, including installing new modular rooftop and indoor air handling units, lab exhaust fans, associated ductwork and piping. Mechanical details cover items such as general notes, legends, new work plans, enlarged pharmacy plans, and seismic and wind requirements. Solicitation number 36C24620R0152 seeks bids to renovate and replace the pharmacy AHUs, with the statement of work, drawings, specifications and narratives to be published separately followed by the RFP. The agency is the Department of Veterans Affairs Veterans Health Administration VISN 6.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24620R0152 0002.docx | DOCX document | |
| RFI 10 A101A and A600.pdf | ||
| Interstitial 2nd Floor.pdf | ||
| A102.pdf | ||
| RFI 001 Response Review VA Comments.pdf | ||
| RFI 25 Attachment 2.pdf | ||
| RFI 19 -20 MH Sheets.pdf | ||
| RFI 12 A600.pdf | ||
| RFI 22 A051.pdf | ||
| RFI 15 M-701.pdf | ||
| 36C24620R0152 0001.docx | DOCX document | |
| RFI 11-13 -A121A -A121B.pdf | ||
| RFI 05 A122.pdf | ||
| 36C24620R0152_3.docx | DOCX document | |
| Past Performance Questionnaire.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIPE TURN UP (UP)
PIPE TURN DOWN (DN)
MECHANICAL PIPING LEGEND
CONDENSATE DRAIN PIPINGCD
HEATING EFFICIENCY: SEE SCHEDULES
COOLING EFFICIENCY: SEE SCHEDULES
MECHANICAL SPACING CONDITIONING SYSTEM
BUILDING COOLING LOAD: EXISTING - NO CHANGE
BUILDING HEATING LOAD: EXISTING - NO CHANGE
EXISTING - NO CHANGE
MECHANICAL SYSTEMS, SERVICE SYSTEMS AND EQUIPMENT.
SUMMER WET BULB: 74.0°F
METHOD OF COMPLIANCE: PRESCRIPTIVE
CODE ENFORCEMENT JURISDICTION: VAMC
NAME OF PROJECT: DURHAM VAMC REPLACE PHARMACY AIR
HANDLER UNITS
BUILDING OCCUPANCY: I-2
OWNER/CONTACT PERSON: DEREK GROTHEER
ADDRESS: 508 FULTON STREET DURHAM, NC 27705
EXTERIOR DESIGN CONDITIONS:
WINTER DRY BULB: 17.5°F
SUMMER DRY BULB: 93.2°F
THERMAL ZONE: 4A
GROSS BUILDING AREA:
PROPOSED USE: HOSPITAL
MECHANICAL CODE SUMMARY
RELATIVE HUMIDITY: 50% R.H.
INTERIOR DESIGN CONDITIONS (PHARMACY COMPOUNDING):
WINTER DRY BULB: 64°F
SUMMER DRY BULB: 64°F
DESCRIPTION OF UNIT: MODULAR ROOFTOP & INDOOR AIR
HANDLING UNITS, LAB EXHAUST FANS
COOLING OUTPUT OF SYSTEMS: SEE SCHEDULES
HEAT OUTPUT OF SYSTEMS: SEE SCHEDULES
DESIGNATION DESCRIPTION
EXISTING TO REMAIN
(EQUIPMENT, DUCTWORK, PIPING, ETC.)
EXISTING/DEMO/NEW LEGEND
EXISTING TO BE DEMOlLISHED OR RELOCATED -
REFER TO PLAN NOTES PRIOR TO DEMOLITION
(EQUIPMENT, DUCTWORK, PIPING, ETC.)
NEW
(EQUIPMENT, DUCTWORK, PIPING, ETC.)
BEGINNING OR END OF NEW WORK -OR-
CONNECT TO EXISTING
MECHANICAL GENERAL NOTES
GENERAL ITEMS
1. GENERAL NOTES ON THIS DRAWING ARE APPLICABLE TO EACH HVAC
DRAWING OF THIS SET. SEE EACH DRAWING FOR SPECIFIC NOTES
APPLICABLE TO THAT DRAWING.
2. OVERHEAD PIPING AND DUCTWORK IN SPACES WITHOUT HUNG CEILINGS
SHALL BE RUN AS CLOSE TO ROOF DECK AS PRACTICAL, AS CLOSE TO
PARALLEL JOISTS AS POSSIBLE AND ABOVE LIGHTING FIXTURES TO
CONCEAL PIPING.
3. OVERHEAD DUCTWORK AND PIPING IN SPACES WITH CEILINGS SHALL BE
CONCEALED UNLESS OTHERWISE NOTED.
4. COORDINATE LOCATION OF GRILLES, REGISTERS, DIFFUSERS,
THERMOSTATS AND OTHER WALL OR CEILING MOUNTED HVAC
ACCESSORIES WITH REFLECTED CEILING PLAN, LIGHTING FIXTURE
LAYOUT AND ACCESSORIES INSTALLED BY OTHER TRADES SO AS TO
PRESENT A NEAT AND ATTRACTIVE INSTALLATION THROUGHOUT THE
ENTIRE BUILDING. IT IS THE INTENT FOR GRILLES, REGISTERS AND
DIFFUSERS TO BE INSTALLED IN THE CENTER OF CEILING PANELS.
5. ARRANGE PIPING AND DUCTWORK, PARTICULARLY ABOVE CEILING AS
REQUIRED TO CLEAR STRUCTURE, DUCTS, CONDUITS, ETC. ALLOWING
SPACE FOR PIPE HANGERS, ACCESS TO VALVES, FILTERS, AND
MAINTENANCE OF EQUIPMENT.
6. EQUIPMENT WITH FILTERS SHALL BE INSTALLED SO THAT FILTERS CAN BE
EASILY REMOVED AND REPLACED.
7. COORDINATE LOCATION AND INSTALLATION OF EQUIPMENT WITH OTHER
TRADES.
8. DO NOT SCALE DRAWINGS. SEE ARCHITECTURAL DRAWINGS FOR EXACT
LOCATIONS OF DOORS, WINDOWS, ETC.
9. THERMOSTATS SHALL BE LOCATED IN THE ROOMS INDICATED. INSTALL
AT 48" ABOVE FINISH FLOOR.
10. PIPING, DUCTWORK, VENTS, ETC., EXTENDING THROUGH EXTERIOR
WALLS AND ROOF SHALL BE FLASHED AND COUNTER FLASHED IN A
WEATHERPROOF MANNER.
11. PIPING AND DUCTWORK INSULATION SHALL RUN CONTINUOUSLY
THROUGH NON-RATED FLOORS, WALLS, ROOF AND PARTITIONS, UNLESS
OTHERWISE INDICATED.
12. FLEXIBLE AIR DUCTS SHALL HAVE UL 181 LISTING, FIBERGLASS SCRIM,
R-6 INSULATION, AND MAXIMUM DISTANCE OF 6'-0".
13. NO PIPING SHALL BE SMALLER THAN 3/4" UNLESS OTHERWISE NOTED.
14. PROVIDE UNION OR FLANGED CONNECTIONS AT EACH PIECE OF
EQUIPMENT AND ON BOTH SIDES OF CONTROL VALVES AND PRESSURE
REGULATING VALVES. PROVIDE SHUT-OFF VALVES ON BOTH SIDES OF
AUTOMATIC VALVES.
15. PIPING SHALL BE SUPPORTED IN ACCORDANCE WITH THE
SPECIFICATIONS. ADDITIONAL SUPPORTS OR HANGERS SHALL BE
ADJACENT TO ELBOWS TO PREVENT WEIGHT OF PIPING BEING PLACED
ON EQUIPMENT.
16. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE
WITH THE LATEST EDITION OF SMACNA'S "HVAC DUCT CONSTRUCTION
STANDARDS - METAL AND FLEXIBLE."
17. PROVIDE BEARING PLATES AND OTHER NECESSARY REINFORCEMENT AT
DUCTWORK SUPPORTS TO ENSURE THAT DUCT INSULATION MAINTAINS
REQUIRED "R" VALUES.
18. PROVIDE ACCESS DOORS IN DUCTWORK WHERE INDICATED OR
REQUIRED FOR ACCESS TO SYSTEM COMPONENTS INCLUDING THE
FOLLOWING:
A. DAMPER MOTORS AND/OR MOTOR OPERATED DAMPERS
B. FILTERS
C. FIRE DAMPERS AND SMOKE DAMPERS
D. SMOKE DETECTORS
19. PROVIDE A MINIMUM OF THREE TIMES THE FAN DIAMETER OF STRAIGHT
DUCTWORK OFF THE SUPPLY AIR FAN DISCHARGE BEFORE ANY TAKEOFFS
OR ELBOWS.
20. PROVIDE EXTENDED VOLUME DAMPER CONTROL RODS SO THAT HANDLES
ARE WELL CLEAR OF DUCT INSULATION.
DESIGNATION DESCRIPTION
TEST AND BALANCE NOTE
1. THE CONTRACTOR SHALL HIRE AN APPROVED TEST
AND BALANCE AGENCY TO PERFORM A FULL TEST
AND BALANCE OF THE RENOVATED AREAS AFTER
CONSTRUCTION IS COMPLETE. TEST AND BALANCE
SHALL INCLUDE (BUT NOT LIMITED TO) MODULAR AIR
HANDLING UNITS, EXHAUST FANS, VAV TERMINAL
UNITS, CHILLED WATER COILS, STEAM HEATING
COILS, STEAM HUMIDIFIERS, HEATING HOT WATER
COILS, AND EXISTING EQUIPMENT TO REMAIN.
2. THE CONTRACTOR IS RESPONSIBLE FOR TEST AND
BALANCE OF ALL SYSTEMS WITHIN THE RENOVATED
AREAS (INCLUDING EXISTING TO REMAIN
EQUIPMENT) TO ACHIEVE THE AIRFLOWS AND FLOW
RATES INDICATED ON THESE CONSTRUCTION
DOCUMENTS.
3. THESE DRAWINGS ARE BASED ON EXISTING
DOCUMENTS AND LIMITED FIELD OBSERVATIONS.
THE CONTRACTOR SHALL CONDUCT A TEST OF
EXISTING SYSTEMS PRIOR TO STARTING WORK TO
ESTABLISH AIRFLOWS FOR ALL EXISTING AIR
DISTRIBUTION DEVICES AND TO VERIFY SUFFICIENT
AIRFLOW IS AVAILABLE TO ACHIEVE THE AIRFLOWS
INDICATED ON THESE DRAWINGS. UPON
COMPLETION OF WORK, ALL AIR DISTRIBUTION
DEVICES NOT SPECIFICALLY TAGGED SHALL BE
BALANCED TO THEIR ORIGINAL AIRFLOWS. REPORT
ANY DEFICIENCIES TO THE VA COR AND ENGINEER
PRIOR TO STARTING WORK.
HOT WATER RETURN (HEATING)HWR
HOT WATER SUPPLY (HEATING)HWS
CHILLED WATER RETURNCWR
CHILLED WATER SUPPLYCWS
2-WAY CONTROL VALVE
BUTTERFLY VALVE
UNION
DIRECTION OF FLOW
FULL PORT BALL VALVE
AUTOMATIC FLOW LIMITING VALVE
AF
CHECK VALVE
Y-STRAINER
FS FLOW SWITCH
FM FLOW METER
TS TEMPERATURE SENSOR
PS PRESSURE SENSOR
RELATIVE HUMIDITYRH
RETURN AIRRA
PHASEPH
PRESSURE DROPPD
OUTDOOR AIROA
MINIMUM CIRCUIT AMPACITYMCA
MECHANICAL CONTRACTORM.C.
1000 BTU PER HOURMBH
MAXIMUMMAX
LEAVING AIR TEMPERATURELAT
FAN FILTER UNITFFU
CUBIC FEET PER MINUTECFM
BIOLOGICAL SAFETY CABINETBSC
SUPPLY AIR
NOISE CRITERIA
MAXIMUM OVER CURRENT PROTECTION
INCHES WATER GAUGE (PRESSURE)
FULL LOAD AMPS
SA
NC
MOCP
EXTERNAL STATIC PRESSURE
ALARM
AIR HANDLING UNIT
ABOVE FINISHED FLOOR
IN. WG.
FLA
ESP
AL
AHU
AFF
MECHANICAL ABBREVIATIONS
VARIABLE AIR VOLUMEVAV
SP STATIC PRESSURE
DESCRIPTIONDESIGNATION
ENTERING AIR TEMPERATUREEAT
SENSIBLESENS
EXHAUST FANEF
WET BULB TEMPERATUREWB
DRY BULB TEMPERATUREDB
ENGINEERING CONTROL CENTER (BAS)ECC
CONTROLS CONTRACTORC.C.
DIFFERENTIAL PRESSUREDP
VARIABLE FREQUENCY DRIVEVFD
TSP TOTAL STATIC PRESSURE
UNLESS NOTED OTHERWISEUNO
HORSEPOWERHP
SUPPLY AIR DUCT WITH TURNING VANES
TURNING UP/DOWN
DESIGNATION DESCRIPTION
RETURN AIR DUCT WITH TURNING VANES
TURNING UP/DOWN
MITERED 90 ELBOW WITH TURNING VANES
EXHAUST AIR DUCT WITH TURNING VANES
TURNING UP/DOWN
MECHANICAL SYMBOL LEGEND
DD
MANUAL VOLUME DAMPER WITH EXTENDED
CONTROL ROD
DUCT
CEILING MOUNTED SUPPLY DIFFUSER
CEILING MOUNTED RETURN GRILLE
CEILING MOUNTED EXHAUST GRILLE
T
TEMPERATURE SENSOR. MOUNT 4'-0" A.F.F. PER
THE ACCESSIBILITY CODE.
COMBINATION FIRE/SMOKE DAMPER, WITH 24V
ACTUATOR, VERTICAL, WITH ACCESS DOOR AND
DUCT SMOKE DETECTOR, UL 555 AND UL 555S.
F/S
FIRE DAMPER, VERTICAL, DYNAMIC TYPE WITH
BLADES OUT OF AIRSTREAM, WITH ACCESS DOOR,
UL 555.
FD
SMOKE DAMPER, VERTICAL, WITH ACCESS DOOR
AND DUCT SMOKE DETECTOR, UL 555.
SD
DUCT ACCESS DOOR LOCATION
DUCT SMOKE DETECTOR ASSEMBLY INCLUDING
SAMPLING TUBE AND SHUTDOWN RELAY.
INSTALLATION PER SECTION 907.3.1 OF THE 2018
INTERNATIONAL FIRE CODE
M
MOTORIZED CONTROL DAMPER WITH 24V
ACTUATOR
AD
COMPONENT
CERTIFICATION
ROOF MOUNTED
COMPONENT
IDENTIFICATION
TABLE NOTES:
1. FLEXIBLE CONNECTIONS REQUIRED FOR PIPE CONNECTIONS ONLY.
2. RESTRAINT IS NOT REQUIRED IF THE PIPING OR DUCTWORK IS SUPPORTED BY HANGERS WHERE EACH
HANGER IS 12 INCHES OR LESS IN LENGTH FROM THE TOP OF THE PIPE OR DUCT TO THE SUPPORTING
STRUCTURE. WHERE PIPES OR DUCTS ARE SUPPORTED ON A TRAPEZE, THE TRAPEZE SHALL BE
SUPPORTED BY HANGERS HAVING A LENGTH OF 12 INCHES OR LESS. WHERE ROD HANGERS ARE
USED, THEY SHALL BE EQUIPPED WITH SWIVELS, EYE NUTS OR OTHER DEVICES TO PREVENT BENDING
IN THE ROD.
3. ALL PIPING AND DUCTWORK, REGARDLESS OF SIZE, DESIGNED TO CARRY TOXIC, HIGHLY TOXIC, OR
EXPLOSIVE GASES OR USED FOR SMOKE CONTROL MUST BE RESTRAINED.
4. COMPONENT CERTIFICATION MUST BE SUPPLIED BY THE EQUIPMENT MANUFACTURER AT THE TIME OF
SUBMITTAL FOR REVIEW BY THE ENGINEER OF RECORD.
SEISMIC AND WIND REQUIREMENTS
FOR MECHANICAL SYSTEMS
INFORMATION FOR IBC-2018/ASCE 7-16
SEISMIC DESIGN CATEGORY: C
RISK CATEGORY: IV
FLOOR MOUNTED
WALL MOUNTED
COMPONENT SUPPORTS
NOT INLINE W/
DUCT/PIPE
INLINE W/
DUCT/PIPE
SUSPENDED
EQUIPMENT
REQUIRED
(SEE NOTE 4)
RESTRAIN ALL
SEISMIC
RESTRAINT
REQUIREMENT
1.5
RESTRAIN ALL
RESTRAIN IF > 75 LBS
PROVIDE FLEX .
CONN. (SEE NOTE 1)
13.2.2
13.1.4.5
ASCE 7-16
REFERENCE
13.1.4.5
13.1.4.5
13.6.5
13.1.4.5
13.6.7
COMPONENT IMPORTANCE
FACTOR (Ip)
SUSPENDED DUCTILE
PIPING
(STEEL, AL, CU, ETC.)
RESTRAIN IF > 2"
(SEE NOTE 2)
13.6.8.3.3.a
SUSPENDED NON-DUCTILE
PIPING (CAST IRON,
PLASTIC, CERAMIC)
RESTRAIN ALL
(SEE NOTE 2)
13.6.8.3.3
SUSPENDED PIPE
ON TRAPEZE
RESTRAIN IF ANY PIPE
ON TRAPEZE >2"
RESTRAIN IF TOTAL
WEIGHT OF PIPES ON
TRAPEZE >10 LBS/FT
(SEE NOTE 2)
13.6.8.3.1
DUCTWORK
RESTRAIN IF > 6 SQ.
FT. OR > 17 LBS/FT
(SEE NOTES 2,3)
13.6.7
MULTIPLE DUCTS ON
TRAPEZE
RESTRAIN IF TOTAL
WEIGHT OF DUCTS ON
TRAPEZE > 10 LBS/FT
(SEE NOTES 2,3)
13.6.7
1. PER 2018 INTERNATIONAL BUILDING CODE, MECHANICAL EQUIPMENT AND COMPONENTS,
INCLUDING THEIR SUPPORTS AND ATTACHMENTS, SHALL BE DESIGNED FOR SEISMIC FORCES IN
ACCORDANCE WITH CHAPTER 13 OF ASCE 7-16.
2. EXTERIOR EQUIPMENT (INCLUDING ROOF CURBS AND ROOF RAILS) EXPOSED TO WIND SHALL BE
DESIGNED AND INSTALLED TO RESIST THE WIND PRESSURES DETERMINED IN ACCORDANCE WITH
CHAPTERS 26 THROUGH 29 OF ASCE 7-16.
3. WHERE DESIGN FOR SEISMIC AND WIND LOADS IS REQUIRED, THE MORE DEMANDING FORCE MUST
BE USED.
4. REFERENCE THE STRUCTURAL DRAWINGS FOR SITE SPECIFIC INFORMATION ON SEISMIC DESIGN
CATEGORY, WIND SPEED, ETC.
5. USE TABLE BELOW TO DETERMINE SEISMIC RESTRAINT REQUIREMENTS FOR EACH COMPONENT.
6. FOR ALL COMPONENTS REQUIRING SEISMIC RESTRAINT, THE COMPONENT SUPPORTS AND
ATTACHMENTS SHALL BE DESIGNED BY A REGISTERED DESIGN PROFESSIONAL.
7. WHERE SEISMIC RESTRAINT IS REQUIRED, HOUSEKEEPING PADS NEEDED FOR THE INSTALLATION
OF EQUIPMENT UNDER THIS CONTRACT MUST BE DESIGNED BY THE SEISMIC ENGINEER. DO NOT
POUR ANY HOUSEKEEPING PADS PRIOR TO THE RECEIPT OF APPROVED SEISMIC SUBMITTAL.
8. SEISMIC RESTRAINTS FOR DUCTWORK, PIPING AND CONDUIT MUST BE SHOWN ON SEISMIC
SUBMITTAL LAYOUT DRAWINGS SHOWING SPECIFIC RESTRAINT LOCATIONS ALONG WITH
ACCOMPANYING DETAILS AND CALCULATIONS.
RESTRAIN ALL
RESTRAIN ALL
RESTRAIN ALL
AIR CONTROL VALVEACV
EXISTING TO BE DEMOLISHEDETBD
EXISTING TO REMAINETR
MEDIUM PRESSURE STEAM (30 PSI)MPS
MEDIUM PRESSURE STEAM (30 PSI)
CONDENSATE RETURN
MPR
VARIABLE FREQUENCY DRIVE
(VFD) NOTES
1. ALL VFD'S SHALL COMPLY WITH IEEE 519-2993. VFD
MANUFACTURER SHALL PROVIDE A DISTORTION
ANALYSIS.
2. ALL VFD'S SHALL BE LIMITED TO A MAXIMUM 60 HZ.
THE TEST AND BALANCE FIRM MAY NOT INCREASE THE
FREQUENCY ON ANY VFD ABOVE 60 HZ TO ACHIEVE
THE AIRFLOWS SHOWN ON THESE CONSTRUCTION
DOCUMENTS.
DUCT SEALING REQUIREMENTS
4.0" PRESSURE CLASSMEDIUM PRESSURE SUPPLY
DUCT PRESSURE REQUIREMENTS
PRESSURE CLASSDUCT SYSTEM
2.0" PRESSURE CLASSLOW PRESSURE SUPPLY
LOW PRESSURE RETURN
LOW PRESSURE EXHAUST
1. ALL DUCTWORK SHALL BE SEALED IN ACCORDANCE WITH
SEAL CLASS "A"
2. SEAL ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, WALL
PENETRATIONS, AND DUCT CONNECTIONS. PRESSURE SENSITIVE
TAPE SHALL NOT BE USED AS THE PRIMARY SEALANT, UNLESS IT
HAS BEEN CERTIFIED TO COMPLY WITH UL-181A OR UL181B BY AN
INDEPENDENT TESTING LABORATORY AND THE TAPE IS USED IN
ACCORDANCE WITH THAT CERTIFICATION.
3. LONGITUDINAL SEAMS ARE JOINTS ORIENTED IN THE
DIRECTION OF AIRFLOW. TRANSVERSE JOINTS ARE CONNECTIONS
OF TWO DUCT SECTIONS ORIENTED PERPENDICULAR TO AIRFLOW.
DUCT WALL PENETRATIONS ARE OPENINGS MADE BY ANY SCREW
FASTENER, PIPE, ROD, OR WIRE. SPIRAL LOCK SEAMS IN ROUND
DUCTS NEED NOT BE SEALED. ALL OTHER CONNECTIONS ARE
CONSIDERED TRANSVERSE JOINTS, INCLUDING BUT NOT LIMITED
TO SPIN-INS, TAPS AND OTHER BRANCH CONNECTIONS, ACCESS
DOORS FRAMES AND JAMBS, DUCT CONNECTIONS TO EQUIPMENT,
ETC.
2.0" PRESSURE CLASS
2.0" PRESSURE CLASS
PHASING & PRE-CONSTRUCTION NOTES
1. CONTRACTOR SHALL REVIEW THE PHASING REQUIREMENTS AND NOTES
INDICATED ON UPDATED PHASING SHEET A051 ISSUED UNDER
ADDENDUM 1. SOME EXISTING AREAS SHALL REMAIN OCCUPIED
MONDAY-SUNDAY. COORDINATE PHASING, DEMOLITION, NEW WORK,
AND ANY SHUT-DOWN OF EXISTING SYSTEMS WITH THE VA COR.
2. SUBMISSION OF A BID INDICATES THE CONTRACTOR HAS PARTICIPATED
IN THE PRE-BID WALK THROUGH AND IS FAMILIAR WITH EXISTING
CONDITIONS.
3. PRIOR TO BIDDING, THE CONTRACTOR SHALL CAREFULLY EXAMINE AND
FAMILIARIZE HIMSELF WITH THE PHASING REQUIREMENTS, EXISTING
CONDITIONS, AND NEW WORK SHOWN ON THE CONSTRUCTION
DOCUMENTS. SUBMISSION OF A PROPOSAL SHALL BE CONSIDERED AS
EVIDENCE THAT SUCH A REVIEW AND EXAMINATION HAS BEEN
PERFORMED.
4. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE CONTINUITY
OF HVAC SYSTEMS FOR ALL OCCUPIED AREAS WITHIN THE PROJECT
SCOPE DURING CONSTRUCTION - REFER TO UPDATED PHASING SHEET
A051 ISSUED UNDER ADDENDUM 1.
5. THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL WORK NEEDING TO BE
DONE AFTER HOURS OR ON WEEKENDS, ANY WORK REQUIRING
SHUTDOWNS, ANY WORK THAT MAY REQUIRE OVERTIME, AND ANY NEED
FOR TEMPORARY HEATING & COOLING. LATER CLAIMS FOR EXTRA
LABOR OR MATERIALS REQUIRED DUE TO DIFFICULTIES ENCOUNTERED
WILL NOT BE RECOGNIZED.
6. THE SPACE ABOVE CEILINGS IS VERY CONGESTED WITH EXISTING
MECHANICAL EQUIPMENT, DUCTWORK, MECHANICAL PIPING, PLUMBING
PIPING, SPRINKLER PIPING, ELECTRICAL CONDUIT, LIGHTS, CABLE
TRAYS, LOOSE CABLES, ABANDONED ITEMS, ETC. INSTALLATION OF
NEW EQUIPMENT, DUCTWORK, AND PIPING WILL BE CHALLENGING.
SOME AREAS ABOVE CEILINGS WERE NOT ACCESSIBLE AND EXTENSIVE
FIELD COORDINATION WILL BE REQUIRED.
7. ANY AIR INTAKES ADJACENT TO WORK AREAS SHALL BE FILTERED FROM
DUST AND DEBRIS WITH MINIMUM MERV 13 FILTRATION.
8. ALL PHASES SHALL BE KEPT UNDER NEGATIVE PRESSURE AND
EXHAUSTED DIRECTLY OUTDOORS.
TB TERMINAL BOX
DOMESTIC COLD WATER FOR
MECHANICAL EQUIPMENT
(INSTALLED BY P.C.)
DCW
MECHANICAL DOMESTIC COLD WATER
FOR MECHANICAL EQUIPMENT
(INSTALLED BY M.C.)
MDCW
ELECTRICAL CONTRACTORE.C.
EXISTING TO BE RELOCATEDETBR
COORDINATION DRAWINGS
1. A MEETING SHALL BE ARRANGED BY THE CONTRACTOR AND TAKE PLACE PRIOR TO STARTING THE
COORDINATION DRAWINGS. THIS MEETING SHALL INCLUDE AT A MINIMUM THE CONTRACTOR AND THE VA SUCH THAT WE CAN CONFIRM THE REQUIREMENTS OF THE COORDINATION DRAWINGS PRIOR TO
THEM BEING SUBMITTED.
2. THE CONTRACTOR SHALL COORDINATE WITH OTHER TRADES SO THAT THE FOLLOWING LISTS OF ITEMS CAN BE INDICATED ON A COMMON SET OF PLANS. FLOOR PLANS AND SECTIONS ARE TO BE DRAWN TO
SCALE IN ALL CONGESTED AREAS (SUCH AS CORRIDORS, CHASES, AND EQUIPMENT ROOMS) AND
SPECIFIC AREAS NOTED IN THESE DOCUMENTS. THESE SHALL BE SUBMITTED COLLECTIVELY FROM ALL DISCIPLINES INTO ONE OVERALL DOCUMENT FOR REVIEW BY THE ENGINEER ON AN AS NEEDED BASIS
OR WHERE SPECIFICALLY DIRECTED WITHIN THE CONTRACT DOCUMENTS. THESE COORDINATION
DRAWINGS SHALL BE SUBMITTED FOR REVIEW PRIOR TO ANY OTHER INDIVIDUAL PRODUCT DATA OR
FABRICATION DRAWINGS. SHOW THE FOLLOWING AT A MINIMUM:
• CEILING.
• FLOOR.
• ROOF OR FLOOR DECKING ABOVE.
• STRUCTURAL ELEMENTS.
• LIGHT FIXTURES.
• LARGE ELECTRICAL OR TELECOM CONDUITS AND/OR PULL BOXES.
• HVAC DUCTWORK.
• HVAC EQUIPMENT ABOVE CEILING, INDICATING SERVICE CLEARANCES.
• HVAC PIPING.
• PLUMBING PIPING.
• SPRINKLER PIPING.
• MOUNTING RACKS AND SUPPORT ASSEMBLIES FOR ASSOCIATED PIPING/DUCTWORK.
3. IT IS IMPORTANT TO NOTE THAT DUCTWORK/PIPING/CABLE TRAY, ETC. CANNOT BE FABRICATED UNTIL THE COORDINATION DRAWINGS HAVE BEEN COMPILED, SUBMITTED, AND APPROVED. ANY MATERIAL
PROCUREMENT OR INSTALLATION WORK COMMENCED PRIOR TO APPROVAL IS TAKEN AT THE RISK OF
THE CONTRACTOR AND MAY HAVE TO BE MODIFIED/MOVED AT THEIR COST.
REMOTE OPERATED MANUAL VOLUME DAMPER
WITH MINI CEILING CABLE TERMINATION - REFER
TO DETAILDUCT
AEROSOL INJECTION PORT ASSEMBLY WITH 3/4"
FLEXIBLE TUBING TO DUCT CONNECTION PLATE
LOCATED IMMEDIATELY DOWNSTREAM OF REMOTE
OPERATED DAMPER
H
ZONE HUMIDITY SENSOR. MOUNT 4'-0" A.F.F.
PER THE ACCESSIBILITY CODE.
EXHAUST AIREA
LOUVERLVR
LOW PRESSURE STEAM (10 PSI)
FOR STEAM-TO-STEAM HUMIDIFIERS
LPS
LOW PRESSURE STEAM (10 PSI)
FOR STEAM-TO-STEAM HUMIDIFIERS
LPR
PM
PRESSURE MONITOR. MOUNT 4'-0" A.F.F. PER
THE ACCESSIBILITY CODE.
CONTRACTING OFFICER'S REPRESENTATIVECOR
P -OR-
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: PRIME CONTRACTOR: Office of Construction and Facilities Management
102 THIRD AVENUE NORTHEAST
HICKORY, NORTH CAROLINA 28601
PHONE: 828.315.9962
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
CHARLOTTE | 704.295.4263
705 EAST MOREHEAD STREET, 28202
NC License No: C-2848
AME Project No: 18104
VA FORM 08-6231
F
E
D
C
B
A
PLAN NORTH TRUE NORTH
558-17-233
Durham VAMC Durham NC
REPLACE PHARMACY AHUS
RENOVATE F1204 & N1004
COMPOUNDING PHARMACIES
- M-001
WEBFFR
MECHANICAL - GENERAL NOTES AND LEGENDS
FINAL CONSTRUCTION DOCUMENTS - FOR BIDDING PURPOSES ONLY
1 Addendum 1 11/12/2020
| Sheets |
| M-001 - MECHANICAL - GENERAL NOTES AND LEGENDS |
| M-701 - MECHANICAL - DETAILS |
| MH101 - MECHANICAL - NEW WORK PLAN - LEVEL 01 & LEVEL 02 - F1204 |
| MH102 - MECHANICAL - NEW WORK PLAN - LEVEL 03 & ROOF - F1204 |
| MH103 - MECHANICAL - NEW WORK PLAN - LEVEL 00 & LEVEL 01 & ROOF - N1004 |
| MH201 - MECHANICAL - ENLARGED PHARMACY PLAN - F1204 |
| MH202 - MECHANICAL - ENLARGED PHARMACY PLAN - N1004 |
File details come from the government source that posted it. Updated .