This document includes a demolition plan and general notes for renovations to an existing pharmacy at a Veterans Affairs medical center, as well as the corresponding federal contract opportunity solicitation. The demolition plan outlines selective demolition requirements to prepare the interstitial mechanical space on level two for new construction, including removal of existing walls, doors, plumbing fixtures, equipment, flooring, windows, millwork, shelving, and ductwork. The general notes specify life safety protections, barrier installations, and coordination requirements. The related solicitation seeks proposals to renovate and replace the pharmacy's air handling units, with drawings, specifications, and narratives to be published separately, and the final RFP to follow the pre-solicitation notice. Proposals are due based on the future publication dates.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24620R0152 0002.docx | DOCX document | |
| RFI 11-13 -A121A -A121B.pdf | ||
| RFI 05 A122.pdf | ||
| RFI 10 A101A and A600.pdf | ||
| Interstitial 2nd Floor.pdf | ||
| RFI 001 Response Review VA Comments.pdf | ||
| RFI 22 A051.pdf | ||
| RFI 15 M-701.pdf | ||
| 36C24620R0152 0001.docx | DOCX document | |
| RFI 25 Attachment 2.pdf | ||
| RFI 19 -20 MH Sheets.pdf | ||
| RFI 16 -17 - 18- M-001.pdf | ||
| RFI 12 A600.pdf | ||
| Past Performance Questionnaire.pdf | ||
| 36C24620R0152_3.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D-15
GYP. FLOORING 25PSI CONCRETE
STRUCTURAL
FLOOR
D-16
E6 A102
D-15
1. SEE SPECIFICATIONS FOR ADDITIONAL SELECTIVE DEMOLITION
REQUIREMENTS.
2. SEE ENGINEERING DEMOLITION PLANS FOR ADDITIONAL
INFORMATION.
3. EXISTING ADJACENT ROOMS, ABOVE AND BELOW WILL REMAIN
OCCUPIED DURING CONSTRUCTION. NO DISRUPTION OF BUILDING
SYSTEMS OR OPERATIONS ARE PERMITTED WITHOUT PRIOR
APPROVAL BY COR.
4. REFER TO NEW CONSTRUCTION PLANS TO COORDINATE THE
EXTENT OF DEMOLITION WITH NEW CONSTRUCTION.
5. DEMOLITION OF BUILDING SYSTEMS INCLUDING CONDUIT, WIRING,
DUCTWORK AND PLUMBING LINES MAY EXTEND BEYOND THE LIMITS
SHOWN ON THE DEMOLITION PLANS. THIS WORK SHALL BE INCLUDED
IN THE CONTRACTORS SCOPE OF WORK.
6. THE GENERAL CONTRACTOR SHALL SEAL OR PROVIDE FILTERS ON
ALL REMAINING DUCTWORK TO PREVENT INFILTRATION OF DUST.
MAINTAIN FILTERS AS REQUIRED.
7. GENERAL CONTRACTOR SHALL MAINTAIN EGRESS AND INTEGRITY
OF LIFE SAFETY SYSTEMS DURING ALL DEMOLITION AND NEW
CONSTRUCTION.
1. REMOVE EXISTING WALL IN ITS ENTIRETY.
2. REMOVE EXISTING DOOR AND FRAME.
3. REMOVE EXISTING PLUMBING FIXTURE.
4. REMOVE EXISTING MODULAR FURNITURE OR PARTITION.
5. REMOVE EXISTING COMPOUNDING EQUIP. IN ITS ENTIRETY.
6.REMOVE EXISTING WALL AS RQD. FOR NEW DOOR.
7. REMOVE EXISTING EQUIP TO BE RELOCATED. SEE NEW PLAN FOR
LOCATION.
8. REMOVE FLOORING BACK TO CONCRETE SUBFLOOR.
9. REMOVE EXISTING WINDOW & ALL ASSOCIATED FLASHING. PROTECT
STRUCTURE & BUILDIGN INTERIOR DURING DURATION OF REMOVAL &
INFILL.
10. REMOVE EXISTING MILLWORK IN ITS ENTIRETY.
11. REMOVE EXISTING SHELVING AS RQD FOR NEW CONSTRUCTION
12. REMOVE EXISTING DOOR & FRAME TO BE REINSTALLED.
SEE NEW PLAN FOR LOCATION.
13. REMOVE EXISTING SINK UNIT IN ITS ENTIRETY TO BE REINSTALLED.
SEE NEW PLAN FOR LOCATION.
14. REMOVE EXISTING EMERGENCY SHOWER/EYE WASH STATION.
15. REMOVE EXISTING LOUVERS AS RQD. FOR AHU.
16. TEMPORARILY REMOVE EXISTING HVAC DUCT WORK.
17.CONTRACTOR SHALL INSTALL A CLASS 4 ICRA COMPLIANT
BARRIER AND MEASURES AT ALL TIMES. CONTRACTOR SHALL
INSTALL TEMPORARY PLASTIC BARRIER DURING SELECTIVE DEMO
AS NECESSARY TO CONSTRUCT A FIRE RATE 1 HOUR BARRIER.
COORDINATE WITH COR TO ENSURE THE BARRIER IS A CLASS 4
COMPLIANT SYSTEM.
D-#
LEVEL 01
0"
LEVEL 02 -
INTERSTITIAL
MECHANICAL
SPACE
12'-8"
LEVEL 03
25'-4"
ROOF
34'-0"
ETR
D-15 D-15
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: PRIME CONTRACTOR: Office of Construction and Facilities Management
102 THIRD AVENUE NORTHEAST
HICKORY, NORTH CAROLINA 28601
PHONE: 828.315.9962
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
CHARLOTTE | 704.295.4263
705 EAST MOREHEAD STREET, 28202
NC License No: C‐2848 AME Project No: 18104
VA FORM 08-6231
F
E
D
C
B
A
PLAN NORTH TRUE NORTH A102
DesignerChecker
DEMOLITION PLAN - LEVEL 02 INTERSTITIAL
SPACE
FINAL CONSTRUCTION DOCUMENTS - FOR BIDDING PURPOSES ONLY
June 30, 2020 June 30, 2020
1/4" = 1'-0"F1 FLR - LEVEL 02 -DEMO INTERSTITIAL SPACE
DEMOLITION GENERAL NOTES
DEMOLITION PLAN KEYED NOTES
1/8" = 1'-0"E6 F1204 EXTERIOR ELEVATION - DEMO
1 Addendum 1 11/12/2020
| Sheets |
| A051 - PHASING PLAN - LEVEL 01 |
| A101A - DEMOLITION PLAN - LEVEL 01 - F1204 |
| A102 - DEMOLITION PLAN - LEVEL 02 INTERSTITIAL SPACE |
| A121A - FLOOR PLAN - LEVEL 01 - F1204 |
| A121B - FLOOR PLAN - LEVEL 01 - N1004 |
| A122 - FLOOR PLAN - LEVEL 02 - INTERSTITIAL MECHANICAL SPACE |
| A500 - EXTERIOR ELEVATIONS |
| A600 - FINISH INFORMATION |
File details come from the government source that posted it. Updated .