This document package includes construction drawings and specifications for the renovation and expansion of operating rooms at the Charles George VA Medical Center in Asheville, North Carolina. The project involves renovating approximately 5,000 square feet of existing operating room space on the second floor as well as constructing an 8,000 square foot addition to house two new operating rooms. Renovation work includes demolition, construction, mechanical, electrical and plumbing systems upgrades. The construction drawings provide details on the demolition and new work plans, wall types, and reflected ceiling plans.
The related federal contract opportunity notice announces an upcoming solicitation for construction services for the project. Services will include permitting, construction, construction management, submittals, fixture installation, scheduling, testing, environmental protections, alterations and strengthening of existing structures, systems integration and expansion of existing operating room systems, commissioning, as-built drawings and closeout. The solicitation is expected to issue on January 13, 2020 with a response date of February 27, 2020. The project value is estimated between $10-20 million. The solicitation will be set aside 100% for service-disabled veteran-owned small businesses and issued on sam.gov.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
13 14 15 16
K
J
L
Ls
H.6
1 1
2 2
DS-3
DB209
DC2-B3
DB211
D213A D213B
D213
DB215
DC2-B2
GENERAL DEMOLITION NOTES
• DEMOLITION DRAWINGS INDICATE IN GENERAL, THE EXTENT OF DEMOLITION. REMOVE ALL ASSOCIATED APPURTENANCES NOT REQUIRED IN THE NEW WORK, ALL ABANDONED ITEMS, AND ALL ITEMS REQUIRED FOR THE INSTALLATION OF NEW WORK, TO PROVIDE FOR A COMPLETE PROJECT. ITEMS NOT SPECIFICALLY INDICATED THAT ARE QUESTIONABLE FOR REMOVAL SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT FOR A DECISION.
• THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL EXISTING CONDITIONS PRIOR TO
THE START OF CONSTRUCTION.
• THE CONTRACTOR SHALL PATCH ALL EXISTING SURFACES TO MATCH EXISTING WHERE AFFECTED BY CONSTRUCTION OPERATIONS, INCLUDING BUT NOT LIMITED TO PLUMBING, MECHANICAL AND ELECTRICAL
WORK.
• THE CONTRACTOR SHALL PATCH NAIL HOLES, ETC, AND REMOVE MISCELLANEOUS APPURTENANCES ON
EXISTING WALLS TO BE PAINTED OR COVERED WITH WALL COVERING.
• ALL EXISTING FLOORING MATERIALS WHICH ARE TO REMAIN IN PLACE SHALL BE COMPLETELY CLEANED
AND STRIPPED OF WAX IN ORDER TO RECEIVE NEW FINISHES.
• ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT UNLESS OTHERWISE NOTED.
• THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY
DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW WORK IS COMPLETE,
REGARDLESS IF THE ITEM WAS SPECIFICALLY NOTED OR NOT.
• THE CONTRACTOR SHALL REMOVE AND PATCH ANY AREAS UNCOVERED WHERE WOOD NAILERS OR GROUNDS ARE FOUND TO EXIST BEHIND ANY TRIM ITEMS OR EQUIPMENT REMOVED. WALLS SHALL BE
MADE FLUSH WITH EXISTING ADJACENT SURFACES AND READY TO RECEIVE NEW FINISHES.
• IF ANY ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON THE CONTRACT DOCUMENTS THE CONTRACTOR SHALL NOTIFY
THE ARCHITECT IMMEDIATELY.
• WHERE EXISTING VINYL WALL COVERING IS REMOVED ON EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL PATCH AND REPAIR WALL AS REQUIRED TO PROVIDE A LEVEL AND TRUE SURFACES ON WHICH TO
INSTALL NEW FINISHES.
• WHERE EXISTING CERAMIC TILE IS REMOVED FROM EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL LEVEL WALL WITH PLASTER AS REQUIRED TO PROVIDE A LEVEL AND TRUE SURFACES ON WHICH TO
INSTALL NEW FINISHES.
• WHERE EXISTING CERAMIC TILE IS REMOVED FROM CONCRETE FLOORS TO REMAIN, THE CONTRACTOR SHALL LEVEL FLOOR AREAS WITH CONCRETE AS REQUIRED TO BE LEVEL WITH ADJACENT FLOOR
SURFACES.
• ALL SIGNAGE WHICH OCCURS ON WALL OR ON DOORS TO BE REMOVED SHALL BE REMOVED BY THE
CONTRACTOR AND TURNED OVER TO THE OWNER.
• ALL FINISHES LISTED IN THE DEMOLITION SCHEDULE SHALL BE REMOVED COMPLETELY UNLESS INDICATED OTHERWISE. DEMOTION SHALL INCLUDE BACKINGS, MASTIC AND GLUES, SETTING BEDS, AND SUBSTRATE
AS REQUIRED TO PREPARE THE MATERIAL FOR NEW WORK AND/OR FINISHES.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS
OTHERWISE NOTED.
• EXISTING HAND RAIL AND BUMPER GUARD SHALL BE REMOVED AND TURNED OVER TO THE OWNER.
• ALL EXISTING NURSE CALL, SMOKE DETECTORS, AND SPEAKERS TO REMAIN AND REWORKED WITH NEW
CEILING SYSTEM.
• EXISTING WALL FINISHES TO BE VERIFIED AND PREPPED ACCORDINGLY FOR NEW FINISHES SCHEDULES -
BY CONTRACTOR.
DEMOLITION NOTES
*** DEMOLITION NOTES APPLY TO THIS SHEET ONLY ***
1. REMOVE DOOR, FRAME, AND HARDWARE AND TURN OVER TO COR.
2. REMOVE EXISTING WALL IN ITS ENTIRELY.
3. REMOVE BLANKET WARMER IN ITS ENTIRETY AND RETAIN FOR USE IN NEW WORK.
4. REMOVE EXSTING WINDOW IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO FRAME AND HARDWARE.
5. REMOVE EXISTING STAINLESS STEEL AND GLASS CABINET UNIT COMPLETE. SALVAGE AND TURN OVER TO COR.
6. REMOVE PLUMBING EQUIPMENT AND ACCESORIES IN ITS ENTIRETY.
7. REMOVE STAINLESS STEEL CORNER GUARD IN ITS ENTIRETY.
8. REMOVE EXISTING CMU WALL IN ITS ENTIRETY.
9. TEMPORARY PARTITION. PROVIDE CUT THRU AT END OF PHASE
PROJECT
LIMITS / PHASE
KEY PLAN
1A
1B2A
12 13 14 15 16 17 18 19
N
M
Ls
L
K
J
H.6
H
G
F.9
F.1
F 17.915W14W14E13E
F.3
F.4
G.4
G.6PLAN NORTH
ACTUAL
NORTH
A S e rv ic e
D is a b le d
Ve t e r an Owned S m a l l B u s iness
SDVOSB
CVE
R
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY
08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT / ENGINEERS:
X
Office of Construction and Facilities
Managemen t o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
NO. DESCRIPTION DATE
www.pfa-architect.com
ARCHITECTURE, PLANNING,
INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510 Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
8815 CENTRE PARK DRIVE, SUITE 200 COLUMBIA, MD
21045
410-750-2246 (BALT) 410-750-2588 (FAX)
KA PROJECT NUMBER: M023-08
K O
F F
E L
ASSOCIATES
ENGINEERS
Fire Protection
RENOVATE AND
EXPAND
OPERATING ROOMS
CHARLES GEORGE VAMC
ASHEVILLE, NC
2019-03-22
Approved: Medical Center Director
Building Number
TTI ENVIRONMENTAL, INC.
1253 NORTH CHURCH
STREET
MOORESTOWN, NJ 08057
BID DOCUMENTS
FULLY SPRINKLERED
637-315
Second Floor Demolition Plan jhtjht
AD102-
ALT
10/14/14
1/4" = 1'-0"
SECOND FLOOR DEMOLITION PLAN
DEMOLITION SCHEDULE
*** FINISHES LISTED IN THIS SCHEDULE ARE TO BE REMOVED COMPLETELY UNLESS
OTHERWISE NOTED ***
NUMBER FLOOR BASE WALL CEILING REMARKS
D213 SV SV CT PTD GWB
D213A VCT RB PTD GWB ACT
D213B SV SV PTD GWB ACT
DB209
DB211 SV SV CT PTD GWB
DB215
DC2-B2
DC2-B3
DS-3
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
ARCHITEC
T
DNDN
PROJECT
LIMITS / PHASE
KEY PLAN
1A
1B2A
12 13 14 15 16 17 18 19
N
M
Ls
L
K
J
H.6
H
G
F.9
F.1
F 17.915W14W14E13E
F.3
F.4
G.4
G.6PLAN NORTH
ACTUAL
NORTH
13 14 15 16 17
N
M
K
L
Ls
RAMP
1:12
M1B
RAMP
1:12
• CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT FOR A RESOLUTION. ADJUSTMENTS TO DIMENSIONS AND CONDITIONS SHOWN MAY BE
REQUIRED.
• ALL DIMENSIONS ARE REFERENCED FROM FACE OF STUD AT NEW CONSTRUCTION UNLESS
OTHERWISE NOTED. DIMENSIONS ARE REFERENCED FROM FACE OF FINISH AT EXISTING
CONSTRUCTION.
• ALL DIMENSIONS INDICATED +/- ARE APPROXIMATE AND MUST BE FIELD VERIFIED PRIOR TO THE START
OF CONSTRUCTION.
• PROVIDE SHALL MEAN TO SUPPLY, TO FURNISH AND TO INSTALL COMPLETE WITH ALL ACCESSORIES, PARTS AND/OR SERVICES TO BE READY FOR ITS INTENDED USE.
• WHERE WORK ABUTS OR ADJOINS EXISTING SURFACES WHICH WILL REMAIN EXPOSED, ALIGN NEW
WORK FLUSH WITH EXISTING ADJACENT SURFACES.
• THE CONTRACTOR SHALL MAINTAIN THE EXISTING BUILDING IN A WATER TIGHT CONDITION
THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. REPAIR DAMAGE CAUSED BY CONSTRUCTION
OPERATIONS. TAKE ALL PRECAUTIONS NECESSARY TO PROTECT THE BUILDING AND ITS OCCUPANTS
DURING THE CONSTRUCTION PERIOD.
• CONTRACTOR SHALL PROVIDE BARRIERS TO PREVENT ENTRY TO THE CONSTRUCTION AREA.
BARRIERS SHALL NOT INTERFERE WITH THE OWNERS USE OF THE SITE.
• THE CONTRACTOR SHALL PROVIDE NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO PREVENT
THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS ONLY UNLESS OTHERWISE
NOTED.
GENERAL NEW WORK NOTES
1. INFILL WALL TO MATCH EXISTING.
NEW WORK NOTES
A S e rv ic e
D is a b le d
Ve t e r an Owned S m a l l B u s iness
SDVOSB
CVE
R
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY
08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT / ENGINEERS:
X
Office of Construction and Facilities
Managemen t o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
NO. DESCRIPTION DATE
www.pfa-architect.com
ARCHITECTURE, PLANNING,
INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510 Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
8815 CENTRE PARK DRIVE, SUITE 200 COLUMBIA, MD
21045
410-750-2246 (BALT) 410-750-2588 (FAX)
KA PROJECT NUMBER: M023-08
K O
F F
E L
ASSOCIATES
ENGINEERS
Fire Protection
RENOVATE AND
EXPAND
OPERATING ROOMS
CHARLES GEORGE VAMC
ASHEVILLE, NC
2019-03-22
Approved: Medical Center Director
Building Number
TTI ENVIRONMENTAL, INC.
1253 NORTH CHURCH
STREET
MOORESTOWN, NJ 08057
BID DOCUMENTS
FULLY SPRINKLERED
637-315
Second Floor New Work Plan jhtjht
A102- ALT09/25/14
1/4" = 1'-0"
SECOND FLOOR
WALL TYPE SCHEDULE
TYPE STC DESCRIPTION FIRE RATING UL REMARKS
M1B N/A 1 5/8" METAL STUDS AT 16" O.C. MAX. 5/8" GWB ONE SIDE. EXTEND
GWB 4" ABOVE CEILING. FASTEN STUD TO UNDERSIDE OF DECK.
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
• ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL
CODES AND ORDINANCES.
• CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF
CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
ARCHITECT FOR A RESOLUTION.
• EACH SUB CONTRACTOR SHALL REVIEW THE CONSTRUCTION DOCUMENTS AND EVALUATE THE SCOPE OF WORK REQUIRED BY THEIR RESPECTIVE TRADE AND ANY CONFLICTS WITH OTHER TRADES. ANY CONFLICTS WILL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT FOR A RESOLUTION.
• PROVIDE SHALL MEAN TO SUPPLY, TO FURNISH AND TO INSTALL COMPLETE WITH ALL ACCESSORIES, PARTS AND/OR SERVICES TO BE READY FOR ITS INTENDED USE.
• CONTRACTOR SHALL COORDINATE ALL REQUIRED CONDUIT, PIPING AND CHASES FOR OWNER
FURNISHED OWNER INSTALLED EQUIPMENT WITH THE OWNER.
• CONTRACTOR SHALL COORDINATE WITH WORK BEING PERFORMED UNDER SEPARATE CONTRACT BY
OWNER.
• SEE FIRE PLAN FOR FIRE WALL AND SMOKE PARTITION LOCATIONS.
• ALL ABUTTING DISSIMILAR MATERIALS ARE TO BE SEALED. COLOR TO MATCH ADJACENT MATERIALS.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS
OTHERWISE NOTED.
1. GWB CEILING @ 8'-0" AFF
CEILING NOTES
GENERAL CEILING NOTES
2 X 2 INDIRECT
FLUORESCENT
LIGHT FIXTURE
CEILING LEGEND
EXHAUST AIR DIFFUSER
RETURN AIR DIFFUSER
SUPPLY AIR DIFFUSER
LINEAR DIFFUSER
2 X 4 INDIRECT
FLUORESCENT
LIGHT FIXTURE
RECESSED CEILING LIGHT
PENDANT LIGHT
EXIT SIGN
STRIP LIGHTING
3 LEVEL
FLUORESCENT
LIGHT FIXTURE
PROJECT
LIMITS / PHASE
KEY PLAN
1A
1B2A
12 13 14 15 16 17 18 19
N
M
Ls
L
K
J
H.6
H
G
F.9
F.1
F 17.915W14W14E13E
F.3
F.4
G.4
G.6PLAN NORTH
ACTUAL
NORTH
13 14 15 16 17
N
M
K
L
Ls
A S e rv ic e
D is a b le d
Ve t e r an Owned S m a l l B u s iness
SDVOSB
CVE
R
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY
08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT / ENGINEERS:
X
Office of Construction and Facilities
Managemen t o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
NO. DESCRIPTION DATE
www.pfa-architect.com
ARCHITECTURE, PLANNING,
INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510 Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
8815 CENTRE PARK DRIVE, SUITE 200 COLUMBIA, MD
21045
410-750-2246 (BALT) 410-750-2588 (FAX)
KA PROJECT NUMBER: M023-08
K O
F F
E L
ASSOCIATES
ENGINEERS
Fire Protection
RENOVATE AND
EXPAND
OPERATING ROOMS
CHARLES GEORGE VAMC
ASHEVILLE, NC
2019-03-22
Approved: Medical Center Director
Building Number
TTI ENVIRONMENTAL, INC.
1253 NORTH CHURCH
STREET
MOORESTOWN, NJ 08057
BID DOCUMENTS
FULLY SPRINKLERED
637-315
Second Floor Reflected Ceiling Plan jhtjht
A202 - ALT
ROOM LEGEND
NUMBER NAME
2081 CLEAN CORE
2082 Room
2083 RAMP
1/4" = 1'-0"
SECOND FLOOR REFLECTED CEILING PLAN
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
| Sheets |
| AD102- ALT - Second Floor Demolition Plan |
| A102- ALT - Second Floor New Work Plan |
| A202 - ALT - Second Floor Reflected Ceiling Plan |
File details come from the government source that posted it. Updated .