This notice announces an upcoming solicitation for construction services to renovate and expand operating rooms at the Charles George VA Medical Center in Asheville, North Carolina. The work includes renovating five existing operating rooms and constructing an 8,000 square foot expansion. Services include permitting, demolition, construction, management, submittals, equipment installation, scheduling, inspections, and commissioning. The estimated value is between $10-20 million. The solicitation will be issued on January 13th with responses due February 27th under NAICS 236220. It is reserved as a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. Potential offerors must attend a mandatory site visit on January 23rd and register in SAM and VIP databases to be considered. The solicitation and amendments will be posted to beta.sam.gov and no paper copies will be provided.
36C24620R0001 0001 Attachment VI - 637-315 02-Architectural.pdf
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOOR TAG
1i
1i
M349
ACE
EXISTING DOOR
NEW DOOR
DEMO DOOR
NEW WALL
EXISTING WALL
DEMO WALL OR ITEMS
ABOVE OR BELOW
WALL PROTECTION TAG
WALL TAG
ROOM NUMBER
REVISION TAG
EQUIPMENT TAG
TOILET ACCESSORY TAG
DEMOLITION NOTE
NEW WORK NOTE
A810
DEMO ROOM NUMBER
CURTAINWALL AND
WINDOW MARKER1i
INTERIOR ELEVATION
MARKER
SECTION OR WALL
SECTION NUMBER
COLUMN GRID NUMBER
EXISTING COLUMN
GRID NUMBER
A120
BUILDING ELEVATION
MARKER
A810
A810 DETAIL MARKER
ARCHITECTURAL SYMBOL LEGEND
1 PHASING NOTES
1. EXECUTE WORK BY METHODS TO
MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE
DISPLACED FOR VISUAL INSPECTIONS.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
C L A
S
I
C L
A
II
1. PROVIDE ACTIVE MEANS TO PREVENT
AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
2.WATER MIST WORK SURFACES TO
CONTROL DUST WHILE CUTTING.
3.SEAL UNUSED DOORS WITH DUCT TAPE.
4.BLOCK OFF AND SEAL AIR VENTS.
5.PLACE DUST MAT AT ENTRANCE AND EXIT
OF WORK AREA.
6.REMOVE OR ISOLATE HVAC SYSTEM IN
AREAS WHERE WORK IS BEING
PERFORMED.
1.WIPE WORK SURFACES WITH DISINFECTANT.
2.CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3.WIPE WORK SURFACES WITH DISINFECTANT,
WET MOP AND/OR VACUUM WITH HEPA
VACUUM BEFORE LEAVING WORK AREA.
4.REMOVE ISOLATION OF HVAC.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS
DEPENDING UPON THE AREA CLASS DESIGNATION
C L A
II
I
C L A
IV
1.REMOVE OR ISOLATE HVAC SYSTEM IN AREA
WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2.COMPLETE ALL CRITICAL BARRIERS, I.E.,
SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON-WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS.
3.MAINTAIN NEGATIVE AIR PRESSURE WITHIN
WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
4.CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
5.COVER TRANSPORT RECEPTACLES OR
CARTS. TAPE COVERING UNLESS SOLID LID.
1.DO NOT REMOVE BARRIERS FROM WORK
AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE ENVIRONMENTAL HEALTH
AND SAFETY AND INFECTION CONTROL AND
THOROUGHLY CLEANED BY ENVIRONMENTAL
SANITATION SECTION.
2.REMOVE BARRIER MATERIALS CAREFULLY TO
MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
3.VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
4.WET MOP AREA WITH DISINFECTANT.
5.REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
1.OBTAIN INFECTION CONTROL PERMIT BEFORE
CONSTRUCTION BEGINS.
2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK
IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
3.COMPLETE ALL CRITICAL BARRIERS OR
IMPLEMENT CONTROL CUBE METHOD BEFORE
CONSTRUCTION BEGINS.
4.MAINTAIN NEGATIVE AIR PRESSURE WITHIN
WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
5.SEAL HOLES, PIPES, CONDUITS AND
PUNCTURES APPROPRIATELY.
6.CONSTRUCT ANTEROOM AND REQUIRE ALL
PERSONNEL TO PASS THROUGH THIS ROOM
SO THEY CAN BE VACUUMED USING A HEPA
VACUUM CLEANER BEFORE LEAVING WORK SITE
OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME
THEY LEAVE THE WORK SITE.
7.ALL PERSONNEL ENTERING WORK SITE ARE
REQUIRED TO WEAR SHOE COVERS.
1.DO NOT REMOVE BARRIERS FROM WORK
AREA UNTIL COMPLETED PROJECT IS
THOROUGHLY CLEANED BY ENVIRONMENTAL
MANAGEMENT.
2.VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
3.WET MOP AREA WITH DISINFECTANT.
4.REMOVE BARRIER MATERIALS CAREFULLY
TO MINIMIZE SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH CONSTRUCTION.
5.CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
6.COVER TRANSPORT RECEPTACLES OR
CARTS. TAPE COVERING.
7.REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING
PERFORMED.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
PATIENT RISK GROUP TABLE
GROUP 1
LOW RISK
GROUP 2
MEDIUM
RISK
GROUP 3
HIGH RISK
GROUP 4
HIGHEST RISK
- ADMINISTRATIVE OFFICES
- PUBLIC CORRIDORS
- ELEVATORS
- DAY ROOMS
- CANTEEN RETAIL STORE
- VACANT WARDS OR
VACANT ICU'S ETC.
- OUTPATIENT, URGENT
CARE & PRIMARY CARE
CLINICS
- LABORATORY
- CARDIOLOGY
- ECHOCARDIOGRAPHY
- ENDOSCOPY
- FOOD SERVICES
- INTERIM CARE & MEDICAL
UNITS
- NUCLEAR MEDICINE
- PHARMACY
- PHYSICAL THERAPY
- RADIOLOGY & NUCLEAR
MEDICINE
- RESPIRATORY THERAPY
- CCU
- EMERGENCY ROOM
- LABORATORY
- OUTPATIENT SURGERY
- PHARMACY
- POST ANESTHESIA CARE
UNIT
- SURGICAL UNITS
- ANY AREA CARING FOR
IMMUNICOMPROMISED
PATIENTS
- SPD STORAGE /
STERILIZATION
- INTENSIVE CARE UNITS
- TB NEGATIVE PRESSURE
ISOLATION ROOMS
-OPERATING ROOM
INFECTION CONTROL MATRIX - CLASS OF PRECAUTIONS:
CONSTRUCTION PROJECT BY PATIENT RISK
PATIENT RISK GROUP
LOW RISK GROUP 1
MEDIUM RISK GROUP 2
HIGH RISK GROUP 3
HIGHEST RISK GROUP 4
TYPE A TYPE B TYPE C TYPE D
I
I
I
II
II
II
II
III/IV
II
II
III/IV
III/IV
III/IV
IV
IV
IV
CONSTRUCTION PROJECT TYPE
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL
INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
Infection Control Risk Mitigation Recommendations Matrix of Precautions for Construction and Renovation
Type of Construction / Project Activity Table
TYPE A
Inspection and Non-Invasive Activities
Includes, but is not limited to:
-Removal of ceiling tiles for visual inspection limited to 20 Ln Ft tile per 160 sq. ft. space.
-Painting (but not sanding).
-Wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
-Patching walls - not exceeding 8 sq. ft.
TYPE B
Small scale, short duration activities which create minimal dust.
Includes, but is not limited to:
-Installation of telephone and computer cabling.
-Access to chase spaces.
-Cutting of walls or ceiling where dust migration can be controlled.
-Patching walls - exceeding 8 sq. ft.
TYPE C
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components and assemblies or new construction.
Includes, but is not limited to:
-Sanding of walls for painting or wall covering exceeding 32 sq. ft., or vacant areas.
-Removal of floor coverings, ceiling tiles and casework.
-New wall construction -Uncontained duct, HVAC or electrical work above ceilings.
-Major cabling activities.
-Any other project where high levels of dust are generated.
TYPE D
Major demolition and construction projects
Includes, but is not limited to:
-Activities that require consecutive work shifts -Requires heavy demolition or removal of a complete cabling system.
-New Construction.
A S e rv ic e
D is a b le d
Ve t e r an Owned S m a l l B u s iness
SDVOSB
CVE
R
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY
08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT / ENGINEERS:
X
Office of Construction and Facilities
Managemen t o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
NO. DESCRIPTION DATE
www.pfa-architect.com
ARCHITECTURE, PLANNING,
INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510 Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
8815 CENTRE PARK DRIVE, SUITE 200 COLUMBIA, MD
21045
410-750-2246 (BALT) 410-750-2588 (FAX)
KA PROJECT NUMBER: M023-08
K O
F F
E L
ASSOCIATES
ENGINEERS
Fire Protection
RENOVATE AND
EXPAND
OPERATING ROOMS
CHARLES GEORGE VAMC
ASHEVILLE, NC
2019-03-22
Approved: Medical Center Director
Building Number
TTI ENVIRONMENTAL, INC.
1253 NORTH CHURCH
STREET
MOORESTOWN, NJ 08057
BID DOCUMENTS
FULLY SPRINKLERED
637-315
Abbreviations, Legends and ICRA Requirements jhtjht A00003/04/15
FOR ALL WORK ON 1ST FLOOR
CONSTRUCTION TYPE: C
PATIENT RISK GROUP: MEDIUM RISK GROUP 2
CLASS OF PRECAUTION: CLASS II
FOR ALL WORK ON BASEMENT FLOOR
CONSTRUCTION TYPE: C
PATIENT RISK GROUP: LOW RISK GROUP 1
CLASS OF PRECAUTION: CLASS II
FOR ALL WORK ON 3RD FLOOR
CONSTRUCTION TYPE: C
PATIENT RISK GROUP: LOW RISK GROUP 1
CLASS OF PRECAUTION: CLASS II
FOR ALL WORK ON 2ND FLOOR
CONSTRUCTION TYPE: D
PATIENT RISK GROUP: HIGH RISK GROUP 4
CLASS OF PRECAUTION: CLASS IV
ACT
ADA
AFF
ATH
BRG
CC
CFCI
CFOI
CG
CI
CL
CLG
COL
CONC
CONT
CORR
CPT
CT
CR
DWGS
ELEC
ELEV
ETR
EWC
EXP
EXST
FEC
FIN
FO
FOF
FOS
FRL
GL
GPDW
GR
GSF
GWB
HDWR
HDW
HR
HT
L
LVT
MAT
MAX
MECH
MTG
MTL
NIC
NSF
OC
OD
ACOUSTICAL TILE
AMERICANS WITH DISABILITIES ACT
ABOVE FINISH FLOOR
ALUMINUM THRESHOLD
BRIDGING
CUBICLE CURTAIN
CONTRACTOR FURNISHED CONTRACTOR
INSTALLED
CONTRACTOR FURNISHED OWNER
INSTALLED
CORNER GUARD
CONTINUOUS INSULATION
CENTERLINE
CEILING
COLUMN
CONCRETE
CONTINUOUS
CORRIDOR
CARPET TILE
CERAMIC TILE
CHAIR RAIL
DRAWINGS
ELECTRIC(AL)
ELEVATOR
EXISTING TO REMAIN
ELECTRIC WATER COOLER
EXPOSED
EXISTING
FIRE EXTINGUISHER CABINET
FINISH(ED)
FACE OF
FACE OF FINISH
FACE OF STEEL
FIBER REINFORCED LAMINATE
GLASS TILE
GEORGIA PACIFIC DRYWALL
GROUT
GROSS SQUARE FOOTAGE
GYPSUM WALLBOARD
HARDWARE
HARDWARE
HOUR
HEIGHT
LENGTH
LUXURY VINYL TILE
CARPET MAT
MAXIMUM
MECHANICAL
MOUNTING
METAL
NOT IN CONTRACT
NET SQUARE FOOTAGE
ON CENTER
OVERFLOW DRAIN
OFCI
OFOI
PCF
PLAM
PNT
PT
PTD
R
RA
RB
RD
RF
RO
RTU
SC
SCHED
SHGC
SIM
SPMR
SS
STOR
STRUCT
SUSP.
SV
T
TLT
TPO
TOS
TYP
UON
VB
VCT
VERT
VWC
W/
WG
W/O
WP
WS
OWNER FURNISHED
CONTRACTOR INSTALLED
OWNER FURNISHED OWNER
INSTALLED
POUNDS PER CUBIC FOOT
PLASTIC LAMINATE
PAINT
PORCELAIN TILE
PAINTED
RISER
RETURN AIR
RUBBER BASE
ROOF DRAIN
RUBBER FLOOR TILE
ROUGH OPENING
ROOF TOP UNIT
SEALED CONCRETE
SCHEDULE
SOLAR HEAT GAIN COEFFICIENT
SIMILAR
SINGLE PLY MEMBRANE ROOFING
SOLID SURFACE
STORAGE
STRUCTURAL
SUSPENDED
SHEET VINYL
TREAD
TOILET
THERMOPLASTIC POLYOLEFIN
TOP OF STEEL
TYPICAL
UNELSS OTHERWISE NOTED
VINYL BASE
VINYL COMPOSITION TILE
VERTICAL
VINYL WALL COVERING
WITH
WALL GUARD
WITHOUT
WALL PANEL
WAINSCOT
AT
ANGLE
CENTER LINE
DIAMETER
ABBREVIATIONS
ø
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
ARCHITEC
T
STORAGE
SKY
LIGHT
STORAGE
SKY
LIGHT
UPUP
UP UP
XXX SF
X
XXX XXX
OCCUPANT LOAD TAG
ROOM AREA
LOAD FACTOR/
OCCUPANT LOAD
USE GROUP
FIRE EXTINGUISHER CABINET
FE
C
EGRESS CAPACITY TAG
XX" DOOR
XX"
INCH/PERSON
XXX PEOPLE
X'-XX"
MAX TRAVEL DISTANCE
REQUIRED EXIT E
LIFE SAFETY LEGEND
E
HE
E
99'-4"184'-0"
HE
E E
FEC
FEC
FEC
FEC
OPEN TO BELOW
EXISTING
2 HR
WALL
EXISTING 2 HR WALL
EXTERIOR WALL
EXISTING 4" CMU WALL
NEW 2HR RATED PARTITION
ROOF ACCESS
CORRIDOR SMOKE PARTITION
1 HOUR FIRE PARTITION
SMOKE BARRIER
2 HOUR FIRE PARTITION
2 HOUR FIRE/SMOKE BARRIER
WALL LEGEND
1 HOUR/SMOKE BARRIER
LIFE SAFETY PLAN LEGEND
E
FEC
EXIT
FIRE EXTINGUISHER CABINET
114'-0" TRAVEL DISTANCE TO EXIT
88' - 11" TRAVEL DISTANCE TO SUITE EXIT
HE HORIZONTAL EXIT
PROJECT
LIMITS / PHASE
KEY PLAN
1A
1B2A
12 13 14 15 16 17 18 19
N
M
Ls
L
K
J
H.6
H
G
F.9
F.1
F 17.915W14W14E13E
F.3
F.4
G.4
G.6PLAN NORTH
ACTUAL
NORTH
BUILDING REGULATION DATA
IBC 2012
USE GROUP
I2: INSTITUTIONAL
CONSTRUCTION TYPE TABLE 601
TYPE 1A FULLY SPRINKLERED
STRUCTURAL FRAME: 3 HOURS
BEARING WALLS: 3 HOURS
FLOOR CONSTRUCTION: 2 HOURS
ROOF CONSTRUCTION: 1 1/2 HOURS
BUILDING AREA AND HEIGHTS TABLE 503
UNLIMITED
HAZARDOUS AREAS TABLE 509
WASTE AND LINEN COLLECTION ROOMS IN USE
GROUP I-2 : 1 HOUR
SECTION 407 GROUP I-2
TRAVEL DISTANCE MAX 200'x0" TO BARRIER DOOR.
407.3 CORRIDOR WALL CONSTRUCTION
CORRIDOR WALLS SHALL BE CONSTRUCTED AS
SMOKE PARTITIONS
407.5 SMOKE BARRIERS
SMOKE BARRIERS SHALL BE PROVIDED TO
SUBDIVIDE EVERY STORY INTO NO FEWER THAN 2
AN AREA OF NO MORE THAN 22,500 SF.
SMOKE BARRIER DOOR TABLE 716.5
1/3 HOUR
MEANS OF EGRESS
EXIT ACCESS TRAVEL DISTANCE TABLE 1016.2
B: 200 FEET WITH SPRINKLER SYSTEM
SECTION 1015 : EXIT AND EXIT ACCESS
DOORWAYS
TWO EXITS ARE REQUIRED SEPARATION
DISTANCE 1/2 THE DIAGONAL WITH SPRINKLER
SYSTEM
EGRESS WIDTH
10053.1 STAIRWAYS CAPACITY IS OCCUPANT
LOAD x .2 INCHES
10053.2 CORRIDORS CAPACITY IS OCCUPANT
LOAD x .15 INCHES
MINIMUM CORRIDOR WIDTH TABLE 1018.2
44 INCHES
96 INCHES GROUP I-2 WHERE REQUIRED FOR
BED MOVEMENT
SHAFT ENCLOSURE 713.4
SHAFT SHALL HAVE FIRE-RESISTANT ROOFING
OF NOT LESS THAN 1 HOUR WHEN
CONNECTING LESS THAN 4 STORIES.
USE GROUP
CHAPTER 18/19 NEW AND EXISTING
HEALTHCARE OCCUPANCIES
CHAPTER 43 BUILDING REHABILITATION
CONSTRUCTION TYPE TABLE 19.1.6.1
TYPE 1 (332) NFPA 220 2015 EDITION
BEARING ALLS 3 HOURS
COLUMNS SUPPORTING MORE THAN ONE
FLOOR: 3 HOURS
BEAMS SUPPORTING MORE THAN ONE
FLOOR: 3 HOURS
FLOOR - CEILING ASSEMBLIES: 2 HOURS
ROOF CEILING ASSEMBLIES: 1 1/2 HOURS
NUMBER OF STORIES
UNLIMITED
HAZARDOUS AREA PROTECTION TABLE
18.3.2.1
ROOMS WITH SOILED LINEN IN VOLUME
GREATER THAN 64 GAL: 1 HOUR
STORAGE ROOMS GREATER THAN 50 SF
AND LESS THAN 100 SF STORING
COMBUSTIBLE MATERIAL PROVIDE
STORAGE ROOMS GREATER THAN 100 SF W/
COMBUSTIBLE MATERIAL: 1 HOUR
ROOMS WITH COLLECTING TRASH IN
VOLUME EXCEEDING 64 GAL: 1 HOUR
CONSTRUCTION OF CORRIDOR HALLS
18.3.6.2.3
CORRIDOR WALLS SHALL FORM A BARRIER
TO BLOCK THE TRANSFER OF SMOKE
SUB DIVISION OF BUILDING SPACE 18.3.7
EVERY STORY OF AMBULATORY
HEALTHCARE FACILITY SHALL DIVIDE INTO
NOT LESS THAN 2 SMOKE COMPARTMENTS
NOT EXCEEDING 22,500SF
TRAVEL DISTANCE FROM ANY POINT TO
REACH SMOKE BARRIER DOOR : 200'-0"
SMOKE BARRIER DOOR EXHIBIT 18/19.90
DOORS IN SMOKE BARRIERS SHALL BE NO
LESS THAN 1-3/4" SELF CLOSING.
LATCHING HARDWARE NOT REQUIRED
18.3.7.8
NFPA 101 2012
INTERNATIONAL BUILDING CODE (IBC 2012)
NFPA-101 LIFE SAFETY CODE (2012)
NFPA-220 STANDARD TYPE OF BUILDING CONSTRUCTION (2012)
NFPA-10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS (2012)
NFPA-70 NATIONAL ELECTRIC CODE (2008)
NFPA-101 LIFE SAFETY CODE (2012) CHAPTER 43.6 RECONSTRUCTION
APPLICABLE CODES AND STANDARDS:
MEANS OF EGRESS
TRAVEL DISTANCE TO EXIT 18.2.6.2.1
TRAVEL DISTANCE SHALL NOT EXCEED 200
FEET WITH SPRINKLER SYSTEM
NUMBER OF MEANS OF EGRESS 18.2.4.2
NOT LESS THAN 2
SEPARATION DISTANCE NOT LESS THAN 1/3 THE
DIAGONAL 7.5.1.3.3
EGRESS WIDTH TABLE 7.3.3.1
STAIRWAYS : OCCUPANCY LOAD x 3 INCHES CORRIDORS : OCCUPANCY LOAD x .2 INCHES
CAPACITY OF MEANS OF EGRESS 18.2.3.4
SHALL NOT BE LESS THAN 8' CLEAR
18.2.3.4 (1) MINIMUM WIDTH OF 44 INCHES IN
NON PATIENT AREAS
SHAFT 8.6.5 ITEM 2
SHAFTS LESS THAN 4 STORIES SHALL HAVE 1-
HOUR FIRE BARRIER.
FINISH REQUIREMENTS (NFPA 101 10.2.2):
EXIT ENCLOSURES/EXIT PASSAGEWAYS:
CLASS A OR B
EXIT ACCESS CORRIDORS & OTHER EXIT
WAYS: CLASS A OR B
ROOMS & ENCLOSED SPACES: CLASS A, B,
OR C
FLOORS IN EXIT ENCLOSURES, EXIT
PASSAGEWAYS AND CORRIDORS
(OTHER THAN WOOD, VINYL, LINOLEUM, AND
RESILIENT FLOORS
W/O FIBER MATERIALS): CLASS I OR II
FIRE PROTECTION:
AUTOMATIC SPRINKLER SYSTEMS: FULLY
SPRINKLERED
PORTABLE FIRE EXTINGUISHERS (NFPA 10):
CLASS ABC TYPE, MIN RATING 2-A
WHERE INDICATED ON LIFE SAFETY PLAN
MAXIMUM TRAVEL DISTANCE: 75'
A S e rv ic e
D is a b le d
Ve t e r an Owned S m a l l B u s iness
SDVOSB
CVE
R
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY
08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT / ENGINEERS:
X
Office of Construction and Facilities
Managemen t o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
NO. DESCRIPTION DATE
www.pfa-architect.com
ARCHITECTURE, PLANNING,
INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510 Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
8815 CENTRE PARK DRIVE, SUITE 200 COLUMBIA, MD
21045
410-750-2246 (BALT) 410-750-2588 (FAX)
KA PROJECT NUMBER: M023-08
K O
F F
E L
ASSOCIATES
ENGINEERS
Fire Protection
RENOVATE AND
EXPAND
OPERATING ROOMS
CHARLES GEORGE VAMC
ASHEVILLE, NC
2019-03-22
Approved: Medical Center Director
Building Number
TTI ENVIRONMENTAL, INC.
1253 NORTH CHURCH
STREET
MOORESTOWN, NJ 08057
BID DOCUMENTS
FULLY SPRINKLERED
637-315
Life Safety Second Floor Plan jhtjht
LS102.110/18/12
1/16" = 1'-0"
SECOND FLOOR -LIFE SAFETY PLAN
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
TR #
A263B
TLT
SURGERY
SKY
LIGHT
S
TR #
A263B
TLT
SURGERY
SKY
LIGHT
N
20x10 RG
8" AFF
975 CFM
(LOW)
20x10 RG
8" AFF
975 CFM
(LOW)
18x10 RG
8" AFF
940 CFM
(LOW)
18x10 RG
8" AFF
940 CFM
(LOW)
20x10 RR
1200 CFM
(LOW WALL)
20x10 RR
1200 CFM
(LOW WALL)
18x12 RR
1340 CFM
(LOW WALL)
20x10 RR
1115 CFM
(LOW WALL)
20x10 RR
1110 CFM
(LOW WALL)
16x12 RR
1015 CFM
(LOW WALL)
18x12 RR
1335 CFM
(LOW WALL)
16x12 RR
1015 CFM
(LOW WALL)
14x14 RR
1020 CFM
(LOW WALL)
18x10 RR
1100 CFM
(LOW WALL)
16x12 RR
1100 CFM
(LOW WALL)
UP UP
STORAGESTORAGE
N
20x10 RG
8" AFF
975 CFM
(LOW)
20x10 RG
8" AFF
975 CFM
(LOW)
18x10 RG
8" AFF
940 CFM
(LOW)
18x10 RG
8" AFF
940 CFM
(LOW)
20x10 RR
1200 CFM
(LOW WALL)
20x10 RR
1200 CFM
(LOW WALL)
18x12 RR
1340 CFM
(LOW WALL)
20x10 RR
1115 CFM
(LOW WALL)
20x10 RR
1110 CFM
(LOW WALL)
16x12 RR
1015 CFM
(LOW WALL)
18x12 RR
1335 CFM
(LOW WALL)
16x12 RR
1015 CFM
(LOW WALL)
14x14 RR
1020 CFM
(LOW WALL)
18x10 RR
1100 CFM
(LOW WALL)
16x12 RR
1100 CFM
(LOW WALL)
UPUP
UP UP
9742 SF
SMOKE ZONE 3
9975 SF
SMOKE ZONE 2
9099 SF
SMOKE ZONE 4
SMOKE ZONE LEGEND
SMOKE ZONE 1
SMOKE ZONE 2
SMOKE ZONE 3
SMOKE ZONE 4
13484 SF
SMOKE ZONE 1
CORRIDOR SMOKE PARTITION
1 HOUR FIRE PARTITION
SMOKE BARRIER
2 HOUR FIRE PARTITION
2 HOUR FIRE/SMOKE BARRIER
WALL LEGEND
SUITES INFORMATION
SUITES 18.2.5.7.1
SUITE SEPERATION SHALL BE CONSTRUCTED IN ACCORDANCE IN 18.3.6.2 - CORRIDOR WALLS.
PATIENT CARE NON SLEEPING SUITES MAXIMUM SIZE 10,000 SF. (18.2.5.7.3)
NON SLEEPING SUITES REQUIRE 2 EXIT ACCESS DOORS IF MORE THAN 2500 SF (18.2.5.7.3.2)
ONE MEANS OF EGRESS SHALL BE DIRECT TO A CORRIDOR OR AN EXIT STAIR.
ONE MEANS OF EGRESS SHALL BE PERMITTED TO BE INTO ANOTHER SUITE.
TRAVEL DISTANCE WITHIN A NON SLEEPING TO AN EXIT ACCESS SHALL NOT EXCEED 100 FEET (18.2.5.7.3.4A)
TRAVEL DISTANCE WITHIN A NON SLEEPING SUITE TO AN EXIT SHALL NOT EXCEED 200 FEET (18.2.5.7.3.4.B)
NFPA 101-2012 LIFE SAFETY PLAN LEGEND
E
FEC
EXIT
FIRE EXTINGUISHER CABINET
114'-0" TRAVEL DISTANCE TO EXIT
88' - 11" TRAVEL DISTANCE TO SUITE EXIT
HE HORIZONTAL EXIT
6639 SF
SUITE 1
3740 SF
SUITE 2
SUITE LEGEND
SUITE 1
SUITE 2
E
99'-4"184'-0"
HE
E
HE
E
98'-6"
78'-2"
90'-8"
PROJECT
LIMITS / PHASE
KEY PLAN
1A
1B2A
12 13 14 15 16 17 18 19
N
M
Ls
L
K
J
H.6
H
G
F.9
F.1
F 17.915W14W14E13E
F.3
F.4
G.4
G.6PLAN NORTH
ACTUAL
NORTH
A S e rv ic e
D is a b le d
Ve t e r an Owned S m a l l B u s iness
SDVOSB
CVE
R
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY
08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT / ENGINEERS:
X
Office of Construction and Facilities
Managemen t o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
NO. DESCRIPTION DATE
www.pfa-architect.com
ARCHITECTURE, PLANNING,
INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510 Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
8815 CENTRE PARK DRIVE, SUITE 200 COLUMBIA, MD
21045
410-750-2246 (BALT) 410-750-2588 (FAX)
KA PROJECT NUMBER: M023-08
K O
F F
E L
ASSOCIATES
ENGINEERS
Fire Protection
RENOVATE AND
EXPAND
OPERATING ROOMS
CHARLES GEORGE VAMC
ASHEVILLE, NC
2019-03-22
Approved: Medical Center Director
Building Number
TTI ENVIRONMENTAL, INC.
1253 NORTH CHURCH
STREET
MOORESTOWN, NJ 08057
BID DOCUMENTS
FULLY SPRINKLERED
637-315
Smoke and Suite Plans jhtjht
LS102.210/09/14
1/16" = 1'-0"
SMOKE ZONES - SECOND FLOOR
1/16" = 1'-0"
SUITE PLANS - SECOND FLOOR
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
1 1
GENERAL DEMOLITION NOTES
• DEMOLITION DRAWINGS INDICATE IN GENERAL, THE EXTENT OF DEMOLITION. REMOVE ALL
ASSOCIATED APPURTENANCES NOT REQUIRED IN THE NEW WORK, ALL ABANDONED ITEMS,
AND ALL ITEMS REQUIRED FOR THE INSTALLATION OF NEW WORK, TO PROVIDE FOR A
COMPLETE PROJECT. ITEMS NOT SPECIFICALLY INDICATED THAT ARE QUESTIONABLE FOR
REMOVAL SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR A DECISION.
• PROTECT ALL EXISTING AND NEW WORK FROM WATER INFILTRATION DURING
CONSTRUCTION.
• THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL EXISTING
CONDITIONS PRIOR TO THE START OF CONSTRUCTION.
• THE CONTRACTOR SHALL PATCH ALL EXISTING SURFACES TO MATCH EXISTING WHERE
AFFECTED BY CONSTRUCTION OPERATIONS, INCLUDING BUT NOT LIMITED TO PLUMBING,
MECHANICAL AND ELECTRICAL WORK.
• THE CONTRACTOR SHALL PATCH NAIL HOLES, ETC, AND REMOVE MISCELLANEOUS
APPURTENANCES ON EXISTING WALLS TO BE PAINTED OR COVERED WITH WALL COVERING.
• ALL EXISTING FLOORING MATERIALS WHICH ARE TO REMAIN IN PLACE SHALL BE COMPLETELY
CLEANED AND STRIPPED OF WAX IN ORDER TO RECEIVE NEW FINISHES.
• ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT UNLESS OTHERWISE
NOTED.
• THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE
PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW WORK
IS COMPLETE, REGARDLESS IF THE ITEM WAS SPECIFICALLY NOTED OR NOT.
• THE CONTRACTOR SHALL REMOVE AND PATCH ANY AREAS UNCOVERED WHERE WOOD
NAILERS OR GROUNDS ARE FOUND TO EXIST BEHIND ANY TRIM ITEMS OR EQUIPMENT
REMOVED. WALLS SHALL BE MADE FLUSH WITH EXISTING ADJACENT SURFACES AND READY
TO RECEIVE NEW FINISHES.
• IF ANY ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF
CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON THE CONTRACT DOCUMENTS THE
CONTRACTOR SHALL STOP WORK IN THAT AREA IMMEDIATELY AND NOTIFY THE COR.
• WHERE EXISTING VINYL WALL COVERING IS REMOVED ON EXISTING WALLS TO REMAIN, THE
CONTRACTOR SHALL PATCH AND REPAIR WALL AS REQUIRED TO PROVIDE A LEVEL AND TRUE
SURFACE ON WHICH TO INSTALL NEW FINISHES.
• WHERE EXISTING CERAMIC TILE IS REMOVED FROM EXISTING WALLS TO REMAIN, THE
CONTRACTOR SHALL LEVEL WALL WITH PLASTER AS REQUIRED TO PROVIDE A LEVEL AND
TRUE SURFACE ON WHICH TO INSTALL NEW FINISHES.
• WHERE EXISTING CERAMIC TILE IS REMOVED FROM CONCRETE FLOORS TO REMAIN, THE
CONTRACTOR SHALL LEVEL FLOOR AREAS WITH CONCRETE AS REQUIRED TO BE LEVEL WITH
ADJACENT FLOOR SURFACES.
• ALL SIGNAGE WHICH OCCURS ON WALL OR ON DOORS TO BE REMOVED SHALL BE
REMOVED BY THE CONTRACTOR AND TURNED OVER TO THE COR.
• ALL FINISHES LISTED IN THE DEMOLITION SCHEDULE SHALL BE REMOVED COMPLETELY
UNLESS INDICATED OTHERWISE. DEMOLITION SHALL INCLUDE BACKINGS, MASTIC AND
GLUES, SETTING BEDS, AND SUBSTRATE AS REQUIRED TO PREPARE THE MATERIAL FOR
NEW WORK AND/OR FINISHES.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY
UNLESS OTHERWISE NOTED.
• EXISTING HAND RAIL AND BUMPER GUARD SHALL BE REMOVED AND TURNED OVER TO THE
COR.
• ALL EXISTING NURSE CALL, SMOKE DETECTORS, AND SPEAKERS TO REMAIN AND
REWORKED WITH NEW CEILING SYSTEM.
• EXISTING WALL FINISHES TO BE VERIFIED AND PREPPED ACCORDINGLY FOR NEW FINISHES
SCHEDULES - BY CONTRACTOR.
• EXISTING CEILING HEIGHT IS TYPICALLY 8'-0" +/-, VERIFY IN FIELD.
• EXISTING FLOOR TO FLOOR HEIGHTS ARE AS FOLLOWS: BASEMENT TO 1ST = 13'-9 1/4", 1ST
TO 2ND = 12'-10 5/8", 2ND TO 3RD = 11'-9 1/4".
• SEE THE S700 SERIES FOR PHOTOGRAPHS OF DEMOLITION WORK REQUIRED AROUND
COLUMNS AND FOOTING
• THESE DEMOLITION NOTES ARE FOR ARCHITECTURAL WORK ONLY. SEE ALL OTHER
DRAWINGS FOR DEMOLITION INFORMATION PERTAINING TO OTHER DISCIPLINES.
• FOR ICRA WALL INFORMATION SEE SHEETS ICRA-102.1 AND ICRA-102.2.
• SALVAGE ALL EXISTING NURSE CALLS, SMOKE DETECTORS AND SPEAKERS REQUIRED TO
BE REMOVED FOR NEW WORK.
2 2 2
FLOOR PLAN DEMOLITION NOTES
1. REMOVE WALL AROUND COLUMN AS REQUIRED TO INSTALL NEW REINFORCEMENT AROUND COLUM. SEE STRUCTURAL
DRAWINGS.
2. REMOVE CEILING AS REQUIRED TO INSTALL NEW REINFORCEMENT AROUND COLUMNS.
3. REMOVE EXISTING COMPUTER FLOOR AS REQUIRED TO UPGRADE COLUNS. REINSTALL FLOORING WHEN WORK IS
COMPLETED.
4. SALVAGE EXISTING DOOR. RELOCATED IN NEW WORK DRAWING.
5. ICRA TEMPORARY FULL HEIGHT PARTITION. DEMOLITON AFTER THE COMPLETION OF NEW WORK.
*** FLOOR PLAN DEMOLITION NOTES APPLY TO THIS SHEET ONLY ***
FLOOR PLAN NEW WORK NOTES
1. EXTEND EXISTING WALL AND PLACE SALVAGED DOOR WHERE LOCATED.
2. COLUMN REINFORCING, SEE STRUCTURAL DRAWINGS.
3. ICRA TEMPORARY FULL HEIGHT PARTITION. DEMOLITON AFTER THE COMPLETION OF NEW WORK.
*** FLOOR PLAN DEMOLITION NOTES APPLY TO THIS SHEET ONLY ***
GENERAL NEW WORK NOTES
• CONTRACTOR TO MATCH EXISTING FINISHES AFTER COLUMN REINFORCEMENT IS COMPLETE.
• ALL NEW WORK SHOWN ON THIS SHEET PERTAINS TO ARCHITECTURAL WORK ONLY. SEE OTHER DISCIPLINES DRAWINGS
FOR MORE INFORMATION.
A S e rv ic e
D is a b le d
Ve t e r an Owned S m a l l B u s iness
SDVOSB
CVE
R
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY
08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT / ENGINEERS:
X
Office of Construction and Facilities
Managemen t o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
NO. DESCRIPTION DATE
www.pfa-architect.com
ARCHITECTURE, PLANNING,
INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510 Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
8815 CENTRE PARK DRIVE, SUITE 200 COLUMBIA, MD
21045
410-750-2246 (BALT) 410-750-2588 (FAX)
KA PROJECT NUMBER: M023-08
K O
F F
E L
ASSOCIATES
ENGINEERS
Fire Protection
RENOVATE AND
EXPAND
OPERATING ROOMS
CHARLES GEORGE VAMC
ASHEVILLE, NC
2019-03-22
Approved: Medical Center Director
Building Number
TTI ENVIRONMENTAL, INC.
1253 NORTH CHURCH
STREET
MOORESTOWN, NJ 08057
BID DOCUMENTS
FULLY SPRINKLERED
637-315
Demolition and New Work Plans
- Basement jhtjht
AD100B02/20/15
1/8" = 1'-0"
DEMOLITION PLAN BASEMENT
1/8" = 1'-0"
NEW WORK PLAN - BASEMENT
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
9 TYP.
FLOOR PLAN DEMOLITION
NOTES
1. ICRA TEMPORARY FULL HEIGHT PARTITION. DEMOLITON AFTER THE COMPLETION OF NEW WORK.
2. REMOVE EXISTING WINDOW AND FRAME IN ITS ENTIRETY. MODIFY FRAME TO FIT IN NEW OPENING.
NEW WINDOW TO MATCH EXISTING MATERIAL AND FINISH.
3. REMOVE DOOR AND RETAIN FOR REUSE.
4. REMOVE EXISTING CEILING.
5. REMOVE EXISTING SKYLIGHT IN ITS ENTIRETY. MAINTAIN WATER TIGHT CONDITION.
6. REMOVE WALL AROUND COLUMN AS REQUIRED TO INSTALL NEW REINFORCING AROUND COLUMN.
SEE STRUCTURAL DRAWINGS.
7. EXISTING PARTITION IS REINFORCED CMU. REMOVE PORTION ABOVE CEILING AS REQUIRED TO
INSTALL NEW WORK. REINSTALL NEW REINFORCED CMU TO DECK ABOVE TO MATCH EXISTING.
8. EXISTING WALL IS 2-HOUR RATED. REINSTALL TO MATCH EXISTING RATING AND FIRE SEAL ALL
PENETRATIONS.
9. NEW STEEL STRUCTURE ABOVE.
*** FLOOR PLAN DEMOLITION NOTES APPLY TO THIS SHEET ONLY ***
-EXTENTS OF EXISTING CEILING DEMOLITION. NEW
WORK TO MATCH EXISTING UNLESS OTHERWISE
NOTED.
FIRST FLOOR DEMOLITION LEGEND
INDICATES ABOVE STRUCTURAL UPGRADES. GENERAL INTENT
IS TO REMOVE CEILINGS AND PORTION OF WALL THAT
EXTENDS ABOVE CEILING, AS REQUIRED TO INSTALL NEW
STRUCTURE. EXISTING WALLS SHALL BE REINSTALLED TO
PREVIOUS CONDITIONS AND NEW ACT CEILING OR GWB
CEILING SHALL BE INSTALLED UNLESS OTHERWISE NOTED.
GENERAL DEMOLITION NOTES
• DEMOLITION DRAWINGS INDICATE IN GENERAL, THE EXTENT OF DEMOLITION. REMOVE ALL ASSOCIATED APPURTENANCES NOT REQUIRED IN THE NEW WORK, ALL ABANDONED ITEMS, AND ALL ITEMS REQUIRED FOR THE INSTALLATION OF NEW WORK, TO PROVIDE FOR A COMPLETE PROJECT. ITEMS NOT SPECIFICALLY INDICATED THAT ARE QUESTIONABLE FOR REMOVAL SHALL BE
BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR A DECISION.
• THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL EXISTING CONDITIONS PRIOR TO THE START OF
CONSTRUCTION.
• THE CONTRACTOR SHALL PATCH ALL EXISTING SURFACES TO MATCH EXISTING WHERE AFFECTED BY CONSTRUCTION OPERATIONS, INCLUDING BUT NOT LIMITED TO PLUMBING, MECHANICAL AND ELECTRICAL WORK.
• THE CONTRACTOR SHALL PATCH NAIL HOLES, ETC, AND REMOVE MISCELLANEOUS APPURTENANCES ON EXISTING WALLS TO BE
PAINTED OR COVERED WITH WALL COVERING.
• ALL EXISTING FLOORING MATERIALS WHICH ARE TO REMAIN IN PLACE SHALL BE COMPLETELY CLEANED AND STRIPPED OF WAX IN
ORDER TO RECEIVE NEW FINISHES.
• ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT UNLESS OTHERWISE NOTED.
• THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW WORK IS COMPLETE, REGARDLESS IF THE ITEM WAS SPECIFICALLY NOTED OR
NOT.
• THE CONTRACTOR SHALL REMOVE AND PATCH ANY AREAS UNCOVERED WHERE WOOD NAILERS OR GROUNDS ARE FOUND TO EXIST BEHIND ANY TRIM ITEMS OR EQUIPMENT REMOVED. WALLS SHALL BE MADE FLUSH WITH EXISTING ADJACENT SURFACES AND READY
TO RECEIVE NEW FINISHES.
• IF ANY ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON THE CONTRACT DOCUMENTS THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY.
• WHERE EXISTING VINYL WALL COVERING IS REMOVED ON EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL PATCH AND REPAIR WALL AS REQUIRED TO PROVIDE A LEVEL AND TRUE SURFACES ON WHICH TO INSTALL NEW FINISHES.
• WHERE EXISTING CERAMIC TILE IS REMOVED FROM EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL LEVEL WALL WITH PLASTER AS REQUIRED TO PROVIDE A LEVEL AND TRUE SURFACES ON WHICH TO INSTALL NEW FINISHES.
• WHERE EXISTING CERAMIC TILE IS REMOVED FROM CONCRETE FLOORS TO REMAIN, THE CONTRACTOR SHALL LEVEL FLOOR AREAS
WITH CONCRETE AS REQUIRED TO BE LEVEL WITH ADJACENT FLOOR SURFACES.
• ALL SIGNAGE WHICH OCCURS ON WALL OR ON DOORS TO BE REMOVED SHALL BE REMOVED BY THE CONTRACTOR AND TURNED
OVER TO THE OWNER.
• ALL FINISHES LISTED IN THE DEMOLITION SCHEDULE SHALL BE REMOVED COMPLETELY UNLESS INDICATED OTHERWISE. DEMOTION SHALL INCLUDE BACKINGS, MASTIC AND GLUES, SETTING BEDS, AND SUBSTRATE AS REQUIRED TO PREPARE THE MATERIAL FOR NEW
WORK AND/OR FINISHES.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS OTHERWISE NOTED.
• EXISTING HAND RAIL AND BUMPER GUARD SHALL BE REMOVED AND TURNED OVER TO THE OWNER.
• ALL EXISTING NURSE CALL, SMOKE DETECTORS, AND SPEAKERS TO REMAIN AND REWORKED WITH NEW CEILING SYSTEM.
• EXISTING WALL FINISHES TO BE VERIFIED AND PREPPED ACCORDINGLY FOR NEW FINISHES SCHEDULES - BY CONTRACTOR.
• EXISTING CEILING HEIGHT IS TYPICALLY 8'-0" +/-, VERIFY IN FIELD.
• EXISTING FLOOR TO FLOOR HEIGHTS ARE AS FOLLOWS: BASEMENT TO 1ST = 13'-9 1/4", 1ST TO 2ND = 12'-10 5/8", 2ND TO 3RD = 11'-9 1/4".
• SEE THE S700 SERIES FOR PHOTOGRAPHS OF DEMOLITION WORK REQUIRED AROUND COLUMNS AND FOOTING
• THESE DEMOLITION NOTES ARE FOR ARCHITECTURAL WORK ONLY. SEE ALL OTHER DRAWINGS FOR DEMOLITION INFORMATION
PERTAINING TO OTHER DISCIPLINES.
• FOR ICRA WALL INFORMATION SEE SHEETS ICRA-102.1 AND ICRA-102.2.
13 14 15 16 17 18
N
M
K
J
H
G
F
12 19
L
H.6
11109
E
D
KEY PLAN
PLAN NORTH
ACTUA
L
NORTH
PROJECT LIMITS / PHASE
ELEVATORS
STAIRS
PARTIAL BUILDING
FOOTPRINT
A S e rv ic e
D is a b le d
Ve t e r an Owned S m a l l B u s iness
SDVOSB
CVE
R
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY
08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT / ENGINEERS:
X
Office of Construction and Facilities
Managemen t o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
NO. DESCRIPTION DATE
www.pfa-architect.com
ARCHITECTURE, PLANNING,
INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510 Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
8815 CENTRE PARK DRIVE, SUITE 200 COLUMBIA, MD
21045
410-750-2246 (BALT) 410-750-2588 (FAX)
KA PROJECT NUMBER: M023-08
K O
F F
E L
ASSOCIATES
ENGINEERS
Fire Protection
RENOVATE AND
EXPAND
OPERATING ROOMS
CHARLES GEORGE VAMC
ASHEVILLE, NC
2019-03-22
Approved: Medical Center Director
Building Number
TTI ENVIRONMENTAL, INC.
1253 NORTH CHURCH
STREET
MOORESTOWN, NJ 08057
BID DOCUMENTS
FULLY SPRINKLERED
637-315
Demolition Plan - First Floor jasjht
AD10102/25/15
1/8" = 1'-0"
DEMOLITION PLAN - FIRST FLOOR
NTSAD101
3 WINDOW DEMOLITION
WINDOW TO BE DEMOLISHED. REPLACE
WITH NEW WINDOW, MATIERLA AND
FINISHES TO MATCH EXISTING. ADJUST
WIDTH OF WINDOW TO FIT NEW
OPENING.
REMOCE UPLIGHTS BELOW DEMOLISHED
SKYLIGHT.
MATCH EXISTING DIFFUSER AND LIGHT
LAYOUT IN LOWER SOFFIT NEW WORK
CEILING PLAN.
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
DB283
8 4
8 4
8 4
4 8
4 8
PROJECT
LIMITS / PHASE
KEY PLAN
1A
1B2A
12 13 14 15 16 17 18 19
N
M
Ls
L
K
J
H.6
H
G
F.9
F.1
F 17.915W14W14E13E
F.3
F.4
G.4
G.6PLAN NORTH
ACTUAL
NORTH
DEMOLITION NOTES
1. REMOVE DOOR, FRAME, AND HARDWARE AND TURN OVER TO COR.
2. REMOVE EXISTING WALL IN ITS ENTIRETY.
3. REMOVE BLANKET WARMER IN ITS ENTIRETY AND RETAIN FOR USE IN NEW WORK.
4. REMOVE EXISTING PRECAST AS NECESSARY TO DO NEW WORK. REMOVE IN ITS ENTIRITY TO NEAREST
JOINT.
5. REMOVE EXISTING STAINLESS STEEL AND GLASS CABINET UNIT COMPLETE. SALVAGE AND TURN OVER TO
COR.
6. REMOVE PLUMBING EQUIPMENT AND ACCESSORIES IN ITS ENTIRETY.
7. REMOVE STAINLESS STEEL CORNER GUARDs IN THEIR ENTIRETY WITHIN THE CORRIDOR.
8. REMOVE EXISTING BRICK.
9. REMOVE ENTIRE EXISTING PRECAST PANEL AS NEEDED TO INSTALL NEW WORK.
10. REMOVE EXISTING ROOF AND INSULATION IN ITS ENTIRETY. MAINTAIN WATER TIGHT CONDITION.
11. REMOVE EXISTING MECHANICAL GRAVITY VENT. RETAIN FOR REUSE. SEE SHEET A300.
12. REMOVE EXISTING SKYLIGHT IN ITS ENTIRETY. MAINTAIN WATER TIGHT CONDITION
13. REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY.
14. REMOVE EXISTING STORE FRONT IN ITS ENTIRETY.
15. REMOVE EXISTING CONC CURB IN ITS ENTIRETY.
16. REMOVE EXISTING PRE CAST PANEL AND ALUM WINDOWS IN ITS ENTIRETY.
17. REMOVE PORTION OF EXISTING CONCRETE BEAM ALONG GRID NUMBER 16 BETWEEN COLUMN GRID L & K.
NEW TOP OF BEAM TO MATCH EXISTING SECOND FLOOR ELEVATION. SEE STRUCTURAL DRAWINGS FOR
MORE INFORMATION.
18. SALVAGE EXISTING STAIR AND SUPPORTS IN THEIR ENTIRETY. STAIR TO BE RELOCATED IN NEW WORK.
PATCH EXISTING ROOF AS NECESSARY.
19. REMOVE EXISTING CMU UP TO PRECAST BEAM ABOVE. REMOVE BRICK AS NEEDED TO INSTALL NEW
WORK.
*** DEMOLITION NOTES APPLY TO SHEETS AD102.1 AND AD102.2 ***
GENERAL DEMOLITION NOTES
• DEMOLITION DRAWINGS INDICATE IN GENERAL, THE EXTENT OF DEMOLITION. REMOVE ALL ASSOCIATED APPURTENANCES NOT REQUIRED IN THE NEW WORK, ALL ABANDONED ITEMS, AND ALL ITEMS REQUIRED FOR THE INSTALLATION OF NEW WORK, TO PROVIDE FOR A COMPLETE PROJECT. ITEMS NOT SPECIFICALLY INDICATED THAT ARE QUESTIONABLE FOR REMOVAL SHALL BE
BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR A DECISION.
• THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL EXISTING CONDITIONS PRIOR TO THE START OF
CONSTRUCTION.
• THE CONTRACTOR SHALL PATCH ALL EXISTING SURFACES TO MATCH EXISTING WHERE AFFECTED BY CONSTRUCTION OPERATIONS, INCLUDING BUT NOT LIMITED TO PLUMBING, MECHANICAL AND ELECTRICAL WORK.
• THE CONTRACTOR SHALL PATCH NAIL HOLES, ETC, AND REMOVE MISCELLANEOUS APPURTENANCES ON EXISTING WALLS TO BE
PAINTED OR COVERED WITH WALL COVERING.
• ALL EXISTING FLOORING MATERIALS WHICH ARE TO REMAIN IN PLACE SHALL BE COMPLETELY CLEANED AND STRIPPED OF WAX IN
ORDER TO RECEIVE NEW FINISHES.
• ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT UNLESS OTHERWISE NOTED.
• THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW WORK IS COMPLETE, REGARDLESS IF THE ITEM WAS SPECIFICALLY NOTED OR
NOT.
• THE CONTRACTOR SHALL REMOVE AND PATCH ANY AREAS UNCOVERED WHERE WOOD NAILERS OR GROUNDS ARE FOUND TO EXIST BEHIND ANY TRIM ITEMS OR EQUIPMENT REMOVED. WALLS SHALL BE MADE FLUSH WITH EXISTING ADJACENT SURFACES AND READY
TO RECEIVE NEW FINISHES.
• IF ANY ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON THE CONTRACT DOCUMENTS THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY.
• WHERE EXISTING VINYL WALL COVERING IS REMOVED ON EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL PATCH AND REPAIR WALL AS REQUIRED TO PROVIDE A LEVEL AND TRUE SURFACES ON WHICH TO INSTALL NEW FINISHES.
• WHERE EXISTING CERAMIC TILE IS REMOVED FROM EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL LEVEL WALL WITH PLASTER AS REQUIRED TO PROVIDE A LEVEL AND TRUE SURFACES ON WHICH TO INSTALL NEW FINISHES.
• WHERE EXISTING CERAMIC TILE IS REMOVED FROM CONCRETE FLOORS TO REMAIN, THE CONTRACTOR SHALL LEVEL FLOOR AREAS
WITH CONCRETE AS REQUIRED TO BE LEVEL WITH ADJACENT FLOOR SURFACES.
• ALL SIGNAGE WHICH OCCURS ON WALL OR ON DOORS TO BE REMOVED SHALL BE REMOVED BY THE CONTRACTOR AND TURNED
OVER TO THE OWNER.
• ALL FINISHES LISTED IN THE DEMOLITION SCHEDULE SHALL BE REMOVED COMPLETELY UNLESS INDICATED OTHERWISE. DEMOTION SHALL INCLUDE BACKINGS, MASTIC AND GLUES, SETTING BEDS, AND SUBSTRATE AS REQUIRED TO PREPARE THE MATERIAL FOR NEW
WORK AND/OR FINISHES.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS OTHERWISE NOTED.
• EXISTING HAND RAIL AND BUMPER GUARD SHALL BE REMOVED AND TURNED OVER TO THE OWNER.
• ALL EXISTING NURSE CALL, SMOKE DETECTORS, AND SPEAKERS TO REMAIN AND REWORKED WITH NEW CEILING SYSTEM.
• EXISTING WALL FINISHES TO BE VERIFIED AND PREPPED ACCORDINGLY FOR NEW FINISHES SCHEDULES - BY CONTRACTOR.
• EXISTING CEILING HEIGHT IS TYPICALLY 8'-0" +/-, VERIFY IN FIELD.
• EXISTING FLOOR TO FLOOR HEIGHTS ARE AS FOLLOWS: BASEMENT TO 1ST = 13'-9 1/4", 1ST TO 2ND = 12'-10 5/8", 2ND TO 3RD = 11'-9 1/4".
• SEE THE S700 SERIES FOR PHOTOGRAPHS OF DEMOLITION WORK REQUIRED AROUND COLUMNS AND FOOTING
• THESE DEMOLITION NOTES ARE FOR ARCHITECTURAL WORK ONLY. SEE ALL OTHER DRAWINGS FOR DEMOLITION INFORMATION
PERTAINING TO OTHER DISCIPLINES.
• FOR ICRA WALL INFORMATION SEE SHEETS ICRA-102.1 AND ICRA-102.2.
DEMOLITION SCHEDULE NOTES
1. REMOVE WALLS ONLY AS INDICATED ON PLAN. EXISTING GWB TO REMAIN ON WALLS INDICATED TO
REMAIN.
2. REMOVE FINISHES ONLY AS REQUIRED TO ACCOMODATE NEW WORK.
3. NO WORK ANTICIPATED THIS ROOM.
4. REMOVE CEILING TO INSTALL NEW MECHANICAL WORK.
5. MINIMAL WORK THIS ROOM, PATCH ESITING FINISHINS AS REUIRED TO INSTALL NEW WORK.
A S e rv ic e
D is a b le d
Ve t e r an Owned S m a l l B u s iness
SDVOSB
CVE
R
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY
08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT / ENGINEERS:
X
Office of Construction and Facilities
Managemen t o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
NO. DESCRIPTION DATE
www.pfa-architect.com
ARCHITECTURE, PLANNING,
INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510 Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
8815 CENTRE PARK DRIVE, SUITE 200 COLUMBIA, MD
21045
410-750-2246 (BALT) 410-750-2588 (FAX)
KA PROJECT NUMBER: M023-08
K O
F F
E L
ASSOCIATES
ENGINEERS
Fire Protection
RENOVATE AND
EXPAND
OPERATING ROOMS
CHARLES GEORGE VAMC
ASHEVILLE, NC
2019-03-22
Approved: Medical Center Director
Building Number
TTI ENVIRONMENTAL, INC.
1253 NORTH CHURCH
STREET
MOORESTOWN, NJ 08057
BID DOCUMENTS
FULLY SPRINKLERED
637-315
Demolition Plan - Second & Third Floors - Phase 1 jasjht
AD102.110/14/14
1/8" = 1'-0"
DEMOLITION PLAN - SECOND FLOOR - PHASE 1
DEMOLITION SCHEDULE - PHASE 1 & 2
*** FINISHES LISTED IN THIS SCHEDULE ARE TO BE REMOVED
COMPLETELY UNLESS OTHERWISE NOTED ***
NUMBER FLOOR BASE WALL CEILING REMARKS
D213 SV SV CT PTD GWB 1
D213A VCT RB PTD GWB ACT -
D213B SV SV PTD GWB ACT 1
DB205 ETR ETR ETR ETR 1
DB206 SV SV CT ACT 1
DB207 SV SV CT PTD GWB 1
DB207A SV SV CMU BLOCK ACT 1
DB207B SV SV CMU BLOCK ACT 1
DB209 SV SV CMU BLOCK ACT 1,2
DB211 SV SV CT PTD GWB -
DB212 SV SV CT PTD GWB -
DB214 SV SV CT PTD GWB -
DB215 SV SV CT PTD GWB 1
DB217 ETR ETR ETR ACT 3
DB217A ETR ETR ETR ACT 3
DB218B ETR ETR ETR ETR 3
DB220A ETR ETR ETR ETR 5
DB221 SV SV ETR ACT 1
DB221A ETR ETR ETR ACT 4
DB221B ETR ETR ETR ACT 4
DB222 SV SV ETR ACT 1
DB283 VCT RB PTD GWB ACT
DC2-B1 ETR ETR ETR ETR 1
DC2-B2 SV SV CT ACT _
DC2-B3 SV SV CT ACT 1
DC2-B4 SV SV CT ACT 1
DS-3 ETR ETR ETR ETR 3
NTSAD102.1
2 SECOND AND THIRD FLOOR DEMOLITION 3D VIEW - PHASE 1
TYP
TYP
TYP
TYP
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
DB206
D207B
DB207A
DS-3
DB209
DC2-B3
DB207
DB211
D213A D213B
D213DB212
DB214
DB215
DC2-B5
DC2-B4
DC2-B2
DB221 DB217A
DB221A
DB222DB281B
DB220A
DB205
DC2-B1
DB217
PHASE 1
PHASE 2
ETR
FINISHES TO BE
REMOVED
E T
R
F
IN
IS
H
E S
T O
B E
R
M
O V
E D
ETRFINISHES TO BE REMOVED
DB221B DEMOLITION NOTES
1. REMOVE DOOR, FRAME, AND HARDWARE AND TURN OVER TO COR.
2. REMOVE EXISTING WALL IN ITS ENTIRETY.
3. REMOVE BLANKET WARMER IN ITS ENTIRETY AND RETAIN FOR USE IN NEW WORK.
4. REMOVE EXISTING PRECAST AS NECESSARY TO DO NEW WORK. REMOVE IN ITS ENTIRITY TO NEAREST
JOINT.
5. REMOVE EXISTING STAINLESS STEEL AND GLASS CABINET UNIT COMPLETE. SALVAGE AND TURN OVER TO
COR.
6. REMOVE PLUMBING EQUIPMENT AND ACCESSORIES IN ITS ENTIRETY.
7. REMOVE STAINLESS STEEL CORNER GUARDs IN THEIR ENTIRETY WITHIN THE CORRIDOR.
8. REMOVE EXISTING BRICK.
9. REMOVE ENTIRE EXISTING PRECAST PANEL AS NEEDED TO INSTALL NEW WORK.
10. REMOVE EXISTING ROOF AND INSULATION IN ITS ENTIRETY. MAINTAIN WATER TIGHT CONDITION.
11. REMOVE EXISTING MECHANICAL GRAVITY VENT. RETAIN FOR REUSE. SEE SHEET A300.
12. REMOVE EXISTING SKYLIGHT IN ITS ENTIRETY. MAINTAIN WATER TIGHT CONDITION
13. REMOVE EXISTING EXPANSION JOINT IN ITS ENTIRETY.
14. REMOVE EXISTING STORE FRONT IN ITS ENTIRETY.
15. REMOVE EXISTING CONC CURB IN ITS ENTIRETY.
16. REMOVE EXISTING PRE CAST PANEL AND ALUM WINDOWS IN ITS ENTIRETY.
17. REMOVE PORTION OF EXISTING CONCRETE BEAM ALONG GRID NUMBER 16 BETWEEN COLUMN GRID L & K.
NEW TOP OF BEAM TO MATCH EXISTING SECOND FLOOR ELEVATION. SEE STRUCTURAL DRAWINGS FOR
MORE INFORMATION.
18. SALVAGE EXISTING STAIR AND SUPPORTS IN THEIR ENTIRETY. STAIR TO BE RELOCATED IN NEW WORK.
PATCH EXISTING ROOF AS NECESSARY.
19. REMOVE EXISTING CMU UP TO PRECAST BEAM ABOVE. REMOVE BRICK AS NEEDED TO INSTALL NEW
WORK.
*** DEMOLITION NOTES APPLY TO SHEETS AD102.1 AND AD102.2 ***
GENERAL DEMOLITION NOTES
• DEMOLITION DRAWINGS INDICATE IN GENERAL, THE EXTENT OF DEMOLITION. REMOVE ALL ASSOCIATED APPURTENANCES NOT REQUIRED IN THE NEW WORK, ALL ABANDONED ITEMS, AND ALL ITEMS REQUIRED FOR THE INSTALLATION OF NEW WORK, TO PROVIDE FOR A COMPLETE PROJECT. ITEMS NOT SPECIFICALLY INDICATED THAT ARE QUESTIONABLE FOR REMOVAL SHALL BE
BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR A DECISION.
• THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL EXISTING CONDITIONS PRIOR TO THE START OF
CONSTRUCTION.
• THE CONTRACTOR SHALL PATCH ALL EXISTING SURFACES TO MATCH EXISTING WHERE AFFECTED BY CONSTRUCTION OPERATIONS, INCLUDING BUT NOT LIMITED TO PLUMBING, MECHANICAL AND ELECTRICAL WORK.
• THE CONTRACTOR SHALL PATCH NAIL HOLES, ETC, AND REMOVE MISCELLANEOUS APPURTENANCES ON EXISTING WALLS TO BE
PAINTED OR COVERED WITH WALL COVERING.
• ALL EXISTING FLOORING MATERIALS WHICH ARE TO REMAIN IN PLACE SHALL BE COMPLETELY CLEANED AND STRIPPED OF WAX IN
ORDER TO RECEIVE NEW FINISHES.
• ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT UNLESS OTHERWISE NOTED.
• THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW WORK IS COMPLETE, REGARDLESS IF THE ITEM WAS SPECIFICALLY NOTED OR
NOT.
• THE CONTRACTOR SHALL REMOVE AND PATCH ANY AREAS UNCOVERED WHERE WOOD NAILERS OR GROUNDS ARE FOUND TO EXIST BEHIND ANY TRIM ITEMS OR EQUIPMENT REMOVED. WALLS SHALL BE MADE FLUSH WITH EXISTING ADJACENT SURFACES AND READY
TO RECEIVE NEW FINISHES.
• IF ANY ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON THE CONTRACT DOCUMENTS THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY.
• WHERE EXISTING VINYL WALL COVERING IS REMOVED ON EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL PATCH AND REPAIR WALL AS REQUIRED TO PROVIDE A LEVEL AND TRUE SURFACES ON WHICH TO INSTALL NEW FINISHES.
• WHERE EXISTING CERAMIC TILE IS REMOVED FROM EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL LEVEL WALL WITH PLASTER AS REQUIRED TO PROVIDE A LEVEL AND TRUE SURFACES ON WHICH TO INSTALL NEW FINISHES.
• WHERE EXISTING CERAMIC TILE IS REMOVED FROM CONCRETE FLOORS TO REMAIN, THE CONTRACTOR SHALL LEVEL FLOOR AREAS
WITH CONCRETE AS REQUIRED TO BE LEVEL WITH ADJACENT FLOOR SURFACES.
• ALL SIGNAGE WHICH OCCURS ON WALL OR ON DOORS TO BE REMOVED SHALL BE REMOVED BY THE CONTRACTOR AND TURNED
OVER TO THE OWNER.
• ALL FINISHES LISTED IN THE DEMOLITION SCHEDULE SHALL BE REMOVED COMPLETELY UNLESS INDICATED OTHERWISE. DEMOTION SHALL INCLUDE BACKINGS, MASTIC AND GLUES, SETTING BEDS, AND SUBSTRATE AS REQUIRED TO PREPARE THE MATERIAL FOR NEW
WORK AND/OR FINISHES.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS OTHERWISE NOTED.
• EXISTING HAND RAIL AND BUMPER GUARD SHALL BE REMOVED AND TURNED OVER TO THE OWNER.
• ALL EXISTING NURSE CALL, SMOKE DETECTORS, AND SPEAKERS TO REMAIN AND REWORKED WITH NEW CEILING SYSTEM.
• EXISTING WALL FINISHES TO BE VERIFIED AND PREPPED ACCORDINGLY FOR NEW FINISHES SCHEDULES - BY CONTRACTOR.
• EXISTING CEILING HEIGHT IS TYPICALLY 8'-0" +/-, VERIFY IN FIELD.
• EXISTING FLOOR TO FLOOR HEIGHTS ARE AS FOLLOWS: BASEMENT TO 1ST = 13'-9 1/4", 1ST TO 2ND = 12'-10 5/8", 2ND TO 3RD = 11'-9 1/4".
• SEE THE S700 SERIES FOR PHOTOGRAPHS OF DEMOLITION WORK REQUIRED AROUND COLUMNS AND FOOTING
• THESE DEMOLITION NOTES ARE FOR ARCHITECTURAL WORK ONLY. SEE ALL OTHER DRAWINGS FOR DEMOLITION INFORMATION
PERTAINING TO OTHER DISCIPLINES.
• FOR ICRA WALL INFORMATION SEE SHEETS ICRA-102.1 AND ICRA-102.2.
PROJECT LIMITS
/ PHASE
KEY PLAN
1A
1B2A
12 13 14 15 16 17 18 19
N
M
Ls
L
K
J
H.6
H
G
F.9
F.1
F 17.915W14W14E13E
F.3
F.4
G.4
G.6PLAN NORTH
ACTUAL
NORTH
DEMOLITION SCHEDULE NOTES
1. REMOVE WALLS ONLY AS INDICATED ON PLAN. EXISTING GWB TO REMAIN ON WALLS INDICATED TO
REMAIN.
2. REMOVE FINISHES ONLY AS REQUIRED TO ACCOMODATE NEW WORK.
3. NO WORK ANTICIPATED THIS ROOM.
4. REMOVE CEILING TO INSTALL NEW MECHANICAL WORK.
5. MINIMAL WORK THIS ROOM, PATCH ESITING FINISHINS AS REUIRED TO INSTALL NEW WORK.
A S e rv ic e
D is a b le d
Ve t e r an Owned S m a l l B u s iness
SDVOSB
CVE
R
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY
08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT / ENGINEERS:
X
Office of Construction and Facilities
Managemen t o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
NO. DESCRIPTION DATE
www.pfa-architect.com
ARCHITECTURE, PLANNING,
INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510 Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
8815 CENTRE PARK DRIVE, SUITE 200 COLUMBIA, MD
21045
410-750-2246 (BALT) 410-750-2588 (FAX)
KA PROJECT NUMBER: M023-08
K O
F F
E L
ASSOCIATES
ENGINEERS
Fire Protection
RENOVATE AND
EXPAND
OPERATING ROOMS
CHARLES GEORGE VAMC
ASHEVILLE, NC
2019-03-22
Approved: Medical Center Director
Building Number
TTI ENVIRONMENTAL, INC.
1253 NORTH CHURCH
STREET
MOORESTOWN, NJ 08057
BID DOCUMENTS
FULLY SPRINKLERED
637-315
Demolition Plan - Second Floor
- Phase 2 jasjht
AD102.203/05/15
1/8" = 1'-0"
DEMOLITION PLAN - SECOND FLOOR - PHASE 2
DEMOLITION SCHEDULE - PHASE 1 & 2
*** FINISHES LISTED IN THIS SCHEDULE ARE TO BE REMOVED
COMPLETELY UNLESS OTHERWISE NOTED ***
NUMBER FLOOR BASE WALL CEILING REMARKS
D213 SV SV CT PTD GWB 1
D213A VCT RB PTD GWB ACT -
D213B SV SV PTD GWB ACT 1
DB205 ETR ETR ETR ETR 1
DB206 SV SV CT ACT 1
DB207 SV SV CT PTD GWB 1
DB207A SV SV CMU BLOCK ACT 1
DB207B SV SV CMU BLOCK ACT 1
DB209 SV SV CMU BLOCK ACT 1,2
DB211 SV SV CT PTD GWB -
DB212 SV SV CT PTD GWB -
DB214 SV SV CT PTD GWB -
DB215 SV SV CT PTD GWB 1
DB217 ETR ETR ETR ACT 3
DB217A ETR ETR ETR ACT 3
DB218B ETR ETR ETR ETR 3
DB220A ETR ETR ETR ETR 5
DB221 SV SV ETR ACT 1
DB221A ETR ETR ETR ACT 4
DB221B ETR ETR ETR ACT 4
DB222 SV SV ETR ACT 1
DB283 VCT RB PTD GWB ACT
DC2-B1 ETR ETR ETR ETR 1
DC2-B2 SV SV CT ACT _
DC2-B3 SV SV CT ACT 1
DC2-B4 SV SV CT ACT 1
DS-3 ETR ETR ETR ETR 3
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
STORAGE
SKY
LIGHT
20x10 RG
8" AFF
975 CFM
(LOW)
20x10 RG
8" AFF
975 CFM
(LOW)
18x10 RG
8" AFF
940 CFM
(LOW)
18x10 RG
8" AFF
940 CFM
(LOW)
18x12 RR
1340 CFM
(LOW WALL)
20x10 RR
1115 CFM
(LOW WALL)
18x10 RR
1100 CFM
(LOW WALL)
16x12 RR
1100 CFM
(LOW WALL)
9 8 5
4 7
PROJECT
LIMITS / PHASE
KEY PLAN
1A
1B2A
12 13 14 15 16 17 18 19
N
M
Ls
L
K
J
H.6
H
G
F.9
F.1
F 17.915W14W14E13E
F.3
F.4
G.4
G.6PLAN NORTH
ACTUAL
NORTH
GENERAL PHASING NOTES
-SEE SHEET A000 FOR ICRA MATRIX AND REQUIREMENTS
-THE CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND COMMUNICATIONS AS REQUIRED TO SUPPORT TEMPORARY RELOCATED EQUIPMENT AND MAINTAIN OPERATIONS IN AREAS NOT UNDER CONSTRUCTION.
-THE CONTRACTOR SHALL COORDINATE WORK OUTSIDE THE AREA UNDER CONSTRUCTION WITH THE COR. NOTE THAT
WORK MAY NEED TO BE PERFORMED AT NIGHT.
-THE CONTRACTOR SHALL COORDINATE WITH THE COR THE SCHEDULING OF ALL INTERRUPTIONS IN SERVICES
REQUIRED BY THIS PROJECT.
-THE CONTRACTOR SHALL MAINTAIN THE EXISTING WEATHERTIGHT CONDITION THROUGHOUT THE CONSTRUCTION
PERIOD AND REPAIR ALL DAMAGE CAUSED BY CONSTRUCTION OPERATIONS.
-THE CONTRACTOR SHALL PROVIDE TEMPORARY DIRECTIONAL SIGNS FOR EACH PHASE OF THE CONSTRUCTION
PROJECT TO BE LOCATED AS DIRECTED BY THE COR.
-TEMPORA…