36C24620R0001-0002019.xlsx

XLSX spreadsheet Posted

Attached to
Renovate and Expand OR Asheville NC Proj No. 637-315
Solicitation number
36C24620R0001
Issued by

About this file

This document contains a federal contract solicitation and related opportunity file. The solicitation is for construction services to renovate and expand five existing operating rooms and construct two new operating rooms at the Charles George VA Medical Center in Asheville, North Carolina. The work includes renovating approximately 5,000 square feet of existing space and constructing approximately 8,000 square feet of new space, bringing the total operating room footprint to 13,000 square feet. The contractor will be responsible for permitting, demolition, construction, construction management, submittals, fixtures and equipment installation, scheduling, inspection and testing, environmental protection, alterations, structural work, mechanical, electrical and plumbing systems, fire protection, hazardous material removal, equipment relocation, utility systems expansion, commissioning, as-built drawings, and project closeout. The pre-proposal site visit is scheduled for January 23, 2020, with responses due February 27, 2020. The solicitation will be issued on a 100% set-aside restricted basis for Service-Disabled Veteran Owned Small Businesses. The estimated value is between $10-20 million.

36C24620R0001 0002 Attachment A - Base Proposal Item Price Breakdown.xlsx

View the file

Other files

File Type Posted
123200 Manufactured Wood Casework.pdf PDF
000110 TOC.pdf PDF
Missing DWGS.pdf PDF
313223 Pressure Grouting Soil Stabilization.pdf PDF
36C24620R0001 0007.pdf PDF
Revised DWGS.pdf PDF
RFI Responses.pdf PDF
010000 General Requirements.pdf PDF
36C24620R0001-0006000.docx DOCX document
36C24620R0001-0005001.pdf PDF
36C24620R0001-0005000.docx DOCX document
36C24620R0001-0004000.docx DOCX document
36C24620R0001-0004001.pdf PDF
36C24620R0001-0003000.docx DOCX document
36C24620R0001-0002012.pdf PDF
36C24620R0001-0002015.pdf PDF
36C24620R0001-0002010.pdf PDF
36C24620R0001-0002021.docx DOCX document
36C24620R0001-0002016.pdf PDF
36C24620R0001-0002018.pdf PDF
36C24620R0001-0002013.pdf PDF
36C24620R0001-0002020.docx DOCX document
36C24620R0001-0002017.pdf PDF
36C24620R0001-0002011.pdf PDF
36C24620R0001-0002009.docx DOCX document
36C24620R0001-0002014.pdf PDF
36C24620R0001-0001023.pdf PDF
36C24620R0001-0001024.pdf PDF
36C24620R0001-0001021.pdf PDF
36C24620R0001-0001022.pdf PDF
36C24620R0001-0001020.docx DOCX document
36C24620R0001-036.pdf PDF
36C24620R0001-037.pdf PDF
36C24620R0001-035.docx DOCX document
36C24620R0001-038.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0