XXX SF
X
XXX XXX
OCCUPANT LOAD TAG ROOM AREA
LOAD FACTOR / OCCUPANT LOAD
OCCUPANCY TYPE
FIRE EXTINGUISHER CABINET
FEC
X'-XX"
MAX TRAVEL DISTANCE
REQUIRED EXIT E
LIFE SAFETY LEGEND
BUILDING REGULATION DATA
1. PROVIDE FIRE STOP DETAIL 1/LS130 AT HEAD OF WALL JOINT SYSTEM FOR ALL RATED
WALLS THIS AREA.
GENERAL NOTES
VUSBC 2012
NFPA 101, 2018
USE AND OCCUPANCY
1. INSTITUTIONAL USE GROUP I-2. SCOPE INCLUDES VARIOUS RENOVATION AREAS WITHIN AN EXISTING
HOSPITAL
2. EXISTING BUILDING IS FULLY SPRINKLERED.
3. SECTION 407.2.2 - NURSE STATIONS= ALLOWED TO BE OPEN TO CORRIDOR
4. SECTION 407.3 - CORRIDOR WALLS = SHALL BE CONSTRUCTED AS SMOKE PARTITIONS IN ACCORDANCE WITH SECTION 711 AND ARE NOT REQUIRED TO HAVE A FIRE-RESISTANCE RATING AND SHALL EXTEND FROM THE FLOOR TO THE UNDERSIDE OF STRUCTURE ABOVE OR TO A CEILING ABOVE THAT IS CONSTRUCTED TO LIMIT
THE TRANSFER OF SMOKE
5 . SECTION 407.3. - CORRIDOR WALLS SHALL BE CONSTRUCTED AS SMOKE PARTITIONS. DOORS CLOSING DEVICES SHALL NOT BE REQUIRED IN CORRIDOR WALL OPENINGS OTHER THAN THOSE SERVING REQUIRED SUCH AS EXITS, SMOKE BARRIERS, OR ENCLOSURES OF VERTICAL OPENINGS AND HAZARDOUS AREAS PER PARAGRAPH 407.3.1. DOORS SHALL HAVE POSITIVE LATCHING AND LIMIT THE TRANSFER OF SMOKE. OTHER
DOORS SHALL CONFORM TO 716.5.
CONSTRUCTION TYPE
1. CONSTRUCTION TYPE PER NFPA 2012 IS TYPE IB (332) PROTECTED, FULLY SPRINKLED IN ACCORDANCE WITH
NFPA.
USE OR OCCUPANCY
1. SPECIAL OCCUPANCY AREAS:
HAZARDOUS AREAS SHALL BE PROTECTED IN ACCORDANCE WITH TABLE 18.3.2.1 AS FOLLOWS:
STORAGE 50 S.F. TO 100 S.F. PER PARAGRAPH 18.3.6.3.4 (DOOR CLOSERS NOT REQ'D.)
STORAGE > 100 S.F. = 1HR
MEANS OF EGRESS (SUITE BASED)
1. TRAVEL DISTANCE: 100'-0" (PATIENT CARE NON SLEEPING SUITE, 18.2.5.7.3.3)
2. EXITS REQUIRED: 2 (EXISTING SUITE SF UNCHANGED)
CORRIDOR WALLS
1. CORRIDOR WALLS SHALL FORM A BARRIER TO LIMIT THE TRANSFER OF SMOKE. NO FIRE RESISTANCE RATING
IS REQUIRED FOR CORRIDOR WALLS PER NFPA 101 PARAGRAPH 18.3.6.2.
2. DOOR CLOSING DEVICES SHALL NOT BE REQUIRED IN CORRIDOR WALL OPENINGS OTHER THAN THOSE SERVING REQUIRED EXITS, SMOKE BARRIERS, OR ENCLOSURES OF VERTICAL OPENINGS AND HAZARDOUS
AREAS PER PARAGRAPH 18.3.6.3.11.
X
Y
Z
AA
BB
171615
158 SF
B
1H-110A
159 SF
S
1H-111
117 SF
B
1H-109A122 SF
B
1H-109
NIC
NIC
NIC
NIC
NIC
NIC
NIC
FUTURE PHASE
E
NIC
162 SF
B
C1H-8
165 SF
B
1H-110
WALL LEGEND
2 HR. FIRE BARRIER
1 HR. SMOKE BARRIER
METAL
NOT IN CONTRACT
VA FURNISHED CONTRACTOR INSTALLED
VA FURNISHED VA INSTALLED
CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CONTRACTOR FURNISHED VA INSTALLED
PLASTIC LAMINATE
PAINT
PAINTED
RISER
RETURN AIR
RUBBER BASE
RUBBER FLOOR
SEALED CONCRETE
SOLID SURFACE
SHEET VINYL
SIMILAR
STORAGE
SUSPENDED
TREAD
TOP OF BOND BEAM
TOP OF STRUCTURE
TYPICAL
VINYL BASE
VINYL TILE
VERTICAL
VINYL WALL COVERING
AT
ANGLE
CENTER LINE
DIAMETER
ABOVE FINISH FLOOR
ACOUSTICAL TILE
ALUMINUM THRESHOLD
CUBICLE CURTAIN
CORNER GUARD
CEILING
COLUMN
CONCRETE
CONTINUOUS
CORRIDOR
CERAMIC TILE
ELECTRIC(AL)
ELEVATOR
EXISTING TO REMAIN
ELECTRIC WATER COOLER
EXISTING
EXPOSED STRUCTURE
FINISH(ED)
FACE OF FINISH
FACE OF STUD
GYSPUM WALLBOARD
HARDWARE
HOUR
HEIGHT
LENGTH
LUXURY VINYL TILE
MAXIMUM
MECHANICAL
MOUNTING
AFF
ACT
ATH.
CC
CG
CLG
COL
CONC.
CONT.
CORR
CT
ELEC
ELEV
ETR
EWC
EXST
EXSTR
FIN
FOF
FOS
GWB
HDW
HR
HT
L
LVT
MAX
MECH
MTG
MTL
NIC
VACI
VAVA
CFCI
CFVA
PLAM
PNT
PTD
R
RA
RB
RF
SC
SS
SV
SIM
STOR
SUSP.
T
TOBB
TOS
TYP
VB
VT
VERT
WVW
O
ABBREVIATIONSZ
142 SF
A
1H-112A
289 SF
B
1H-112
A Se rv ic e D i s a b l e d Ve t e r an Owned
S m a l l B u s iness
SDVOSB
CVE
B
A
C
D
E
F www.pfa-architect.com
ARCHITECTURE, PLANNING, INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510
Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO:
B
A
C
D
E
F
NO. DESCRIPTION DATE
KEYPLAN
FULLY SPRINKLERED
ACTUAL & PLAN
NORTH
NTS
Department of
Veterans Affairs
MILLER-REMICK LLC
PROFESSIONAL
ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
PFA Project #:
Im a c -1
\d p e ro n n e t\
P h a rm a c y R e n o v a ti o n
C e n tr a l_ d p e ro n n e t.
rv t
/1
/2
:4
:2
A
M
DJPDJP
LS101
LIFE SAFETY PLAN
652-17-104UPGRADE PHARMACY TO
USP 800
Project Number
BID DOCUMENTS
01-11-2019
HUNTER HOLMES MCGUIRE
VAMC RICHMOND
01-11-2019
1/8" = 1'-0"
LIFE SAFETY PLAN - PHASE 1
OCCUPANT LOAD PHASE 1
ROOM NO ROOM
USE
GROUP
OCCUPANCY
FACTOR AREA
OCCUPANT
LOAD
1H-109 ANTE ROOM 1 B 100 122 SF 2
1H-109A HD BUFFER B 100 117 SF 2
1H-110 ANTE ROOM 2 B 100 165 SF 2
1H-110A STERILE BUFFER B 100 158 SF 2
1H-111 MECHANICAL S 300 159 SF 1
C1H-8 WORK AREA B 100 162 SF 2
883 SF 11
1/8" = 1'-0"
LIFE SAFETY PLAN - PHASE 2
OCCUPANT LOAD PHASE 2
ROOM NO ROOM
USE
GROUP
OCCUPANCY
FACTOR AREA
OCCUPANT
LOAD
1H-112 OFFICE B 100 289 SF 3
1H-112A CONFERENCE A 15 142 SF 10
431 SF 13
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
ARCHITEC
T
Z
AA
BB
ANTE ROOM 1
1H-109
HD BUFFER
1H-109A
STERILE BUFFER
1H-110A
MECHANICAL
1H-111
110A
109A
5' - 0" 5' - 3 3/4"
ANTE ROOM 2
1H-110
± 1' - 8"
3' - 0" 10' - 4" ± 10' - 5 3/8" ± 3' - 5"
7' - 5" ± 12' - 6 1/8" 11' - 4 5/8" ± 10' - 2"
/8
/4
/2
/8
15' - 4 1/4"
/8
5' - 10" 6' - 10"
/4
/4
AE601
AE601
AE601
PHASE 2
WORK AREA
C1H-8
NIC
NIC
± 7' - 4"
A
AE601
/2
WALL LEGEND
2 HR. FIRE BARRIER
1 HR. SMOKE BARRIER
Z
AA
BB
2' - 0"
2 2
/8
WALL ONLY
D-1H-108E
D-1H-109 D-1H-110
D-1H-107
D-1H-111
D-1H-112
D-C1H-8
PHASE 2
NIC
NIC
DOOR TAG
TYP
Room name
M349
XXX
EXISTING DOOR
NEW DOOR
DEMO DOOR
NEW WALL
EXISTING WALL
DEMO WALL OR ITEMS
ABOVE OR BELOW
WALL TAG
ROOM NUMBER
REVISION TAG
EQUIPMENT TAG
TOILET ACCESSORY TAG
DEMOLITION NOTE
NEW WORK NOTE
A810
DEMO ROOM NUMBER
CURTAIN WALL AND
WINDOW MARKER
1i
INTERIOR ELEVATION
MARKER
SECTION OR WALL
SECTION NUMBER
COLUMN GRID NUMBER
EXISTING COLUMN
GRID NUMBER
A120
BUILDING ELEVATION
MARKER
A810
A810 DETAIL MARKER
1 PHASING NOTES
JSN
A.F.F.
ACT
CFCI
CG
CLG, CLNG
COL
CONC.
CONT.
CORR
CT
ELEC
ELEV
EWC
EXIST.
FIN
GWB
HDWR
HR
HT
L L.O.D.
MAX
MECH
MFR
MTG
MTL
NIC
ABOVE FINISH FLOOR
ACOUSTICAL CEILING TILE
CONTRACTOR FURNISHED,
CONTRACTOR INSTALLED
CORNER GUARD
CEILING
COLUMN
CONCRETE
CONTINUOUS
CORRIDOR
CERAMIC TILE
ELECTRIC(AL)
ELEVATOR
ELECTRIC WATER
COOLER
EXISTING
FINISH(ED)
GYSPUM
WALLBOARD
HARDWARE
HOUR
HEIGHT
LENGTH
LINE OF DEMARCATION
MAXIMUM
MECHANICAL
MANUFACTURER
MOUNTING
METAL
NOT IN CONTRACT
O.C.
PLAM
PNT
PTD
QT.
R
RA
RF
RT
RS
SC
SIM
SS
STOR
SUSP.
TYP
U/C
VACI
VAVA
VB
VERT
Ø
BT
ETR
TER
TME
ON CENTER
PLASTIC LAMINATE
PAINT
PAINTED
QUARRY TILE
RISER
RETURN AIR
RUBBER FLOOR
RUBBER TILE
RUBBER SHEET
SEALED CONCRETE
SIMILAR
SOLID SURFACE
STORAGE
SUSPENDED
TYPICAL
UNDERCOUNTER
VA FURNISHED,
CONTRACTOR INSTALLED
VA FURNISHED,
VA INSTALLED
VINYL BASE
VERTICAL
AT
ANGLE
CENTER LINE
DIAMETER
BRICK TILE
EXISTING TO REMAIN
TERRAZZO
TO MATCH EXISTING
CL
X
MECHANICAL
2A-217
A Se rv ic e D i s a b l e d Ve t e r an Owned
S m a l l B u s iness
SDVOSB
CVE
B
A
C
D
E
F www.pfa-architect.com
ARCHITECTURE, PLANNING, INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510
Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO:
B
A
C
D
E
F
NO. DESCRIPTION DATE
KEYPLAN
FULLY SPRINKLERED
ACTUAL & PLAN
NORTH
NTS
Department of
Veterans Affairs
MILLER-REMICK LLC
PROFESSIONAL
ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
PFA Project #:
Im a c -1
\d p e ro n n e t\
P h a rm a c y R e n o v a ti o n
C e n tr a l_ d p e ro n n e t.
rv t
/1
/2
:4
:1
A
M
DJPDJP
AE101
DEMOLITION & NEW WORK PLAN -
PHASE 1
652-17-104UPGRADE PHARMACY TO
USP 800
Project Number
BID DOCUMENTS
01-11-2019
HUNTER HOLMES MCGUIRE
VAMC RICHMOND
01-11-2019
WALL TYPE SCHEDULE
TYPE STC DESCRIPTION
FIRE
RATING UL REMARKS
M1B N/A 1 5/8" METAL STUDS AT 16" O.C. MAX.
5/8" GWB ONE SIDE. EXTEND WALL
ASSEMBLY TO 4" ABOVE FINISHED
CEILING.
N/A N/A
M3 N/A 3 5/8" METAL STUDS AT 16" O.C. MAX.
5/8" GWB BOTH SIDES. EXTEND WALL
ASSEMBLY TO 4" ABOVE FINISHED
CEILING.
N/A N/A
M3_A 3 5/8" METAL STUDS AT 16" O.C. MAX.
5/8" GWB ONE SIDE. 1/4" AIR SPACE,
METAL CLIP AND METAL CLAD 5/8"
GWB
N/A N/A ASSEMBLY TO MATCH EXISTING UNRATED FURRED
WALL.
M6 N/A 6" METAL STUDS AT 16" O.C. MAX. 5/8"
GWB BOTH SIDES. EXTEND GWB TO
4" ABOVE FINISHED CEILING. ANCHOR
STUDS TO UNDERSIDE OF DECK OR
STRUCTURE ABOVE AT 48" O.C. MAX
N/A N/A
M355_2 55 3 5/8" METAL STUDS AT 16" O.C. MAX.
WITH 2 LAYERS OF 1/2" FIRE RATED
GWB BOTH SIDES. PROVIDE 1 1/2"
MINERAL WOOL. EXTEND WALL
ASSEMBLY TO UNDERSIDE OF DECK
ABOVE
2 HR
BARRIER
U419 PROVIDE 3" STENCILED WITH 3/8" STROKE TEXT
EVERY 8' O.C. MAX. READING "2 HR FIRE RATED
BARRIER" AS REQUIRED BY BUILDING CODE.
PROVIDE INSULATION WHERE COMPONENTS MEET
DECK ABOVE. PROVIDE ACOUSTICAL SEALANT AT
RUNNER AND HEAD PRIOR TO INSTALLATION OF
GWB. PROVIDE ACOUSTICAL SEALANT AT ALL WALL
PENETRATIONS.
M662_2 62 6" METAL STUDS AT 16" O.C.MAX. 2
LAYERS 5/8" FIRE RATED GWB BOTH
SIDES. PROVIDE 5" MINERAL WOOL.
EXTEND WALL ASSEMBLY TO
UNDERSIDE OF DECK ABOVE
2 HR
BARRIER
U454 PROVIDE 3" STENCILED TEXT EVERY 8' O.C. READING
"2 HR FIRE RATED BARRIER" AS REQUIRED BY
BUILDING CODE. PROVIDE INSULATION WHERE
COMPONENTS MEET DECK ABOVE. PROVIDE
ACOUSTICAL SEALANT AT RUNNER AND HEAD PRIOR
TO INSTALLATION OF GWB. PROVIDE ACOUSTICAL
SEALANT CONTINUOUS BETWEEN LAYERS OF GWB
AND DABS AT 8" O.C. PROVIDE ACOUSTICAL SEALANT
AT ALL WALL PENETRATIONS.
S2 N/A 2-1/2” C-H STUDS, 25 GA. AT 24” O.C.
TWO LAYERS OF 1/2 IN. THICK GWB. 1”
MIN. THICK MINERAL WOOL BATT
INSULATION, 1” GYPSUM LINER
PANELS FRICTION FIT.
2 HR U415 -
ROOM LEGEND - PHASE 1
NUMBER NAME AREA
1H-109 ANTE ROOM 1 122 SF
1H-109A HD BUFFER 117 SF
1H-110 ANTE ROOM 2 165 SF
1H-110A STERILE BUFFER 158 SF
1H-111 MECHANICAL 159 SF
C1H-8 WORK AREA 162 SF
883 SF
1/4" = 1'-0"
LEVEL1 - NEW WORK PLAN - PHASE 1 1/4" = 1'-0"
LEVEL 1 - DEMOLITION PLAN - PHASE 1
DEMOLITION SCHEDULE - PHASE 1
*** ALL FINISHES LISTED IN SCHEDULE ARE TO BE REMOVED
COMPLETELY UNLESS OTHERWISE NOTED ***
NUMBER FLOOR BASE WALL CEILING REMARKS
D-1H-107 VT RB PTD GWB ACT
D-1H-108E VT RB PTD GWB ACT
D-1H-109 VT RB PTD GWB ACT
D-1H-110 VT RB PTD GWB ACT
D-1H-111 VT RB PTD GWB ACT
D-1H-112 VT RB PTD GWB ACT
D-C1H-8 VT RB PTD GWB ACT
GENERAL DEMOLITION NOTES
DEMOLITION DRAWINGS INDICATE IN GENERAL, THE EXTENT OF DEMOLITION. REMOVE ALL ASSOCIATED APPURTENANCES NOT REQUIRED IN THE NEW WORK, ALL ABANDONED ITEMS, AND ALL ITEMS REQUIRED FOR THE INSTALLATION OF NEW WORK, TO PROVIDE FOR A COMPLETE PROJECT. ITEMS NOT SPECIFICALLY INDICATED THAT ARE QUESTIONABLE FOR REMOVAL SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR A DECISION.
• PROTECT ALL EXISTING AND NEW WORK FROM WATER INFILTRATION DURING CONSTRUCTION.
THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL EXISTING CONDITIONS PRIOR TO THE START
OF CONSTRUCTION.
THE CONTRACTOR SHALL PATCH ALL EXISTING SURFACES TO MATCH EXISTING WHERE AFFECTED BY CONSTRUCTION OPERATIONS, INCLUDING BUT NOT LIMITED TO PLUMBING, MECHANICAL AND ELECTRICAL WORK.
THE CONTRACTOR SHALL PATCH NAIL HOLES, ETC, AND REMOVE MISCELLANEOUS APPURTENANCES ON EXISTING
WALLS TO BE PAINTED OR COVERED WITH WALL COVERING.
ALL EXISTING FLOORING MATERIALS WHICH ARE TO REMAIN IN PLACE SHALL BE COMPLETELY CLEANED AND STRIPPED
OF WAX IN ORDER TO RECEIVE NEW FINISHES.
• ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT UNLESS OTHERWISE NOTED.
THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW WORK IS COMPLETE, REGARDLESS IF THE ITEM WAS SPECIFICALLY
NOTED OR NOT.
THE CONTRACTOR SHALL REMOVE AND PATCH ANY AREAS UNCOVERED WHERE WOOD NAILERS OR GROUNDS ARE FOUND TO EXIST BEHIND ANY TRIM ITEMS OR EQUIPMENT REMOVED. WALLS SHALL BE MADE FLUSH WITH EXISTING
ADJACENT SURFACES AND READY TO RECEIVE NEW FINISHES.
IF ANY ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON THE CONTRACT DOCUMENTS THE CONTRACTOR SHALL STOP WORK IN THAT AREA
IMMEDIATELY AND NOTIFY THE COR.
WHERE EXISTING VINYL WALL COVERING IS REMOVED ON EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL PATCH AND REPAIR WALL AS REQUIRED TO PROVIDE A LEVEL AND TRUE SURFACE ON WHICH TO INSTALL NEW FINISHES.
ALL SIGNAGE WHICH OCCURS ON WALL OR ON DOORS TO BE REMOVED SHALL BE REMOVED BY THE CONTRACTOR AND
TURNED OVER TO THE COR.
ALL FINISHES LISTED IN THE DEMOLITION SCHEDULE SHALL BE REMOVED COMPLETELY UNLESS INDICATED OTHERWISE.
DEMOLITION SHALL INCLUDE BACKINGS, MASTIC AND GLUES, SETTING BEDS, AND SUBSTRATE AS REQUIRED TO
PREPARE THE MATERIAL FOR NEW WORK AND/OR FINISHES.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS OTHERWISE NOTED.
• EXISTING HAND RAIL AND BUMPER GUARD SHALL BE REMOVED AND TURNED OVER TO THE COR.
ALL EXISTING NURSE CALL, SMOKE DETECTORS, AND SPEAKERS TO REMAIN AND REWORKED WITH NEW CEILING
SYSTEM.
EXISTING WALL FINISHES TO BE VERIFIED AND PREPPED ACCORDINGLY FOR NEW FINISHES SCHEDULES - BY
CONTRACTOR.
• EXISTING CEILING HEIGHT IS TYPICALLY 9'-0" +/-, VERIFY IN FIELD.
EXISTING FLOOR TO FLOOR HEIGHTS ARE AS FOLLOWS: BASEMENT TO 1ST = 13'-9 1/4", 1ST TO 2ND = 12'-10 5/8", 2ND TO
3RD = 11'-9 1/4".
• SEE THE S700 SERIES FOR PHOTOGRAPHS OF DEMOLITION WORK REQUIRED AROUND COLUMNS AND FOOTING.
THESE DEMOLITION NOTES ARE FOR ARCHITECTURAL WORK ONLY. SEE ALL OTHER DRAWINGS FOR DEMOLITION
INFORMATION PERTAINING TO OTHER DISCIPLINES.
DEMOLITION NOTES PHASE 1
1 ICRA TEMPORARY FULL HEIGHT PARTITION. DEMOLISH AFTER THE COMPLETION OF NEW WORK.PROVIDE
TEMPORARY 1/3 HOUR RATED DOOR, FRAME, AND HARDWARE WHERE ILLUSTRATED. PROVIDE HINGES, CLOSER, AND CLASSROOM LOCKSET, AUTOMATIC DOOR BOTTOMS AND RUBBER SEALS.
2 REMOVE DOOR AND FRAME. TURN OVER TO COR.
3 REMOVE AND DISCARD EXISTING CASEWORK.
4 48" - 1 1/2 HR RATED STEEL DOOR AND FRAME. RETAIN DOOR FOR REUSE AS DOOR 108E.
5 REMOVE PORTION OF EXISTING CASEWORK TO MAINTAIN 42" MIN. CLEARANCE. SEE NEW WORK PLAN FOR
CLEAR AREA REQUIRED.
• CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR FOR A RESOLUTION. ADJUSTMENTS
TO DIMENSIONS AND CONDITIONS SHOWN MAY BE REQUIRED.
• ALL DIMENSIONS ARE REFERENCED FROM FACE OF STUD AT NEW CONSTRUCTION UNLESS OTHERWISE NOTED.
DIMENSIONS ARE REFERENCED FROM FACE OF FINISH AT EXISTING CONSTRUCTION.
• ALL DIMENSIONS INDICATED +/- ARE APPROXIMATE AND MUST BE FIELD VERIFIED PRIOR TO THE START OF
CONSTRUCTION.
• PROVIDE SHALL MEAN TO SUPPLY, TO FURNISH AND TO INSTALL COMPLETE WITH ALL ACCESSORIES, PARTS AND/OR
SERVICES TO BE READY FOR ITS INTENDED USE.
• WHERE WORK ABUTS OR ADJOINS EXISTING SURFACES WHICH WILL REMAIN EXPOSED, ALIGN NEW WORK FLUSH
WITH EXISTING ADJACENT SURFACES.
• THE CONTRACTOR SHALL MAINTAIN THE EXISTING BUILDING IN A WATER TIGHT CONDITION THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. REPAIR DAMAGE CAUSED BY CONSTRUCTION OPERATIONS. TAKE ALL PRECAUTIONS NECESSARY TO PROTECT THE BUILDING AND ITS OCCUPANTS DURING THE CONSTRUCTION PERIOD.
• CONTRACTOR SHALL PROVIDE BARRIERS TO PREVENT ENTRY TO THE CONSTRUCTION AREA. BARRIERS SHALL NOT
INTERFERE WITH THE OWNERS USE OF THE SITE.
• THE CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO PREVENT
THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS ONLY UNLESS OTHERWISE NOTED.
• ALL DOORS TO BE MOUNTED 4" FROM FACE OF FINISH UON.
• ALL MODIFICATIONS TO THE EXISTING ROOF SHALL BE MADE IN ACCORDANCE WITH VAMC'S EXISTING ROOF
WARRANTY. COORDINATE ALL MODIFICATIONS TO THE ROOF WITH THE COR.
• ALL SYMBOLS AND ABBREVIATIONS CAN BE REFERENCED FROM SHEET AE101.
• ALL DASHED FURNITURE IS VAVA.
GENERAL NEW WORK NOTES
NEW WORK AND FINISH NOTES#
1. PROVIDE WALL BLOCKING FOR WALL MOUNTED SYSTEMS FURNITURE.
2. PROVIDE WP#2 AT THIS LOCATION FROM TOP OF COVE BASE TO CEILING. ALL OTHER WALLS THIS ROOM RECEIVE
WP#1 FROM TOP OF COVE BASE TO CEILING. PROVIDE COLOR MATCHING CAULK AT ALL SEAMS.
3. PROVIDE FLOOR PATTERN WITH RF#2. CONTINUE RF#2 UP WALL FOR INTEGRAL COVE BASE. CONTACT ARCHITECT
FOR CAD PLAN IF NEEDED.
4. PATCH FLOORING, WALL BASE, PAINT, CEILING TYPE AND HEIGHT AS REQUIRED TO MATCH EXISTING.
5. PROVIDE PNT#4 AT THIS WALL, CORNER TO CORNER.
SYMBOLS ABBREVIATIONS
1/8" = 1'-0"
LEVEL 2 - NEW WORK PLAN
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
2 X 2 INDIRECT
LED LIGHT FIXTURE
CEILING LEGEND
RETURN AIR DIFFUSER
SUPPLY AIR DIFFUSER
LINEAR DIFFUSER
2 X 4 INDIRECT
LED LIGHT FIXTURE
RECESSED CEILING LIGHT
EXIT SIGN
EXHAUST AIR DIFFUSER
CEILING HEIGHT MARKER
PTD GWB
ACT CEILING
LED INDUSTRITAL
STRIP FIXTURE ACCESS PANEL
Z
AA
ANTE ROOM 1
1H-109
HD BUFFER
1H-109A
STERILE BUFFER
1H-110A
MECHANICAL
1H-111
L.
O .D
ANTE ROOM 2
1H-110
L .O
.D
U6000 U6000
L2321
M3073 A5108
U1200 F2010M3070
A5025
A5025 M3070
E0948
E0948
U1200
E0948
A5108
L2320
U1300
E0948 F2000
L2320
F2000
U6010U6010
M1801 A1011
F0340
F0340
F0340
F0340
NIC
NIC
PHASE 2
WORK AREA
C1H-8
A
A
A
F
F2000
A
P
P
M1801
U6000
E0948
E0948E0948
E0948
M
M1830
U
Z
AA
9' - 0" 9' - 0"
ANTE ROOM 1
1H-109
HD BUFFER
1H-109A
MECHANICAL
1H-111
ANTE ROOM 2
1H-110
STERILE BUFFER
1H-110A
NIC
NIC
PHASE 2
WORK AREA
C1H-8
9' - 0"
9' - 0"
9' - 0"
E Q
E Q
EQ EQ
1' - 0" TYP
EQ EQ
1' - 0"
1' - 0"E Q
E Q
E Q
E Q
8"
8"
E Q
E Q
EQ EQ
2' - 0" 2' - 0"
A Se rv ic e D i s a b l e d Ve t e r an Owned
S m a l l B u s iness
SDVOSB
CVE
B
A
C
D
E
F www.pfa-architect.com
ARCHITECTURE, PLANNING, INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510
Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO:
B
A
C
D
E
F
NO. DESCRIPTION DATE
KEYPLAN
FULLY SPRINKLERED
ACTUAL & PLAN
NORTH
NTS
Department of
Veterans Affairs
MILLER-REMICK LLC
PROFESSIONAL
ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
PFA Project #:
Im a c -1
\d p e ro n n e t\
P h a rm a c y R e n o v a ti o n
C e n tr a l_ d p e ro n n e t.
rv t
/1
/2
:4
:2
A
M
DJPDJP
AE102
REFLECTED CEILING & EQUIPMENT
PLAN
652-17-104UPGRADE PHARMACY TO
USP 800
Project Number
BID DOCUMENTS
01-11-2019
HUNTER HOLMES MCGUIRE
VAMC RICHMOND
01-11-2019
GENERAL CEILING NOTES
• ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL CODES AND
ORDINANCES.
• CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR FOR A RESOLUTION.
• EACH SUB CONTRACTOR SHALL REVIEW THE CONSTRUCTION DOCUMENTS AND EVALUATE THE SCOPE OF WORK REQUIRED BY THEIR RESPECTIVE TRADE AND ANY CONFLICTS WITH OTHER TRADES. ANY CONFLICTS WILL BE
BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR FOR A RESOLUTION.
• PROVIDE SHALL MEAN TO SUPPLY, TO FURNISH AND TO INSTALL COMPLETE WITH ALL ACCESSORIES, PARTS AND/OR
SERVICES TO BE READY FOR ITS INTENDED USE.
• CONTRACTOR SHALL COORDINATE ALL REQUIRED CONDUIT, PIPING AND CHASES FOR OWNER FURNISHED OWNER
INSTALLED EQUIPMENT WITH THE OWNER.
• CONTRACTOR SHALL COORDINATE WITH WORK BEING PERFORMED UNDER SEPARATE CONTRACT BY OWNER.
• SEE FIRE PLAN FOR FIRE WALL AND SMOKE PARTITION LOCATIONS.
• ALL ABUTTING DISSIMILAR MATERIALS ARE TO BE SEALED. COLOR TO MATCH ADJACENT MATERIALS.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS OTHERWISE NOTED.
• ALL DIMS ON CEILING PLAN ARE TAKEN FROM FACE OF FINISH.
• ALL SOFFITS TO BE PNT#3.
1/4" = 1'-0"
LEVEL 1 - EQUIPMENT PLAN - PHASE 1
1/4" = 1'-0"
LEVEL 1 - REFLECTED CEILING PLAN - PHASE 1
EQUIPMENT SCHEDULE - PHASE 1
MARK NAME VACI VAVA CFCI COMMENTS
A1011 DESK PHONE *** PROVIDE POWER AND DATA
A5025 BENCH
A5080 PAPER TOWEL DISPENSER ***
A5100 SHOE COVER DISPENSER *** PROVIDE POWER
A5108 SHARPS ***
E0948 CART, GENERAL STORAGE *** ---
F0340 STOOL, ROLLING ***
F2000 TRASH CAN ***
F2010 TRASH CAN, STEP ON ***
L2320 LAMINAR AIRFLOW CABINET *** PROVIDE POWER
L2321 BIO SAFETY CABINET *** PROVIDE POWER
M1801 COMPUTER AND MONITOR *** PROVIDE POWER AND DATA
M3070 HAMPER, LINEN, MOBILE, W/ LID *** ---
M3073 CHEMO WASTE BASKET ***
P1965 EYEWASH *** SEE PLUMBING DRAWINGS
U1200 PASS THRU CABINET *** 18"wX18"hX18"d SEE SPECS FOR MORE INFORMATION
U1300 PINNACLE PUMP ***
U1600 MOP HOOK RACK *** MOUNT IN CASEWORK - SEE CASEWORK SECTIONS
U6000 UNDER COUNTER
REFRIGERATOR
*** PROVIDE POWER
U6010 REFRIGERATOR, FULL SIZE ***
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
Z
Z
± 20' - 7 3/8"
CONFERENCE
1H-112A
OFFICE
1H-112
1H-112
1H-112A
M1801
M1801
M
M
M1810
1H-112B
A1011
A
A1011
A
M
A
F3050
A1020
9' - 2 7/8" 11' - 4 1/2"
/8
/8
/8
/8
/4
/4
D-1H-108B
D-1H-108C
D-1H-108A
Z
AA
CONFERENCE
1H-112A
OFFICE
1H-112
9' - 0"
9' - 0"
A Se rv ic e D i s a b l e d Ve t e r an Owned
S m a l l B u s iness
SDVOSB
CVE
B
A
C
D
E
F www.pfa-architect.com
ARCHITECTURE, PLANNING, INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510
Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO:
B
A
C
D
E
F
NO. DESCRIPTION DATE
KEYPLAN
FULLY SPRINKLERED
ACTUAL & PLAN
NORTH
NTS
Department of
Veterans Affairs
MILLER-REMICK LLC
PROFESSIONAL
ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
PFA Project #:
Im a c -1
\d p e ro n n e t\
P h a rm a c y R e n o v a ti o n
C e n tr a l_ d p e ro n n e t.
rv t
/1
/2
:4
:2
A
M
EEBDJP
AE103
DEMOLITION, NEW WORK,
REFLECTED CEILING PLAN - PHASE 2
652-17-104UPGRADE PHARMACY TO
USP 800
Project Number
BID DOCUMENTS
01-11-2019
HUNTER HOLMES MCGUIRE
VAMC RICHMOND
01-11-2019
1/4" = 1'-0"
DEMOLITION PLAN - PHASE 2
1/4" = 1'-0"
NEW WORK, EQUIPMENT, AND FINISH PLAN - PHASE 2
DEMOLITION SCHEDULE - PHASE 2
*** ALL FINISHES LISTED IN SCHEDULE ARE TO BE REMOVED
COMPLETELY UNLESS OTHERWISE NOTED ***
NUMBER FLOOR BASE WALL CEILING REMARKS
D-1H-108A SV RB GWB, PNT GWB, PNT
D-1H-108B SV RB GWB, PNT GWB, PNT
D-1H-108C SV RB GWB, PNT GWB, PNT
GENERAL DEMOLITION NOTES
DEMOLITION DRAWINGS INDICATE IN GENERAL, THE EXTENT OF DEMOLITION. REMOVE ALL ASSOCIATED APPURTENANCES NOT REQUIRED IN THE NEW WORK, ALL ABANDONED ITEMS, AND ALL ITEMS REQUIRED FOR THE INSTALLATION OF NEW WORK, TO PROVIDE FOR A COMPLETE PROJECT. ITEMS NOT SPECIFICALLY INDICATED THAT ARE QUESTIONABLE FOR REMOVAL SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR A DECISION.
• PROTECT ALL EXISTING AND NEW WORK FROM WATER INFILTRATION DURING CONSTRUCTION.
THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL EXISTING CONDITIONS PRIOR TO THE START
OF CONSTRUCTION.
THE CONTRACTOR SHALL PATCH ALL EXISTING SURFACES TO MATCH EXISTING WHERE AFFECTED BY CONSTRUCTION OPERATIONS, INCLUDING BUT NOT LIMITED TO PLUMBING, MECHANICAL AND ELECTRICAL WORK.
THE CONTRACTOR SHALL PATCH NAIL HOLES, ETC, AND REMOVE MISCELLANEOUS APPURTENANCES ON EXISTING
WALLS TO BE PAINTED OR COVERED WITH WALL COVERING.
ALL EXISTING FLOORING MATERIALS WHICH ARE TO REMAIN IN PLACE SHALL BE COMPLETELY CLEANED AND STRIPPED
OF WAX IN ORDER TO RECEIVE NEW FINISHES.
• ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT UNLESS OTHERWISE NOTED.
THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW WORK IS COMPLETE, REGARDLESS IF THE ITEM WAS SPECIFICALLY
NOTED OR NOT.
THE CONTRACTOR SHALL REMOVE AND PATCH ANY AREAS UNCOVERED WHERE WOOD NAILERS OR GROUNDS ARE FOUND TO EXIST BEHIND ANY TRIM ITEMS OR EQUIPMENT REMOVED. WALLS SHALL BE MADE FLUSH WITH EXISTING
ADJACENT SURFACES AND READY TO RECEIVE NEW FINISHES.
IF ANY ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON THE CONTRACT DOCUMENTS THE CONTRACTOR SHALL STOP WORK IN THAT AREA
IMMEDIATELY AND NOTIFY THE COR.
WHERE EXISTING VINYL WALL COVERING IS REMOVED ON EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL PATCH AND REPAIR WALL AS REQUIRED TO PROVIDE A LEVEL AND TRUE SURFACE ON WHICH TO INSTALL NEW FINISHES.
ALL SIGNAGE WHICH OCCURS ON WALL OR ON DOORS TO BE REMOVED SHALL BE REMOVED BY THE CONTRACTOR AND
TURNED OVER TO THE COR.
ALL FINISHES LISTED IN THE DEMOLITION SCHEDULE SHALL BE REMOVED COMPLETELY UNLESS INDICATED OTHERWISE.
DEMOLITION SHALL INCLUDE BACKINGS, MASTIC AND GLUES, SETTING BEDS, AND SUBSTRATE AS REQUIRED TO
PREPARE THE MATERIAL FOR NEW WORK AND/OR FINISHES.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS OTHERWISE NOTED.
• EXISTING HAND RAIL AND BUMPER GUARD SHALL BE REMOVED AND TURNED OVER TO THE COR.
ALL EXISTING NURSE CALL, SMOKE DETECTORS, AND SPEAKERS TO REMAIN AND REWORKED WITH NEW CEILING
SYSTEM.
EXISTING WALL FINISHES TO BE VERIFIED AND PREPPED ACCORDINGLY FOR NEW FINISHES SCHEDULES - BY
CONTRACTOR.
• EXISTING CEILING HEIGHT IS TYPICALLY 9'-0" +/-, VERIFY IN FIELD.
EXISTING FLOOR TO FLOOR HEIGHTS ARE AS FOLLOWS: BASEMENT TO 1ST = 13'-9 1/4", 1ST TO 2ND = 12'-10 5/8", 2ND TO
3RD = 11'-9 1/4".
• SEE THE S700 SERIES FOR PHOTOGRAPHS OF DEMOLITION WORK REQUIRED AROUND COLUMNS AND FOOTING.
THESE DEMOLITION NOTES ARE FOR ARCHITECTURAL WORK ONLY. SEE ALL OTHER DRAWINGS FOR DEMOLITION
INFORMATION PERTAINING TO OTHER DISCIPLINES.
DEMOLITION NOTES PHASE 2
1 ICRA TEMPORARY FULL HEIGHT PARTITION. DEMOLISH AFTER THE COMPLETION OF NEW WORK.PROVIDE TEMPORARY
1/3 HOUR RATED DOOR, FRAME, AND HARDWARE WHERE ILLUSTRATED. PROVIDE HINGES, CLOSER, AND CLASSROOM
LOCKSET, AUTOMATIC DOOR BOTTOMS AND RUBBER SEALS.
2 REMOVE DOOR AND FRAME. TURN OVER TO COR.
3 REMOVE AND DISCARD EXISTING CASEWORK.
4 48" - 1 1/2 HR RATED STEEL DOOR AND FRAME. RETAIN DOOR FOR REUSE AS DOOR 108E.
5 REMOVE PORTION OF EXISTING CASEWORK TO MAINTAIN 42" MIN. CLEARANCE. SEE NEW WORK PLAN FOR CLEAR AREA
REQUIRED.
1/4" = 1'-0"
REFLECTED CEILING PLAN - PHASE 2
GENERAL CEILING NOTES
• ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL CODES AND
ORDINANCES.
• CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR FOR A RESOLUTION.
• EACH SUB CONTRACTOR SHALL REVIEW THE CONSTRUCTION DOCUMENTS AND EVALUATE THE SCOPE OF WORK REQUIRED BY THEIR RESPECTIVE TRADE AND ANY CONFLICTS WITH OTHER TRADES. ANY CONFLICTS WILL BE
BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR FOR A RESOLUTION.
• PROVIDE SHALL MEAN TO SUPPLY, TO FURNISH AND TO INSTALL COMPLETE WITH ALL ACCESSORIES, PARTS AND/OR
SERVICES TO BE READY FOR ITS INTENDED USE.
• CONTRACTOR SHALL COORDINATE ALL REQUIRED CONDUIT, PIPING AND CHASES FOR OWNER FURNISHED OWNER
INSTALLED EQUIPMENT WITH THE OWNER.
• CONTRACTOR SHALL COORDINATE WITH WORK BEING PERFORMED UNDER SEPARATE CONTRACT BY OWNER.
• SEE FIRE PLAN FOR FIRE WALL AND SMOKE PARTITION LOCATIONS.
• ALL ABUTTING DISSIMILAR MATERIALS ARE TO BE SEALED. COLOR TO MATCH ADJACENT MATERIALS.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS OTHERWISE NOTED.
• ALL DIMS ON CEILING PLAN ARE TAKEN FROM FACE OF FINISH.
• ALL SOFFITS TO BE PNT#3.
• CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR FOR A RESOLUTION. ADJUSTMENTS
TO DIMENSIONS AND CONDITIONS SHOWN MAY BE REQUIRED.
• ALL DIMENSIONS ARE REFERENCED FROM FACE OF STUD AT NEW CONSTRUCTION UNLESS OTHERWISE NOTED.
DIMENSIONS ARE REFERENCED FROM FACE OF FINISH AT EXISTING CONSTRUCTION.
• ALL DIMENSIONS INDICATED +/- ARE APPROXIMATE AND MUST BE FIELD VERIFIED PRIOR TO THE START OF
CONSTRUCTION.
• PROVIDE SHALL MEAN TO SUPPLY, TO FURNISH AND TO INSTALL COMPLETE WITH ALL ACCESSORIES, PARTS AND/OR
SERVICES TO BE READY FOR ITS INTENDED USE.
• WHERE WORK ABUTS OR ADJOINS EXISTING SURFACES WHICH WILL REMAIN EXPOSED, ALIGN NEW WORK FLUSH
WITH EXISTING ADJACENT SURFACES.
• THE CONTRACTOR SHALL MAINTAIN THE EXISTING BUILDING IN A WATER TIGHT CONDITION THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. REPAIR DAMAGE CAUSED BY CONSTRUCTION OPERATIONS. TAKE ALL PRECAUTIONS NECESSARY TO PROTECT THE BUILDING AND ITS OCCUPANTS DURING THE CONSTRUCTION PERIOD.
• CONTRACTOR SHALL PROVIDE BARRIERS TO PREVENT ENTRY TO THE CONSTRUCTION AREA. BARRIERS SHALL NOT
INTERFERE WITH THE OWNERS USE OF THE SITE.
• THE CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO PREVENT
THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS ONLY UNLESS OTHERWISE NOTED.
• ALL DOORS TO BE MOUNTED 4" FROM FACE OF FINISH UON.
• ALL MODIFICATIONS TO THE EXISTING ROOF SHALL BE MADE IN ACCORDANCE WITH VAMC'S EXISTING ROOF
WARRANTY. COORDINATE ALL MODIFICATIONS TO THE ROOF WITH THE COR.
• ALL SYMBOLS AND ABBREVIATIONS CAN BE REFERENCED FROM SHEET AE101.
• ALL DASHED FURNITURE IS VAVA.
GENERAL NEW WORK NOTES
NEW WORK AND FINISH NOTES#
EQUPIMENT SCHEDULE - PHASE 2
MARK NAME VACI VAVA CFCI COMMENTS
A1011 TELEPHONE, DESK, 1 LINE *** PROVIDE POWER AND DATA
A1020 TELEPHONE, CONFERENCING
SYSTEM
*** PROVIDE POWER AND DATA
F3050 WHITEBOARD *** PROVIDE BLOCKING AS REQUIRED
M1801 COMPUTER SYSTEM *** PROVIDE POWER AND DATA
M1810 FLOOR STANDING COPY MACHINE *** PROVIDE POWER AND DATA
FINISH SCHEDULE / ROOM LEGEND - PHASE 2
NUMBER ROOM NAME FLOOR WALL BASE WALLS CEILING REMARKS
1H-112 OFFICE CPT#1 RB#1 PNT#1, 4 ACT#2
1H-112A CONFERENCE CPT#1 RB#1 PNT#1, 4 ACT#2
1. PROVIDE WALL BLOCKING FOR WALL MOUNTED SYSTEMS FURNITURE.
2. PROVIDE WP#2 AT THIS LOCATION FROM TOP OF COVE BASE TO CEILING. ALL OTHER WALLS THIS ROOM
RECEIVE WP#1 FROM TOP OF COVE BASE TO CEILING. PROVIDE COLOR MATCHING CAULK AT ALL SEAMS.
3. PROVIDE FLOOR PATTERN WITH RF#2. CONTINUE RF#2 UP WALL FOR INTEGRAL COVE BASE. CONTACT
ARCHITECT FOR CAD PLAN IF NEEDED.
4. PATCH FLOORING, WALL BASE, PAINT, CEILING TYPE AND HEIGHT AS REQUIRED TO MATCH EXISTING.
5. PROVIDE PNT#4 AT THIS WALL, CORNER TO CORNER.
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
FM
FLUSH , ACOUSTIC METAL DOOR
S C
H E
D U
L E
D H
E
IG
H T
SCHEDULED WIDTH
ASD
6-PANEL, TELESCOPING, SLIDING AUTOMATIC
DOOR
ALUMINUM AND GLASS
6' - 3"
/4
A400
A400
FV
FLUSH , FULL VISION,
WOOD DOOR
S C
H E
D U
L E
D H
E
IG
H T
SCHEDULED WIDTH
BD
WOOD BARN DOOR
PULL AND DEADBOLD
LOCK - SEE SPECS
VALANCE
SCHEDULED WIDTH
S C
H E
D U
L E
D H
E
IG
H T
BDNV
WOOD BARN DOOR
NARROW VISION
PULL AND DEADBOLD
LOCK - SEE SPECS
VALANCE
SCHEDULED WIDTH
S C
H E
D U
L E
D H
E
IG
H T
8" 6"
M A
X
G-1
6"
2" 2"VARIES
V A
R
IE
S
GWB
DBL MTL STUDS
AT HEAD AND
JAMB
CONT. CAULK
AT BOTH SIDES
HOLLOW METAL FRAME
EQ
VARIES
JAMB SIMILAR
SEE WALL TYPE
EQ
INTERIOR
THREE VERTICAL 6"
STUDS AT HEAD
"L" CASING BEAD-
TYP AT BOTH SIDES
1/4" SHIM
CONT . CAULK -
PTD-TYP
TELESCOPING
AUTOMATIC DOOR C
L O
F I C
U D
O O
R A
N D
W A
L L T
Y P
E
"L" CASING BEAD-TYP AT
ALL EXPOSED CORNERS
CONT. CAULK
AT BOTH SIDES - PTD
LINE OF WALL
7' - 11 5/8"
PASS-THRU
COMPUTER
DESK PHONE
WALL BASE, TYP.
PRE-MFR'D
STAINLESS STEEL
COUNTERTOP
AND SUPPORTS
AS REQUIRED
PRINTER
STAINLESS
STEEL SINK
WITH DRAIN
BOARD. SEE
PLUMBING
DRAWINGS.
REFRIGERATOR
Z
AA
ANTE ROOM 1
1H-109 HD BUFFER
1H-109A
STERILE BUFFER
1H-110A
MECHANICAL
1H-111
ANTE ROOM 2
1H-110
NIC
PHASE 2
WORK AREA
C1H-8
4 4
2 2
GENERAL FINISH NOTES
• PROVIDE ONE-PIECE VINYL TRANSITION STRIP AT ALL FLOOR FINISH TRANSITIONS. COLOR
SHALL MATCH ADJAENT RUBBER BASE.
• ALL FLOOR FINISH TRANSITIONS SHALL BE CONCEALED BY A CLOSED DOOR.
• ALL FINISHES LISTED ARE NEW UNLESS SPECIFIALLY NOTED AS EXISTING.
• WALL BASE SHALL BE RUBBER ROLL GOODS.
• WHERE PAINTED GWB ARE INDICATED, PAINTING INCLUDES ALL PREVIOUSLY PAINTED
SURFACES AND TRIM.
• ALL WALLS TO BE PAINTED PNT#1, EGGSHELL, UNLESS OTHERWISE NOTED. SEE FINISH
COLORS FOR INFORMATION. ALL PAINT IN PHASE 1 SHALL BE EPOXY TYPE EXCEPT IN
MECHANICAL ROOM.
• ALL TRIM TO BE PAINTED PNT#2, SEMI-GLOSS, UNLESS OTHERWISE NOTED. SEE FINISH
COLORS FOR INFORMATION.
• ALL INTEGRAL COVE BASES TO BE 4" HIGH.
FINISH LEGEND
FLOOR
CPT#1 [PHASE 2 OFFICES] BROWN CARPET
RF#1 [FLOOR AND COVE BASE] FIELD RUBBER FLOORING
RF#2 [FLOOR AND COVE BASE] ACCENT GREEN RUBBER FLOORING
SC#1 [SEALED CONCRETE]
WALL AND CEILING
ACT#1 FIELD TILE
PNT#1 [FIELD]
PNT#2 [TRIM]
PNT#3 [CEILINGS]
PNT#4 [ACCENT]
RB#1 BEIGE COVE BASE
WP#1 FIELD WALL PROTECTION
WP#2 GREEN ACCENT WALL PROTECTION
CASEWORK AND ACCESSORIES
PLAM#1 CHERRY LAMINATE
SS#1 BEIGE SOLID SURFACE
GENERAL CASEWORK NOTES
TELESCOPING
DOORS
PASS-THRU
U/C
REFRIGERATORS
1' - 6"
" PRE-MFR'D
STAINLESS STEEL
END PANEL
PRE-MFR'D
STAINLESS STEEL
COUNTERTOP
7' - 0"
4' - 0"
G-1
FINISH FLOOR
10" 2' - 8" 2' - 9 1/8"
CLEANING
SUPPLY
CABINET
PPE
CABINET
A
AE601
B
AE601
2' - 8"2' - 8"10"
CLEANING
SUPPLY
CABINET
PPE
CABINET
B
AE601
A
AE601
/4
/4
"CLEAR
1' - 0"
WOOD FRAME - TYPICAL
PLASTIC LAMINATE AT
UNDERSIDE OF CABINET (GP-28)
DOOR PULL
RECESSED SHELF STANDARDS
(ATTACH TO CABINET SIDES)
1/4" PLYWOOD BACK
PANEL (DADO INTO
CABINET SIDES)
3/4" PLYWOOD SHELVES
(MELAMINE WITH MATCHING
3MM EDGE BANDING)
PLASTIC LAMINATE SOFFIT
F O
R C
A S
E W
O R
K H
E
IG
H T
S E
E C
A S
E W
O R
K E
L E
V A
T
IO
N S
1' - 1 3/4"
3/4" 2' - 0"
1/4" PLYWOOD BACK PANEL
(DADO INTO CABINET SIDES)
WOOD FRAME (TYPICAL)
FACE OF WALL
3/4" PLYWOOD SHELVES
(MELAMINE WITH MATCHING
3MM EDGE BANDING)
RECESSED SHELF
STANDARDS (SCREW
ATTACH TO CABINET SIDES)
/4
/4
DOOR PULL
MOP HOOK RACK (U1600)
CEILING
F O
R C
A S
E W
O R
K H
E
IG
H T
S E
E E
L E
V A
T
IO
N
6" WALL BASE AS SCHEDULED
INSIDE CABINET
A Se rv ic e D i s a b l e d Ve t e r an Owned
S m a l l B u s iness
SDVOSB
CVE
B
A
C
D
E
F www.pfa-architect.com
ARCHITECTURE, PLANNING, INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510
Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO:
B
A
C
D
E
F
NO. DESCRIPTION DATE
KEYPLAN
FULLY SPRINKLERED
ACTUAL & PLAN
NORTH
NTS
Department of
Veterans Affairs
MILLER-REMICK LLC
PROFESSIONAL
ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
PFA Project #:
Im a c -1
\d p e ro n n e t\
P h a rm a c y R e n o v a ti o n
C e n tr a l_ d p e ro n n e t.
rv t
/1
/2
:4
:2
A
M
EEBDJP
AE601
DOORS, WINDOWS, CASEWORK, AND
FINISHES
652-17-104UPGRADE PHARMACY TO
USP 800
Project Number
BID DOCUMENTS
01-11-2019
HUNTER HOLMES MCGUIRE
VAMC RICHMOND
01-11-2019
DOOR SCHEDULE - PHASE 1
NUMBER
DOOR FRAME FIRE
RATING
HARDWARE REMARKS
TYPE WIDTH HEIGHT THICKNESS TYPE HEAD JAMB SILL
109 ASD 5' - 11" 7' - 4 3/4" 1 3/4" PER MFR 1 / AE601 2 / AE601 None PER MFR
109A ASD 5' - 11" 7' - 4 3/4" 1 3/4" PER MFR 1 / AE601 2 / AE601 None PER MFR
110 ASD 5' - 11" 7' - 4 3/4" 1 3/4" PER MFR 1 / AE601 2 / AE601 None PER MFR
110A ASD 5' - 11" 7' - 4 3/4" 1 3/4" PER MFR 1 / AE601 2 / AE601 None PER MFR
111 FM 4' - 0" 7' - 0" 1 3/4" 1 3 / AE601 3 / AE601 1 1/2 HR 5G
REUSE STEEL DOOR FROM
ICRA CONSTRUCTION BARRIER.
STC 45 MIN.
217 FM 2' - 0" 2' - 0" 1 3/4" 1 3 / AE601 3 / AE601 1 1/2 HR
3/8" = 1'-0"
DOOR TYPES
3/8" = 1'-0"
DOOR FRAME TYPE - HOLLOW METAL
AE601 1 1/2" = 1'-0"
3 HEAD DETAIL
AE601 1 1/2" = 1'-0"
1 HEAD DETAIL
AE601 1 1/2" = 1'-0"
2 JAMB DETAIL
3/8" = 1'-0"AE101
5 ANTE ROOM 2B - 2
3/8" = 1'-0"AE101
6 ANTE ROOM 2 - 3
1/4" = 1'-0"
FINISH PLAN - PHASE 1
FINISH SCHEDULE - PHASE 1
NUMBER ROOM NAME FLOOR WALL BASE WALLS CEILING REMARKS
1H-109 ANTE ROOM 1 RF#1, 2 RF#1, 2 (COVE) WP#1, WP#2 EPOXY PTD GWB - PNT#3
1H-109A HD BUFFER RF#1 RF#1 (COVE) WP#1, WP#2 EPOXY PTD GWB - PNT#3
1H-110 ANTE ROOM 2 RF#1, 2 RF#1, 2 (COVE) WP#1, WP#2 EPOXY PTD GWB - PNT#3
1H-110A STERILE BUFFER RF#1 RF#1 (COVE) WP#1, WP#2 EPOXY PTD GWB - PNT#3
1H-111 MECHANICAL SC RB#1 PNT#1 ETR
C1H-8 WORK AREA TME TME TME (FIELD PNT), PNT#4 TME
• ALL CABINETS SHALL BE FLUSH OVERLAY DESIGN, AWI PREMIUM GRADE UNLESS
OTHERWISE NOTED OR DETAILED.
• PROVIDE 3 MM EDGE BANDING TO MATCH LAMINATE ON EXPOSED EDGES.
• DOOR HARDWARE SHALL BE SELF CLOSING SEMI CONCEALED 5 KNUCKLE HINGES.
• DRAWER SLIDES SHALL BE FULL EXTENSION TYPE 100 LB CAPACITY PROVIDE 150 LB
CAPACITY AT ALL DRAWERS MARKED FC. SIDE MOUNTED WITH INTEGRAL STOP. PROVIDE
SELF CLOSING/STAY CLOSED TYPE.
• CABINET LOCKS SHALL BE KEYED CYLINDER, TWO KEYS PER LOCK.
• DOOR AND DRAWER PULLS SHALL BE 4" STAINLESS STEEL U SHAPED.
• ADJUSTABLE SHELF SUPPORTS SHALL BE STANDARD SIDE MOUNTED SYSTEM USING
RECESSED METAL SHELF STANDARDS AND COORDINATED SHELF RESTS, POLISHED
CHROME FINISHED, FOR NOMINAL 1 INCH SPACING ADJUSTMENTS.
• DRAWER CONSTRUCTION: DOVETAIL JOINTS.
• PROVIDE PLAM#1 AT ALL BASE AND WALL CABINETS U.O.N. ON ELEVATIONS.
• PROVIDE SS#1 AT ALL COUNTERTOPS U.O.N. ON ELEVATIONS.
• SEE SCHEDULE FOR FINISHES FOR MORE INFORMATION ON PREMANUFACTURED
STAINLESS STEEL CASEWORK.
DOOR SCHEDULE - PHASE 2
NUMBER
DOOR FRAME
FIRE
RATING HARDWARE REMARKSTYPE WIDTH HEIGHT
THICKNES
S TYPE HEAD JAMB SILL
1H-112 FV 3' - 0" 7' - 0" 1 3/4" 1 3 / AE601 3 / AE601 - N/A 3E
1H-112A BDNV 3' - 7 1/4" 7' - 0" 1 3/4" PER MFR PER MFR PER MFR - N/A B-1
1H-112B BDNV 3' - 7 1/4" 7' - 0" 1 3/4" PER MFR PER MFR PER MFR - N/A B-1
3/8" = 1'-0"AE101
8 ANTE ROOM 1 - 2
3/8" = 1'-0"
WINDOW TYPE - HOLLOW METAL
A
3/8" = 1'-0"AE101
4 ANTE ROOM 2B -1
3/8" = 1'-0"AE101
7 ANTE ROOM 1 - 1
AE601 1" = 1'-0"
B WALL CAB 2 SHELF
AE601 1" = 1'-0"
A CLEANING SUPPLY CABINET
1. PROVIDE WP#2 AT THIS LOCATION FROM TOP OF COVE BASE TO CEILING. ALL OTHER WALLS THIS ROOM RECEIVE WP#1 FROM TOP OF COVE BASE TO CEILING. PROVIDE COLOR MATCHING CAULK AT ALL SEAMS.
2. PROVIDE FLOOR PATTERN WITH RF#2. CONTINUE RF#2 UP WALL FOR INTEGRAL COVE BASE. CONTACT
ARCHITECT FOR CAD PLAN IF NEEDED.
3. PATCH FLOORING, WALL BASE, PAINT, CEILING TYPE AND HEIGHT AS REQUIRED TO MATCH EXISTING.
4. PROVIDE PNT#4 AT THIS WALL, CORNER TO CORNER.
NEW WORK AND FINISH NOTES#
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
File details come from the government source that posted it.