36C24619R0057-0001012.docx
DOCX document 105 KB Posted
- Attached to
- Upgrade Pharmacy to USP800
- Solicitation number
- 36C24619R0057
About this file
36C24619R0057 0001 S06 - REVISED Exhibit A - Past Performance Questionnaire.docx
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 36C24619R0057
EXHIBIT A: PAST PERFORMANCE QUESTIONAIRRE REQUEST LETTER
FROM:
Darren E. Taliaferro Contracting Officer-Construction Team Network Contracting Office (NCO) 6 Building 507 05E/90 H.H. McGuire VAMC 1201 Broad Rock Blvd Richmond, VA 23249
SUBJECT: Request for Past/Present Performance Information
1. You have been identified as a point of contact for a past and/or present performance evaluation of ______________________________________. This firm is currently being considered for a contract at the H.H. McGuire VA Medical Center in Richmond, VA.
2. Your prompt attention to this survey will be greatly appreciated. Please be sure to e-mail the completed worksheet directly to Darren E. Taliaferro: darren.taliaferro@va.gov NLT March 8, 2019
Questionnaires shall not be sent back to the Contractor. If you have any questions or concerns regarding this request, please contact Darren E. Taliaferro at 804-675-5170 or by email at the address listed above.
Past Performance Questionnaire
SECTION A.1: Contractor and Project Information (to be completed by the contractor (offeror) prior to sending to references.
A. Contractor’s name and address: _________________________________________
B. Project Owner -POC: _________________________________________
| C. Phone: | _________________________________________ | |
| D. Email Address: | _________________________________________ |
D. Contract Number: _________________________________________ E. Project Title/Desc of Work: _________________________________________
| _________________________________________ | ||
| F. Contract Type: | _________________________________________ | |
| G. Project Award Date: ______________ | Scheduled Completion Date: ________________ |
Current/Final Completion Date: ________________
H. Project Award Amount: ____________ Current/Final Project Amount: ________________
I. Contractor being evaluated performed as the: Prime Contractor Subcontractor Supplier
A.2: EVALUATED BY: (to be completed by Project Owner)
(Signature) (Date)
_____________________________________ Address: _____________________________ (Typed or Printed Name) _____________________________________ (Title)
(Phone/Fax/Email)
| A |
| B |
| C |
| D |
NA
| Substantial Confidence |
| Satisfactory Confidence |
| Limited Confidence |
| No |
Confidence
Unknown Confidence
| Based on the offeror’s performance record, there is a high expectation that the offeror will successfully perform. |
| Based on the offeror’s performance record, there is an expectation that the offeror will successfully perform. |
| Based on the offeror’s performance record, there is low expectation that the offeror will successfully perform. |
| Based on the offeror’s performance record, there is no expectation that the offeror will successfully perform. |
No performance record is identifiable or the offeror’s performance record is so sparse that no rating can be reasonably assigned.
EVALUATION AREAS
I. Quality A B C D NA
| 1. |
| Contractor provided effective quality control and inspection procedures that resulted in a quality-finished project. |
| □ |
| □ |
| □ |
| □ |
| 2. |
| Contractor developed and submitted realistic progress schedules. |
| □ |
| □ |
| □ |
| □ |
| 3. |
| Contractor provided well researched and clearly identified submittals that matched contract requirements. |
| □ |
| □ |
| □ |
| □ |
| 4. |
| Contractor completed all work with good workmanship and in conformance with the specifications, resulting in minor, if any, punchlist items. |
| □ |
| □ |
| □ |
| □ |
| 5. |
| Contractor thoroughly reviewed design package proposals for accuracy, completeness, and compliance with contract requirements. |
| □ |
| □ |
| □ |
| □ |
| 6. |
| Contractor designs were all concise, accurate and captured all details of the site visit. |
| □ |
| □ |
| □ |
| □ |
II. Timely Performance A B C D NA
| 1. |
| Contractor met established project schedules to complete the project on time. |
| □ |
| □ |
| □ |
| □ |
| 2. |
| Contractor performed all work without the issuance of a cure notice or show cause letter. (If a notice was issued, please describe the circumstances on a separate sheet of paper and identify if liquidated damages were assessed.) |
| □ |
| □ |
| □ |
| □ |
| 3. |
| Contractor provided timely cost/design proposals. |
| □ |
| □ |
| □ |
| □ |
| 4. |
| Contractor submitted the progress schedule and interim progress reports as required in a timely manner and the schedule was approved prior to actual construction. |
| □ |
| □ |
| □ |
| □ |
| 5. |
| Contractor provided submittals on time as required. |
| □ |
| □ |
| □ |
| □ |
| 6. |
| Contractor provided payrolls for both their firm and their subcontractor’s employees as required and scheduled |
| □ |
| □ |
| □ |
| □ |
| 7. |
| Contractor provided timely resolution of all punchlist items. |
| □ |
| □ |
| □ |
| □ |
III. Management Effectiveness A B C D NA
| 1. |
| Contractor provided experienced qualified managers and supervisors with the technical and administrative abilities needed to meet contract requirements. |
| □ |
| □ |
| □ |
| □ |
| 2. |
| Contractor hired quality subcontractors and effectively managed and coordinated their work. |
| □ |
| □ |
| □ |
| □ |
| 3. |
| Contractor hired, maintained, and replaces as necessary, qualified personnel and subcontractors/suppliers. |
| □ |
| □ |
| □ |
| □ |
| 4. |
| Contractor ensured the site manager had sufficient authority to make decisions and take actions during project performance to keep the project on schedule. |
| □ |
| □ |
| □ |
| □ |
| 5. |
| Contractor provided timely and satisfactory response to warranty issues after project completion. |
| □ |
| □ |
| □ |
| □ |
| 6. |
| Contractor paid employees/subcontractors/suppliers as required. |
| □ |
| □ |
| □ |
| □ |
| 7. |
| Contractor cooperated to resolve problems, attended meetings and maintained communication to assure satisfactory resolution. |
| □ |
| □ |
| □ |
| □ |
IV. Compliance with Safety Standards A B C D NA
| 1. |
| Adequacy of Safety Plan |
| □ |
| □ |
| □ |
| □ |
| 2. |
| Implementation of Safety Plan |
| □ |
| □ |
| □ |
| □ |
V. Overall Performance A B C D NA
| 1. |
| Please rate the contractor’s overall performance |
| □ |
| □ |
| □ |
| □ |
Additional Information:
(1) Identify the contractor's overall strengths and weaknesses.
(2) Given the choice, would you award to this contractor again?
(3) Are you aware of any other contracted efforts performed by this contractor similar in nature to this contract? Please identify contract/program and point of contact.
(4) Is there anyone else we should send this questionnaire to? Please identify by name, organization, and phone number.
(If more comment space is needed, write on back or attach pages.)
Thank you for taking the time to complete this questionnaire.
If you have any additional questions or comments please contact Darren E. Taliaferro @ darren.taliaferro@va.gov or @ (804)675-5170.
image1.png image10.png
File details come from the government source that posted it.