36C24619R0057-0003001.pdf

PDF 277 KB Posted

Attached to
Upgrade Pharmacy to USP800
Solicitation number
36C24619R0057
Issued by

About this file

36C24619R0057 0003 S06 - AMENDMENT #3_AE101.pdf

View the file

Other files

File Type Posted
36C24619C0043-000.docx DOCX document
36C24619R0057-0005000.docx DOCX document
36C24619R0057-0004001.pdf PDF
36C24619R0057-0004000.docx DOCX document
36C24619R0057-0003003.pdf PDF
36C24619R0057-0003000.docx DOCX document
36C24619R0057-0003005.docx DOCX document
36C24619R0057-0003004.docx DOCX document
36C24619R0057-0003006.docx DOCX document
36C24619R0057-0003002.pdf PDF
36C24619R0057-0002001.pdf PDF
36C24619R0057-0002002.pdf PDF
36C24619R0057-0002000.docx DOCX document
36C24619R0057-0001014.docx DOCX document
36C24619R0057-0001007.pdf PDF
36C24619R0057-0001009.pdf PDF
36C24619R0057-0001001.pdf PDF
36C24619R0057-0001002.pdf PDF
36C24619R0057-0001011.pdf PDF
36C24619R0057-0001005.pdf PDF
36C24619R0057-0001004.pdf PDF
36C24619R0057-0001000.docx DOCX document
36C24619R0057-0001008.pdf PDF
36C24619R0057-0001012.docx DOCX document
36C24619R0057-0001003.pdf PDF
36C24619R0057-0001010.pdf PDF
36C24619R0057-0001006.pdf PDF
36C24619R0057-0001013.docx DOCX document
36C24619R0057-010.pdf PDF
36C24619R0057-012.pdf PDF
36C24619R0057-002.docx DOCX document
36C24619R0057-004.docx DOCX document
36C24619R0057-011.pdf PDF
36C24619R0057-008.pdf PDF
36C24619R0057-003.docx DOCX document
36C24619R0057-007.pdf PDF
36C24619R0057-001.docx DOCX document
36C24619R0057-006.pdf PDF
36C24619R0057-009.pdf PDF
36C24619R0057-005.docx DOCX document
36C24619R0057-000.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Z

AA

BB

ANTE ROOM 1

1H-109

HD BUFFER

1H-109A

STERILE BUFFER

1H-110A

MECHANICAL

1H-111

110A

109A

5' - 0" 5' - 3 3/4"

ANTE ROOM 2

1H-110

± 1' - 8"

3' - 0" 10' - 4" ± 10' - 5 3/8" ± 3' - 5"

7' - 5" ± 12' - 6 1/8" 11' - 4 5/8" ± 10' - 2"

M3

M6

M6

M3

M3

M662_2

M3

/8

/4

/2

/8

M662_2

M355_2

15' - 4 1/4"

/8

5' - 10" 6' - 10"

/4

/4

AE601

AE601

AE601

PHASE 2

WORK AREA

C1H-8

NIC

NIC

M3_A

± 7' - 4"

M662_2

A

M3

M3

M6

AE601

/2

WALL LEGEND

2 HR. FIRE BARRIER

1 HR. SMOKE BARRIER

Z

AA

BB

2' - 0"

2 2

/8

WALL ONLY

D-1H-108E

D-1H-109 D-1H-110

D-1H-107

D-1H-111

D-1H-112

D-C1H-8

PHASE 2

NIC

NIC

DOOR TAG

TYP

Room name

M349

XXX

EXISTING DOOR

NEW DOOR

DEMO DOOR

NEW WALL

EXISTING WALL

DEMO WALL OR ITEMS

ABOVE OR BELOW

WALL TAG

ROOM NUMBER

REVISION TAG

EQUIPMENT TAG

TOILET ACCESSORY TAG

DEMOLITION NOTE

NEW WORK NOTE

A810

DEMO ROOM NUMBER

CURTAIN WALL AND

WINDOW MARKER1i

INTERIOR ELEVATION

MARKER

SECTION OR WALL

SECTION NUMBER

COLUMN GRID NUMBER

EXISTING COLUMN

GRID NUMBER

A120

BUILDING ELEVATION

MARKER

A810

A810 DETAIL MARKER

1 PHASING NOTES

JSN

A.F.F.

ACT

CFCI

CG

CLG, CLNG

COL

CONC.

CONT.

CORR

CT

ELEC

ELEV

EWC

EXIST.

FIN

GWB

HDWR

HR

HT

L L.O.D.

MAX

MECH

MFR

MTG

MTL

NIC

ABOVE FINISH FLOOR

ACOUSTICAL CEILING TILE

CONTRACTOR FURNISHED,

CONTRACTOR INSTALLED

CORNER GUARD

CEILING

COLUMN

CONCRETE

CONTINUOUS

CORRIDOR

CERAMIC TILE

ELECTRIC(AL)

ELEVATOR

ELECTRIC WATER

COOLER

EXISTING

FINISH(ED)

GYSPUM

WALLBOARD

HARDWARE

HOUR

HEIGHT

LENGTH

LINE OF DEMARCATION

MAXIMUM

MECHANICAL

MANUFACTURER

MOUNTING

METAL

NOT IN CONTRACT

O.C.

PLAM

PNT

PTD

QT.

R

RA

RES

RF

RT

RS

SC

SIM

SS

STOR

SUSP.

TYP

U/C

VACI

VAVA

VB

VERT

Ø

BT

ETR

TER

TME

ON CENTER

PLASTIC LAMINATE

PAINT

PAINTED

QUARRY TILE

RISER

RETURN AIR

RESINOUS FLOORING

RUBBER FLOOR

RUBBER TILE

RUBBER SHEET

SEALED CONCRETE

SIMILAR

SOLID SURFACE

STORAGE

SUSPENDED

TYPICAL

UNDERCOUNTER

VA FURNISHED,

CONTRACTOR INSTALLED

VA FURNISHED,

VA INSTALLED

VINYL BASE

VERTICAL

AT

ANGLE

CENTER LINE

DIAMETER

BRICK TILE

EXISTING TO REMAIN

TERRAZZO

TO MATCH EXISTING

CL

X

S2

MECHANICAL

2A-217

A Se rv ic e D i s a b l e d Ve t e r an Owned

Sm a l l

B us iness

SDVOSB

CVE

B

A

C

D

E

F www.pfa-architect.com

ARCHITECTURE, PLANNING, INTERIORS

World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510

Phone: 757-471-0537 Fax: 757-471-4205

PF&A DESIGN

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t

B

A

C

D

E

F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO:

B

A

C

D

E

F

NO. DESCRIPTION DATE

KEYPLAN

FULLY SPRINKLERED

ACTUAL & PLAN

NORTH

NTS

Department of Veterans Affairs

MILLER-REMICK LLCPROFESSIONAL ENGINEERPRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

PFA Project #:

C U s e rs

\e b ic ke l\ D o cu m e n ts

\2

P h a rm a c y

R e n o v a ti o n

C e n tr a l_ e b ic ke l@ p fa

-a rc h it e c t.

c o m

.r v t

/2

/2

:2

:5

P

M

DJPDJP

AE101

DEMOLITION & NEW WORK PLAN -

PHASE 1

652-17-104UPGRADE PHARMACY TO

USP 800

250417

BID DOCUMENTS

02-27-2019

HUNTER HOLMES MCGUIRE

VAMC RICHMOND

02-27-2019

WALL TYPE SCHEDULE

TYPE STC DESCRIPTION

FIRE

RATING UL REMARKS

M1B N/A 1 5/8" METAL STUDS AT 16" O.C. MAX.

5/8" GWB ONE SIDE. EXTEND WALL

ASSEMBLY TO 4" ABOVE FINISHED

CEILING.

N/A N/A

M3 N/A 3 5/8" METAL STUDS AT 16" O.C. MAX.

5/8" GWB BOTH SIDES. EXTEND WALL

ASSEMBLY TO 4" ABOVE FINISHED

CEILING.

N/A N/A

M3_A 3 5/8" METAL STUDS AT 16" O.C. MAX.

5/8" GWB ONE SIDE. 1/4" AIR SPACE,

METAL CLIP AND METAL CLAD 5/8"

GWB

N/A N/A ASSEMBLY TO MATCH EXISTING UNRATED FURRED

WALL.

M6 N/A 6" METAL STUDS AT 16" O.C. MAX. 5/8"

GWB BOTH SIDES. EXTEND GWB TO

4" ABOVE FINISHED CEILING. ANCHOR

STUDS TO UNDERSIDE OF DECK OR

STRUCTURE ABOVE AT 48" O.C. MAX

N/A N/A

M355_2 55 3 5/8" METAL STUDS AT 16" O.C. MAX.

WITH 2 LAYERS OF 1/2" FIRE RATED

GWB BOTH SIDES. PROVIDE 1 1/2"

MINERAL WOOL. EXTEND WALL

ASSEMBLY TO UNDERSIDE OF DECK

ABOVE

2 HR

BARRIER

U419 PROVIDE 3" STENCILED WITH 3/8" STROKE TEXT

EVERY 8' O.C. MAX. READING "2 HR FIRE RATED

BARRIER" AS REQUIRED BY BUILDING CODE.

PROVIDE INSULATION WHERE COMPONENTS MEET

DECK ABOVE. PROVIDE ACOUSTICAL SEALANT AT

RUNNER AND HEAD PRIOR TO INSTALLATION OF

GWB. PROVIDE ACOUSTICAL SEALANT AT ALL WALL

PENETRATIONS.

M662_2 62 6" METAL STUDS AT 16" O.C.MAX. 2

LAYERS 5/8" FIRE RATED GWB BOTH

SIDES. PROVIDE 5" MINERAL WOOL.

EXTEND WALL ASSEMBLY TO

UNDERSIDE OF DECK ABOVE

2 HR

BARRIER

U454 PROVIDE 3" STENCILED TEXT EVERY 8' O.C. READING

"2 HR FIRE RATED BARRIER" AS REQUIRED BY

BUILDING CODE. PROVIDE INSULATION WHERE

COMPONENTS MEET DECK ABOVE. PROVIDE

ACOUSTICAL SEALANT AT RUNNER AND HEAD PRIOR

TO INSTALLATION OF GWB. PROVIDE ACOUSTICAL

SEALANT CONTINUOUS BETWEEN LAYERS OF GWB

AND DABS AT 8" O.C. PROVIDE ACOUSTICAL SEALANT

AT ALL WALL PENETRATIONS.

S2 N/A 2-1/2” C-H STUDS, 25 GA. AT 24” O.C.

TWO LAYERS OF 1/2 IN. THICK GWB. 1”

MIN. THICK MINERAL WOOL BATT

INSULATION, 1” GYPSUM LINER

PANELS FRICTION FIT.

2 HR U415 -

ROOM LEGEND - PHASE 1

NUMBER NAME AREA

1H-109 ANTE ROOM 1 122 SF

1H-109A HD BUFFER 117 SF

1H-110 ANTE ROOM 2 165 SF

1H-110A STERILE BUFFER 158 SF

1H-111 MECHANICAL 159 SF

C1H-8 WORK AREA 162 SF

883 SF

1/4" = 1'-0"

LEVEL1 - NEW WORK PLAN - PHASE 1 1/4" = 1'-0"

LEVEL 1 - DEMOLITION PLAN - PHASE 1

DEMOLITION SCHEDULE - PHASE 1

*** ALL FINISHES LISTED IN SCHEDULE ARE TO BE REMOVED

COMPLETELY UNLESS OTHERWISE NOTED ***

NUMBER FLOOR BASE WALL CEILING REMARKS

D-1H-107 VT RB PTD GWB ACT

D-1H-108E VT RB PTD GWB ACT

D-1H-109 VT RB PTD GWB ACT

D-1H-110 VT RB PTD GWB ACT

D-1H-111 VT RB PTD GWB ACT

D-1H-112 VT RB PTD GWB ACT

D-C1H-8 VT RB PTD GWB ACT

GENERAL DEMOLITION NOTES

DEMOLITION DRAWINGS INDICATE IN GENERAL, THE EXTENT OF DEMOLITION. REMOVE ALL ASSOCIATED APPURTENANCES NOT REQUIRED IN THE NEW WORK, ALL ABANDONED ITEMS, AND ALL ITEMS REQUIRED FOR THE INSTALLATION OF NEW WORK, TO PROVIDE FOR A COMPLETE PROJECT. ITEMS NOT SPECIFICALLY INDICATED THAT ARE QUESTIONABLE FOR REMOVAL SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR A DECISION.

• PROTECT ALL EXISTING AND NEW WORK FROM WATER INFILTRATION DURING CONSTRUCTION.

THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL EXISTING CONDITIONS PRIOR TO THE START

OF CONSTRUCTION.

THE CONTRACTOR SHALL PATCH ALL EXISTING SURFACES TO MATCH EXISTING WHERE AFFECTED BY CONSTRUCTION OPERATIONS, INCLUDING BUT NOT LIMITED TO PLUMBING, MECHANICAL AND ELECTRICAL WORK.

THE CONTRACTOR SHALL PATCH NAIL HOLES, ETC, AND REMOVE MISCELLANEOUS APPURTENANCES ON EXISTING

WALLS TO BE PAINTED OR COVERED WITH WALL COVERING.

ALL EXISTING FLOORING MATERIALS WHICH ARE TO REMAIN IN PLACE SHALL BE COMPLETELY CLEANED AND STRIPPED

OF WAX IN ORDER TO RECEIVE NEW FINISHES.

• ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT UNLESS OTHERWISE NOTED.

THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW WORK IS COMPLETE, REGARDLESS IF THE ITEM WAS SPECIFICALLY

NOTED OR NOT.

THE CONTRACTOR SHALL REMOVE AND PATCH ANY AREAS UNCOVERED WHERE WOOD NAILERS OR GROUNDS ARE FOUND TO EXIST BEHIND ANY TRIM ITEMS OR EQUIPMENT REMOVED. WALLS SHALL BE MADE FLUSH WITH EXISTING

ADJACENT SURFACES AND READY TO RECEIVE NEW FINISHES.

IF ANY ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON THE CONTRACT DOCUMENTS THE CONTRACTOR SHALL STOP WORK IN THAT AREA

IMMEDIATELY AND NOTIFY THE COR.

WHERE EXISTING VINYL WALL COVERING IS REMOVED ON EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL PATCH AND REPAIR WALL AS REQUIRED TO PROVIDE A LEVEL AND TRUE SURFACE ON WHICH TO INSTALL NEW FINISHES.

ALL SIGNAGE WHICH OCCURS ON WALL OR ON DOORS TO BE REMOVED SHALL BE REMOVED BY THE CONTRACTOR AND

TURNED OVER TO THE COR.

ALL FINISHES LISTED IN THE DEMOLITION SCHEDULE SHALL BE REMOVED COMPLETELY UNLESS INDICATED OTHERWISE.

DEMOLITION SHALL INCLUDE BACKINGS, MASTIC AND GLUES, SETTING BEDS, AND SUBSTRATE AS REQUIRED TO

PREPARE THE MATERIAL FOR NEW WORK AND/OR FINISHES.

• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS OTHERWISE NOTED.

• EXISTING HAND RAIL AND BUMPER GUARD SHALL BE REMOVED AND TURNED OVER TO THE COR.

ALL EXISTING NURSE CALL, SMOKE DETECTORS, AND SPEAKERS TO REMAIN AND REWORKED WITH NEW CEILING

SYSTEM.

EXISTING WALL FINISHES TO BE VERIFIED AND PREPPED ACCORDINGLY FOR NEW FINISHES SCHEDULES - BY

CONTRACTOR.

• EXISTING CEILING HEIGHT IS TYPICALLY 9'-0" +/-, VERIFY IN FIELD.

EXISTING FLOOR TO FLOOR HEIGHTS ARE AS FOLLOWS: BASEMENT TO 1ST = 13'-9 1/4", 1ST TO 2ND = 12'-10 5/8", 2ND TO

3RD = 11'-9 1/4".

• SEE THE S700 SERIES FOR PHOTOGRAPHS OF DEMOLITION WORK REQUIRED AROUND COLUMNS AND FOOTING.

THESE DEMOLITION NOTES ARE FOR ARCHITECTURAL WORK ONLY. SEE ALL OTHER DRAWINGS FOR DEMOLITION

INFORMATION PERTAINING TO OTHER DISCIPLINES.

DEMOLITION NOTES PHASE 1

1 ICRA TEMPORARY FULL HEIGHT PARTITION. DEMOLISH AFTER THE COMPLETION OF NEW WORK.PROVIDE

TEMPORARY 1/3 HOUR RATED DOOR, FRAME, AND HARDWARE WHERE ILLUSTRATED. PROVIDE HINGES, CLOSER, AND CLASSROOM LOCKSET, AUTOMATIC DOOR BOTTOMS AND RUBBER SEALS.

2 REMOVE DOOR AND FRAME. TURN OVER TO COR.

3 REMOVE AND DISCARD EXISTING CASEWORK.

4 48" - 1 1/2 HR RATED STEEL DOOR AND FRAME. RETAIN DOOR FOR REUSE AS DOOR 108E.

5 REMOVE PORTION OF EXISTING CASEWORK TO MAINTAIN 42" MIN. CLEARANCE. SEE NEW WORK PLAN FOR

CLEAR AREA REQUIRED.

• CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR FOR A RESOLUTION. ADJUSTMENTS

TO DIMENSIONS AND CONDITIONS SHOWN MAY BE REQUIRED.

• ALL DIMENSIONS ARE REFERENCED FROM FACE OF STUD AT NEW CONSTRUCTION UNLESS OTHERWISE NOTED.

DIMENSIONS ARE REFERENCED FROM FACE OF FINISH AT EXISTING CONSTRUCTION.

• ALL DIMENSIONS INDICATED +/- ARE APPROXIMATE AND MUST BE FIELD VERIFIED PRIOR TO THE START OF

CONSTRUCTION.

• PROVIDE SHALL MEAN TO SUPPLY, TO FURNISH AND TO INSTALL COMPLETE WITH ALL ACCESSORIES, PARTS AND/OR

SERVICES TO BE READY FOR ITS INTENDED USE.

• WHERE WORK ABUTS OR ADJOINS EXISTING SURFACES WHICH WILL REMAIN EXPOSED, ALIGN NEW WORK FLUSH

WITH EXISTING ADJACENT SURFACES.

• THE CONTRACTOR SHALL MAINTAIN THE EXISTING BUILDING IN A WATER TIGHT CONDITION THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. REPAIR DAMAGE CAUSED BY CONSTRUCTION OPERATIONS. TAKE ALL PRECAUTIONS NECESSARY TO PROTECT THE BUILDING AND ITS OCCUPANTS DURING THE CONSTRUCTION PERIOD.

• CONTRACTOR SHALL PROVIDE BARRIERS TO PREVENT ENTRY TO THE CONSTRUCTION AREA. BARRIERS SHALL NOT

INTERFERE WITH THE OWNERS USE OF THE SITE.

• THE CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO PREVENT

THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.

• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS ONLY UNLESS OTHERWISE NOTED.

• ALL DOORS TO BE MOUNTED 4" FROM FACE OF FINISH UON.

• ALL MODIFICATIONS TO THE EXISTING ROOF SHALL BE MADE IN ACCORDANCE WITH VAMC'S EXISTING ROOF

WARRANTY. COORDINATE ALL MODIFICATIONS TO THE ROOF WITH THE COR.

• ALL SYMBOLS AND ABBREVIATIONS CAN BE REFERENCED FROM SHEET AE101.

• ALL DASHED FURNITURE IS VAVA.

GENERAL NEW WORK NOTES

NEW WORK AND FINISH NOTES#

SYMBOLS ABBREVIATIONS

1/8" = 1'-0"

LEVEL 2 - NEW WORK PLAN

NO.

A I

N I

G

RI

V

FOHTLA

E W

N O

M M

O

C JOSEPH H. TROST

ARCHITEC

T

1. PROVIDE WALL BLOCKING FOR WALL MOUNTED SYSTEMS FURNITURE.

2. PROVIDE WP#2 (ACCENT COLOR WALL PROTECTION) AT THIS LOCATION FROM TOP OF COVE BASE TO CEILING. ALL OTHER WALLS THIS ROOM TO RECEIVE WP#1 (FIELD COLOR WALL PROTECTION) FROM TOP OF

COVE BASE TO CEILING.

PROVIDE MANUFACTURER'S COLOR MATCHED OR CLEAR CAULK IN LIEU OF MANFACTURER'S AVAILABLE TRIM

PIECES AT THE FOLLOWING LOCATIONS:

- AT ANY VERTICAL OR HORIZONTAL SEAM WHERE PANELS ABUT

- WHERE COVE BASE CAP AND WALL PROTECTION PANELS ABUT AT 4" AFF

- WHERE TOP OF WALL PROTECTION ABUTS CEILING

- ADDITIONAL LOCATIONS AS SPECIFIED IN MANUFACTURER'S INSTALLATION INSTRUCTIONS

3. PROVIDE FLOOR PATTERN WITH RES#2. CONTINUE RES#2 UP WALL FOR INTEGRAL COVE BASE. CONTACT

ARCHITECT FOR CAD PLAN IF NEEDED.

4. PATCH FLOORING, WALL BASE, PAINT, CEILING TYPE AND HEIGHT AS REQUIRED TO MATCH EXISTING.

5. PROVIDE PNT#4 AT THIS WALL, CORNER TO CORNER.

Sheets
AE101 - DEMOLITION & NEW WORK PLAN - PHASE 1

File details come from the government source that posted it.