Z
Z
± 20' - 7 3/8"
CONFERENCE
1H-112A
OFFICE
1H-112
1H-112
1H-112A
M3
M3
M3
M1801
M1801
M
M
M1810
1H-112B
A1011
A
A1011
A
M
A
F3050
A1020
9' - 2 7/8" 11' - 4 1/2"
/8
/8
/8
/8
/4
/4
D-1H-108B
D-1H-108C
D-1H-108A
Z
AA
CONFERENCE
1H-112A
OFFICE
1H-112
9' - 0"
9' - 0"
A Se rv ic e D i s a b l e d Ve t e r an Owned
Sm a l l
B us iness
SDVOSB
CVE
B
A
C
D
E
F www.pfa-architect.com
ARCHITECTURE, PLANNING, INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510
Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO:
B
A
C
D
E
F
NO. DESCRIPTION DATE
KEYPLAN
FULLY SPRINKLERED
ACTUAL & PLAN
NORTH
NTS
Department of Veterans Affairs
MILLER-REMICK LLCPROFESSIONAL ENGINEERPRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
PFA Project #:
C U s e rs
\e b ic k e l\ D o c u m e n ts
\2
P h a rm a c y R e n o v a ti o n
C e n tr a l_ e b ic k e l@ p fa -a rc h it e c t.
c o m
.r v t
/2
/2
:2
:2
P
M
EEBDJP
AE103
DEMOLITION, NEW WORK,
REFLECTED CEILING PLAN - PHASE 2
652-17-104UPGRADE PHARMACY TO
USP 800
250417
BID DOCUMENTS
02-27-2019
HUNTER HOLMES MCGUIRE
VAMC RICHMOND
02-27-2019
1/4" = 1'-0"
DEMOLITION PLAN - PHASE 2
1/4" = 1'-0"
NEW WORK, EQUIPMENT, AND FINISH PLAN - PHASE 2
DEMOLITION SCHEDULE - PHASE 2
*** ALL FINISHES LISTED IN SCHEDULE ARE TO BE REMOVED
COMPLETELY UNLESS OTHERWISE NOTED ***
NUMBER FLOOR BASE WALL CEILING REMARKS
D-1H-108A SV RB GWB, PNT GWB, PNT
D-1H-108B SV RB GWB, PNT GWB, PNT
D-1H-108C SV RB GWB, PNT GWB, PNT
GENERAL DEMOLITION NOTES
DEMOLITION DRAWINGS INDICATE IN GENERAL, THE EXTENT OF DEMOLITION. REMOVE ALL ASSOCIATED APPURTENANCES NOT REQUIRED IN THE NEW WORK, ALL ABANDONED ITEMS, AND ALL ITEMS REQUIRED FOR THE INSTALLATION OF NEW WORK, TO PROVIDE FOR A COMPLETE PROJECT. ITEMS NOT SPECIFICALLY INDICATED THAT ARE QUESTIONABLE FOR REMOVAL SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR A DECISION.
• PROTECT ALL EXISTING AND NEW WORK FROM WATER INFILTRATION DURING CONSTRUCTION.
THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL EXISTING CONDITIONS PRIOR TO THE START
OF CONSTRUCTION.
THE CONTRACTOR SHALL PATCH ALL EXISTING SURFACES TO MATCH EXISTING WHERE AFFECTED BY CONSTRUCTION OPERATIONS, INCLUDING BUT NOT LIMITED TO PLUMBING, MECHANICAL AND ELECTRICAL WORK.
THE CONTRACTOR SHALL PATCH NAIL HOLES, ETC, AND REMOVE MISCELLANEOUS APPURTENANCES ON EXISTING
WALLS TO BE PAINTED OR COVERED WITH WALL COVERING.
ALL EXISTING FLOORING MATERIALS WHICH ARE TO REMAIN IN PLACE SHALL BE COMPLETELY CLEANED AND STRIPPED
OF WAX IN ORDER TO RECEIVE NEW FINISHES.
• ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT UNLESS OTHERWISE NOTED.
THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW WORK IS COMPLETE, REGARDLESS IF THE ITEM WAS SPECIFICALLY
NOTED OR NOT.
THE CONTRACTOR SHALL REMOVE AND PATCH ANY AREAS UNCOVERED WHERE WOOD NAILERS OR GROUNDS ARE FOUND TO EXIST BEHIND ANY TRIM ITEMS OR EQUIPMENT REMOVED. WALLS SHALL BE MADE FLUSH WITH EXISTING
ADJACENT SURFACES AND READY TO RECEIVE NEW FINISHES.
IF ANY ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON THE CONTRACT DOCUMENTS THE CONTRACTOR SHALL STOP WORK IN THAT AREA
IMMEDIATELY AND NOTIFY THE COR.
WHERE EXISTING VINYL WALL COVERING IS REMOVED ON EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL PATCH AND REPAIR WALL AS REQUIRED TO PROVIDE A LEVEL AND TRUE SURFACE ON WHICH TO INSTALL NEW FINISHES.
ALL SIGNAGE WHICH OCCURS ON WALL OR ON DOORS TO BE REMOVED SHALL BE REMOVED BY THE CONTRACTOR AND
TURNED OVER TO THE COR.
ALL FINISHES LISTED IN THE DEMOLITION SCHEDULE SHALL BE REMOVED COMPLETELY UNLESS INDICATED OTHERWISE.
DEMOLITION SHALL INCLUDE BACKINGS, MASTIC AND GLUES, SETTING BEDS, AND SUBSTRATE AS REQUIRED TO
PREPARE THE MATERIAL FOR NEW WORK AND/OR FINISHES.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS OTHERWISE NOTED.
• EXISTING HAND RAIL AND BUMPER GUARD SHALL BE REMOVED AND TURNED OVER TO THE COR.
ALL EXISTING NURSE CALL, SMOKE DETECTORS, AND SPEAKERS TO REMAIN AND REWORKED WITH NEW CEILING
SYSTEM.
EXISTING WALL FINISHES TO BE VERIFIED AND PREPPED ACCORDINGLY FOR NEW FINISHES SCHEDULES - BY
CONTRACTOR.
• EXISTING CEILING HEIGHT IS TYPICALLY 9'-0" +/-, VERIFY IN FIELD.
EXISTING FLOOR TO FLOOR HEIGHTS ARE AS FOLLOWS: BASEMENT TO 1ST = 13'-9 1/4", 1ST TO 2ND = 12'-10 5/8", 2ND TO
3RD = 11'-9 1/4".
• SEE THE S700 SERIES FOR PHOTOGRAPHS OF DEMOLITION WORK REQUIRED AROUND COLUMNS AND FOOTING.
THESE DEMOLITION NOTES ARE FOR ARCHITECTURAL WORK ONLY. SEE ALL OTHER DRAWINGS FOR DEMOLITION
INFORMATION PERTAINING TO OTHER DISCIPLINES.
DEMOLITION NOTES PHASE 2
1 ICRA TEMPORARY FULL HEIGHT PARTITION. DEMOLISH AFTER THE COMPLETION OF NEW WORK.PROVIDE TEMPORARY
1/3 HOUR RATED DOOR, FRAME, AND HARDWARE WHERE ILLUSTRATED. PROVIDE HINGES, CLOSER, AND CLASSROOM
LOCKSET, AUTOMATIC DOOR BOTTOMS AND RUBBER SEALS.
2 REMOVE DOOR AND FRAME. TURN OVER TO COR.
3 REMOVE AND DISCARD EXISTING CASEWORK.
4 48" - 1 1/2 HR RATED STEEL DOOR AND FRAME. RETAIN DOOR FOR REUSE AS DOOR 108E.
5 REMOVE PORTION OF EXISTING CASEWORK TO MAINTAIN 42" MIN. CLEARANCE. SEE NEW WORK PLAN FOR CLEAR AREA
REQUIRED.
1/4" = 1'-0"
REFLECTED CEILING PLAN - PHASE 2
GENERAL CEILING NOTES
• ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL CODES AND
ORDINANCES.
• CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR FOR A RESOLUTION.
• EACH SUB CONTRACTOR SHALL REVIEW THE CONSTRUCTION DOCUMENTS AND EVALUATE THE SCOPE OF WORK REQUIRED BY THEIR RESPECTIVE TRADE AND ANY CONFLICTS WITH OTHER TRADES. ANY CONFLICTS WILL BE
BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR FOR A RESOLUTION.
• PROVIDE SHALL MEAN TO SUPPLY, TO FURNISH AND TO INSTALL COMPLETE WITH ALL ACCESSORIES, PARTS AND/OR
SERVICES TO BE READY FOR ITS INTENDED USE.
• CONTRACTOR SHALL COORDINATE ALL REQUIRED CONDUIT, PIPING AND CHASES FOR OWNER FURNISHED OWNER
INSTALLED EQUIPMENT WITH THE OWNER.
• CONTRACTOR SHALL COORDINATE WITH WORK BEING PERFORMED UNDER SEPARATE CONTRACT BY OWNER.
• SEE FIRE PLAN FOR FIRE WALL AND SMOKE PARTITION LOCATIONS.
• ALL ABUTTING DISSIMILAR MATERIALS ARE TO BE SEALED. COLOR TO MATCH ADJACENT MATERIALS.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS OTHERWISE NOTED.
• ALL DIMS ON CEILING PLAN ARE TAKEN FROM FACE OF FINISH.
• ALL SOFFITS TO BE PNT#3.
• CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR FOR A RESOLUTION. ADJUSTMENTS
TO DIMENSIONS AND CONDITIONS SHOWN MAY BE REQUIRED.
• ALL DIMENSIONS ARE REFERENCED FROM FACE OF STUD AT NEW CONSTRUCTION UNLESS OTHERWISE NOTED.
DIMENSIONS ARE REFERENCED FROM FACE OF FINISH AT EXISTING CONSTRUCTION.
• ALL DIMENSIONS INDICATED +/- ARE APPROXIMATE AND MUST BE FIELD VERIFIED PRIOR TO THE START OF
CONSTRUCTION.
• PROVIDE SHALL MEAN TO SUPPLY, TO FURNISH AND TO INSTALL COMPLETE WITH ALL ACCESSORIES, PARTS AND/OR
SERVICES TO BE READY FOR ITS INTENDED USE.
• WHERE WORK ABUTS OR ADJOINS EXISTING SURFACES WHICH WILL REMAIN EXPOSED, ALIGN NEW WORK FLUSH
WITH EXISTING ADJACENT SURFACES.
• THE CONTRACTOR SHALL MAINTAIN THE EXISTING BUILDING IN A WATER TIGHT CONDITION THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. REPAIR DAMAGE CAUSED BY CONSTRUCTION OPERATIONS. TAKE ALL PRECAUTIONS NECESSARY TO PROTECT THE BUILDING AND ITS OCCUPANTS DURING THE CONSTRUCTION PERIOD.
• CONTRACTOR SHALL PROVIDE BARRIERS TO PREVENT ENTRY TO THE CONSTRUCTION AREA. BARRIERS SHALL NOT
INTERFERE WITH THE OWNERS USE OF THE SITE.
• THE CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO PREVENT
THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS ONLY UNLESS OTHERWISE NOTED.
• ALL DOORS TO BE MOUNTED 4" FROM FACE OF FINISH UON.
• ALL MODIFICATIONS TO THE EXISTING ROOF SHALL BE MADE IN ACCORDANCE WITH VAMC'S EXISTING ROOF
WARRANTY. COORDINATE ALL MODIFICATIONS TO THE ROOF WITH THE COR.
• ALL SYMBOLS AND ABBREVIATIONS CAN BE REFERENCED FROM SHEET AE101.
• ALL DASHED FURNITURE IS VAVA.
GENERAL NEW WORK NOTES
NEW WORK AND FINISH NOTES#
EQUPIMENT SCHEDULE - PHASE 2
MARK NAME VACI VAVA CFCI COMMENTS
A1011 TELEPHONE, DESK, 1 LINE *** PROVIDE POWER AND DATA
A1020 TELEPHONE, CONFERENCING
SYSTEM
*** PROVIDE POWER AND DATA
F3050 WHITEBOARD *** PROVIDE BLOCKING AS REQUIRED
M1801 COMPUTER SYSTEM *** PROVIDE POWER AND DATA
M1810 FLOOR STANDING COPY MACHINE *** PROVIDE POWER AND DATA
FINISH SCHEDULE / ROOM LEGEND - PHASE 2
NUMBER ROOM NAME FLOOR WALL BASE WALLS CEILING REMARKS
1H-112 OFFICE CPT#1 RB#1 PNT#1, 4 ACT#2
1H-112A CONFERENCE CPT#1 RB#1 PNT#1, 4 ACT#2
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
ARCHITEC
T
1. PROVIDE WALL BLOCKING FOR WALL MOUNTED SYSTEMS FURNITURE.
2. PROVIDE WP#2 (ACCENT COLOR WALL PROTECTION) AT THIS LOCATION FROM TOP OF COVE BASE TO CEILING. ALL OTHER WALLS THIS ROOM TO RECEIVE WP#1 (FIELD COLOR WALL PROTECTION) FROM TOP OF
COVE BASE TO CEILING.
PROVIDE MANUFACTURER'S COLOR MATCHED OR CLEAR CAULK IN LIEU OF MANFACTURER'S AVAILABLE TRIM
PIECES AT THE FOLLOWING LOCATIONS:
- AT ANY VERTICAL OR HORIZONTAL SEAM WHERE PANELS ABUT
- WHERE COVE BASE CAP AND WALL PROTECTION PANELS ABUT AT 4" AFF
- WHERE TOP OF WALL PROTECTION ABUTS CEILING
- ADDITIONAL LOCATIONS AS SPECIFIED IN MANUFACTURER'S INSTALLATION INSTRUCTIONS
3. PROVIDE FLOOR PATTERN WITH RES#2. CONTINUE RES#2 UP WALL FOR INTEGRAL COVE BASE. CONTACT
ARCHITECT FOR CAD PLAN IF NEEDED.
4. PATCH FLOORING, WALL BASE, PAINT, CEILING TYPE AND HEIGHT AS REQUIRED TO MATCH EXISTING.
5. PROVIDE PNT#4 AT THIS WALL, CORNER TO CORNER.