36C24619B0021-007.pdf
PDF 2 MB Posted
- Solicitation number
- 36C24619B0021
About this file
36C24619B0021 S02 2 DWGS-Architectural.pdf
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
METAL
NOT IN CONTRACT
VA FURNISHED CONTRACTOR INSTALLED
VA FURNISHED VA INSTALLED
CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CONTRACTOR FURNISHED VA INSTALLED
PLASTIC LAMINATE
PAINT
PAINTED
RISER
RETURN AIR
RUBBER BASE
SEALED CONCRETE
SOLID SURFACE
SHEET VINYL
SIMILAR
STORAGE
SUSPENDED
TREAD
TOP OF BOND BEAM
TOP OF STEEL
TYPICAL
VINYL BASE
VERTICAL
VINYL WALL COVERING
AT
ANGLE
CENTER LINE
DIAMETER
ABOVE FINISH FLOOR
ACOUSTICAL TILE
ALUMINUM THRESHOLD
CUBICLE CURTAIN
CORNER GUARD
CEILING
COLUMN
CONCRETE
CONTINUOUS
CORRIDOR
CERAMIC TILE
ELECTRIC(AL)
ELEVATOR
EXISTING TO REMAIN
ELECTRIC WATER COOLER
EXISTING
EXISTING
FINISH(ED)
FACE OF FINISH
FACE OF STUD
GYSPUM WALLBOARD
HARDWARE
HARDWARE
HOUR
HEIGHT
LENGTH
LUXURY VINYL TILE
MAXIMUM
MECHANICAL
MOUNTING
A.F.F.
ACT
ATH.
CC
CG
CLG
COL
CONC.
CONT.
CORR
CT
ELEC
ELEV
ETR
EWC
EXIST.
EXST
FIN
FOF
FOS
GWB
HDWR
HDW
HR
HT
L
LVT
MAX
MECH
MTG
MTL
NIC.
VAFCI
VAFVAI
CFCI
CFVAI
PLAM
PNT
PTD
R
RA
RB
SC
SS
SV
SIM
STOR
SUSP.
T T.O.B.B.
T.O.S.
TYP
BV
VERT
WVW
O
ABBREVIATIONS
DOOR TAG
TYP
1i
M349
ACE
EXISTING DOOR
NEW DOOR
DEMO DOOR
NEW WALL
EXISTING WALL
DEMO WALL OR ITEMS
ABOVE OR BELOW
WALL PROTECTION TAG
WALL TAG
ROOM NUMBER
REVISION TAG
EQUIPMENT TAG
TOILET ACCESSORY TAG
DEMOLITION NOTE
NEW WORK NOTE
A810
DEMO ROOM NUMBER
CURTAINWALL AND
WINDOW MARKER
1i
INTERIOR ELEVATION
MARKER
SECTION OR WALL
SECTION NUMBER
COLUMN GRID NUMBER
EXISTING COLUMN
GRID NUMBER
A120
BUILDING ELEVATION
MARKER
A810
A810 DETAIL MARKER
ARCHITECTURAL SYMBOL LEGEND
1 PHASING NOTES
23 24 25 25A
T
U
V
1137 SF
PHASE 2
1195 SF
PHASE 1
NOTE: REFER TO
STRUCTURAL
DRAWINGS
FOR PRE PHASE WORK
REQUIRED TO INSTALL
NEW PILES THIS AREA.
GENERAL PHASING NOTES
• THE CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND COMMUNICATIONS AS REQUIRED TO
SUPPORT TEMPORARY RELOCATED EQUIPMENT AND MAINTAIN OPERATIONS IN AREAS NOT UNDER
CONSTRUCTION.
• THE CONTRACTOR SHALL COORDINATE WORK OUTSIDE THE AREA UNDER CONSTRUCTION WITH THE
OWNER. NOTE THAT WORK MAY NEED TO BE PERFORMED AT NIGHT.
• THE CONTRACTOR SHALL COORDINATE WITH THE OWNER THE SCHEDULING OF ALL INTERRUPTIONS IN
SERVICES REQUIRED BY THIS PROJECT.
• THE CONTRACTOR SHALL MAINTAIN THE EXISTING WEATHERTIGHT CONDITION THROUGHOUT THE
CONSTRUCTION PERIOD AND REPAIR ALL DAMAGE CAUSED BY CONSTRUCTION OPERATIONS.
• THE CONTRACTOR SHALL PROVIDE TEMPORARY DIRECTIONAL SIGNS FOR EACH PHASE OF THE
CONSTRUCTION PROJECT TO BE LOCATED AS DIRECTED BY THE OWNER.
• TEMPORARY PARTITIONS INDICATED ARE THE MINIMUM REQUIREMENTS AND ARE FOR DESIGN INTENT ONLY. IF ADDITIONAL PARTITIONS ARE REQUIRED TO ENSURE SAFETY AND TO FACILITATE THE OWNER’S OPERATIONS IT IS THE CONTRACTOR’S RESPONSIBILITY TO PROVIDE. DOORS SHALL BE PROVIDED IN
PARTITIONS AS REQUIRED BY THE OWNER.
• WORK NOT INDICATED WITHIN A SPECIFIED PHASING PLAN SHALL BE COORDINATED WITH THE OWNER
PRIOR TO COMMENCEMENT OF THE WORK.
• THE CONTRACTOR SHALL MAINTAIN INTERIM LIFE SAFETY STANDARDS AT ALL TIMES DURING
CONSTRUCTION.
• THE CONTRACTOR SHALL PROVIDE NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO PREVENT
THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.
• ALL DEBRIS CARTS UTILIZED SHALL HAVE TIGHT FITTING COVERS TO MINIMIZE THE SPREAD OF DUST.
• EACH PHASE MUST BE COMPLETE AND OCCUPIED BY THE OWNER PRIOR TO BEGINNING THE NEXT
PHASE. COORDINATE PHASING REQUIREMENTS WITH COR.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS
OTHERWISE NOTED.
• ARCHITECTURAL WORK SUCH AS CEILING REMOVAL/REPLACEMENT, PATCHING, ETC. SHALL BE PROVIDED AS REQUIRED BY MECHANICAL, PLUMBING AND ELECTRICAL WORK OUTSIDE OF THE MAJOR WORK ARES. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND FIELD VERIFY EXISTING CONDITIONS TO
DETERMINE SCOPE OF THIS WORK.
• CONTRACTOR TO REVIEW RESTRICTED WORKING HOURS IN GENERAL CONDITIONS AND PLAN WORK
ACCORDINGLY.
• ROOF SHIELDING CAN BE INSTALLED POST PILE INSTALLATION AND AND BEFORE PHASE ONE WORK IS
COMPLETE AND TURNED OVER TO OWNER.
PHASING COORDINATION
OWNER, ENGINEER AND CONTRACTOR SHALL
REVIEW AND COORDINATE PHASING
REQUIREMENTS PER GENERAL CONDITIONS
WHEN CONTRACT IS AWARDED.
1. EXECUTE WORK BY METHODS TO
MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE
DISPLACED FOR VISUAL INSPECTIONS.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
C L A
S
I
C L
A S
S
II
1. PROVIDE ACTIVE MEANS TO PREVENT
AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
2.WATER MIST WORK SURFACES TO
CONTROL DUST WHILE CUTTING.
3.SEAL UNUSED DOORS WITH DUCT TAPE.
4.BLOCK OFF AND SEAL AIR VENTS.
5.PLACE DUST MAT AT ENTRANCE AND EXIT
OF WORK AREA.
6.REMOVE OR ISOLATE HVAC SYSTEM IN
AREAS WHERE WORK IS BEING
PERFORMED.
1.WIPE WORK SURFACES WITH DISINFECTANT.
2.CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3.WIPE WORK SURFACES WITH DISINFECTANT,
WET MOP AND/OR VACUUM WITH HEPA
VACUUM BEFORE LEAVING WORK AREA.
4.REMOVE ISOLATION OF HVAC.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS
DEPENDING UPON THE AREA CLASS DESIGNATION
C L
A
II
I
C L A
IV
1.REMOVE OR ISOLATE HVAC SYSTEM IN AREA
WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2.COMPLETE ALL CRITICAL BARRIERS, I.E.,
SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON-WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS.
3.MAINTAIN NEGATIVE AIR PRESSURE WITHIN
WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
4.CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
5.COVER TRANSPORT RECEPTACLES OR
CARTS. TAPE COVERING UNLESS SOLID LID.
1.DO NOT REMOVE BARRIERS FROM WORK
AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE ENVIRONMENTAL HEALTH
AND SAFETY AND INFECTION CONTROL AND
THOROUGHLY CLEANED BY ENVIRONMENTAL
SANITATION SECTION.
2.REMOVE BARRIER MATERIALS CAREFULLY TO
MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
3.VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
4.WET MOP AREA WITH DISINFECTANT.
5.REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
1.OBTAIN INFECTION CONTROL PERMIT BEFORE
CONSTRUCTION BEGINS.
2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK
IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
3.COMPLETE ALL CRITICAL BARRIERS OR
IMPLEMENT CONTROL CUBE METHOD BEFORE
CONSTRUCTION BEGINS.
4.MAINTAIN NEGATIVE AIR PRESSURE WITHIN
WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
5.SEAL HOLES, PIPES, CONDUITS AND
PUNCTURES APPROPRIATELY.
6.CONSTRUCT ANTEROOM AND REQUIRE ALL
PERSONNEL TO PASS THROUGH THIS ROOM
SO THEY CAN BE VACUUMED USING A HEPA
VACUUM CLEANER BEFORE LEAVING WORK SITE
OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME
THEY LEAVE THE WORK SITE.
7.ALL PERSONNEL ENTERING WORK SITE ARE
REQUIRED TO WEAR SHOE COVERS.
1.DO NOT REMOVE BARRIERS FROM WORK
AREA UNTIL COMPLETED PROJECT IS
THOROUGHLY CLEANED BY ENVIRONMENTAL
MANAGEMENT.
2.VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
3.WET MOP AREA WITH DISINFECTANT.
4.REMOVE BARRIER MATERIALS CAREFULLY
TO MINIMIZE SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH CONSTRUCTION.
5.CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
6.COVER TRANSPORT RECEPTACLES OR
CARTS. TAPE COVERING.
7.REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING
PERFORMED.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
PATIENT RISK GROUP TABLE
GROUP 1
LOW RISK
GROUP 2
MEDIUM RISK
GROUP 3
HIGH RISK
GROUP 4
HIGHEST RISK
- ADMINISTRATIVE OFFICES
- PUBLIC CORRIDORS
- ELEVATORS
- DAY ROOMS
- CANTEEN RETAIL STORE
- VACANT WARDS OR
VACANT ICU'S ETC.
- OUTPATIENT, URGENT CARE
& PRIMARY CARE CLINICS
- LABORATORY
- CARDIOLOGY
- ECHOCARDIOGRAPHY
- ENDOSCOPY
- FOOD SERVICES
- INTERIM CARE & MEDICAL
UNITS
- NUCLEAR MEDICINE
- PHARMACY
- PHYSICAL THERAPY
- RADIOLOGY & NUCLEAR
MEDICINE
- RESPIRATORY THERAPY
- CCU
- EMERGENCY ROOM
- LABORATORY
- OUTPATIENT SURGERY
- PHARMACY
- POST ANESTHESIA CARE
UNIT
- SURGICAL UNITS
- ANY AREA CARING FOR
IMMUNICOMPROMISED
PATIENTS
- SPD STORAGE /
STERILIZATION
- INTENSIVE CARE UNITS
- TB NEGATIVE PRESSURE
ISOLATION ROOMS
-OPERATING ROOM
INFECTION CONTROL MATRIX - CLASS OF PRECAUTIONS:
CONSTRUCTION PROJECT BY PATIENT RISK
PATIENT RISK GROUP
LOW RISK GROUP 1
MEDIUM RISK GROUP 2
HIGH RISK GROUP 3
HIGHEST RISK GROUP 4
TYPE A TYPE B TYPE C TYPE D
I
I
I
II
II
II
II
III/IV
II
II
III/IV
III/IV
III/IV
IV
IV
IV
CONSTRUCTION PROJECT TYPE
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL
INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
Infection Control Risk Mitigation Recommendations Matrix of Precautions for Construction and Renovation
Type of Construction / Project Activity Table
TYPE A
Inspection and Non-Invasive Activities
Includes, but is not limited to:
-Removal of ceiling tiles for visual inspection limited to 20 Ln Ft tile per 160 sq. ft. space.
-Painting (but not sanding).
-Wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
-Patching walls - not exceeding 8 sq. ft.
TYPE B
Small scale, short duration activities which create minimal dust.
Includes, but is not limited to:
-Installation of telephone and computer cabling.
-Access to chase spaces.
-Cutting of walls or ceiling where dust migration can be controlled.
-Patching walls - exceeding 8 sq. ft.
TYPE C
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components and assemblies or new construction.
Includes, but is not limited to:
-Sanding of walls for painting or wall covering exceeding 32 sq. ft., or vacant areas.
-Removal of floor coverings, ceiling tiles and casework.
-New wall construction -Uncontained duct, HVAC or electrical work above ceilings.
-Major cabling activities.
-Any other project where high levels of dust are generated.
TYPE D
Major demolition and construction projects
Includes, but is not limited to:
-Activities that require consecutive work shifts -Requires heavy demolition or removal of a complete cabling system.
-New Construction.
A Se rv ic e D i s a b l e d Vet e r an Owned
S m a l l B u s iness
SDVOSB
CVE
www.pfa-architect.com - Project No: 2412.17B
ARCHITECTURE, PLANNING, INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510
Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0004
B
A
C
D
E
F
NO. DESCRIPTION DATE
KEYPLAN
BID DOCUMENTS
ACTUAL & PLAN
NORTH
NTS
LINAC VAULTS 1 & 2
MODIFICATIONS
HUNTER HOLMES MCGUIRE
VAMC RICHMOND, VA
652-16-107
BLDG. 500
Department of Veterans Affairs
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
/1 /2
:4
:2
P
M Im a c -1
\d p e ro n n e t\
B
L
IN
A C
V a u lt s
M o d if ic a ti o n s
C e n tr a l_ d p e ro n n e t.
rv t
AG001
PHASING INFORMATION,
ABBREVIATIONS, AND LEGENDS
JCHDJP12-14-2018
12-14-2018
1/8" = 1'-0"
PHASING PLAN - NEW WORK
CONSTRUCTION TYPE: D
PATIENT RISK GROUP: MEDIUM RISK, GROUP 3
INFECTIION CONTROL PRECAUTIONS: CLASS IV
FOR ALL WORK:
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
ARCHITEC
T
DEMOLITION REMARKS
1. DASHED LINES INDICATE EXTENT OF DEMOLITION WORK.
2. REMOVE CONCRETE SLAB COMPLETELY.
6 6
17 1617
PHASE 1PHASE 2
PHASE 1PHASE 2
IREMOVE PASE 1 ICRA BARRIER
UPON ERECTING PHASE 2 ICRA BARRIER.
23 24 25 25A
T
U
± 64' - 0"
PHASE 1PHASE 2
PHASE 1PHASE 2
± 30' - 5 1/2" ± 33' - 6 1/2"
1Z-133 1Z-134
1Z-133A
1Z-132
1Z-135
A Se rv ic e D i s a b l e d Vet e r an Owned
S m a l l B u s iness
SDVOSB
CVE
www.pfa-architect.com - Project No: 2412.17B
ARCHITECTURE, PLANNING, INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510
Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0004
B
A
C
D
E
F
NO. DESCRIPTION DATE
KEYPLAN
BID DOCUMENTS
ACTUAL & PLAN
NORTH
NTS
LINAC VAULTS 1 & 2
MODIFICATIONS
HUNTER HOLMES MCGUIRE
VAMC RICHMOND, VA
652-16-107
BLDG. 500
Department of Veterans Affairs
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
/1 /2
:4
:0
P
M Im a c -1
\d p e ro n n e t\
B
L
IN
A C
V a u lt s
M o d if ic a ti o n s
C e n tr a l_ d p e ro n n e t.
rv t
AD101
DEMOLITION PLANS
JCHDJP12-14-2018
12-14-2018
1/4" = 1'-0"
DEMOLITION PLAN - FIRST LEVEL
1 DEMOLISH CONCRETE SLAB, SEE STRUCTURAL DRAWINGS FOR EXTENT OF DEMOLITION.
2 NOT USED
3 REMOVE AND RETAIN EXISTING CASEWORK FOR REUSE.
4 REMOVE TURNTABLE AND FRAME COMPONENTS COMPLETE.
5 REMOVE AND DISCARD DECORATIVE LIGHT FIXTURE.
6 COORDINATE REMOVAL OF ALL "BRAINLAB" POSITIONING EQUIPMENT WITH COR AND INDEPENDENT CONTRACTOR.
7 REMOVE ALL CEILING MOUNTED EQUIPMENT AND STRUCTURAL SUPPORT. TURN EQUIPMENT OVER TO COR.
8 REMOVE AND DISCARD EXISTING ROOF SYSTEM TO EXTENTS NOTED. COORDINATE AREAS OF PHASED REMOVAL WITH NEW WORK.
MAINTAIN WATERTIGHT / WATER RESISTANT TEMPORARY ROOF WHERE REQUIRED BETWEEN PHASES.
9 REMOVE AND DISCARD EXISTING GRAVEL STOP TO MATCH LENGTH OF ROOF REMOVED.
10 REMOVE FENCE SYSTEM AND TURN OVER MATERIAL TO COR. COORDINATE REQUIRED TEMPORARY FENCING TO REMAIN DURING
CONSTRUCTION WITH PHASING AND COR.
11 REMOVE EXISTING TOILET ACCESSORIES AND SALVAGE FOR REUSE.
12 REMOVE EXISTING WALL IN IT'S ENTIRETY.
13 REMOVE DOOR, FRAME, AND HARDWARE. TURN OVER TO COR.
14 REMOVE CASEWORK IN IT'S ENTIRETY INCLUDING BUT NOT LIMITED TO: BASE CABINETS, WALL CABINETS, BRACING, AND HARDWARE.
15 REMOVE PLUMBING FIXTURE. SEE PLUMBING DRAWINGS.
16 ICRA TEMPORARY FULL HEIGHT 1 HR PARTITION. DEMOLISH AFTER THE COMPLETION OF NEW WORK OR END OF PHASE. ERECT ICRA
BARRIER UPON COMPLETION OF PILE INTALLATION AND BEFORE PHASE 1 BEGINS
17 PROVIDE TEMPORARY 1/3 HOUR RATED DOOR, FRAME, AND HARDWARE. PROVIDE HINGES, CLOSER, AND CLASSROOM LOCKSET, AUTOMATIC DOOR BOTTOMS AND RUBBER SEALS.
18 REMOVE SHELVING UNITS COMPLETELY, THIS ROOM.
1/8" = 1'-0"
PARTIAL DEMOLITION PLAN - ROOF LEVEL
DEMOLITION SCHEDULE
*** ALL FINISHES LISTED IN SCHEDULE ARE TO BE REMOVED
COMPLETELY UNLESS OTHERWISE NOTED ***
NUMBER FLOOR BASE WALL CEILING REMARKS
1Z-132 ETR ETR ETR ETR -
1Z-133 LVT RB PTD GWB ACT 1
1Z-133A LVT RB PTD GWB ACT -
1Z-134 LVT RB PTD GWB ACT 1, 2
1Z-135 ETR ETR ETR ETR -
• DEMOLITION DRAWINGS INDICATE IN GENERAL, THE EXTENT OF DEMOLITION. REMOVE ALL ASSOCIATED APPURTENANCES NOT REQUIRED IN THE NEW WORK, ALL ABANDONED ITEMS, AND ALL ITEMS REQUIRED FOR THE INSTALLATION OF NEW WORK, TO PROVIDE FOR A COMPLETE PROJECT. ITEMS NOT SPECIFICALLY INDICATED THAT ARE QUESTIONABLE FOR REMOVAL SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT FOR A DECISION.
• THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL EXISTING CONDITIONS PRIOR TO THE START OF CONSTRUCTION.
• THE CONTRACTOR SHALL PATCH ALL EXISTING SURFACES TO MATCH EXISTING WHERE AFFECTED BY CONSTRUCTION OPERATIONS, INCLUDING BUT NOT LIMITED TO PLUMBING, MECHANICAL AND ELECTRICAL WORK.
• THE CONTRACTOR SHALL PATCH NAIL HOLES, ETC, AND REMOVE MISCELLANEOUS APPURTENANCES ON EXISTING WALLS TO BE PAINTED
OR COVERED WITH WALL COVERING.
• ALL EXISTING FLOORING MATERIALS WHICH ARE TO REMAIN IN PLACE SHALL BE COMPLETELY CLEANED AND STRIPPED OF WAX IN ORDER
TO RECEIVE NEW FINISHES.
• ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT UNLESS OTHERWISE NOTED.
• THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW WORK IS COMPLETE, REGARDLESS IF THE ITEM WAS SPECIFICALLY NOTED OR NOT.
• THE CONTRACTOR SHALL REMOVE AND PATCH ANY AREAS UNCOVERED WHERE WOOD NAILERS OR GROUNDS ARE FOUND TO EXIST BEHIND ANY TRIM ITEMS OR EQUIPMENT REMOVED. WALLS SHALL BE MADE FLUSH WITH EXISTING ADJACENT SURFACES AND READY TO
RECEIVE NEW FINISHES.
• IF ANY ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON THE CONTRACT DOCUMENTS THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY.
• WHERE EXISTING VINYL WALL COVERING IS REMOVED ON EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL PATCH AND REPAIR WALL AS REQUIRED TO PROVIDE A LEVEL AND TRUE SURFACES ON WHICH TO INSTALL NEW FINISHES.
• ALL SIGNAGE WHICH OCCURS ON WALL OR ON DOORS TO BE REMOVED SHALL BE REMOVED BY THE CONTRACTOR AND TURNED OVER TO
THE OWNER.
• ALL FINISHES LISTED IN THE DEMOLITION SCHEDULE SHALL BE REMOVED COMPLETELY UNLESS INDICATED OTHERWISE. DEMOLITION SHALL INCLUDE BACKINGS, MASTIC AND GLUES, SETTING BEDS, AND SUBSTRATE AS REQUIRED TO PREPARE THE MATERIAL FOR NEW
WORK AND/OR FINISHES.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS OTHERWISE NOTED.
• EXISTING HAND RAIL AND BUMPER GUARD SHALL BE REMOVED AND TURNED OVER TO THE OWNER.
• ALL EXISTING NURSE CALL, SMOKE DETECTORS, AND SPEAKERS TO REMAIN AND REWORKED WITH NEW CEILING SYSTEM.
• EXISTING WALL FINISHES TO BE VERIFIED AND PREPPED ACCORDINGLY FOR NEW FINISHES SCHEDULES - BY CONTRACTOR.
• THESE DEMOLITION NOTES ARE FOR ARCHITECTURAL WORK ONLY. SEE ALL OTHER DRAWINGS FOR DEMOLITION INFORMATION
PERTAINING TO OTHER DISCIPLINES.
• FOR ICRA RESTRICTIONS AND INFORMATION SEE SHEET AG001.
GENERAL DEMOLITION NOTES
DEMOLITION NOTES
1/8" = 1'-0"
DEMOLITION - REFLECTED CEILING PLAN
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
AE401 24
AE401
1Z-133
1Z-134
1Z-132
1Z-135
M3B
± 3 1/2"
1Z-133A
9' - 6" 12' - 0"
5 6
M3B
M3B M3B
M3B
M3B
133A
6' - 0" 15' - 1 7/8"
4 9
M1B
M1B
M1B
PHASE 1PHASE 2
PHASE 1PHASE 2
± 21' - 1 7/8"
/2
1' - 11 1/4"
1' - 7 5/8"
M1B
M1B
M1BM3
M3
/4
/2
/4
/2
AE300
AE300
1Z-133
1Z-134
1Z-132
1Z-135
2' - 1" 7' - 0 3/4" 9' - 9 1/2" 2' - 1"
EQ EQ
± 3' - 8" 15' - 0" 1' - 0"
1' - 0"
/4
/2
/4
/8
/8
+ 10' - 2"
+ 9' - 8"
+ 9' - 6"
11' - 0"
10 1/2"
E Q
E Q
C L O
F L
IN
A
C
E Q
' - 0
E
Q
EQ
16' - 0"
EQ
1Z-133A
+ 9' - 6"
+ 10' - 2"
+ 10' - 2"
PHASE 1PHASE 2
PHASE 1PHASE 2
TYP.
TYP.
+ 9' - 6"
+ 9' - 8"
AE112
Sim
AE112
Sim
TYP.
TYP.
AE112
SimTYP.
E Q
E Q
EQEQ
EQEQ
E Q
E Q
" 1' - 4"
1' - 6" 4' - 0" 4' - 0"
/8
2' - 6" 4' - 0" 4' - 0"
EQ EQ
E Q
E Q
E Q
E Q
E Q
5' - 0" 1' - 8"
EQ EQ
EQ EQ
E Q
E Q
2' - 0" EQ EQ EQ EQ 2' - 0"
/8
/2
EQ EQ
2 X 2 INDIRECT
LED LIGHT FIXTURE
CEILING LEGEND
RETURN AIR DIFFUSER
SUPPLY AIR DIFFUSER
RECESSED CEILING LIGHT
EXIT SIGN
LOUVERED SUPPLY DIFFUSER
STRUCTURAL SUPPORT
FOR CEILING EQUIPMENT
COORDINATE AND CONFIRM ALL FIXED EQUIPMENT AND DEVICE LOCATIONS WITH MANUFACTURER
INSTALLATION DOCUMENTS.
CONTRACTOR'S NOTE
F
FLUSH SOLID CORE WOOD
S C
H E
D U
L E
D H
E
IG
H T
SCHEDULED WIDTH
2" 2"VARIES
V A
R
IE
S
DBL STUDS
CONT. CAULK AT BOTH
SIDES -PTD. TYP.
HOLLOW METAL FRAME- PTD
TYP
1/2"
SEE WALL TYPE
DBL STUDS - 16 GA
EXTEND TO DECK
ABOVE
CONT . CAULK AT BOTH
SIDES - PTD
HOLLOW METAL FRAME -PTD.
TYP
1/2"
PROVIDE MINIMUM OF
3 JAMB ANCHORS PER
JAMB
SEE WALL TYPE
FOR DIMENSION
SEE RCP
3 5/8" METAL STUDS FASTENED
TO STRUCTURE ABOVE, TYP
CEILING AS SCHEDULED
5/8" PTD GWB, TYP
T Y
P
T Y
P
FOR DIMENSION
SEE RCP
CEILING AS SCHEDULED
5/8" PTD
GWB, TYP
3 5/8" MTL STUDS,
FASTENED TO
STRUCTURE ABOVE,
TYP
SEE WALL TYPE
A Se rv ic e D i s a b l e d Vet e r an Owned
S m a l l B u s iness
SDVOSB
CVE
www.pfa-architect.com - Project No: 2412.17B
ARCHITECTURE, PLANNING, INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510
Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0004
B
A
C
D
E
F
NO. DESCRIPTION DATE
KEYPLAN
BID DOCUMENTS
ACTUAL & PLAN
NORTH
NTS
LINAC VAULTS 1 & 2
MODIFICATIONS
HUNTER HOLMES MCGUIRE
VAMC RICHMOND, VA
652-16-107
BLDG. 500
Department of Veterans Affairs
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
/1 /2
:4
:1
P
M Im a c -1
\d p e ro n n e t\
B
L
IN
A C
V a u lt s
M o d if ic a ti o n s
C e n tr a l_ d p e ro n n e t.
rv t
AE112
NEW WORK PLANS
JCHDJP12-14-2018
12-14-2018
ROOM LEGEND
NUMBER NAME Comments
1Z-132 CONTROL SEE MEP DRAWINGS FOR WORK IN THIS AREA
1Z-133 VAULT 1 -
1Z-133A EQUIPMENT CLOSET -
1Z-134 VAULT 2 -
1Z-135 CONTROL SEE MEP DRAWINGS FOR WORK IN THIS AREA
1/4" = 1'-0"
NEW WORK PLAN - FIRST LEVEL
1/4" = 1'-0"
REFLECTED CEILING PLAN - FIRST LEVEL
• CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR FOR A RESOLUTION. ADJUSTMENTS TO DIMENSIONS AND CONDITIONS
SHOWN MAY BE REQUIRED.
• ALL DIMENSIONS ARE REFERENCED FROM FACE OF STUD AT NEW CONSTRUCTION UNLESS OTHERWISE NOTED. DIMENSIONS ARE
REFERENCED FROM FACE OF FINISH AT EXISTING CONSTRUCTION.
• ALL DIMENSIONS INDICATED +/- ARE APPROXIMATE AND MUST BE FIELD VERIFIED PRIOR TO THE START OF CONSTRUCTION.
• PROVIDE SHALL MEAN TO SUPPLY, TO FURNISH AND TO INSTALL COMPLETE WITH ALL ACCESSORIES, PARTS AND/OR SERVICES TO BE
READY FOR ITS INTENDED USE.
• WHERE WORK ABUTS OR ADJOINS EXISTING SURFACES WHICH WILL REMAIN EXPOSED, ALIGN NEW WORK FLUSH WITH EXISTING
ADJACENT SURFACES.
• THE CONTRACTOR SHALL MAINTAIN THE EXISTING BUILDING IN A WATER TIGHT CONDITION THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. REPAIR DAMAGE CAUSED BY CONSTRUCTION OPERATIONS. TAKE ALL PRECAUTIONS NECESSARY TO PROTECT THE BUILDING
AND ITS OCCUPANTS DURING THE CONSTRUCTION PERIOD.
• CONTRACTOR SHALL PROVIDE BARRIERS TO PREVENT ENTRY TO THE CONSTRUCTION AREA. BARRIERS SHALL NOT INTERFERE WITH THE
OWNERS USE OF THE SITE.
• THE CONTRACTOR SHALL PROVIDE NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO PREVENT THE SPREAD OF DUST TO OCCUPIED
AREAS OF THE BUILDING.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS ONLY UNLESS OTHERWISE NOTED.
• ALL DOORS TO BE MOUNTED 4" FROM FACE OF FINISH UON.
WALL TYPE SCHEDULE
TYPE STC DESCRIPTION
FIRE
RATING UL REMARKS
M1B N/A 1 5/8" METAL STUDS AT 16" O.C. MAX. 5/8" GWB ONE SIDE. EXTEND WALL
ASSEMBLY TO 4" ABOVE FINISHED CEILING.
N/A N/A
M3 N/A 3 5/8" METAL STUDS AT 16" O.C. MAX. 5/8" GWB BOTH SIDES. EXTEND
WALL ASSEMBLY TO 4" ABOVE FINISHED CEILING.
N/A N/A
M3B N/A 3 5/8" METAL STUDS AT 16" O.C. MAX. 5/8" GWB ONE SIDE. EXTEND WALL
ASSEMBLY TO 4" ABOVE FINISHED CEILING.
N/A N/A
GENERAL NOTES
1 ISOCENTER
2 SKY FACTORY REVELATION SKYCEILINGS W/ IMAGE #8FE. MODIFY IMAGE AS NECESSARY TO FIT SIZE. SEE FINISH PLAN SHEET.
3 SEE STRUCTURAL DRAWINGS FOR NEW CONCRETE LOCATIONS.
4 INFILL FORMER EQUIPMENT RECESS TO MATCH EXISTING SLAB. SEE STRUCTURAL DRAWINGS.
5 COOLING WATER SUPPLY AND RETURN CONTROL VALVES. SEE PLUMBING DRAWINGS.
6 RELAY JUNCTION BOX BY "VARIAN"
7 EXACTRAC COMPUTER CABINET BY "BRAINLAB".
8 PROVIDE 2x4 ACT TILE (ACT#2) IN THIS LOCATION ONLY.
9 COORDINATE CONCRETE SLAB VOIDS WITH EQUIPMENT INSTALLATION DOCUMENTS. SEE STRUCTURAL DRAWINGS FOR DIMENSIONS.
10 NEW CONCRETE SLAB, ENTIRE ROOM. SEE STRUCTURAL DRAWINGS.
11 PROVIDE NEW SINGLE BOWL SCRUB SINK WITH FOOT PEDAL CONTROLS. SEE PLUMBING DRAWINGS.
12 PROVIDE NEW DOOR CONTROLLER AND HARDWARE. COORDINATE SECURITY REQUIREMENTS WITH COR.
13 PAINT GWB CEILING PNT#4. SEE FINISH COLORS FOR MORE INFORMATION.
14 STRUCTURAL SUPPORT FOR CEILING MOUNTED EQUIPMENT. COORDINATE LOCATION WITH STRUCTURAL, EQUIPMENT MANUFACTURER
INSTALLATION INSTRUCTIONS, AND COR.
15 WORK COUNTER BY OTHERS
NEW WORK NOTES
3/8" = 1'-0"
DOOR TYPE
DOOR SCHEDULE
NUMBER
DOOR FRAME FIRE
RATING
HARDWARE REMARKS
TYPE WIDTH HEIGHT THICKNESS TYPE HEAD JAMB SILL
133A F 3' - 0" 7' - 0" 1 3/4" 1 H1 J1 - HW-SH-3 PROVIDE CARD READER
3/8" = 1'-0"
FRAME TYPE - HOLLOW METAL
1 1/2" = 1'-0"
H1 HOLLOW METAL HEAD DETAIL
1 1/2" = 1'-0"
J1 HOLLOW METAL JAMB DETAIL
AE112 1 1/2" = 1'-0"
3 SOFFIT DETAIL - CEILING TO CEILING
AE112 1 1/2" = 1'-0"
4 SOFFIT DETAIL - CEILING TO WALL
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
AE401 24
AE401
1Z-133
1Z-134
1Z-132
1Z-135
± 3 1/2"
1Z-133A
9' - 6" 12' - 0"
8 9
133A
6' - 0" 15' - 1 7/8"
5 15
PT
SD
HSD
PT
SDHSD
PT
SDHSD
PHASE 1PHASE 2
PHASE 1PHASE 2
AE300
AE300
1Z-133
1Z-134
1Z-132
1Z-135
2' - 1" 7' - 0 3/4" 9' - 9 1/2" 2' - 1"
EQ EQ
± 3' - 8" 15' - 0" 1' - 0"
1' - 0"
/4
/2
/4
/8
/8
+ 9' - 8"
+ 9' - 6"
11' - 0"
10 1/2"
E Q
E Q
C L O
F L
IN
A
C
E Q
' - 0
E
Q
EQ
16' - 0"
EQ
1Z-133A
+ 9' - 6"
14 14
+ 10' - 2"
PHASE 1PHASE 2
PHASE 1PHASE 2
+ 10' - 2"
A Se rv ic e D i s a b l e d Vet e r an Owned
S m a l l B u s iness
SDVOSB
CVE
www.pfa-architect.com - Project No: 2412.17B
ARCHITECTURE, PLANNING, INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510
Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0004
B
A
C
D
E
F
NO. DESCRIPTION DATE
KEYPLAN
BID DOCUMENTS
ACTUAL & PLAN
NORTH
NTS
LINAC VAULTS 1 & 2
MODIFICATIONS
HUNTER HOLMES MCGUIRE
VAMC RICHMOND, VA
652-16-107
BLDG. 500
Department of Veterans Affairs
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
/1 /2
:4
:1
P
M Im a c -1
\d p e ro n n e t\
B
L
IN
A C
V a u lt s
M o d if ic a ti o n s
C e n tr a l_ d p e ro n n e t.
rv t
AE113
EQUIPMENT PLANS
JCHDJP12-14-2018
12-14-2018
TOILET ACCESSORY SCHEDULE
MARK DESCRIPTION MOUNTING HEIGHT OFCI OFOI CFCI REMARKS Comments
HSD HAND SANITIZING DISPENSER 48" A.F.F. TO BOTTOM OF CONTROLS *** SALVAGED FROM EXISTING
SD VERTICAL MOUNT SOAP DISPENSER 48" TO BOTTOM OF CONTROLS *** SALVAGED FROM EXISTING
PT AUTOMATIC PAPER TOWEL DISPENSER 48" A.F.F. TO BOTTOM OF OPENING *** SALVAGED FROM EXISTING
ROOM LEGEND
NUMBER NAME Comments
1Z-132 CONTROL SEE MEP DRAWINGS FOR WORK IN THIS AREA
1Z-133 VAULT 1 -
1Z-133A EQUIPMENT CLOSET -
1Z-134 VAULT 2 -
1Z-135 CONTROL SEE MEP DRAWINGS FOR WORK IN THIS AREA
1/4" = 1'-0"
EQUIPMENT PLAN - FIRST LEVEL
1/4" = 1'-0"
EQUIPMENT PLAN - REFLECTED CEILING PLAN - FIRST LEVEL
1 ISOCENTER
2 SKY FACTORY REVELATION SKYCEILINGS W/ IMAGE #8FE. MODIFY IMAGE AS NECESSARY TO FIT SIZE. SEE 3 / AE112
3 NOT USED.
4 EQUIPMENT BY OTHERS. COORDINATE WITH COR.
5 INFILL FORMER EQUIPMENT RECESS TO MATCH EXISTING SLAB. SEE STRUCTURAL DRAWINGS.
6 FUTURE CASEWORK, VA FURNISHED CONTRACTOR INSTALLED. COORDINATE WITH COR.
7 X-RAY FLOOR BOX BY "BRAINLAB"
8 COOLING WATER SUPPLY AND RETURN CONTROL VALVES. SEE PLUMBING DRAWINGS.
9 RELAY JUNCTION BOX BY "VARIAN"
10 DUAL X-RAY GENERATOR CABINETS BY "BRAINLAB"
11 EXACTRAC COMPUTER CABINET BY "BRAINLAB".
12 CONTROL STATION FOR "VARIAN" AND "BRAINLAB" EQUIPMENT.
13 "TRUEBEAM 2-1 CABINET" BY "VARIAN".
14 PROVIDE 2x4 ACT TILE (ACT#2) IN THIS LOCATION TO ACCOMMODATE VARIAN EQUIPMENT.
15 COORDINATE CONCRETE SLAB VOIDS WITH EQUIPMENT. SEE STRUCTURAL DRAWINGS.
16 NEW CONCRETE SLAB, ENTIRE ROOM. SEE STRUCTURAL DRAWINGS.
17 PROVIDE NEW SINGLE BOWL SCRUB SINK WITH FOOT PEDAL CONTROLS. SEE PLUMBING DRAWINGS.
18 VA FURNISHED, CONTRACTOR INSTALLED DOUBLE DIAGNOSTIC LIGHT. CELING MOUNTED. SEE STRUCTURAL DRAWINGS.
19 PROVIDE NEW DOOR CONTROLLER AND HARDWARE. COORDINATE SECURITY REQUIREMENTS WITH COR.
20 PAINT GWB CEILING PNT#4. SEE FINISH COLORS FOR MORE INFORMATION.
GENERAL NOTES
EQUIPMENT NOTES
• CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR FOR A RESOLUTION. ADJUSTMENTS TO DIMENSIONS AND CONDITIONS
SHOWN MAY BE REQUIRED.
• ALL DIMENSIONS ARE REFERENCED FROM FACE OF STUD AT NEW CONSTRUCTION UNLESS OTHERWISE NOTED. DIMENSIONS ARE
REFERENCED FROM FACE OF FINISH AT EXISTING CONSTRUCTION.
• ALL DIMENSIONS INDICATED +/- ARE APPROXIMATE AND MUST BE FIELD VERIFIED PRIOR TO THE START OF CONSTRUCTION.
• PROVIDE SHALL MEAN TO SUPPLY, TO FURNISH AND TO INSTALL COMPLETE WITH ALL ACCESSORIES, PARTS AND/OR SERVICES TO BE
READY FOR ITS INTENDED USE.
• WHERE WORK ABUTS OR ADJOINS EXISTING SURFACES WHICH WILL REMAIN EXPOSED, ALIGN NEW WORK FLUSH WITH EXISTING
ADJACENT SURFACES.
• THE CONTRACTOR SHALL MAINTAIN THE EXISTING BUILDING IN A WATER TIGHT CONDITION THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. REPAIR DAMAGE CAUSED BY CONSTRUCTION OPERATIONS. TAKE ALL PRECAUTIONS NECESSARY TO PROTECT THE BUILDING
AND ITS OCCUPANTS DURING THE CONSTRUCTION PERIOD.
• CONTRACTOR SHALL PROVIDE BARRIERS TO PREVENT ENTRY TO THE CONSTRUCTION AREA. BARRIERS SHALL NOT INTERFERE WITH THE
OWNERS USE OF THE SITE.
• THE CONTRACTOR SHALL PROVIDE NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO PREVENT THE SPREAD OF DUST TO OCCUPIED
AREAS OF THE BUILDING.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS ONLY UNLESS OTHERWISE NOTED.
• ALL DOORS TO BE MOUNTED 4" FROM FACE OF FINISH UON.
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
AE300
AE300
TYP.
AE300
PHASE 2
± 23' - 6"
PHASE 1
± 32' - 1 1/8"
± 8' - 9" ± 55' - 8"
LEVEL 1 - INT
10' - 2 1/2"
23242525A
PHASE 2
± 23' - 6"
PHASE 1
± 32' - 1 1/8"
FIBER CEMENT PANEL SYSTEM
PROVIDE NEW GRAVEL STOP TO MATCH EXISITING
PREFABRICATED METAL FASCIA
CONT. BACKER ROD AND SEALANT
5/8" CDX PLYWOOD
FIBER CEMENT PANEL SYSTEM
3 5/8" METAL STUDS @ 16" O.C.
5/8" CDX PLYWOOD
PVC MEMBRANE ROOFING
5/8" CDX PLYWOOD
6" METAL STUD RAFTERS @ 24" O.C.
PROVIDE BRIDGING AS REQUIRED.
14 GAUGE METAL CLIP ANGLE
ALIGN F.O. STUDS WITH
CONCRETE PLANKS
FLUID APPLIED AIR BARRIER
5 1/2"
SOFFIT VENT
R-13 BATT INSULATION
R-15 RIGID INSULATION
PREFABRICATED METAL FASCIA
CONT. BACKER ROD AND SEALANT
5/8" CDX PLYWOOD
PVC MEMBRANE ROOFING
5/8" CDX PLYWOOD
6" METAL STUD RAFTERS @ 24" O.C.
PROVIDE BRIDGING AS REQUIRED.
14 GAUGE METAL CLIP ANGLE
SOFFIT VENT
FIBER CEMENT PANEL SYSTEM
3 5/8" METAL STUDS @ 16" O.C.
5/8" CDX PLYWOOD
FLUID APPLIED AIR BARRIER
5 1/2"
SEAL ROOF TO METAL FASCIA PER
MANUFACTURER DETAIL
21' - 9 11/16"T.O. CONCRETE
ALIGN F.O. STUD WITH
CONCRETE PLANKS
M
IN
R-13 BATT INSULATION
R-15 RIGID INSULATION
PREFABRICATED METAL FASCIA
PVC MEMBRANE ROOFING
5/8" CDX PLYWOOD
6" METAL STUD CHANNEL
METAL STUD OUTRIGGER
@ 24" O.C.
AE300
SLOPED ROOF
17' - 9"T.O. DECK
FLUID APPLIED AIR BARRIER
5/8" CDX PLYWOOD
3 5/8" METAL STUDS @ 16" O.C.
FIBER CEMENT PANEL SYSTEM
RIDGE BEYOND
6" METAL STUD RAFTERS @ 24" O.C.
LEVEL 1 - INT
10' - 2 1/2"
TOS
17' - 7 1/2"
AE300
PHASE 1PHASE 2
27' - 6 1/2" 32' - 1 1/8"
NEW PVC ROOF
PHASE 1PHASE 2
NEW PVC ROOF AE300
,OH
NEW CONCRETE SLAB
EQUIPMENT SUPPORTS, TYP.
SEE STRUCTURAL DRAWINGS
AE300
PRECAST CONCRETE PLANKS.
SEE STRUCTURAL DRAWINGS.
NEW PVC ROOF
AE300
1" / 1'-0"
RIDGE HEIGHT
5' - 10"±
BASE SHEET AS REQUIRED
FOR DESIRED WARRANTY
INTERPLY SHEET
CANT STRIP
TAPERED INSULATION
EXISTING METAL DECK
6" METAL STUD RUNNER
ANCHOR TO EXISTING
METAL DECK AS SPECIFIED.
M
IN
CONTINUOUS COUNTER FLASHING
FIBER CEMENT PANEL STARTER STRIP
FIBER CEMENT PANEL SYSTEM
A Se rv ic e D i s a b l e d Vet e r an Owned
S m a l l B u s iness
SDVOSB
CVE
www.pfa-architect.com - Project No: 2412.17B
ARCHITECTURE, PLANNING, INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510
Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0004
B
A
C
D
E
F
NO. DESCRIPTION DATE
BID DOCUMENTS
LINAC VAULTS 1 & 2
MODIFICATIONS
HUNTER HOLMES MCGUIRE
VAMC RICHMOND, VA
652-16-107
BLDG. 500
Department of Veterans Affairs
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
/1 /2
:4
:1
P
M Im a c -1
\d p e ro n n e t\
B
L
IN
A C
V a u lt s
M o d if ic a ti o n s
C e n tr a l_ d p e ro n n e t.
rv t
AE300
ROOF PLAN, BUILDING AND WALL
SECTIONS
JCHDJP12-14-2018
12-14-2018
1/8" = 1'-0"
PARTIAL ROOF PLAN - NEW WORK
1 LINE OF WALL BELOW
2 NEW SHED ROOF. PVC ROOFING OVER PLYWOOD SHEATHING ON 6" METAL STUDS @ 24" O.C.
3 PROVIDE NEW GRAVEL STOP AT EDGE OF ROOF.
4 EXTENTS OF NEW ROOFING.
AE300 1/8" = 1'-0"
6 NORTH ELEVATION
GENERAL NOTES
NEW WORK ROOF NOTES
AE300 1 1/2" = 1'-0"
4 WALL SECTION - HIGH SIDE
AE300 1 1/2" = 1'-0"
5 WALL SECTION - LOW SIDE
AE300 1 1/2" = 1'-0"
3 WALL SECTION - END WALL
1/4" = 1'-0"AE300
1 LONGITUDINAL SECTION
1/4" = 1'-0"AE300
2 TRANSVERSE SECTION
• CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR FOR A RESOLUTION. ADJUSTMENTS TO DIMENSIONS AND CONDITIONS
SHOWN MAY BE REQUIRED.
• ALL DIMENSIONS ARE REFERENCED FROM FACE OF STUD AT NEW CONSTRUCTION UNLESS OTHERWISE NOTED. DIMENSIONS ARE
REFERENCED FROM FACE OF FINISH AT EXISTING CONSTRUCTION.
• ALL DIMENSIONS INDICATED +/- ARE APPROXIMATE AND MUST BE FIELD VERIFIED PRIOR TO THE START OF CONSTRUCTION.
• PROVIDE SHALL MEAN TO SUPPLY, TO FURNISH AND TO INSTALL COMPLETE WITH ALL ACCESSORIES, PARTS AND/OR SERVICES TO BE
READY FOR ITS INTENDED USE.
• WHERE WORK ABUTS OR ADJOINS EXISTING SURFACES WHICH WILL REMAIN EXPOSED, ALIGN NEW WORK FLUSH WITH EXISTING
ADJACENT SURFACES.
• THE CONTRACTOR SHALL MAINTAIN THE EXISTING BUILDING IN A WATER TIGHT CONDITION THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. REPAIR DAMAGE CAUSED BY CONSTRUCTION OPERATIONS. TAKE ALL PRECAUTIONS NECESSARY TO PROTECT THE BUILDING
AND ITS OCCUPANTS DURING THE CONSTRUCTION PERIOD.
• CONTRACTOR SHALL PROVIDE BARRIERS TO PREVENT ENTRY TO THE CONSTRUCTION AREA. BARRIERS SHALL NOT INTERFERE WITH THE
OWNERS USE OF THE SITE.
• THE CONTRACTOR SHALL PROVIDE NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO PREVENT THE SPREAD OF DUST TO OCCUPIED
AREAS OF THE BUILDING.
• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS ONLY UNLESS OTHERWISE NOTED.
• ALL DOORS TO BE MOUNTED 4" FROM FACE OF FINISH UON.
• ALL MODIFICATIONS TO THE EXISTING ROOF SHALL BE MADE IN ACCORDANCE WITH VAMC'S EXISTING ROOF WARRANTY. COORDINATE
ALL MODIFICATIONS TO THE ROOF WITH THE COR.
AE300 3" = 1'-0"
7 TYPICAL WALL TO ROOF DETAIL
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
LINE OF WALL
VA FURNISHED STORAGE CABINETS
CEILING MOUNTED SURGICAL LIGHTS
LINE OF WALL
LINE OF WALL
LINE OF CEILING SOFFIT BEYOND
OPEN TO
PASSAGEWAY
3' - 4"2' - 6"
STAINLESS STEEL CASEWORK
STAINLESS STEEL
COUNTERTOP
LINE OF WALL
LINE OF CEILING SOFFIT BEYOND
RESIN PANEL WITH IMAGE
AND LIGHT BOX
1' - 0" 8' - 0"
LINE OF WALL
LINE OF CEILING SOFFIT BEYOND
RESIN PANEL WITH IMAGE
AND LIGHT BOX
CASEWORK. VA FURNISHED,
CONTRACTOR INSTALLED
5' - 0" 8' - 0"
BASE AS SCHEDULED, TYP.
" RELAY JUNCTION BOX BY VARIAN
CASEWORK. VA FURNISHED,
CONTRACTOR INSTALLED
CASEWORK. VA FURNISHED,
CONTRACTOR INSTALLED
VARIAN GENERATOR
CABINET
OPEN TO
PASSAGEWAY
F 2' - 6" 3' - 4"
SS#1
PLAM#1
CASEWORK. VA FURNISHED, CONTRACTOR INSTALLED
B
AE610
A
AE610
LINE OF WALL
MED GAS
OUTLET
10 1/2"
CASEWORK. VA FURNISHED,
CONTRACTOR INSTALLED
CASEWORK. VA FURNISHED,
CONTRACTOR INSTALLED
VARIAN
EQUIPMENT
LINE OF WALL
LINE OF WALL
COORDINATE AND CONFIRM ALL FIXED EQUIPMENT AND DEVICE LOCATIONS WITH MANUFACTURER
INSTALLATION DOCUMENTS.
CONTRACTOR'S NOTE
A Se rv ic e D i s a b l e d Vet e r an Owned
S m a l l B u s iness
SDVOSB
CVE
www.pfa-architect.com - Project No: 2412.17B
ARCHITECTURE, PLANNING, INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510
Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0004
B
A
C
D
E
F
NO. DESCRIPTION DATE
KEYPLAN
BID DOCUMENTS
ACTUAL & PLAN
NORTH
NTS
LINAC VAULTS 1 & 2
MODIFICATIONS
HUNTER HOLMES MCGUIRE
VAMC RICHMOND, VA
652-16-107
BLDG. 500
Department of Veterans Affairs
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
/1 /2
:4
:1
P
M Im a c -1
\d p e ro n n e t\
B
L
IN
A C
V a u lt s
M o d if ic a ti o n s
C e n tr a l_ d p e ro n n e t.
rv t
AE401
VAULT 1 AND 2 ELEVATIONS
JCHDJP12-14-2018
12-14-2018
3/8" = 1'-0"AE112
1 VAULT 1 NORTH
3/8" = 1'-0"AE112
2 VAULT 1 EAST
3/8" = 1'-0"AE112
3 VAULT 1 SOUTH
3/8" = 1'-0"AE112
4 VAULT 1 WEST
3/8" = 1'-0"AE112
5 VAULT 2 EAST
3/8" = 1'-0"AE112
6 VAULT 2 NORTH
3/8" = 1'-0"AE112
7 VAULT 2 SOUTH
3/8" = 1'-0"AE112
8 VAULT 2 WEST
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
2 2
7 7
1Z-133
1Z-133A
1Z-134
1Z-135
1Z-132
13' - 3 1/4"
10' - 7 1/4"
6' - 9"
6' - 0"
3' - 2"
GENERAL FINISH NOTES
• PROVIDE ONE-PIECE METAL TRANSITION STRIP AT ALL FLOOR FINISH TRANSITIONS. COLOR
SHALL MATCH ADJACENT RUBBER BASE.
• ALL FLOOR FINISH TRANSITIONS SHALL BE CONCEALED BY A CLOSED DOOR.
• ALL FINISHES LISTED ARE NEW UNLESS SPECIFIALLY NOTED AS EXISTING.
• WALL BASE SHALL BE RUBBER ROLL GOODS.
• WHERE PAINTED GWB ARE INDICATED, PAINTING INCLUDES ALL PREVIOUSLY PAINTED
SURFACES AND TRIM.
• HATCH PATTERNS ON FINISH PLANS ARE REPRESENTATIONAL ONLY TO DISTINGUISH
COLOR CHANGES, UNLESS OTHERWISE NOTED.
• ALL WALLS TO BE PAINTED PNT #1, EGGSHELL, UNLESS OTHERWISE NOTED. SEE FINISH
COLORS FOR INFORMATION.
• ALL TRIM TO BE PAINTED PNT#2, SEMI-GLOSS, UNLESS OTHERWISE NOTED. SEE FINISH
COLORS FOR INFORMATION.
FINISH COLORS
FLOOR
SV#1 GRAY
SV#2 BLUE
WALL AND CEILING
ACT#1 (WHITE) 24" X 24" TILE
ACT#2 (WHITE) 24" X 48" TILE
CG#1 CREAM
CG#2 CREAM
CG#3 LIGHT BLUE
PNT#1 (FIELD) OFF WHITE
PNT#2 (TRIM) TAN
PNT#3 (ACCENT) LIGHT BLUE
PNT#4 (CEILING) WHITE
RB#1 TAN
RCP#1 SKYLIGHT
WS#1 CREAM
WS#2 LIGHT BLUE
CASEWORK
SS#1 (TAN) TAN WITH SPECS
PLAM#1 GREY WOOD GRAIN
RP#1 RESIN PANEL WITH IMAGE
FINISH NOTES#
1. PROVIDE CORNER GUARD (CG#1) THIS LOCATION. SEE FINISH COLORS FOR MORE
INFORMATION.
2. PROVIDE CORNER GUARD (CG#2) THIS LOCATION. SEE FINISH COLORS FOR MORE
INFORMATION.
3. PROVIDE CORNER GUARD (CG#3) THIS LOCATION. SEE FINISH COLORS FOR MORE
INFORMATION.
4. PROVIDE ACCENT PAINT (PNT#3) THIS WALL, CORNER TO CORNER. SEE FINISH COLORS
FOR MORE INFORMATION.
5. PROVIDE WAINSCOT (WS#1) THIS WALL, FROM TOP OF COVE BASE TO 52" A.F.F. SEE
FINISH COLORS FOR MORE INFORMATION.
6. PROVIDE WAINSCOT (WS#2) THIS LOCATION. FROM TOP OF COVE BASE TO 52" A.F.F.
SEE FINISH COLORS FOR MORE INFORMATION.
7. PROVIDE RP#1 THIS LOCATION. SEE ELEVATIONS FOR MORE INFORMATION.
FLOOR PATTERN LEGEND
SV#1
SV#2
WALL PROTECTION
WHERE APPLICABLE
FLOORING
TURNED UP TO FORM BASE
COVE STRIP
FLOORING
COUNTERTOP SEE ELEVATION FOR
MATERIAL CAULK AT BACKSPLASH
DRAWER PULL - TYPICAL
BACKSPLASH SEE ELEVATION
FOR MATERIAL CAULK AT WALL
DRAWER CONSTRUCTION:
DOVETAIL OR DOWELED CORNERS.
1/4" PLYWOOD DRAWER DADO
BOTTOM AT ALL 4 SIDES
BODY EGDES
1/4" PLYWOOD BACK PANEL (DADO
INTO CABINET BOTTOM AND SIDES)
BASE AS SCHEDULED
FINISH FLOOR
2' - 1"
F O
R C
A S
E W
O R
K H
E
IG
H T
S E
E C
A S
E W
O R
K E
L E
V A
T
IO
N S
/4
/4
" 1
/4
/2
DOOR PULL
RECESSED SHELF
STANDARDS (ATTACH
TO CABINET SIDES)
3/4" PLYWOOD SHELVES
(MELAMINE WITH MATCHING
3MM EDGE BANDING)
SOLID SURFACE COUNTER TOP WITH
MARINE GRADE PLYWOOD PROVIDE
CONTINUOUS BED OF SEALANT UNDER
PERIMETER OF DROP IN SINK FOR
WATERTIGHT SEAL
BACKSPLASH SEE ELEVATION FOR
MATERIAL CAULK AT WALL
UNDERMOUNT SINK (SEE PLUMBING
DRAWINGS)
FACE OF WALL
F O
R C
A S
E W
O R
K H
E
IG
H T
S
S E
E C
A S
E W
O R
K E
L E
V A
T
IO
N S
BASE AS SCHEDULED
FINISH FLOOR
DOOR PULL
/4
/4
/2
TOE KICK ATTACHED
2' - 1"
RECESSED SHELF STANDARDS
(ATTACH TO CABINET SIDES)
3/4" PLYWOOD SHELVES (MELAMINE
W/ 3MM EDGE BAND)
COUNTERTOP SEE ELEVATION FOR
MATERIAL CAULK AT BACKSPLASH
A Se rv ic e D i s a b l e d Vet e r an Owned
S m a l l B u s iness
SDVOSB
CVE
www.pfa-architect.com - Project No: 2412.17B
ARCHITECTURE, PLANNING, INTERIORS
World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510
Phone: 757-471-0537 Fax: 757-471-4205
PF&A DESIGN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: Office of Construction and Facilities Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0500-0004
B
A
C
D
E
F
NO. DESCRIPTION DATE
KEYPLAN
BID DOCUMENTS
ACTUAL & PLAN
NORTH
NTS
LINAC VAULTS 1 & 2
MODIFICATIONS
HUNTER HOLMES MCGUIRE
VAMC RICHMOND, VA
652-16-107
BLDG. 500
Department of Veterans Affairs
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
/1 /2
:4
:1
P
M Im a c -1
\d p e ro n n e t\
B
L
IN
A C
V a u lt s
M o d if ic a ti o n s
C e n tr a l_ d p e ro n n e t.
rv t
AE610
FINISH PLAN - FIRST FLOOR
SMCDJP12-14-2018
12-14-2018
1/4" = 1'-0"
FINISH PLAN - FIRST FLOOR
FINISH SCHEDULE
NUMBER ROOM NAME
FLOOR BASE WALL CEILING
MTL / COLOR MTL / COLOR MTL COLOR MTL / COLOR HEIGHT
1Z-133 VAULT 1 SV#1, 2 SV#1, 2 PTD GWB / WS / RP PNT#1, 3 / WS#1, 2 / RP#1 ACT#1 / PNT#4 / RCP#1 VARIES, SEE RCP.
1Z-133A EQUIPMENT CLOSET SV#2 RB#1 PTD GWB PNT#1 -
1Z-134 VAULT 2 SV#1, 2 SV#1, 2 PTD GWB / WS / RP PNT#1, 3 / WS#1, 2 / RP#1 ACT#1, 2 / PNT#4 / RCP#1 VARIES, SEE RCP
3" = 1'-0"
1 COVE BASE DETAIL
AE401 1" = 1'-0"
A BASE CABINET - DRAWER/CABINET
AE401 1" = 1'-0"
B SINK - SWINGING DOORS
12" = 1'-0"
2 SKY CEILING IMAGE
NO.
A I
N I
G
RI
V
FOHTLA
E W
N O
M M
O
C JOSEPH H. TROST
File details come from the government source that posted it.