This document is a technical specification section (31 20 11) for Earthwork (Short Form), providing detailed requirements for earthwork operations including excavation, fill, backfill, and site restoration for a construction project. The specification covers key aspects such as material requirements, excavation classifications, compaction standards, and site preparation procedures.

The document outlines specific requirements for fill materials, which must have a minimum dry density of 1,760 kg/m3, a maximum Plasticity Index of 6, and a maximum Liquid Limit of 30. It provides comprehensive guidance on site preparation, including clearing, topsoil stripping, and disposal of unsuitable materials. The specification mandates precise compaction techniques, requiring each layer to be compacted to at least 95 percent of maximum density determined by ASTM D698, with special considerations for backfilling near structures. Additional requirements include grading, lawn area preparation, seeding, and post-construction site cleanup, emphasizing thorough and methodical earthwork execution.

View the file

Other files

File Type Posted
TIL SPEC MATERIALS TESTING 014529.pdf PDF
TIL SPEC 013526 Safety.pdf PDF
TIL SPEC 312319_DeWatering.pdf PDF
36C24525Q0343 0003_1.docx DOCX document
Oil Ops Permit Extended PP VA MDE 03132024.pdf PDF
ICP_Loch Raven VAMC FinalAugust2020_v6r1eSigsreducedAD sign - SIGNED.pdf PDF
Tank Bldg D344_1977_1.pdf PDF
MDE AST_Closure_Fact_Sheet_6.9.23_6pgs.pdf PDF
ICP_1st half_Perry Point VAMC FINAL Oct 2021 SIGNED.pdf PDF
36C24525Q0343 0002 AMENDMENT.pdf PDF
Oil Ops Permit_PP MAR 2019 Update pg2.pdf PDF
VAMHCS SOW_AST SUPPORT 2025 Final R1 03202025.pdf PDF
SOP_Liquid Fuel Systems.pdf PDF
Oil Ops Permit_PP MAR 2019.pdf PDF
POLICY_VAMHCS AST UST 2022.pdf PDF
DWGS_Tank D315_1978 150KGal.pdf PDF
Tank Bldg D344_1977_3.pdf PDF
VAMHCS AST UST MCP 2022.pdf PDF
RFI Question and Answers.docx DOCX document
ICP 2nd half_Perry Point VAMCFINAL Oct 2021 SIGNED.pdf PDF
36C24525Q0343 0002_1.docx DOCX document
Tank Bldg D344_1977_2.pdf PDF
Tank D315_1978 150KGal_Dwgs.pdf PDF
ICP_Baltimore FINAL-August 2020_SIGNED.pdf PDF
36C24525Q0343 0001.pdf PDF
36C24525Q0343 0001_1.docx DOCX document
WAGE DETERMINATION 2015-4265_BT.pdf PDF
WAGE DETERMINATION 2015-4215_PP.pdf PDF
AST_Closure_Fact_Sheet_6.9.23_6pgs.pdf PDF
Loch Raven VAMC ICP Site Plan.pdf PDF
Perry Point VA Medical Center Visitor Guide.pdf PDF
Perry Point VAMC ICP Site Plan.pdf PDF
36C24525Q0343_RFQ-.pdf PDF
36C24525Q0343_1.docx DOCX document
Baltimore VAMC ICP Site Plan.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10-01-12

31 20 11 - 1

SECTION 31 20 11

EARTHWORK (SHORT FORM)

PART 1 - GENERAL

1.1:DESCRIPTION:

This section specifies the requirements for furnishing all equipment, materials, labor and techniques for earthwork including excavation, fill, backfill and site restoration utilizing fertilizer, seed and/or sod.

1.2 DEFINITIONS:

A. Unsuitable Materials:

1. Fills: Topsoil, frozen materials; construction materials and materials subject to decomposition; clods of clay and stones larger than 75 mm (3 inches); organic materials, including silts, which are unstable; and inorganic materials, including silts, too wet to be stable.

2. Existing Subgrade (except footings): Same materials as above paragraph, that are not capable of direct support of slabs, pavement, and similar items, with the possible exception of improvement by compaction, proofrolling, or similar methods of improvement.

3. Existing Subgrade (footings only): Same as Paragraph 1, but no fill or backfill. If materials differ from design requirements, excavate to acceptable strata subject to COR's approval.

B. Earthwork: Earthwork operations required within the new construction area. It also includes earthwork required for auxiliary structures and buildings and sewer and other trenchwork throughout the job site.

C. Degree of Compaction: Degree of compaction is expressed as a percentage of maximum density obtained by the test procedure presented in ASTM

D698.

D. The term fill means fill or backfill as appropriate.

1.3 RELATED WORK:

A. Materials testing and inspection during construction: Section 01 45 29, TESTING LABORATORY SERVICES.

B. Safety Requirements: Section 01 35 26

C. Protection of existing utilities, fire protection services, existing equipment, roads, and pavements: Section 01 00 00, GENERAL

REQUIREMENTS.

31 20 11 - 2

D. Subsurface Investigation: Section 01 00 00, GENERAL REQUIREMENTS, Article, PHYSICAL DATA.

1.4 CLASSIFICATION OF EXCAVATION:

A. Unclassified Excavation: Removal and disposal of pavements and other man-made obstructions visible on the surface; utilities, and other items including underground structures indicated to be demolished and removed; together with any type of materials regardless of character of material and obstructions encountered.

B. Classified Excavation: Removal and disposal of all material not defined as rock.

1.5 MEASUREMENT AND PAYMENT FOR EXCAVATION:

Measurement: The unit of measurement for excavation and borrow will be the cubic yard, computed by the average end area method from cross sections taken before and after the excavation and borrow operations, including the excavation for ditches, gutters, and channel changes, when the material is acceptably utilized or disposed of as herein specified. Quantities should be computed by a Registered Professional

Land Surveyor or Registered Civil Engineer, specified in Section 01 00

00, GENERAL REQUIREMENTS. The measurement will not include the volume of subgrade material or other material used for purposes other than directed. The volume of overburden stripped from borrow pits and the volume of excavation for ditches to drain borrow its, unless used as borrow material, will not be measured for payment. The measurement will not include the volume of any excavation performed prior to taking of elevations and measurements of the undisturbed grade.

1.6 SUBMITTALS:

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES.

B. Contractor shall submit procedure and location for disposal of unused satisfactory material. Proposed source of borrow material. Advance notice on the opening of excavation or borrow areas. Advance notice on shoulder construction for rigid pavements.

31 20 11 - 3

C. Furnish to COR, soil samples, suitable for laboratory tests, of proposed off site or on site fill material.

D. Qualifications of the commercial testing laboratory or Contractor’s

Testing facility shall be submitted.

1.7 APPLICABLE PUBLICATIONS:

A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.

B. American Nursery and Landscape Association (ANLA):

2004....................American Standard for Nursery Stock

C. American Association of State Highway and Transportation Officials

(AASHTO):

T99-10..................Moisture-Density Relations of Soils Using a 2.5 kg (5.5 lb) Rammer and a 305 mm (12 inch) Drop

T180-10.................Standard Method of Test for Moisture-Density

Relations of Soils Using a 4.54-kg [10 lb]

Rammer and a 457 mm (18 inch) Drop

D. American Society for Testing and Materials (ASTM):

C33-03..................Concrete Aggregate

D698-e1.................Laboratory Compaction Characteristics of Soil

Using Standard Effort

D1140-00................Amount of Material in Soils Finer than the No.

200 (75-micrometer) Sieve

D1556-00................Standard Test Method for Density and Unit

Weight of Soil in Place by the Sand-Cone Method

D1557-09................Laboratory Compaction Characteristics of Soil

Using Modified Effort

D2167-94 (2001).........Standard Test Method for Density and Unit

Weight of Soil in Place by the Rubber Balloon

Method

D2487-06................Standard Classification of Soil for Engineering

Purposes (Unified Soil Classification System)

D6938-10................Standard Test Methods for Density of Soil and

Soil-Aggregate in Place by Nuclear Methods

(Shallow Depth)

E. Standard Specifications of Maryland State

Department of Transportation, latest revision.

31 20 11 - 4

PART 2 - PRODUCTS

2.1 MATERIALS:

A. Fills: Materials approved from on site and off site sources having a minimum dry density of 1760 kg/m3 (110 pcf), a maximum Plasticity Index of 6, and a maximum Liquid Limit of 30.

B. Fertilizer: (5-10-5) delivered to site in unopened containers that clearly display the manufacturer's label, indicating the analysis of the contents.

C. Seed: Grass mixture comparable to existing turf delivered to site in unopened containers that clearly display the manufacturer's label, indicating the analysis of the contents.

D. Sod: Comparable species with existing turf. Use State Certified or

State Approved sod when available. Deliver sod to site immediately after cutting and in a moist condition. Thickness of cut must be 19 mm to 32 mm (3/4 inch to 1 1/4 inches) excluding top growth. There shall be no broken pads and torn or uneven ends

E. Requirements For Offsite Soils: Offsite soils brought in for use as backfill shall be tested for TPH, BTEX and full TCLP including ignitability, corrosivity and reactivity. Backfill shall comply with

MDE AST Closure regulations (most current) and MDE Closure Fact Sheet

(most current). TCLP shall be performed in accordance with EPA SW-

846.3-3a Method 1311. All other test methods as required per MDE.

Material shall not be brought on site until tests have been approved by the MDE and COR.

PART 3 - EXECUTION

3.1 SITE PREPARATION:

A. Clearing: Clearing within the limits of earthwork operations as described or designated by the COR. Work includes removal of trees, shrubs, fences, foundations, incidental structures, paving, debris, trash and any other obstructions. Remove materials from the medical center property.

B. Stripping Topsoil: Unless otherwise indicated on the drawings, the limits of earthwork operations shall extend anywhere the existing grade is filled or cut or where construction operations have compacted or otherwise disturbed the existing grade or turf. Strip topsoil as

31 20 11 - 5 defined herein, or as indicated in the geotechnical report, from within the limits of earthwork operations as specified above unless specifically indicated or specified elsewhere in the specifications or shown on the drawings. Topsoil shall be fertile, friable, natural topsoil of loamy character and characteristic of the locality. Topsoil shall be capable of growing healthy horticultural crops of grasses.

Stockpile topsoil and protect as directed by the COR. Eliminate foreign material, such as weeds, roots, stones, subsoil, frozen clods, and similar foreign materials, larger than 0.014 m3 (1/2 cubic foot) in volume, from soil as it is stockpiled. Retain topsoil on the station.

Remove foreign materials larger than 50 mm (2 inches) in any dimension from topsoil used in final grading. Topsoil work, such as stripping, stockpiling, and similar topsoil work, shall not, under any circumstances, be carried out when the soil is wet so that the tilth of the soil will be destroyed.

C. Disposal: All materials removed from the property shall be disposed of at a legally approved site, for the specific materials, and all removals shall be in accordance with all applicable Federal, State and local regulations. No burning of materials is permitted onsite.

3.2 EXCAVATION:

A. Excavation Drainage: Operate pumping equipment and/or provide other materials, means and equipment as required, to keep excavations free of water and subgrades dry, firm, and undisturbed until approval of permanent work has been received from COR. Approval by the COR is also required before placement of the permanent work on all subgrades. When subgrade for foundations has been disturbed by water, remove the disturbed material to firm undisturbed material after the water is brought under control. Replace disturbed subgrade in trenches by mechanically tamped sand or gravel. Groundwater flowing toward or into excavations shall be controlled to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. French drains, sumps, ditches or trenches will not be permitted within 0.9 m

(3 feet) of the foundation of any structure, except with specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Control measures shall be taken by the time the excavation reaches the water level in order to maintain the integrity of the in situ material. While the

31 20 11 - 6 excavation is open, the water level shall be maintained continuously below the working level. Operate dewatering system continuously until construction work below existing water levels is complete.

B. Site Earthwork: Excavation shall be accomplished as required by statement of work and specifications. Remove subgrade materials that are determined by the COR or MDE as unsuitable, and replace with acceptable material. If there is a question as to whether material is unsuitable or not, the Contractor shall obtain samples of the material, under the direction of the COR or MDE, and the materials shall be examined by an independent testing laboratory for soil classification to determine whether it is unsuitable or not.

C. Finished elevation of subgrade shall be as follows:

1. Planting and Lawn Areas - 100 mm (4 inches) below the finished grade, unless otherwise specified.

3.3 FILLING AND BACKFILLING:

A. General: Do not fill or backfill until all debris, unsatisfactory soil materials, obstructions, and deleterious materials have been removed from the excavation. Proof-roll exposed subgrades with a fully loaded dump truck. Use excavated materials or borrow for fill and backfill, as applicable. Do not use unsuitable excavated materials. Do not backfill until foundation walls have been completed above grade and adequately braced, waterproofing or dampproofing applied, and pipes coming in contact with backfill have been installed, and inspected and approved by COR.

B. Proof-rolling Existing Subgrade: - Proof rolling shall be done on an exposed subgrade free of surface water (wet conditions resulting from rainfall) which would promote degradation of an otherwise acceptable subgrade. Notify the COR a minimum of 3 days prior to proof rolling.

Proof rolling shall be performed in the presence of the COR. Rutting or pumping of material shall be undercut as directed by the COR and replaced with fill and backfill material.

C. Placing: Place material in horizontal layers not exceeding 200 mm (8 inches) in loose depth and then compacted. Do not place material on surfaces that are muddy, frozen, or contain frost.

D. Compaction: Use approved equipment (hand or mechanical) well suited to the type of material being compacted. Do not operate mechanized

31 20 11 - 7 vibratory compaction equipment within 3000 mm (10 feet) of new or existing building walls without the prior approval of the Resident

Engineer. Moisten or aerate material as necessary to provide the moisture content that will readily facilitate obtaining the specified compaction with the equipment used. Compact each layer to not less than

95 percent of the maximum density determined in accordance with the following test method ASTM D698. Backfill adjacent to any and all types of structures shall be placed and compacted to at least 90 percent laboratory maximum density for cohesive materials or 95 percent laboratory maximum density for cohesionless materials to prevent wedging action or eccentric loading upon or against the structure.

E. Borrow Material: Borrow material shall be selected to meet the requirements and conditions of the particular fill or embankment for which it is to be used. Borrow material shall be obtained from the borrow areas selected by the Contractor from approved private sources.

Unless otherwise provided in the contract, the Contractor shall obtain from the owners the right to procure material, pay royalties and other charges involved, and bear the expense of developing the sources, including rights-of-way for hauling. Borrow material from approved sources on Government-controlled land may be obtained without payment of royalties. Unless specifically provided, no borrow shall be obtained within the limits of the project site without prior written approval. Necessary clearing, grubbing, and satisfactory drainage of borrow pits and the disposal of debris thereon shall be considered related operations to the borrow excavation.

3.4 GRADING:

A. General: Uniformly grade the areas within the limits of this section, including adjacent transition areas. Smooth the finished surface within specified tolerance. Provide uniform levels or slopes between points where elevations are indicated, or between such points and existing finished grades. Provide a smooth transition between abrupt changes in slope.

B. Slope backfill outside the building away from the building walls for a minimum distance of 3048 mm (10 feet)at a minimum five percent (5%) slope.

C. The finished grade shall be 150 mm (6 inches) below bottom line of windows or other building wall openings unless greater depth is shown.

31 20 11 - 8

D. Maintain finished subgrade in a smooth and compacted condition until the succeeding operation has been accomplished. Scarify, compact, and grade the subgrade prior to further construction when approved compacted subgrade is disturbed by contractor's subsequent operations or adverse weather.

3.5 LAWN AREAS:

A. Finished Grading: Begin finish grading after rough grading has had sufficient time for settlement. Scarify subgrade surface in lawn areas to a depth of 100 mm (4 inches). Apply topsoil so that after normal compaction, dragging and raking operations (to bring surface to indicated finish grades) there will be a minimum of 100 mm (4 inches) of topsoil over all lawn areas; make smooth, even surface and true grades, which will not allow water to stand at any point. Shape top and bottom of banks to form reverse curves in section; make junctions with undisturbed areas to conform to existing topography. Solid lines within grading limits indicate finished contours. Existing contours, indicated by broken lines are believed approximately correct but are not guaranteed.

B. Seeding: Seed at a rate of 2 kg/100 m2 (4 pounds per 1000 square feet) and accomplished only during periods when uniform distribution may be assured. Lightly rake seed into bed immediately after seeding.

C. Watering: The VAMC is responsible for having adequate water available at the site. As seeding is completed in any one section, the entire seeded area shall be thoroughly irrigated by the contractor, to a sufficient depth, that the soil is thoroughly wet. VAMC will be responsible for soil after acceptance.

3.6 DISPOSAL OF UNSUITABLE AND EXCESS EXCAVATED MATERIAL:

A. Disposal: Remove surplus satisfactory soil and waste material, including unsatisfactory soil, trash, and debris, and legally dispose of it off Medical Center property.

B. Disposal: Transport surplus satisfactory soil to designated storage areas on Medical Center property. Stockpile or spread soil as directed by COR.

C. Segregate all excavated contaminated soil designated by the COR from all other excavated soils, and stockpile on site on two 0.15 mm (6 mil) polyethylene sheets with a polyethylene cover. A designated area shall

31 20 11 - 9 be selected for this purpose. Dispose of excavated contaminated material in accordance with State and Local requirements.

3.7 CLEAN-UP:

Upon completion of earthwork operations, clean areas within contract limits, remove tools, and equipment. Provide site clear, clean, free of debris, and suitable for subsequent construction operations. Remove debris, rubbish, and excess material from the Medical Center Property.

- - - E N D - - -