This document is an Integrated Contingency Plan (ICP) for the Perry Point Veterans Affairs Medical Center (VAMC), focusing on Spill Prevention, Control, and Countermeasure (SPCC) requirements. The plan details the facility's hazardous waste storage areas, universal waste storage locations, emergency response protocols, and aboveground storage tank (AST) inventory. Key elements include:

The document provides a comprehensive overview of hazardous waste management, with 37 different storage areas across the facility containing various types of waste such as hand sanitizers, partially used aerosols, pesticides, laboratory chemicals, and pharmaceutical wastes. The waste types are categorized as flammable, toxic, corrosive, and reactive, with storage locations spanning multiple buildings. The facility maintains a central hazardous waste storage shed behind the REMRO Garage and has established emergency contact procedures using the VA-Personnel Accountability System (VA-PAS). The plan includes detailed inventories of aboveground storage tanks, with 24 tanks primarily storing diesel fuel across different buildings, ranging in capacity from 75 to 150,000 gallons, and featuring various containment and spill control mechanisms.

View the file

Other files

File Type Posted
TIL SPEC 312011_Earthwork Compaction Backfilling.pdf PDF
TIL SPEC MATERIALS TESTING 014529.pdf PDF
TIL SPEC 013526 Safety.pdf PDF
TIL SPEC 312319_DeWatering.pdf PDF
36C24525Q0343 0003_1.docx DOCX document
Oil Ops Permit Extended PP VA MDE 03132024.pdf PDF
ICP_Loch Raven VAMC FinalAugust2020_v6r1eSigsreducedAD sign - SIGNED.pdf PDF
Tank Bldg D344_1977_1.pdf PDF
MDE AST_Closure_Fact_Sheet_6.9.23_6pgs.pdf PDF
ICP_1st half_Perry Point VAMC FINAL Oct 2021 SIGNED.pdf PDF
36C24525Q0343 0002 AMENDMENT.pdf PDF
Oil Ops Permit_PP MAR 2019 Update pg2.pdf PDF
VAMHCS SOW_AST SUPPORT 2025 Final R1 03202025.pdf PDF
SOP_Liquid Fuel Systems.pdf PDF
Oil Ops Permit_PP MAR 2019.pdf PDF
POLICY_VAMHCS AST UST 2022.pdf PDF
DWGS_Tank D315_1978 150KGal.pdf PDF
Tank Bldg D344_1977_3.pdf PDF
VAMHCS AST UST MCP 2022.pdf PDF
RFI Question and Answers.docx DOCX document
36C24525Q0343 0002_1.docx DOCX document
Tank Bldg D344_1977_2.pdf PDF
Tank D315_1978 150KGal_Dwgs.pdf PDF
ICP_Baltimore FINAL-August 2020_SIGNED.pdf PDF
36C24525Q0343 0001.pdf PDF
36C24525Q0343 0001_1.docx DOCX document
WAGE DETERMINATION 2015-4265_BT.pdf PDF
WAGE DETERMINATION 2015-4215_PP.pdf PDF
AST_Closure_Fact_Sheet_6.9.23_6pgs.pdf PDF
Loch Raven VAMC ICP Site Plan.pdf PDF
Perry Point VA Medical Center Visitor Guide.pdf PDF
Perry Point VAMC ICP Site Plan.pdf PDF
36C24525Q0343_RFQ-.pdf PDF
36C24525Q0343_1.docx DOCX document
Baltimore VAMC ICP Site Plan.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4 112.2 aryland

Physical Layout of the Facility..............................................................................................2.0 Oil Storage Inventory ...........................................................................................................2.3 Discharge Prevention Measures .................................................................................4.0, 13.0 Discharge or Drainage Controls.........................................................................................12.1 Countermeasures for Discharge Recovery ........................................................................16.0 Methods of Disposal for Recovered Materials ...................................................................16.0 Contact List and Phone Numbers ......................................................................................16.0

Personnel Instructions, (f) (1)...............................................................................................7.1 Designated Person Accountable for Spill Prevention, (f)(2).................................................7.2 Spill Prevention Briefings, (f)(3) ...........................................................................................7.3

Fencing and Gates, (g)(1) ....................................................................................................8.1 Flow and Drain Valves Secured, (g)(2) ................................................................................8.2 Starter Controls Secured, (g)(3)...........................................................................................8.3 Pipeline Loading/Unloading Connections Secured, (g)(4) ...................................................8.4 Lighting Adequate to Detect and Deter Spills, (g)(5)............................................................8.5

Adequate Secondary Containment for Vehicles, (h)(1)........................................................9.2 Warning or Barrier System for Vehicles, (h)(2) ....................................................................9.3 Vehicles Examined for Lowermost Drainage Outlets before Leaving, (h)(3) .......................9.4

Drainage from Diked Storage Areas, (b)(1) .......................................................................12.1 Valves Used on Diked Storage Areas, (b)(2) .....................................................................12.2 Plant Drainage Systems from Undiked Areas, (b)(3) .........................................................12.3 Final Discharge of Drainage, (b)(4)....................................................................................12.4 Facility Drainage Systems and Equipment, (b)(5)..............................................................12.5

Tank Compatibility with Its Contents, (c)(1) .......................................................................13.0 Diked Area Construction and Containment Volume for Storage Tanks, (c)(2) .................. 13.0 Diked Area, Inspection and Drainage of Rainwater, (c)(3).................................................13.1 Corrosion Protection of Buried Metallic Storage Tanks, (c)(4)...........................................13.2 Corrosion Protection of Partially Buried Metallic Tanks, (c)(5)...........................................13.3 Aboveground Tank Periodic Integrity Testing, (c)(6)..........................................................13.4 Control of Leakage through Internal Heating Coils, (c)(7)..................................................13.5 Liquid Level Sensing Devices, (c)(8)..................................................................................13.6 Observation of Disposal Facilities for Effluent Discharge, (c)(9)........................................13.7 Visible Oil Leak Corrections from Tank Seams and Gaskets, (c)(10)................................13.8 Appropriate Position of Mobile or Portable Oil Storage Tanks, (c)(11) ..............................13.9

Buried Piping Installation Protection and Examination, (d)(1)............................................14.0 Not-In-Service and Standby Service Terminal Connections, (d)(2) ...................................14.0 Pipe Supports Design, (d)(3)..............................................................................................14.0 Aboveground Valve and Pipeline Examination, (d)(4) .......................................................14.0 Aboveground Piping Protection from Vehicular Traffic, (d)(5)............................................14.0

4 2 2.4

1.

No te

Th is lis t m ay ch an ge a s V

AM

HC

S w as te st re am s a re re -e va lu at ed

Ad di tio na l A re as m ay b e ad de d or so m e ar ea s m ay b e m ov ed o r s ub tr ac te d de pe nd in g up on

V

AM

HC

S

Se rv ice n ee ds

2.

September 2021

QUICK REFERENCE GUIDE

FOR HAZARDOUS WASTE SPILL RESPONSE

Veterans Affairs Medical Center Perry Point, Maryland

Prepared by:

Potomac-Hudson Engineering, Inc.

Rockville, Maryland www.PHE.com

Quick Reference Guide September 2021 Perry Point VAMC

P a g e | 1

Introduction

The Perry Point Veteran’s Affairs Medical Center (VAMC) located in Perryville, Cecil County, Maryland, is pleased to provide you with this Quick Reference Guide (QRG) for our facility’s Integrated Contingency Plan (ICP) pursuant to 40 CFR 262.262(a), (b), and (c). As an entity with which the Perry Point VAMC currently has a Mutual Aid Agreement, you are being provided with this document as a reference to be used in the event your agency responds to a spill, release, fire, explosion, or other type of emergency occurring at the VAMC.

Recent revisions to the Resource Conservation and Recovery Act (RCRA) promulgated by the U.S.

Environmental Protection Agency (EPA) have impacted the way in which certain generators of hazardous waste inform local first responders and other emergency personnel about the hazards presented onsite as a result of hazardous waste generation and storage.

Background

Large quantity generators (LQGs) of hazardous waste have always been required to have a RCRA Contingency Plan for hazardous waste spills, fires, and other emergencies. The plan must be made available to local hospitals, fire departments, police departments, and state and local emergency response teams that might be called upon to provide emergency services.

Because of all the information required in the Plan, it can be cumbersome to quickly find essential information when it is needed in the event of an emergency. EPA has addressed this issue by establishing a new requirement for contingency plans that went into effect at the federal level on May 30, 2017 and will become effective in Maryland on or before July 1, 2019. The new regulations require the Perry Point VAMC to prepare this QRG, which shall act as an “Executive Summary” of the ICP currently in effect at the facility. The QRG is intended to summarize the most critical aspects of the facility for quick review in the event of an emergency, when time is of the essence.

Quick Reference Guide Elements

40 CFR 262.262(b) lists eight essential elements which must be included in the QRG. These items are summarized below and in the attached figures.

1.0 TYPES AND/OR NAMES OF HAZARDOUS WASTE AND ASSOCIATED HAZARDS

A summary of the types of hazardous wastes generated onsite as well as their corresponding hazard(s) are presented in Table 1.

2.0 ESTIMATED MAXIMUM AMOUNTS OF HAZARDOUS WASTES ONSITE AT ANY ONE TIME

Table 1 also provides a reasonable estimate of the maximum amount of each hazardous waste type which would be expected to be present onsite at any one time. As an LQG, there is no regulatory time limit for the storage of hazardous waste in satellite accumulation areas (SAAs); however, there is a volume limit of 55 gallons for most types of hazardous waste (1 quart for others). Hazardous waste is periodically moved from the SAAs to the facility’s central accumulation area (CAA) when the volumes limits are reached. There is no regulatory limit for the volume of hazardous waste stored at the CAA;

however, there is a time limit of 90 days. Due to these two factors, making an accurate determination of the “maximum” amount of hazardous waste onsite at any one time is complicated. The estimates in Table 1 were made by determining the typical monthly generation rates for each waste stream. Then, a

P a g e | 2 one-years’ worth of generation volumes was assumed, while also taking into account the volume and time limits enforced at the SAAs and CAA, respectively. For waste streams with variable or sporadic generation rates, a conservatively high monthly generation volume was used.

Hazardous waste SAAs are located throughout the campus. Long-term storage at the CAA (up to 90 days) occurs at the hazardous waste storage shed located adjacent to the REMRO Garage. Refer to attached Figure A-1.

3.0 HAZARDOUS WASTE REQUIRING UNIQUE/SPECIAL TREATMENT

Hazardous waste generated at the Perry Point VAMC runs the gambit of flammable, corrosive, reactive, and toxic hazardous waste, including P- and U-listed wastes.

P-listed wastes are the most toxic and therefore are the most regulated. However, in the event of a fire or spill, the flammable and/or corrosive wastes present the greatest risk to emergency responders.

In the event of a fire, wastes containing mercury (Engineering 18H, Dental PP) and barium (Radiology) can create toxic air hazards.

4.0 LOCATION OF HAZARDOUS WASTES GENERATED, ACCUMULATED, STORED, OR TREATED ONSITE

Hazardous waste is generated and accumulated in SAAs located throughout the campus. Long-term storage (up to 90 days) occurs at the hazardous waste storage shed located adjacent to the REMRO Garage. No hazardous waste treatment is performed at the Perry Point VAMC.

Figure A-1 depicts the location of the hazardous waste storage shed as well as all the hazardous waste SAAs onsite, identified by the SAA ID listed in Table 1.

5.0 ROUTES OF ACCESS AND EVACUATION

The Perry Point VAMC is located on a peninsula in the Susquehanna River on the south side of Perryville, Maryland. Due to its location, there are essentially three ways of ingress/egress by motor vehicle.

These include:

Avenue G to Aiken Avenue 1st Street/Avenue A to Broad Street Marion Tapp Parkway to Ikea Road

Additional evacuation on foot could occur through the wooded areas on the north side of the campus, while a water-borne evacuation could occur on the south and west sides.

Figure A-2 depicts the primary routes of access and evacuation at the Perry Point VAMC.

6.0 LOCATION OF ONSITE WATER SUPPLY

The location of Perry Point VAMC’s central water supply reservoir is depicted on Figure A-1. The Perry Point VA Fire Department (PPVAFD) currently maintains 78 fire hydrants located throughout the campus. In addition to an adequate water supply, 33 buildings onsite are equipped with either wet or dry fire suppression systems. The PPVAFD also maintains 447 fire extinguishers located across the campus.

Q ui ck R ef er en ce

G de

Se pt em be r 2

Pe rr y Po in t V

AM

C

P a g e

TA

BL

E 1.

SU

M

M

AR

Y O

F

HA

ZA

RD

O

US

W

AS

TE

ST

O

RA

GE

A

RE

AS

SA

A

ID

Lo ca tio n W as te

T yp e/ Na m e

Ha za rd (s

Ge ne ra tio n

Ra

M ax . A m ou nt

O ns ite

EM

S-

PP

Bu ild in g

H, R oo m

W as te h an d sa ni tiz er s

Fl am m ab le

-3 ga llo ns m on th g al lo in g

H, R oo

Sp en t/

Pa rt ia lly u se d ae ro so ls Fl am m ab le

, T ox ic

-2 ga llo ns m al

Pe st

C on tr ol

-P P

Bu ild in g

H, B as em en t Ex pi re d/ Un us ed p es tic id es

To xi c In fre qu en t g al at h an d

La b

He m at ol og y

La b

Bu ild in g

1, nd

F or

St ai n w as te

(m et ha no l a nd rig ht

’s st n)

Fl am m ab le

, T ox ic

-6 m L/ da y ga llo

RO

-P

P

RE

M

RO

G ar ag e

Sp en t/ Pa rt ia lly u se d ae ro so ls

Fl am m ab le , T ox ic

-2 ga llo ns m al lo ns

RE

M

RO

-P

P

RE

M

RO

G ar ag e

W as te o ily ra gs

Co bu st ib

Va ria bl e g al

Pa in t S ho p, 8H

-P P

Bu ild in g

H

Sp en t/ Pa rt ia lly u se d ae ro so ls

Fl am m ab le , T ox ic

-2 ga llo ns m al

En gi ne er in g

H

Bu ild in g

H, C on ne x pa rk in g lo t

Br ok en fl uo re sc en t l ps

(c ta in s m er cu ry

To xi c ga llo ns

/ m al t S ho p, P

Sp y

Bo ot h, 1W -P

P Bu ild in g

W , P ai nt

S pr ay

Bo ot h Sp en t/

Pa rt ia lly u se d ae ro so ls;

t s pr ay b oo th fi lte rs m ab le , T ox ic

-2 ga llo ns m al ile r/ Ch ill er

P la nt

F& E, M

O P

P Bu ild in g

W as te o ily gs bu st ib

Va ria bl e g al r/ Ch ill er

P la nt

F& E, M

O P

P Bu ild in g

Sp en t/

Pa rt ia lly u se d ae ro so ls Fl am m ab le

, T ox ic 2-ga llo ns

/ m ga

De al P

P Bu ild in g

H, D en ta l C lin ic La bo ra to ry ch em ica ls

Fl am m ab le , T ox ic, rr os iv e

Va ria bl e g al

De al P

P Bu ild in g

H, D en ta l C lin ic Sc ra p an d co nt ac t d en ta l am al ga m (r ec yc d) c

Va ria bl e ga llo n

St er ile P ro ce ss in g Se rv ice in g

H, B as em en t

Ci de x O

PW

, S te ris

0, a nd o er

SP

S

W as te C he m ica ls

Co rr os iv e Va ria bl e g al

Ph ar m ac y in g

D-a nd

U -li st ed p ha rm ac eu tic al s;

em pt y co nt ai ne rs o f P

-li st ed w te s

Fl am m ab le , C or ro siv e, Re ac tiv e, T ox ic g al lo ns / m al

Ph m ac y in g

P-lis te d w c qu ar t/ m

0.

g al lo n

Po di at ry in g

H, st F lo or

, 1 E-

7/

8/

3/

Ex

Ro om s

Si lv er n itr at e sw ab s

To xi c qu ar t/ m g al lo n

Po di at in g

H, st F lo or

, 1 E-

W as te p he no l Fl am m ab qu ar t/ m g al n

Q ck R ef er en ce

G de

Se pt em be r 2

Pe rr y Po in t V

AM

C a g e

TA

BL

E 1.

SU

M

M

AR

Y O

F

HA

ZA

RD

O

US

W

AS

TE

ST

O

RA

GE

A

AS

SA

ID

Lo ca tio n W as te

T yp e/ Na m e

Ha za rd (s

Ge ne ra tio n ax . A m ou ite di ol og y Bu ild in g

1, R oo m

A-

W as te b ar iu m su lfa te so lu tio n

To xi c g al lo ns

/ w ee k ga

Ho sp ice

9H

R oo m

Sm al l q ua nt ity w ph m ac eu tic al s Fl am m ab le

, C or ro c 5-q ua rt s/ m al in g

A

Ro om

A Sm al l q ua nt ity w m ac eu tic al s Fl am m ab le

, C or ro c 5-q ua rt s/ m al in g

B

Ro om

A Sm al l q ua nt ity w m ac eu tic al s Fl am m ab le

, C or ro c 5-q ua rt s/ m al in g

A

Ro om

Sm al l q ua nt ity w m ac eu tic al s

Fl am m ab le , C or ro c

5-q ua rt s/ m on th g al lo ns

Bu ild in g

B

Ro om l q ua nt ity w m ac eu tic al s Fl am m ab le

, C or ro c 5-q ua rt s/ m al

Ur ge nt C ar e

GB

-1 l q ua nt ity w m ac eu tic al s

Fl am m ab le , C or ro c

5-q ua rt s/ m al

Pr im ar y

Ca re

(B ld g

1)

GB

l q ua nt ity w m ac eu tic al s

Fl am m ab le , C or ro c

5-q ua rt s/ m al in

9-

H

-8

0H l q ua nt ity w m ac eu tic al s

Fl am m ab le , C or ro c

5-q ua rt s/ m al

4B

-D om ici lla

4B l q ua nt ity w m ac eu tic al s Fl am m ab le

, C or ro c 5-q ua rt s/ m al

H-

Do m ici

H-

Sm al l q ua nt ity w m ac eu tic al s

Fl am m ab le , C or ro c

5-q ua rt s/ m al in g

1- Do m ici

5A -1

H Sm al l q ua nt ity w m ac eu tic al s Fl am m ab le

, C or ro c 5-q ua rt s/ m al

Ha za rd ou s W

St or ag e

Sh

(C en tr

Ac cu m ul at io n Ar ea

Be hi nd R

EM

RO

G ar ag e

An y or a ll w as te s d es cr ib ed a bo ve m ab le

, C or ro

Re ac tiv e, T ox ic Va ria bl e In clu de d in to ta ls ab ov e

No te

Th is lis t m ay ch an ge a s V

AM

HC

S w as te st re am s a re re -e va lu at ed

Ad di tio na l A re as m ay b e ad de d or so m e ar ea s m ay b e m ov ed o r s ub tr ac te d de pe nd in g up on

V

AM

HC

S

Se rv ice n ee ds

P a g e | 5

TABLE 2. SUMMARY OF UNIVERSAL WASTE STORAGE AREAS

Location/Service Type of Universal Waste Stored Container Size

23H Dental Batteries 1 gallon 361/Pathology Laboratory Batteries 1 gallon Building 26 Firehouse Batteries 5 gallon Building 82H, Rooms 207 and 241 Batteries 2 x 1 gallon 18/Behind Electric Shop Batteries (wet & dry cell-lead acid; NiCad; alkaline/fluorescent bulbs (4'; U-Tube; 8'); ballasts - PCB and non-PCB

4 x 30 gallon + 5 gallon and boxes for bulbs

Building 101/Loading Dock Batteries - lead acid; NiCad;

alkaline

30 gallon

25H/ RM 5-EMS Batteries 30 gallon 11W/Warehouse Batteries - lead acid; NiCad;

alkaline; Li Ion 3 gallon

27H/ Biomed Batteries - lead acid; NiCad;

alkaline

30 gallon

Building 321 – Boiler House mercury switches 30 gallon Building 321 - Chiller Plant Used Oil 30 gallon REMRO Used oil, used gas, used antifreeze 3 x 55 gallon

7.0 ONSITE NOTIFICATION SYSTEM

The VAMC uses the VA-Personnel Accountability System (VA-PAS) to notify VA personnel in the event of an emergency. The primary functions of VA-PAS are:

1) Maintain contact information for all employees/contractors

2) Enable alert messages to be sent to employees/contractors during emergency events

3) Enable employees/contractors to report if they are in a safe or unsafe condition during an event

4) Capture employee/contractor responses to alerts, leveraging the VA Notification System (VANS)

5) Report individual and organization accountability status during and after emergency events

While there is a national component to tracking all VA personnel (to include reporting), the primary utility of VA-PAS will be at the local level. VA-PAS is intended to allow VISN and facility emergency managers to send alerts as local conditions require, and then conduct personnel accountability based upon employee/contractor responses.

P a g e | 6

8.0 DESIGNATED EMERGENCY RESPONSE COORDINATOR AND ALTERNATES

TABLE 3. EMERGENCY CONTACT INFORMATION

Primary Response Coordinator (No. 1) Jennifer Dallaire VAMHCS GEMS Coordinator

Office: (410) 642 2411 x25227 Home: (443) 206 9394

Alternate Response Coordinator (No. 2) Andrew Bannon Perry Point VAMC Fire Chief

Office: (410) 642 2411 x 25208 Cell: (443) 350 4492

Alternate Response Coordinator (No. 3) Robert Johnson Acting VAMHCS Emergency Manager

Office: (410) 642 2411 x26499 Cell: (443) 206 8222

Alternate Response Coordinator (No. 4) Robert Johnson Acting Safety and Health Program Manager

Office: (410) 642 2411 x26499 Cell: (443) 206 8222

VAMC Fire Department 22222 Safety Office (410) 642 2411 x26499 io n

Ta pp

Pa rk w ay

In gr es s

Eg re ss

Fi gu re

-2

Pe rr y Po in t V

AM

C

O il

O pe ra tio ns P er m it Ta bl e

1.

A bo ve gr ou nd S to ra ge T an k

In ve nt or y

TA

N K

N O

Bu ilt Y ea r

LO

CA

TI

N

CA

PA

CI

TY

(g lo ns

PR

O

DU

CT

HI

-L

EV

EL

AL

AR

CO

TA

IN

M

EN

T

AN

D

SP

IL

L C

O N

TR

O

L

FE

AT

U

RE

S

D-

H

Ki tc he n, Bl dg . 1

7H

3, Di es el

F ue l Ye s Do ub le

-w al le d ta nk

, o ve rf ill p re ve nt io n de vi ce

DT

7H

Em ge nc y

Ge ne ra to r, Bl dg

H

Di es el F ue l

Ye s

In te gr al

S ec on da ry C on ta in m en t

D-

H ica l W d, . 1

9H

2, Di es el

F ue l

Do ub le

-w al le d ta nk

D-

EW

w W at er

P um pi ng

S ta tio

. 2

Di es el

F ue le

-w al le d ta nk

, S ec on da ry co nt ai nm en t

D-

H/ D-

Ge ne ra to r B ld g.

, a dj ac en t to

B ld g.

0H

Di es el

F ue l Ye s Do ub le

-w al le d ta nk

, o ve rfi ll pr ev en tio n de vi ce sp ill b uc ke t

DT

-2 0H

/D T-ra to r B ld g.

Di es el

F ue le

-w al le d

H/ D-

1G

Ho sp ita l C lin ic, . 2

(O ut sid e Bu ild in g

H)

Di es el

F ue l Ye s Do ub le

-w al le d ta nk

, s pi ll bu ck et

3H /D

T-

1G ge nc y

Ge ne ra to r, Bl dg

1G

(O ut sid e

Bu ild in g

Di el

F ue l Ye s Do ub le

-w al le d

3H /G

G1

Un kn ow n Ro om G

G-

6, . 2 3H

(I ns id e

Bu ild in g el

F ue l Ye s Do ub le

-w al le d te w at er

P um pi ng

S ta tio

. 3

1, Di es el

F ue l Ye s Do ub le

-w al le d ta nk

, s pi ll bu ge nc y

Ge ne ra to r, Bl dg el F ue l

Ye s

Se co nd ar y Co nt ai nm en t

D-r P la nt , B ld g.

0, He at in g O il

4, 0-ga l.

ea rt he n be rm w ith li ne r

D-

1.

A

Ch ill er

P la nt , B ld g.

Di es el

F ue le

-w al le d ta nk

, s pi ll bu

.A ge nc y Ge ne ra to r, Bl dg el

F ue l Ye s Do ub le

-w al le d

1.

B er

P la nt , B ld g.

,0 el

F ue l Ye s Do ub le

-w al le d

.B er

P la nt , B ld g.

el

F ue l Ye s Do ub le

-w al le d

.C er

P la nt , B ld g.

el

F ue l Ye s Do ub le

-w al le d

.C er

P la nt , B ld g.

el

F ue l Ye s Do ub le

-w al le d ra to r B ld g.

Di es el

F ue le

-w al le d ta nk

, s pi ll bu

ADC Map Coord Date of spill Mo L I Day L i Yr 20 Lg Time of spill t2 Z L fi Hours 24 hour dock:
Fire Department Report No:
Police Department Report No:
undefined_30:
C Qno I o AJ L t 411 5h:
1_5:
2_2:
3:
undefined_31:
Fixed Facility Incident:
DOT or ICC MC Number:
8u Company Responsible for Spill:
Name VfSJQf 1 W 001 if tkmf:
Sections Address:
CityState 11lN Pt I HD Zip 2j 9 0 2:
H CityState:
undefined_32:
Phone Y I Olplj Z2k I I:
Spill Mitigation D Responsible Party:
Materials used by You to containcleanup spill:
undefined_33:
MDE ERD:
Federal:
Sorbent Pads 35 each or bales:
Transfer Accident:
lJCLocal PtXfj:
Qoo VAMC t D Overpack Drums ea Steel or Poly:
THE UNDERSIGCERTIFIES ED IS TRUE AND CORRECT TO THE BEST QF HIS OR HE PLETED:
Address ol City State Zip 4a:
undefined_34:
undefined_35:
undefined_36:
PSORHH 1DPH:
PSORHH1DPHRow2:
Row1_2:
PSORHH1DPHRow3:
Row2_2:
Row1_3:
undefined_37:
undefined_38:
undefined_39:
PSORHH1DPHRow4:
undefined_40:
PSORHH1DPHRow5:
undefined_41:
PSORHH1DPHRow6:
undefined_42:
6RGLXPGURLGH:
KORULQH:
3KHQRO:
6XOIXULFFLG:
1LWULFFLG:
PPRQLD:
DUERIXUDQ:
0HUFXU:
0HWKDQRO:
FHWLFFLG:
OHQH:
7ROXHQH:
HQHQH:
WKOEHQHQH:
I loATE:
Scott Hurst Fire Chief:
DATE:
Page 1:
Page 2:
Page 5:
undefined_43:
Page 6:
Marion Tapp Parkway:
undefined_44:
undefined_45:
Permit Number:
Effective Date:
undefined_46:
Doublewalled tank overfill prevention device:
undefined_47:
undefined_48:
undefined_49:
undefined_50:
undefined_51:
undefined_52:
undefined_53:
undefined_54:
undefined_55:
undefined_56:
undefined_57:
Row1_4:
undefined_58:
undefined_59:
Row2_3:
undefined_60:
undefined_61:
Row3_2:
undefined_62:
TANK NO_4:
Built Year:
LOCATION_7:
PRODUCT_4:
20050344:
4000_3:
Diesel Fuel:
No:
Doublewalled tank Secondary containment:
DT103A_2:
242_5:
Diesel Fuel_2:
No_2:
Doublewalled tank secondary containment:
DT103B_2:
242_6:
Diesel Fuel_3:
No_3:
Doublewalled tank secondary containment_2:
LOCATION_8:
TANK NORow1:
BulltYearRow1:
CAPACITY lallons200kw:
PRODUCT200kw:
HILEVEL ALARM200kw:
CONTAINMENT AND SPILL CONTROL FEATURES200kw:

File details come from the government source that posted it. Updated .