About this file

This document appears to be a set of circuit diagram specifications and installation plans for a 40 KVA Uninterruptible Power Supply (UPS) system to support new processing equipment in the Core Lab at the Washington DC Veterans Affairs Medical Center (DC VAMC).

The key details include the requirement for the Electrical Contractor to install power distribution and routing from the 40 KVA UPS in room GB 220 to the new equipment in Suite GB 200, as outlined in the attached space plan. The UPS will be supplied by an existing feeder, and the contractor must interface the UPS to the new panelboard and distribute power to the specified equipment locations. The document provides the POWERVAR 3300 Series UPS circuit diagram, clearance specifications, and recommended installation details.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POWERVAR 3300 SERIES UPS CIRCUIT DIAGRAM CLEARANCE SPECIFICATIONS

RECOMMENDED INSTALLATION OPTIONAL PCDU OPTIONAL PCDU INSTALLATION

NOT TO SCALE SHEET 4 OF 4

ROCHE DIAGNOSTICS

9115 HAGUE ROAD

INDIANAPOLIS, IN 46256

VA Washington DC_Construction Plan042623MS.vsdx
1/4" - UTILITIES CONST. PLAN
1/4" - INSTALL CONST. PLAN
1/4" - SPECS
1/4" - UPS/PCDU SPECS

File details come from the government source that posted it. Updated .